PROJECT REQUIREMENTS CHECKLIST

CUSTOMER NAME : MRS. REMEGIOS G. MABALAY


PROJECT NAME : RESIDENTIAL
STRUCTURE TYPE : TWO STOREY
LOCATION : BRGY SAN EUGENIO ARINGAY LA UNION
Project Duration : 15 DAYS
Date :

ITEM DETAILS/DESCRIPTIONS

I.        MATERIAL SPECIFICATIONS:


1. Profile/s DURARIB1070MMTHK
2. Longest Panel 6.40METERS
3. Thickness 0.4
4. Bended Accessories WC,EF,BG.FC.EM
II. BUILDING STRUCTURES:
1. Bungalow/Multi-Storey TWO STOREY BUILDING
2. Scope of Works: FABRICATION OF TRUSSES AND ROOFING INSTALLATION
a. Roofing Installation YES
b. Bended Installation YES
c.   With Insulations and Wire Mesh NO
d. Civil Works YES
e. Truss Works YES
f. Ceiling Works (Interior/Exterior) NO
h. Dry Wall Partitions YES
i. Dismantling NO
j. Rectification (Specify if any)
III.     PAYMENT TERMS:
1. Down Payment Upon Order (%)
2.  Balance (%)
3. Bonds & Insurances
IV.    SAFETY REQUIREMENTS:
1.   Full PPE?
2.   Full-time Safety Engineer needed?
3.   Contractor’s All Risk Insurance (CARI) required?
4.   Lifting Method:
a.    Manual
b.    Crane, provided by owner?
5.   Scaffoldings and/or Shoring:
a.   Owner supplied?
6.   Clearances and Certificate required:
a.   Medical w/ X-ray
b.   NBI, Brgy, Police Clearances
c.   TESDA certificate (welders/scaffold erectors)
V.    SUPERVISION REQUIREMENTS:
1.   Project Manager/Engineer
2.   Project In-Charge
3.   Quality Assurance
VI. OTHER REQUIREMENTS:
1.   Temporary Facilities (TEMFACIL)
a.   Stay-In ?
                i.   Provided by owner?
b.    Power & H2O by owner?
2.  Working Time
a.   What is Regular working time?
b.   Overtime allowed?
c.   Holidays & Sundays?
d.   Beyond regular time
e.   Is there working permit requirement?
f.   Worker's Uniforms and I.D. required?

Conformed by: