BPM 305 (TMA01) – PROJECT SCHEDULING AND CONTROL (MOHAMED ALI B1210887)

This method is applicable only if floor area can be determined, measured and
computed fairly well and precisely. It is employed only during the initial stages
and not at the successive stages as more useful and prominent statistics, data
and information
immediate, would
prompt then be obtainable
or express and realizable.
and self explanatory It is adopted
estimates where
are required.
Where modification or readjustments for variations in plan architecture, floor 
height, site condition, construction methods or modus operandi, quality and
quantity are tedious, this method could be applied. It is advisable to verify and
scrutinize the rates published in the price books for inclusions or exclusions of 
major and extensive installations such as lifts, air conditioners and fire protection
system to prevent miscalculations, misinterpretation or misjudgment. Isolated
and sup
supple
plemen
mentar
tary
y provisi
provisions
ons and allowa
allowance
nces
s hav
have
e to be catcatered
ered for non
standard,
standar d, exceptional
exceptional and unconventiona
unconventionall items and works beyond the exterior 
exterior 
surface of the building that covers the precinct works, landscaping, underground
services, special civil and earth works and foundations.

Page 9 of 22