INSPECTION

Observations of the PMED Engineers

Must be rectified before the concrete pouring

Pictures of Columns needed to be rectified

 Cement must be removed from the bars


 Rectified Alignment of Main Bars

 Adjust Lateral Ties spacing

(All comments with rectifications are subjected for concrete pouring)


ACCOMPLISHED & RECTIFIED PICTURES BEFORE THE CONCRETE POURING
CONCRETE POURING PICTURES

 Third Floor Columns


 Parapet Wall
 Acu Pad
Slump Test