SUMMARY REPORT

Contractor : KN JITU ENTERPRISE

Package No : B 88

Period Ending: : 25 OKTOBER 2020

RO1 - REPAIR EXISTING PAVEMENT

a = f+g c = f+g h=
b d e f g
(type 1 only) (type 2 only) a+b+c+d+e

Section Date Quantity of 50mm thick Size of potholes Types of Repair MATERIAL

TYPE 1 (including cutting TYPE 2 (excluding cutting


A B C D E F Quantity for
existing premix) existing premix)
Sealing of Patching
No Route No. 2 2 Pothole Remarks
Reinstate Reinstate Surface < 1m > 1m ACW 20
From To Start End Edge Edge Cracks DO Number
Patching of Patching of Damage caused by Settlement /
Deterioration Deterioration New pothole Repeating pothole Crocodile crack Shoving
Potholes Potholes third parties Depression
Of Backfilled Of Backfilled
Trench Trench
2 2 2 2 2 Nos 2 Nos 2 Nos 2 Nos 2 Nos 2 Nos 2 Nos 2 Nos 2 ( mt) (m2)
(m ) (m ) (m ) (m ) (m ) (m ) (m ) (m ) (m ) (m ) (m ) (m ) (m )
PROTOCOL

Sub Total Protocol Road - - - - - - - - - - - - - - - - - - - - -


1 FT 009 36.00 37.00 30.09.2020 30.09.2020 18.27 4 18.27 4 18.27
2 FT 009 50.00 51.00 01.10.2020 01.10.2020 9.60 2 9.60 2 9.60
3 FT 009 42.00 43.00 02.10.2020 02.10.2020 6.95 5 6.95 5 6.95
4 FT 011 4.00 5.00 02.10.2020 02.10.2020 6.72 1 6.72 1 6.72
5 FT 010 70.00 71.00 06.10.2020 06.10.2020 1.96 1 1.96 1 1.96
6 FT 010 56.00 57.00 06.10.2020 06.10.2020 7.36 2 7.36 2 7.36 3 24.60
7 FT 010 41.00 42.00 06.10.2020 06.10.2020 5.50 2 5.50 2 5.50
8 FT 051 15.40 16.00 08.10.2020 08.10.2020 3.01 2 3.01 2 3.01
9 FT 009 49.00 50.00 08.10.2020 08.10.2020 3.12 1 3.12 1 3.12
10 FT 009 53.00 54.00 09.10.2020 09.10.2020 10.13 5 10.13 5 10.13
11 FT 010 30.00 31.00 13.10.2020 13.10.2020 4.99 2 4.99 2 4.99
12 FT 010 59.00 60.00 13.10.2020 13.10.2020 5.48 3 5.48 3 5.48
13 FT 010 48.00 49.00 13.10.2020 13.10.2020 7.84 3 7.84 3 7.84
14 FT 051 27.00 28.00 14.10.2020 14.10.2020 9.45 2 1.62 4 7.83 6 9.45
15 FT 051 28.00 29.00 14.10.2020 14.10.2020 3.78 1 3.78 1 3.78
PRIMARY

16 FT 009 53.00 54.00 14.10.2020 14.10.2020 8.15 2 8.15 2 8.15


17 FT 010 50.00 51.00 15.10.2020 15.10.2020 3.62 2 3.62 2 3.62
18 FT 010 49.00 50.00 15.10.2020 15.10.2020 7.83 3 7.83 3 7.83
19 FT 011 4.00 5.00 17.10.2020 17.10.2020 13.47 3 13.47 3 13.47
20 FT 009 35.00 36.00 19.10.2020 19.10.2020 17.24 5 17.24 5 17.24
21 FT 009 46.00 47.00 19.10.2020 19.10.2020 23.38 1 0.80 8 22.58 9 23.38
22 FT 010 44.00 45.00 21.10.2020 21.10.2020 6.45 4 6.45 4 6.45
23 FT 010 33.00 34.00 22.10.2020 22.10.2020 29.38 7 29.38 7 29.38
24 FT 010 36.00 37.00 22.10.2020 22.10.2020 5.17 1 5.17 1 5.17
25 FT 010 49.00 50.00 22.10.2020 22.10.2020 17.41 4 17.41 4 17.41
26 FT 009 15.00 16.00 24.10.2020 24.10.2020 12.90 6 12.90 6 12.90
27 FT 009 17.00 18.00 24.10.2020 24.10.2020 2.24 1 2.24 1 2.24
28 FT 051 26.00 27.00 24.10.2020 24.10.2020 19.32 6 19.32 6 19.32

Sub Total Primary Road 270.72 - - - - 1 2.42 90 268.30 93 270.72 - - - - 3 24.60 - - - - - - -


SECODARY

Sub Total Secondary Road - - - - - - - - - - - - - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Grand Total (Protocol, Primary and Secondary) 270.72 - - - - 1 2.42 90 268.30 93 270.72 - - - - 3 24.60 - - - -

Prepared by: Certified by: Verified by:

……………………… ………… ……………………… ………………………


Sub Contractor SSSSB Rep. Area Manager
Date : 25.10.2020 Date: Date: