GOVERNMENT OF TELANGANA

ABSTRACT
Establishment Irrigation & CAD Department- TSES In-charge
arrangements to the posts of Executive Engineers, in relaxation of Rule
10 (h) of T.S. State and Subordinate Service Rules, 1996- Posting
orders of Executive Engineer Orders Issued.
=== = = = = = = = = = = = = = = = = = = = =
= = =:
=

IRRIGATION & CAD (Ser. II) DEPARTMENT

G.0.Rt.No.336 Dated: 31.12.2020.


Read the following:
1) G.O.Ms.No.45, 1&CAD(Ser.11) Department, dated 28.12.2020
2) From the Engineer-in-Chief(AW), 1&CAD Dept., Lr.No.RC/ENC/
C1/ 10122020/2020, dated 31.12.2020.

&&&
ORDER:
In G.0. first read above, the administrative structure of Irrigation
department was reorganized with 19 territorial Engineer-in-Chiefs/Chief
Engineers and 09 Head quarter ENCs/CEs for better and more responsive
management of the extensive Irrigation infrastructure, which has been
created after formation of Telangana State.

2. Based on the recommendations of the Engineer-in-Chief (Admn.


Wing), Irrigation & CAD Department, Hyderabad in his letter second read
above and after careful examination of the entire matte, it has been
decided to consider in-charge arrangements to the posts of Executive
Engineers. Accordingly, Government hereby place eligible Deputy
Executive Engineers, to the post of Executive Engineers, in relaxation of
Rule 100(h) of T.S. State and Subordinate Service Rules, 1996, and also
post Executive Engineers shown in the annexure-I appended to the
G.0., subject to the conditions mentioned below.

a) The incumbent shall continue to hold the pay-scale of the


substantive lower post, i.e., DEE only and discharge the duties of
the Executive Engineers after assuming charge, essentially as a
temporary arrangement.

b) This in-charge arrangement is subject to outcome of the court


cases pending, if any in the Hon'ble Courts i.e., High Court
Supreme Court.

c) This temporary arrangement shall be terminated, as soon as the


requirement is over, without any prior notice.

d) The Government reserves the right to suo-motu review / modify


substitute terminate the in-charge arrangement so made,
without assigning any reasons thereof, at any time.

e) It is also reiterated that, temporary arrangement is not a


recognition of seniority. No rights, equities or claims shall therefore
be based on the temporary arrangement. If makes any claim
based on the arrangement thus effected, Government reserves the
right to immediately terminate such in-charge arrangement
without any notice, and without assigning any reasons thereof.

3. These orders shall come into force with effect from January 2021
(P.T.O)
::2

& CAD
4. The Engineer-in-Chief (Admn. Wing), Irrigation
further action in the
Department, Hyderabad, shall take necessary
matter accordingly.

ORDER AND IN THE NAME OF THE GOVERNOR


OF TELANGANA)
(BY
Dr.RAJAT KUMAR
PRINCIPAL SECRETARY TO GOVERNMENT

To
The Engineer-in-Chief (Admn. Wing), Irrigation & CAD Department,
Hyderabad.
The Individuals through the Engineer-in-Chief (Admn. Wing), I&CAD
Department, Hyderabad.
Copy to
The Engineer-in-Chief (Irrigation), 1&CAD Department, Hyderabad.
The Chief Engineers concerned through the Engineer-in-Chief
(AW),Irrigation &CAD Department.
The PAO concerned through the Engineer-in-Chief (AW), I&CAD

Department.
The Director of Works & Accounts, Hyderabad.
The P.S. to Chief Secretary to Government.
The P.S to Secretary to Chief Minister
The P.S. to Principal Secretary to Government, I&CAD Department.

SF/SC.

//FORWARDED: BY ORDER//

SECTION OFFICER
Dated 31.12.2020
ANNEXURE to G.O. RI. No. 336, 18CAD (SER. I) Dept.

postod as Remarks
SI. SUR NAME Present place of working
No. NAME
Deputy Superintending
Sub Division-3, Manthani of Circle No.3,L.M.D Engineer IC, Khagaznagar
Division

MK KHAISHAGI Peddapally of Godavari Valley 4, of


(new)
|Colony, Karimnagar
Sub Division No.2, Laxmipuram of SRLroject Executive Engineer, Irigation
K MAHESWARAR RAO Division No.1, Palvancha of Sita Rama Lift Division No.4, Yellandu,
Irrigation Project Circle, Kothagudem
Deputy Chief Engineer, Olo
Chief Engineer, Irrigation
PBV Dhan Kumar Reddy O/o Chief Engineer (Projects), Khammam Kothagudem.(NEW)_
Executive Engineer, Irrigation
Jadcherla of PRLIS Division Division No.1, Mahabubnagar,
KRISHNA MOHAN
Sub Division.No.2, (PRLIS Division No.7,
S No.6, Jadcherla
Mahabubnagar,)
Deputy Superintending
Engineer of Irrigation Circle
Bhongir
S MURALIDHAR Ofo Engineer-in-Chief(VW) 1&CAD Dept, (Kaleshwaram Project
Hyderabad Construction Circle No.2,
Bhongin in place of R.
Division Executive Engineer, Irrigation
Sub Division.No.1, Jadcherla of PRLIS Division No.7 Narayanpet, Ravinder, now
TV RAVINDRA KISHEN No.6, Jadcherla of Palamur Ranga Reddy LIS
(1B Division Narayanpet) posted
Circle No.2, Mahabubnagar Executive Engineer, Irrigation
Unit, Olo Division No. 1 Gadwal,
RUKSANA KAUSAR
Prioritidsed Projects Monitoring |(Mechancical Division No.2,
Hyderabad
Engineer in Chief (lrrigation)
-

|Gadwal of Mechanical Circle)


t &Deputy Chief Engineer of Oo
Olo Chief Engineer, Nagarjuna Sagar Project &Chief Engineer, Irrigation
8 B MADHAVI AMR SLBC Project, Hyderabad Suryapet, (NEW)_
Executive Engineer, Irigation
Hill
Planning & Development
ofVISIon No.1,
P ANITA o Commissioner
Godavari Basin, Hyderabad
Colony,Nagarjunasagar
(Dam Maintenance Division,
Hill Colony, Nagarjunasagar)_
Executive Engineer, Irigation
Qc&I Sub Division No.4, Bhadrachalam of Division No.2 Bhupalapally
JOGI VENKATA Qc&I Division No.6, Khammam of Quality
10 G (1B Division Bhupalapally of lc
SATYANARAYANA
Control & lnspection Circle,Warangal Warangal)_
Executive Engineer, Irrigation
Sub Division No.3, Enkoor of SRLI Project Division No.6,Bhadrachalam,
(Hydrology& Investigation
1 S SRINIVASA REDDY Division No.3, Khammam of Sita Rama Lift Division No.5 (Godavari Basin)
Irrigation Project Circle, Kothagudem
Bhadrachalam)
Executive Engineer, Irigation
Qc&I Sub Division No.4, Kamareddy of QC&l Division No.2 Nizamabad
Division No.4, Nizamabad of Quality Control d (IB Division Nizamabad of IC
12 AR ASHOK KUMAR
Inspection Circle,Hyderabad
Nizamabad)
Sub Division Executive Engineer, Irrigation
Stage-ll Division 2, Jangaon
AV KRISHNA RAO Division No.4 Eturunagaram
|No.1,Thirumalgiri of Stage-ll Division 2, Jangaon (New)
of SRSP STAGE-2 Circle, Warangal of IC, Narsampet

Sub Division No.5, Gjwel of Kaleshwaram Executive Engineer, Irigation


of
G JITENDER REDDY Project Construction Div No.2, Gajwel 3
14 |Kaleshwaram Project Construction Circle No.3, Div.No. Gajwel,(NEW)
Gajwel
Engineer, Irrigation
Sub Division No.3, MP Banjara of SRLI ProiectExecutive
|Division No.4, Husnabad
15 T VENKATESWARA Division No.1, Palvancha of Sita Rama Lift (IFFC Division No.3,
RAO Irrigation Project Circle, Kothagudem
Husnabad of IFFC)

Page 1 of 4
SI. SUR
NAME Present place of working postod as Remarks
No. NAME

NSLBC O M Sub Division No 2,Tekulapally ofExecutive Engineer, Irrigation


SRINIVAS NSLBC O &M Division, Tekulapally of NSLBC Division No.3
O &M Circle, Tekulapally Huzurnagar, (NEW)_
Sub Division No.1, Julurupadu of SRLI ProjectXcutive Engineer, Irigation
17 M AKSHMI NARAYAN Division No.3, Khammam of Sita Rama Lift Division No.1, Palair Hq
Irrigation Project Circle, Kothagudem @Khammam
(IB Division Khammam,)
Executive Engineer, Irrigation
JAGAN MOHAN Olo Chief Engineer, Hydrology & Investigation, Division No. 2, Pebbair,
18
REDDY Hyderabad (PJP Dam Division No.2,
Nandimalla)
QC&I Sub Division No.3, Jagityal, QC&I DivisionXecutive Engineer, Irrigation
19 C MADHUSUDHAN No.7, Karimnagar, Quality Control & Inspection
REDDY (Kaleshwaram Project
Circle, Warangal
Construction Div No.2, Gajwel)
Executive Engineer, Irrigation
DivisionNo.2 Huzurabad
20 D GIRIDHARA CHARY Olo ACE, SRSP, Karimnagar (Division No.2, Huzurabad of
CCH Circle)
Sub Divison No 2, Marrigudem, DLIS Division Deputy Chief Engineer, Olo
21 A SURYANARAYANA No 4, Marrigudem, Sri Ramaraju Vidyasagar Chief Engineer, Irrigation
REDDY Rao Dindi Lift Irrigation Project Circle Nagarkurnool,
(NEW)_
Deputy Superintending
CH LAXMI NARAYANA Olo SE, NSLBC O & M Circle, Tekulapally, Engineer of Irigation Circle
22
NSP&AMR SLBC Project Sattupally
Irrigation Circle, Khammam)
Superintendin9
KW NAGESWARA RAO NSC Monitoring Sub Division, Huzurnagar, NSCeputy
&MENgineer of lrrigation Circle Hill
23
Monitoring Division, Tekulapally, NSLBC O
Circle, Miryalaguda, NSP& AMR SLBC Project
(NS Dam Circle Hillcolony)
Deputy Chief Engineer, Olo
RDS Sub Division No 2 (RDS), Undavelli, Chief Engineer, Irigation
24 N VENKATA REDDY RDS(LOC) Division, Uppal, Priyadarishini Jurala |Wanaparthy
Project Circle-1, Gadwal |(ChiefEngineer(P)
|Mahabubnagar)
Executive Engineer, Irrigation
25 SUBRAHMANYAM Olo Engineer - in Chief(Irrigation) Circle:
Division Zaheerabad,New
PRASAD Prioritidsed Projects Monitoring Unit
Division (NEW)
Sub Division-5, Manakondur, Division No.4, Deputy Chief Engineer, Olo
26 MOHD ASMATH ALI L.M.D.Colony, Godavari Valley Circle -4, L.M.D Chief Engineer (lrrigation)
Colony, Karimnagar |Mancherial
EE, Irrigation Division No.3,
IB Sub Division Wardhannapet, IB Division Khagaznagar (erstwhile MIP
B Prabhakar |Warangal, Irrigation Circle Warangal Division, Mancherial) of IC,
|Khagaznagar (new)
|Deputy Superintending
1.B.Sub Division Hasanparthy, 1B Division Engineer of Irrigation Circle,
28 KHAJA ZUBAIR AHMED Warangal, Irigation Circle Warangal |Jagitiyal (erstwhile 1C,
Karimnagar)_
Executive Engineer Chief in place of A.
CHANDRA SEKHARA Olo Chief Engineer, Central Designs |Engineer CDO (Executive
29 D
aryanarayana
RAO Organisation, Hyderabad Engineer Chief Engineer CDO
)Olo CE, CDO, Hyderabad Reddy holding FAC|
Executive Engineer, Irrigation
AFZAL HUSSAIN Qc&I Sub Division No.2,Sircilla, QC&I Division Division No.5 Gangadhara
30 No.7, Karimnagar, Quality Control & Inspection (Executive Engineer, SYP
KHAN Circle, Warangal Division No.2, L.M.D.Colony
of SYP Circle)
Earth dam Sub-Division, Pylon, Nagarjunasagar, Deputy Superintending
31 A SOLOMAN Dam Maintenance Division, Hill Colony, |Engineer of Irrigation Circle
Nagarjuna Sagar Dam Circle, Hill Colony Banswada (new)

Page 2 of 4
SI. SUR
NAME Present place of working postad as Remarks
No. NAME

Evecutive Engineer, Irrigation


Oc&I Sub Division No.5, Sangareddy, OC& Division No.1 Banswada
32 P RAME SH Division No.1, Hyderabad, Quality Control & (Hydrology2 Irvestigation
Inspection Circle,Hyderabad Division No 3(Godavari Basin).
Adilabad)
Deputy Superintending
SANTHU PRAKASH Sub Division No.3, Kataram, SYP Division No2, Engineer of Irigation Circe
33 P M.D.Colony, Sripada Yellampally Project No.1 Ramagundam,
RAO |Circle, LMD Colony, Karimnagar (K.P Circle No.1
Rarnagundarn,)
|Executive Engineer
34 RAMANARAYANA Olo Chief Engineer(IS&WR), Hyderabad (Hydrology1)
SHARMA (Executive Engineer
Investigation)
NSLBC O8 M Sub Divn. Bonakal, NSLBC O eDeputy Superintending
Engineer of IC, Adilabad
35 IR PREMCHAND M Division, Tekulapally, NSLBC O &M Circle,
(erstwhile Penganga Circle,
Tekulapally |Adilabad)
Sub Division No.3, Bikanoor, Kaleshwaram
Deputy Chief Engineer, Olo
36 T BHOOMA REDDY Project Construction Division No.4,
KamareouyChief Engineer,
Engineer, Irrigation
Kaleshwaram Project Construction Circle No.1,ner
Kamareddy (New)
Siddipet
Sub Division.No.1, Kollapur, MGKLIP Division-1, Executive Engineer, Irrigation
37 K JOSEPH Nagarkurnool, Rajeev Bhima Lift Irrigation Division No.9, Kodangal,
Scheme Project Circle |NEW)_
Sub Division No.2, Cheriyal, JCR DLIS.4, Deputy Superintending
38 SRINIVASA REDDY Warangal, J.Chokka Rao Devadula Lift Irrigation Engineer of Irrigation Circle
|Scheme Circle, Warangal Narsampet (new)_
Qc&I Sub Division No.5, Chinthapally, QC&I Deputy Chief Engineer, Olo
39 S GOVERDHAN Division No.2, G.V.Gudem, Nalgonda, Quality Chief Engineer, Irigation
Control &Inspection Circle, Hyderabad Sangareddy.(NEW)_
Sub Division-4, Huzurabad, Division No.4, Deputy Superintending
Irrigation Circle
40 M RAVINDER L.M.D.Colony, Godavari Valley Circle 4,
-
L.M.Dgineer
Colony, Karimnagar Karimnagar, (K.P. Circle
|No.2 Karimnagar.)
RAGHUNATHA Olo Chief Engineer, Central Designs Executive Engineer (ISWR-1
41 V (DD Krishna)
SARMA Organisation, Hyderabad

H&I Sub Division No.1, Nizambad, Hydrology Deputy Superintending


VENKATA Investigation Division No.4(Godavari Basin),
42 S Engineer of Imigation Circle
NARASIMHA RAO LMD Colony, Hydrology & Investigation
Circle(Godavari Basin), Karimnagar Kamareddy (NEW)

Deputy Superintending
|Engineer of Imigation Circle,
43 YMG KRISHNA Olo. Chief Engineer(S&WR), Hyderabad |Siddipet,
(K.P Construction Circle No. 1
Siddipet)

Page 3 of 4
S. SUR
NAME
NAME Present place of working posted as Remarks
No.
Executive Engineer, Irigation
QC &I Sub Division No.1, K.C Camp, No.8 Naranyanpet of
CampVision
Hanmakonda of QC&I Division No.5,K.C Superintending Engineer
44 M RAMU Hanmakonda of Quality Control & Inspection Circle No. 3,
|Irrigation
Circle, Warangal. Makthal/Narayanpet
Engineer, Inrigation
QC&I Sub Division No.1, Khammam of QC&IExecutive
of Quality Control& sion No.5, Sattupally,
45 G SAMMI REDDY Division
No.6, Khammam (SRLI Project Division
Inspection Circle,Warangal. No.4,Sathupally.)
Hill Colony
DEE, H&I Sub Division No:1, Deputy Superintending

CH.V. |LAKSHMA REDDY


Nagarjuna sagar of Hydrology & Investigation
& Engineer of Irrigation Circle
Division No:3(Krishna Basin) of Hydrology
Hyderabad
No.2, Nagarkurnool.(NEW)
Investigation Circle(Krishna Basin),
Deputy Chief Engineer Olo
|Chief Engineer, Irigation
DEE, PW Sub Division, Alampur of RDS(LOC)
VENKETESWARA of Priyadarishini Jurala Project
Division,Uppal Nizamabad
(Commisioner P&D Godavari
47 G
RAO Circle-1, Gadwal
Basin, Hyderabad)_
Gadwal of Deputy Superintending
DEE, QC&I Sub Division No.2, Circle
Mahabubnagar of Quality Engineer of Irigation
8
V SURESH BABU Qc&I Division No.3, Medak (NEW)_
Control &Inspection Circle,Hyderabad
Deputy Superintending
DEE, LB Sub Division Palakurthy of lB DiVisIon Engineer of Irigation Circle
49 K BALARAJU |Janagaon of Irigation Circle Warangal. No.3, Makthal (New)

Executive Engineer, Irigation

DEE, QC&I Sub Division No.1, LMD Colony, Division No.2 Nizamsagar of
VENKATA RAMANA of QC&l Division No.7, KarimnagaIrigation Circle, Banswada
T Karimnagar
|of Quality Control & Inspection Circle,Warangal (new
50 RAO

DR RAJAT KUMAR
TO GOVERNMENT
PRINICPAL SECRETARY

SETION OAFICER

Page 4 of 4