OFFICE OF STRUCTURES

STRUCTURAL DETAIL MANUAL

Chapter 02 - Substructure

SECTION 01

DRAINAGE
(SUB-DR)
If inlets are required at each side of bridge, and
distance between inlets is less than 60’, then cross
District Engineer shall have option of requiring
pipe shall be considered with outlet used on
sockets, placing posts, and filling with 9’’+ of grout,
lower inlet. If length is greater than 60’ or it would
(grout in accordance with Standard Specification
be more ecomonical to provide a separate outlet
Section 902.11) sloped to drain, as second stage
for pipes less than 60’, then each inlet shall have
construction.
its own outlet pipe, etc. For details see sht. 2 of 2.

Secure traffic barrier thrie beam


to end posts as per SHA Standard
MD-605.41, 605.41-01, 605.41-02, 605.51
and 605.51-01.

Offset Bracket

Cross Pipe 18’’


Runoff Flow Reinforced Concrete
Pipe, Class IV. For
bedding requirements
c
L of see Section 303.03.02.
Roadway

Roadway
Pavement

Runoff Flow

Portion of shoulder to Precast Standard


End of End Post remain as called for on Type E Combination
(Curb, shown shaded, shall be typical highway section. Inlet, Elevation to be
poured monolithically with end established in the
post. No joint allowed.) field. See SHA Std.
MD-374.74.

PLAN
Scale: 1’’ = 20’-0’’

Notes:
1. Payment for Drainage Inlet at End of Bridge
Structure shall be on an each basis. Cost for entire
installation of hatched area, curb and gutter, inlet,
etc. Cross pipe, outlet pipe, elbows and concrete end
section shall be incidental to the unit cost of inlet.
Outlet pad will be paid for separately.
2. Open Approach Roadway is defined as a highway
with full shoulders, no curbed sections, sidewalks
SUBSTRUCTURE - DRAINAGE

and/or raised medians.


3. See note on General Plan and APPROVAL
STATE OF MARYLAND
Elevation as to which ends of DIRECTOR
DEPARTMENT OF TRANSPORTATION
OFFICE OF STRUCTURES
structure will require inlets. STATE HIGHWAY ADMINISTRATION
4. Traffic barrier posts shall be driven DATE: 01-30-2007 OFFICE OF STRUCTURES

prior to placing concrete gutter pan


VERSION DRAINAGE INLET
except if option above is utilized.
5. See sheet 2 of 2 for additional
AT END OF BRIDGE STRUCTURE
details. 1.0 (OPEN APPROACH ROADWAY)

DETAIL NO. SUB-DR-101 SHEET 1 OF 2


End of End Post
(Curb, shown shaded, shall be poured c
L of
monolithically with end post see Inlet
reinforcing detail below. No joint allowed.)

38’-6’’ 8’-0’’

Control
Joint A

3’-0’’

5’-6’’
2’-0’’

Rear face
of backwall.
A
2 - #5 bars epoxy
coated, 5’-6’’ long Outlet pipe - 18’’
This angle shall
bent as shown placed Reinforced Concrete
be determined
in end post and curb. Pipe, Class IV, with
in the field.
Std. Concrete End
Section (MD 368.01).

2’-0’’ Pipe should empty onto


new or existing slope
protection. If not feasible,
provide a 4’x 4’x 4’’
outlet block of Mix. No.1
Concrete or Class I Riprap.

Modified Type A Combination Curb


and Gutter; Gutter Pan shall be This side of pad to be
as shown hatched, 9’’ in depth. built up to dissipate flow.
Single hatched area shall be sloped
to follow shoulder configuration.
Double hatched area to be sloped PLAN OF INLET AREA
at 10%, see Section A-A.
Scale: 1/8 ’’ = 1’-0’’

Shoulder

Shoulder Cross Slo


pe
10%

9’’ Gutter Pan

3’-0’’ Varies

SECTION A-A
Scale: 1/4 ’’ = 1’-0’’
SUBSTRUCTURE - DRAINAGE

APPROVAL
STATE OF MARYLAND
DIRECTOR
DEPARTMENT OF TRANSPORTATION
OFFICE OF STRUCTURES
STATE HIGHWAY ADMINISTRATION
DATE: 01-30-2007 OFFICE OF STRUCTURES

VERSION DRAINAGE INLET


AT END OF BRIDGE STRUCTURE
1.0 (OPEN APPROACH ROADWAY)

DETAIL NO. SUB-DR-101 SHEET 2 OF 2


Plug ends of pipes with same material
that underdrain is composed of.

A
6'' Perforated PVC circular
ope pipe underdrain (typ.)

ope
Drain in each
direction from
.sl

.sl
midpoint @ ‚''/ft.
'/ft

'/ft
slope (Typ.)
n ‚'

n ‚'
Drai

Drai
PLAN VIEW

15'+
- (Typical)
A

Outlet as shown through the


abutment onto the slope
protection or finished ground

6'' perforated PVC


underdrain behind
wing wall
ELEVATION VIEW
PLAN
Scale: ‘'' = 1'-0'' 90° bend from
underdrain
behind
6'' + length
- wing wall
6'' PVC pipe

90° bend
Note:
All joints glued.
6'' perforated PVC
Notes: underdrain behind
1.To be used for all fixed abutments or expansion abutments abutment
with lengths contributing to expansion less than or equal to
70 feet.
2.Minimum slope of Pipe Underdrain Outlets is ‚''/ft.
3.For Section A-A see Sheet No. 2, 3 or 4 6.The cost of the PVC underdrains complete in place
4.The drainage system behind each wing wall can be will be incidental to the Substructure Concrete item.
SUBSTRUCTURE - DRAI

connected to the drainage system behind the 7.For section through wing wall, see Detail No.
abutment using 2 - 90° bends and a short length SUB-DR-203.
of pipe. This will necessitate the APPROVAL
STATE OF MARYLAND
drainage system behind the wing wall
DIRECTOR DEPARTMENT OF TRANSPORTATION
be slightly higher. OFFICE OF STRUCTURES
STATE HIGHWAY ADMINISTRATION
5.For wing walls over 15 ft. long, the
DATE: 10/02/2014 OFFICE OF STRUCTURES
drainage system behind them may be
DRAINAGE SYSTEM AND BACKFILL FOR ABUTMENTS WITH
independent of the drainage system VERSION
FIXED BEARINGS OR EXPANSION BEARINGS WITH LENGTHS
behind the abutment. They can be
outletted directly through the wing CONTRIBUTING TO EXPANSION LESS THAN OR
1.0 EQUAL TO 70 FEET
NAGE

wall.
DETAIL NO. SUB-DR-201 SHEET 1 OF 4
6'
' 30'
-0'
'Max.(
m easured along c
L approach roadw ay)

Class SD Type I nonw oven geotexti


le.

Approach Roadw ay Cost to be i


nci
dental to the pavi
ng i
tem s.

6'
' Perforated PVC Ci
rcular Pavem ent

Pi
pe Underdrai
n

6'
' Non-Perforated PVC Ci
rcular
Pi
pe Underdrai
n Outlet,
Dam pproof
Slope ‚ '
'/ ft.

Porous backfi
ll placed and
Bottom of
tam ped i
n conform ance wi
th Secti
on 210
pavem ent
Slope as steep as ground
2
2'-0'' min.
Graded
aggregate
base

wi
llallow (
Typ.
)1:2 m axi
m um

1.0
1

VERSION
Slope 2'
'/ ft.

APPROVAL
Slope to drai
n

DATE: 10/02/2014
3'
'

OFFICE OF STRUCTURES
Place Class SD Type IInonw oven geotexti
le betw een tow ard abutm ent

DIRECTOR
#5 Threaded porous backfi
ll and approach em bankm ent and w i
ng w alls at
rebar dow el ‚ '
'/ ft.
coupler at Vari
es - 1'
-4'
'Mi
n.

1'
-6'
'c/c
#5'
s spaced *
as show n

#5 @ 1'
-6'
'c/c *

Slope
2'
-0'
'
Protecti
on
Notes:

DETAIL NO. SUB-DR-201


1. Graded aggregate base to be placed and com pacted
Concrete Base (
Mix
i
n 6'
'li
fts i
n conform ance wi
th Secti
on 501.
No.1or better)
2.Porous backfi
ll (
refer to Secti
on 469)shall be placed
SECTI
ON A-A as show n behi
nd the abutm ent and to the sam e
geom etri
cs behi
nd the abutm ent w i
ng w alls w hen
Scale:‚ '
'= 1'
-0'
'
they parallel the hi
ghw ay.(
See sheet 5 of 5)
3.The Contractor m ust provi
de a w ell com pacted

OFFICE OF STRUCTURES
surface to place the geotexti
le and stone fi
ll

STATE OF MARYLAND
agai
nst.I
n fi
ll areas i
t wi
ll be necessary to overfi
ll
a suffi
cient di
stance so that a w ell com pacted

STATE HIGHWAY ADMINISTRATION


DEPARTMENT OF TRANSPORTATION
surface wi
ll be produced w hen the overfi
lli
s

LESS THAN OR EQUAL TO 70 FEET


rem oved.The rem oved m ateri
al w i
ll be i
nci
dentalto

SHEET
the perti
nent Structure Concrete i
tem s.
1'
-6'
'w i
dth of the concrete base i
s poured
*If 4.The cost of the geotexti
le wi
thi
n the li
mits show n
to rest on top of footi
ng, the rei
nforci
ng can

(PEDESTAL) WITH FIXED BEARINGS OR EXPANSION


wi
llbe i
nci
dentalto the perti
nent Structure

DRAINAGE SYSTEM AND BACKFILL FOR ABUTMENTS


be eli
minated.No addi
tional com pensati
on
Concrete I
tem s.

BEARINGS WITH LENGTHS CONTRIBUTING TO EXPANSION


wi
ll be allow ed for thi
s opti
on.

2 OF 4
NAGE
SUBSTRUCTURE - DRAI
6’’ 30’-0’’ Max. (measured alongcL approach roadway)

Class SD Type I nonwoven geotextile.


Approach Roadway Cost to be incidental to the paving items.
Pavement

6’’ Perforated PVC Circular


Pipe Underdrain

Dampproof
6’’ Non-Perforated PVC
Circular Pipe Underdrain Slope to drain toward abutment
Outlet, Slope 1/4 ’’ / ft. and wing walls at 1/4 ’’ / ft.
Bottom of
Porous backfill placed and pavement
2’-0’’ min.
Graded
aggregate
base

tamped in conformance with Section 210

Slope as steep as ground 2


will allow (Typ.) 1 : 2 maximum

DATE:
1

1.0
VERSION
10-02-2014
APPROVAL
Place Class SD Type I I nonwoven geotextile between

OFFICE OF STRUCUTRES
porous backfill and approach embankment

DIRECTOR
Slope 2’’ / ft.
3’’

*#5 Threaded
rebar dowel
Varies - 1’-4’’ Min.
coupler at
1’-6’’ c/c

2’-0’’ Notes:

DETAIL NO. SUB-DR-201


1. Graded aggregate base to be placed and compacted
in 6’’ lifts in conformance with Section 501.
2. Porous backfill (refer to Section 469) shall be placed
as shown behind the abutment and to the same
geometrics behind the abutment wing walls when
Slope protection
#5’s spaced * they parallel the highway. (See sheet 5 of 5)
Concrete base as shown 3. The Contractor must provide a well compacted

OFFICE OF STRUCTURES
(Mix No. 1 or better)

STATE OF MARYLAND
#5 @ 1’-6’’ c/c * surface to place the geotextile and stone fill
against. In fill areas it will be necessary to overfill
a sufficient distance so that a well compacted

STATE HIGHWAY ADMINISTRATION


DEPARTMENT OF TRANSPORTATION
SECTION A-A surface will be produced when the overfill is

LESS THEN OR EQUAL TO 70 FEET


removed. The removed material will be incidental to

SHEET
Scale: 1/4 ’’ = 1’-0’’
the pertinent Structure Concrete items.
1’-6’’ width of the concrete base is poured
*If 4. The cost of the geotextile within the limits shown
to rest on top of footing, the reinforcing can
will be incidental to the pertinent Strucutre

DRAINAGE SYSTEM AND BACKFILL FOR ABUTMENTS


be eliminated. No additional compensation

BEARINGS WITH LENGTHS CONTRIBUTING TO EXPANSION


Concrete Items.

(SEMI-CANTILEVER) WITH FIXED BEARINGS OR EXPANSION


will be allowed for this option.

3 OF 4
SUBSTRUCTURE - DRAINAGE
6’’ 30’-0’’ Max. (measured alongcL approach roadway)
Class SD Type I nonwoven geotextile.
Approach Roadway Cost to be incidental to the paving items.
Pavement

Dampproof

6’’ Perforated PVC Circular Slope to drain toward


Pipe Underdrain abutment and wing walls
at 1/4 ’’ / ft.
2’-0’’ min.
Graded
aggregate
base

6’’ Non-Perforated PVC


Circular Pipe Underdrain
Porous backfill placed and Bottom of
Outlet, Slope 1/4 ’’ / ft.
tamped in conformance with Section 210 pavement

DATE:
Slope as steep as ground 2

1.0
will allow (Typ.) 1 : 2 maximum
1

VERSION
APPROVAL

10-02-2014
OFFICE OF STRUCUTRES
DIRECTOR
Place Class SD Type I I nonwoven
geotextile between porous backfill
and approach embankment

Finished 3’’
groundline Slope 2’’ / ft.

*#5 Threaded
rebar dowel
coupler at Varies - 1’-4’’ Min.
1’-6’’ c/c Notes:

DETAIL NO. SUB-DR-201


1. Graded aggregate base to be placed and compacted
2’-0’’
Concrete base in 6’’ lifts in conformance with Section 501.
(Mix No. 1 or 2. Porous backfill (refer to Section 469) shall be placed
better) as shown behind the abutment and to the same
geometrics behind the abutment wing walls when
they parallel the highway. (See sheet 5 of 5)
3. The Contractor must provide a well compacted

OFFICE OF STRUCTURES
STATE OF MARYLAND
surface to place the geotextile and stone fill
against. In fill areas it will be necessary to overfill
a sufficient distance so that a well compacted

STATE HIGHWAY ADMINISTRATION


DEPARTMENT OF TRANSPORTATION
#5’s spaced * surface will be produced when the overfill is
*#5 @ 1’-6’’ c/c

LESS THEN OR EQUAL TO 70 FEET


as shown removed. The removed material will be incidental to

SHEET
the pertinent Structure Concrete items.
*If 1’-6’’ width of the concrete base is poured 4. The cost of the geotextile within the limits shown
to rest on top of footing, the reinforcing can SECTION A-A will be incidental to the pertinent Structure

DRAINAGE SYSTEM AND BACKFILL FOR ABUTMENTS


be eliminated. No additional compensation Concrete Items.

BEARINGS WITH LENGTHS CONTRIBUTING TO EXPANSION


Scale: 1/4 ’’ = 1’-0’’

(FULL CANTILEVER) WITH FIXED BEARINGS OR EXPANSION


will be allowed for this option.

4 OF 4
SUBSTRUCTURE - DRAINGE
Plug ends of pipes with same material
that underdrain is composed of.

A
6'' Perforated PVC circular
pipe underdrain (typ.)

Drain in each
direction from
midpoint @ ‚''/ft.
c
L Expansion slope (Typ.)
joint cross
beam support
columns (typ.)

15'+
- (Typical)
A

Outlet as shown through the Minimum of one outlet


Note: abutment onto the slope pipe for each wing wall
The expansion joint cross protection or finished ground
beam is not shown for clarity.

PLAN
Scale: ‘'' = 1'-0''

Notes:
1.To be used for all expansion abutments where an
expansion cross beam is called for.
2.Minimum slope of Pipe Underdrain Outlets is ‚''/ft.
3.For Section A-A see Sheet No. 2, 3 or 4
SUBSTRUCTURE - DRAI

4.The drainage system behind wing walls


shall be independent of the drainage
system behind the abutment. They shall APPROVAL
STATE OF MARYLAND
be outletted directly through the
DIRECTOR DEPARTMENT OF TRANSPORTATION
wing wall. OFFICE OF STRUCTURES
STATE HIGHWAY ADMINISTRATION
5.The cost of the PVC underdrains
DATE: 10/02/2014 OFFICE OF STRUCTURES
complete in place will be incidental
DRAINAGE SYSTEM AND
to the Substructure Concrete item. VERSION
BACKFILL FOR ABUTMENTS WITH
6.For section through wing wall, see
Detail No. SUB-DR-203. EXPANSION BEARINGS WITH LENGTHS CONTRIBUTING TO
1.0 EXPANSION GREATER THAN 70 FEET
NAGE

DETAIL NO. SUB-DR-202 SHEET 1 OF 4


30’-0’’ Max. (measured alongcL approach roadway)
Expansion joint cross beam
Class SD Type I nonwoven geotextile.
Approach Roadway Cost to be incidental to the paving items.
6’’ Perforated PVC Circular Pavement
Pipe Underdrain

6’’ Non-Perforated PVC Circular


Pipe Underdrain Outlet, Dampproof
Slope 1/4 ’’ / ft.

Porous backfill (shown shaded) placed and Bottom of


Backwall

DATE:
tamped in conformance with Section 210 pavement
Slope as steep as ground
2
2’-0’’ min.
Graded
aggregate
base

will allow (Typ.) 1 : 2 maximum

1.0
1

VERSION
10-02-2014
APPROVAL
Slope 2’’ / ft. Slope to drain
3’’

OFFICE OF STRUCUTRES
Place Class SD Type I I nonwoven geotextile between toward abutment

DIRECTOR
porous backfill and approach embankment and wing walls at
1/4 ’’ / ft.
Varies - 1’-4’’ Min., full
length between columns
Expansion joint cross
beam support columns

#5’s spaced *
as shown

#5 @ 1’-6’’ c/c *
Slope 2’-0’’ Notes:

DETAIL NO. SUB-DR-202


Protection 1. Graded aggregate base to be placed and compacted
in 6’’ lifts in conformance with Section 501.
2. Porous backfill (refer to Section 469) shall be placed
Concrete Base (Mix SECTION A-A as shown behind the abutment and to the same
#5 Threaded
* No. 1 or better) geometrics behind the abutment wing walls when
Scale: 1/4 ’’ = 1’-0’’
rebar dowel they parallel the highway. (See sheet 5 of 5)
coupler at 3. The Contractor must provide a well compacted

OFFICE OF STRUCTURES
1’-6’’ c/c

STATE OF MARYLAND
surface to place the geotextile and stone fill

DRAINAGE SYSTEM AND


against. In fill areas it will be necessary to overfill
a sufficient distance so that a well compacted

STATE HIGHWAY ADMINISTRATION


DEPARTMENT OF TRANSPORTATION
surface will be produced when the overfill is

EXPANSION GREATER THAN 70 FEET


removed. The removed material will be incidental to

SHEET
the pertinent Structure Concrete items.

BACKFILL FOR ABUTMENTS (PEDESTAL) WITH


*If 1’-6’’ width of the concrete base is poured 4. The cost of the geotextile within the limits shown
to rest on top of footing, the reinforcing can will be incidental to the pertinent Structure
be eliminated. No additional compensation Concrete Items.

EXPANSION BEARINGS WITH LENGTHS CONTRIBUTING TO


will be allowed for this option.

2 OF 4
SUBSTRUCTURE - DRAINAGE
30’-0’’ Max. (measured alongcL approach roadway)
Expansion joint cross beam
Class SD Type I nonwoven geotextile.
Approach Roadway Cost to be incidental to the paving items.
Backwall Pavement

6’’ Perforated PVC Circular


Pipe Underdrain
Dampproof
6’’ Non-Perforated PVC
Circular Pipe Underdrain
Outlet, Slope 1/4 ’’ / ft. Slope to drain toward abutment
and wing walls at 1/4 ’’ / ft.
Bottom of
Porous backfill placed and pavement
2’-0’’ min.
Graded
aggregate
base

tamped in conformance with Section 210

Slope as steep as ground 2


will allow (Typ.) 1 : 2 maximum

DATE:
1
Expansion joint cross
beam support columns

1.0
*#5 Threaded

VERSION
APPROVAL
rebar dowel

10-02-2014
Place Class SD Type I I nonwoven geotextile between
coupler at

OFFICE OF STRUCTURES
porous backfill and approach embankment

DIRECTOR
1’-6’’ c/c

Slope 2’’ / ft.


3’’

DETAIL NO.
Varies - 1’-4’’ Min., full
length between columns

2’-0’’ Notes:

SUB-DR-202
1. Graded aggregate base to be placed and compacted
in 6’’ lifts in conformance with Section 501.
2. Porous backfill (refer to Section 469) shall be placed
as shown behind the abutment and to the same
geometrics behind the abutment wing walls when
Slope protection
#5’s spaced * they parallel the highway. (See sheet 5 of 5)
Concrete base as shown 3. The Contractor must provide a well compacted

OFFICE OF STRUCTURES
(Mix No. 1 or better)

STATE OF MARYLAND
#5 @ 1’-6’’ c/c * surface to place the geotextile and stone fill
against. In fill areas it will be necessary to overfill
a sufficient distance so that a well compacted

STATE HIGHWAY ADMINISTRATION


DEPARTMENT OF TRANSPORTATION
surface will be produced when the overfill is

DRAINAGE SYSTEM AND BACKFILL


SECTION A-A
removed. The removed material will be incidental to

EXPANSION GREATER THAN 70 FEET


SHEET
Scale: 1/4 ’’ = 1’-0’’

FOR ABUTMENTS (SEMI-CANTILEVER) WITH


the pertinent Structure Concrete items.
1’-6’’ width of the concrete base is poured
*If 4. The cost of the geotextile within the limits shown
to rest on top of footing, the reinforcing can
be eliminated. No additional compensation will be incidental to the pertinent Structure

EXPANSION BEARINGS WITH LENGTHS CONTRIBUTING TO


will be allowed for this option. Concrete Items.

3 OF 4
SUBSTRUCTURE - DRAINAGE
30’-0’’ Max. (measured alongcL approach roadway)
Expansion joint cross beam
Class SD Type I nonwoven geotextile.
Approach Roadway Cost to be incidental to the paving items.
Backwall Pavement

Dampproof

6’’ Perforated PVC Circular Slope to drain toward


Pipe Underdrain abutment and wing walls
at 1/4 ’’ / ft.
2’-0’’ min.
Graded
aggregate
base

6’’ Non-Perforated PVC


Circular Pipe Underdrain Bottom of
Outlet, Slope 1/4 ’’ / ft. Porous backfill placed and
pavement
tamped in conformance with Section 210

Expansion joint cross

DATE:
beam support columns

Slope as steep as ground 2

1.0
will allow (Typ.) 1 : 2 maximum

VERSION
1

APPROVAL

10-02-2014
OFFICE OF STRUCTURES
*#5 Threaded

DIRECTOR
rebar dowel Place Class SD Type I I nonwoven
coupler at geotextile between porous backfill
1’-6’’ c/c and approach embankment

3’’
Slope 2’’ / ft.

DETAIL NO.
Finished
groundline

Varies - 1’-4’’ Min., full Notes:

SUB-DR-202
length between columns 1. Graded aggregate base to be placed and compacted
in 6’’ lifts in conformance with Section 501.
2. Porous backfill (refer to Section 469) shall be placed
2’-0’’ as shown behind the abutment and to the same
Concrete base
geometrics behind the abutment wing walls when
(Mix No. 1 or
they parallel the highway. (See sheet 5 of 5)
better)
3. The Contractor must provide a well compacted

OFFICE OF STRUCTURES
STATE OF MARYLAND
surface to place the geotextile and stone fill
#5’s spaced * against. In fill areas it will be necessary to overfill
*#5 @ 1’-6’’ c/c as shown a sufficient distance so that a well compacted

STATE HIGHWAY ADMINISTRATION


DEPARTMENT OF TRANSPORTATION
surface will be produced when the overfill is

DRAINAGE SYSTEM AND BACKFILL


removed. The removed material will be incidental to

EXPANSION GREATER THAN 70 FEET


SHEET
the pertinent Structure Concrete items.

FOR ABUTMENTS (FULL CANTILEVER) WITH


*If 1’-6’’ width of the concrete base is poured 4. The cost of the geotextile within the limits shown
to rest on top of footing, the reinforcing can SECTION A-A will be incidental to the pertinent Strucutre
be eliminated. No additional compensation
Scale: 1/4 ’’ = 1’-0’’ Concrete Items.

EXPANSION BEARINGS WITH LENGTHS CONTRIBUTING TO


will be allowed for this option.

4 OF 4
SUBSTRUCTURE - DRAINAGE
Class SD Type I nonwoven geotextile.
Approach Roadway Cost to be incidental to the paving items.
Pavement

6’’ Perforated PVC Circular


Pipe Underdrain

Dampproof
6’’ Non-Perforated PVC
Circular Pipe Underdrain Slope to drain toward abutment
Outlet, Slope 1/4 ’’ / ft. and wing walls at 1/4 ’’ / ft.
Bottom of
Porous backfill placed and pavement
2’-0’’ min.
Graded
aggregate
base

tamped in conformance with Section 210

DATE:
Slope as steep as ground 2
will allow (Typ.) 1 : 2 maximum
1

1.0
VERSION
10-02-2014
APPROVAL

OFFICE OF STRUCUTRES
DIRECTOR
Place Class SD Type I I nonwoven
geotextile between porous backfill
and approach embankment
*#5 Threaded Slope 2’’ / ft.
rebar dowel 3’’
coupler at
1’-6’’ c/c

DETAIL NO.
Varies - 1’-4’’ Min.
Finished
groundline
Notes:
2’-0’’ 1. Graded aggregate base to be placed and compacted

SUB-DR-203
in 6’’ lifts in conformance with Section 501.
Concrete base 2. Porous backfill (refer to Section 469) shall be placed
(Mix No. 1 or as shown behind the abutment wing walls when they
better) parallel the highway.
#5’s spaced * 3. The Contractor must provide a well compacted
as shown
surface to place the geotextile and stone fill
against. In fill areas it will be necessary to overfill

OFFICE OF STRUCTURES
*#5 @ 1’-6’’ c/c

STATE OF MARYLAND
a sufficient distance so that a well compacted
surface will be produced when the overfill is
SECTION THROUGH WING WALL removed. The removed material will be incidental to

STATE HIGHWAY ADMINISTRATION


DEPARTMENT OF TRANSPORTATION
the pertinent Structure Concrete items.

DRAINAGE SYSTEM AND BACKFILL


Scale: 1/4 ’’ = 1’-0’’
4. The cost of the geotextile within the limits shown

SHEET
will be incidental to the pertinent Structure
*If 1’-6’’ width of the concrete base is poured Concrete items.
to rest on top of footing, the reinforcing can 5. For bridges with wing walls that are not parallel to

1 OF
be eliminated. No additional compensation highway see std. no. RW-301 for details.

FOR WING WALLS THAT ARE PARALLEL TO THE HIGHWAY


will be allowed for this option.

1
SUBSTRUCTURE - DRAINAGE

You might also like