The document is a shift handover logbook from the operations department of a power station. It summarizes the status of transmission lines and circuit breakers during the 8 AM to 12 AM shift. All equipment was reported to be energized and functioning properly. Routine checks of equipment rooms and switchyards were completed without issues. Voltage and frequency readings from the main buses were also reported to be within normal ranges. No faults, alarms, work permits or trouble memos were recorded during the shift.
The document is a shift handover logbook from the operations department of a power station. It summarizes the status of transmission lines and circuit breakers during the 8 AM to 12 AM shift. All equipment was reported to be energized and functioning properly. Routine checks of equipment rooms and switchyards were completed without issues. Voltage and frequency readings from the main buses were also reported to be within normal ranges. No faults, alarms, work permits or trouble memos were recorded during the shift.
The document is a shift handover logbook from the operations department of a power station. It summarizes the status of transmission lines and circuit breakers during the 8 AM to 12 AM shift. All equipment was reported to be energized and functioning properly. Routine checks of equipment rooms and switchyards were completed without issues. Voltage and frequency readings from the main buses were also reported to be within normal ranges. No faults, alarms, work permits or trouble memos were recorded during the shift.
Doc No. KLIC-OPE-LGB02-01 Date: 01-Nov-20 Record time 00:00-8:00 Shift: 3 Name: Mr vanxai Sylaphet XPXN-PSE Status MW MVar XPXN-PSE Status MW MVar Line 1 Energize De-Energize -29.43 34.56 Line 2 Energize De-Energize -29.65 34.09
PSE-UB3 Status MW MVar PSE-UB3 Status MW MVar
Line 1 Energize De-Energize 29.59 -34.21 Line 2 Energize De-Energize 29.61 -34.80 CB 80112 CB 80122 CB 80132 CB 80312 Close Open Close Open Close Open Close Open CB 80212 CB 80222 CB 80232 FUSE 603 Close Open Close Open Close Open Close Open
Service Voltage (kV) Current (A)
KW1A TR 21.85 0.8
Record Time Note
I. Transmission Line Status 00:00-8:00 Pakse Substation Energization Line1 XPXN-PSE 00:00-8:00 Pakse Substation Energization Line2 XPXN-PSE 00:00-8:00 Pakse Substation Energization Line 1 PSE-UB3 00:00-8:00 Pakse Substation Energization Line 2 PSE-UB3 II. Daily Activities 0:30 Receiving and Sending information to power house (call) 6:00 DCMS, Equipment Room Check (No problem) 6:30 DCMS, Equipment Room and Switch Yard Check (No problem) 7:45 230kV Main Bus 1 230kV Main Bus 2 𝑈𝑎𝑏 = 245.6 kV 𝑈𝑎𝑏 = 245.5 kV 𝑈𝑏𝑐 = 346.6 kV 𝑈𝑏𝑐 = 246.7 kV 𝑈𝑐𝑎 = 244.4 kV 𝑈𝑐𝑎 = 244.4 kV F = 50.00 Hz F = 50.00 Hz III. Switching Order Activities No have IV. Fault and Alarm Event Log No have V. Special Activities No have VI. Work Permit Activivties No have VII. Issue Trouble Memo No have VIII. Handover Activities Observe Transmission line No. 1&2
Management Notification
Incomming Shift Signature: ……………………………… Out Going Shift Signature: ………………………………….
Pakse Sub Operation Supervisor Signature: ………………………………