Analisa HSP GB 2016

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 25

RENTAL EQUIPMENT

No. Equipment Manufacturer Type Supplier Rental Contract Period Remark


Unit Rate Start Finish

1 Rafter Crane 60t Tadano GR-600TX BAP 186,500,000 /Month 1-Apr-15


2 Rafter Crane 60t Tadano GR-600TX BAP 186,500,000 /Month 1-Apr-15
3 Crawler Crane 250t Kobelco CKE 2500 GTA 2,342,500,000 /Month 16-Feb-15
4 Crawler Crane 250t Kobelco CKE 2500 GTA 2,342,500,000 /Month 16-Feb-15
5 Mobile Crane 120t Kato KA 1200 Proton 200,000,000 /Month 1-Jun-15 1-Jul-15 De-Mobilize in July (No Extend)
6 Excavator/Breaker Sumitomo SH 210 PT. Akio 65,500,000 /Month 24-Jun-15 15-Dec-16 18 months contract
7 Excavator/Breaker Sumitomo SH 210 PT. Akio 65,500,000 /Month 24-Jun-15 15-Dec-16 19 months contract
8 Excavator/Breaker Komatsu PC.200-8 Bahtera Motor 70,000,000 /Month 23-Apr-15 Monthly extend
9 Mini Excavator/Breaker Komatsu PC50-UU Beni Gunawan 46,000,000 /Month 20-Apr-15 Monthly extend
10 Mini Excavator Komatsu PC 75 UU Beni Gunawan 27,000,000 /Month 23-Apr-15 Monthly extend
11 Mini Excavator Komatsu PC 75 UU Beni Gunawan 27,000,000 /Month 9-Jul-15 Monthly extend
12 Mini Excavator Komatsu PC 75 UU Bahtera Motor 27,000,000 /Month 6-Jul-15 Monthly extend
13 Man lift Genie S60-8763 Superkrane 45,000,000 /Month 13-Mar-15 Monthly extend
14 Man lift Genie S60-8763 PT. BAP 58,800,000 /Month 8-Apr-15
15 Scissor Lift Haulotte H18 SX PT. Probesco 27,000,000 /Month 26-Mar-15
16 Truck Crane Plat Bed Mitsubishi 8 Ton Bahtera Motor 50,000,000 /Month 14-May-15 Monthly extend
17 Truck Trailer 350,000 /jam
18 Gerinda 70,000 /jam
19 Dump truck 20 m3 200,000 /jam

LABOUR
No Uraian Satuan harga Jumlah
1 Mandor man hour 20,000.00 20,000.00
2 Tukang man hour 17,142.86 17,142.86
3 Kepala Tukang man hour 18,571.43 18,571.43
4 Pekerja man hour 17,142.86 17,142.86
5 Pembantu operator man hour 15,714.29 15,714.29
6 Operator man hour 21,428.57 21,428.57

MATERIAL
No Uraian Satuan harga Jumlah
1 Solar liter 7,150.00 7,150.00
2 Adjustable base pcs 85,000.00 85,000.00
3 Main frame pcs 240,000.00 240,000.00
4 Cross brace pcs 80,000.00 80,000.00
5 Connector pin pcs 15,000.00 15,000.00
6 Stair pcs 575,000.00 575,000.00
7 Catwalk pcs 375,000.00 375,000.00
1 Site clearing

1. Harga satuan pekerjaan site clearing m2

I. URAIAN
Uraian Kode Koefisien Satuan Keterangan
Kondisi jalan : baik
Menggunakan alat secara mekanis
Lokasi : P21 - P17
Jarak hauling 2.00 km
Jam kerja efektif per hari Tk 7.00 jam
HSD sewa Excavator 110 HP, Komatsu PC 200-8 RpE10 359,890.11 jam
Tenaga excavator Pw 110.00 HP
Upah operator excavator U1 21,428.57 Rp/jam
Upah pembantu operator excavator U2 17,142.86 Rp/jam
Bahan bakar solar Ms 7,150.00 Liter

II. URUTAN KERJA

1. Excavator 110 HP, Komatsu PC 200-8

Uraian Kode Koefisien Satuan Keterangan


Kapasitas bucket Pw 0.93 m2
Faktor bucket Fb 1.10
Faktor efisiensi alat Fa 0.83
Faktor konversi (perapihan) Fv 0.97
Waktu siklus: Sedang
- Mengayun 1 T1 0.12 menit
- Meratakan T2 1.00 menit
- Mengayun 2 T3 0.12 menit
Ts1 1.23 menit
Kap. Prod/jam:
=(0.93×1.1×0.83×60)/(0.42×0.7)
=(𝑃𝑤×𝐹_𝑏×𝐹_𝑎×60)/(𝑇_𝑠1×𝐹_𝑣 ) Q1 42.58 m2/jam

Koefisien alat/m3 = 1 : Q1 (E10) 0.0235 jam

2. Upah untuk Site Clearing

Uraian Kode Koefisien Satuan Keterangan


Produksi menentukan : excavator Q1 42.58 m2/jam
Produksi perataan tanah/hari = Tk x Q1 Qt 298.09 m2
Kebutuhan tenaga
- Pekerja P 2.00 orang
- Mandor M 1.00 orang
Koefisien tenaga/m3
- Pekerja = (Tk x P) : Qt (L01) 0.0470 jam
- Mandor = (Tk x M) : Qt (L03) 0.0235 jam
3. Biaya Operasi Alat

Uraian Kode Koefisien Satuan Keterangan


a) Excavator
Bahan Bakar = (12%-15%) x Pwt x Ms H 102,245.00 Rupiah
Operator = (1 orang/jam) x U1 I 21,428.57 Rupiah
Biaya operasi per jam = H + I + J K 123,673.57 Rupiah

V. HARGA SATUAN PEKERJAAN

Pekerjaan Perataan Tanah Biasa (per m3)

Uraian Satuan Koefisien Harga satuan Jumlah Harga


Tenaga

Pekerja jam 0.0470 17,142.86 805.12


Mandor jam 0.0235 20,000.00 469.65
Jumlah harga tenaga 1,274.77

Bahan
Jumlah harga bahan -

Peralatan
Excavator jam 0.0235 359,890.11 8,451.18
Jumlah harga peralatan 8,451.18

Biaya Operasi Peralatan


Excavator jam 0.0235 123,673.57 2,904.18
Jumlah biaya operasi peralatan 2,904.18

Jumlah harga tenaga, bahan, peralatan, dan


operasi peralatan (A+B+C+D) D 12,630.13

Overhead & profit, 15% x D E 1,894.52


Harga satuan pekerjaan (D+E) F 14,524.65 /m2
1 Embankment

1. Harga satuan pekerjaan Embankment 1 m3

I. URAIAN
Uraian Kode Koefisien Satuan Keterangan
Kondisi jalan : baik
Menggunakan alat secara mekanis
Lokasi : P21 - P17
Jarak hauling 2.00 km
Jam kerja efektif per hari Tk 7.00 jam
HSD sewa Excavator 110 HP, Komatsu PC 200-8 359,890.11 jam
Tenaga excavator Pw 110.00 HP
Upah operator excavator U1 21,428.57 Rp/jam
Upah pembantu operator excavator U2 17,142.86 Rp/jam
Bahan bakar solar Ms 7,150.00 Liter

II. URUTAN KERJA

1. Excavator 110 HP, Komatsu PC 200-8

Uraian Kode Koefisien Satuan Keterangan


Kapasitas bucket Pw 0.93 m3
Faktor bucket Fb 1.10
Faktor efisiensi alat Fa 0.83
Faktor konversi (kedalaman <40%) Fv 0.97
Waktu siklus: Ts1 Sedang
- Menggali, meratakan T1 5.00 menit
- Lain - lain (waktu tunda dll) T2 5.00 menit
Ts1 10.00 menit
Kap. Prod/jam:
=(0.93×1.1×0.83×60)/(0.42×0.7)
=(𝑃𝑤×𝐹_𝑏×𝐹_𝑎×60)/(𝑇_𝑠1×𝐹_𝑣 ) Q1 5.25 m3/jam

Koefisien alat/m3 = 1 : Q1 (E10) 0.1904 jam

2. Upah untuk Mobilisasi

Uraian Kode Koefisien Satuan Keterangan


Produksi menentukan : excavator Q1 5.25 m3/jam
Produksi galian/hari = Tk x Q1 Qt 36.76 ton
Kebutuhan tenaga
- Pekerja P 1.00 orang
- Mandor M 1.00 orang
Koefisien tenaga/m3
- Pekerja = (Tk x P) : Qt (L01) 0.1904 jam
- Mandor = (Tk x M) : Qt (L03) 0.1904 jam
3. Biaya Operasi

Uraian Kode Koefisien Satuan Keterangan


a) Excavator
Bahan Bakar = (12%-15%) x Pwt x Ms H 102,245.00 Rupiah
Operator = (1 orang/jam) x U1 I 21,428.57 Rupiah
Pembantu operator = (1 orang/jam) x U2 J 17,142.86 Rupiah
Biaya operasi per jam = H + I + J K 140,816.43 Rupiah

III. HARGA SATUAN PEKERJAAN

Pekerjaan Embankment (per m3)

Uraian Satuan Koefisien Harga satuan Jumlah Harga


Tenaga

Pekerja jam 0.1904 17,142.86 3,264.00


Mandor jam 0.1904 20,000.00 3,808.00
Jumlah harga tenaga 7,072.00

Bahan
Jumlah harga bahan -

Peralatan
Excavator jam 0.1904 350,000.00 66,639.97
Jumlah harga peralatan 66,639.97

Biaya Operasi Peralatan


Excavator jam 0.1904 140,816.43 26,811.44
Jumlah biaya operasi peralatan 26,811.44

Jumlah harga tenaga, bahan, peralatan, dan operasi


peralatan (A+B+C+D) D 100,523.40
2. Dump truck 20 m3
I. URAIAN
Uraian Kode Koefisien Satuan Keterangan
Kondisi jalan : baik
Menggunakan alat secara mekanis
Lokasi : P21 - P17
Jarak hauling 2.00 km
Jam kerja efektif per hari Tk 7.00 jam
Dump truck 20 m3 RpE10 200,000.00 jam
Tenaga dump truck Pw 110.00 HP
Upah driver dump truck U1 17,142.86 Rp/jam
Upah pembantu driver dump truck U2 15,714.29 Rp/jam
Bahan bakar solar Ms 7,150.00 Liter

II. URUTAN KERJA

1. Dump truck 20 m3

Uraian Kode Koefisien Satuan Keterangan


Kapasitas bak Pw 20.00 m3
Faktor koreksi Fb 0.77
Faktor efisiensi alat Fa 0.83
Faktor konversi (kedalaman <40%) Fv 0.97
Waktu siklus: Ts1 Sedang
Kecepatan Isi V1 25.00 km/jam
Kecepatan Kosong V2 35.00 km/jam
Loading T1 1,740.00 detik
Unloading T2 2,100.00 detik

Ts1 65.86 menit


Kap. Prod/jam:
=(0.93×1.1×0.83×60)/(0.42×0.7)
=(𝑃𝑤×𝐹_𝑏×𝐹_𝑎×60)/(𝑇_𝑠1×𝐹_𝑣 ) Q1 12.00 m3/jam

Koefisien alat/m3 = 1 : Q1 (E10) 0.0833 jam

2. Upah untuk Mobilisasi

Uraian Kode Koefisien Satuan Keterangan


Produksi menentukan : dumptruck Q1 12.00 m3/jam
Produksi galian/hari = Tk x Q1 Qt 84.03 ton
Kebutuhan tenaga
- Pekerja P 1.00 orang
- Mandor M 1.00 orang
Koefisien tenaga/m3
- Pekerja = (Tk x P) : Qt (L01) 0.0833 jam
- Mandor = (Tk x M) : Qt (L03) 0.0833 jam
3. Biaya Operasi

Uraian Kode Koefisien Satuan Keterangan


a) Dump truck
Bahan Bakar = (12%-15%) x Pwt x Ms H 102,245.00 Rupiah
Operator = (1 orang/jam) x U1 I 17,142.86 Rupiah
Pembantu operator = (1 orang/jam) x U2 J 15,714.29 Rupiah
Biaya operasi per jam = H + I + J K 135,102.14 Rupiah

IV. HARGA SATUAN PEKERJAAN

Pekerjaan Embankment (per m3)

Uraian Satuan Koefisien Harga satuan Jumlah Harga


Tenaga

Pekerja jam 0.0833 17,142.86 1,428.04


Mandor jam 0.0833 20,000.00 1,666.05
Jumlah harga tenaga 3,094.09

Bahan
Jumlah harga bahan -

Peralatan
Dump truck jam 0.0833 200,000.00 16,660.46
Jumlah harga peralatan 16,660.46

Biaya Operasi Peralatan


Dump truck jam 0.0833 135,102.14 11,254.32
Jumlah biaya operasi peralatan 11,254.32

Jumlah harga tenaga, bahan, peralatan, dan operasi


peralatan (A+B+C+D) D 31,008.87
1 Scaffolding arrengement
1. Harga satuan pekerjaan Scaffolding Arrengment

I. URAIAN
Uraian Kode Koefisien Satuan Keterangan
Upah pekerja Up 17,142.86 Rp/jam
Upah mandor Um 20,000.00 Rp/jam
Jam kerja efektif per hari Tk 7.00 jam
1 set scaffolding terdiri dari:
- Adjustable base Ab 4.00 pcs
- Main frame Mf 2.00 pcs
- Cross brace Cb 2.00 pcs
- Connector pin Cp 4.00 pcs
- Stair St 1.00 pcs
- Catwalk Ct 1.00 pcs

II. URUTAN KERJA


1 Scaffolding disusun setinggi pier head

Uraian Kode Koefisien Satuan Keterangan


Produktivitas tenaga kerja/hari Qt 420.00 set
Kebutuhan tenaga
- Pekerja P 6.00 orang
- Mandor M 1.00 orang
Koefisien tenaga/set
- Pekerja = (Tk x P) : Qt (L01) 0.10 jam
- Mandor = (Tk x M) : Qt (L03) 0.02 jam

III. HARGA SATUAN PEKERJAAN


Pekerjaan Scafolding

Uraian Satuan Koefisien Harga satuan Jumlah Harga


Tenaga

Pekerja jam 0.1000 17,142.86 1,714.29


Mandor jam 0.0167 20,000.00 333.33
Jumlah harga tenaga 2,047.62

Bahan
Jumlah harga bahan -

Peralatan
Excavator
Jumlah harga peralatan -

Biaya Alat Bantu


Adjustable base pcs 4.00 85,000.00 340,000.00
Main frame pcs 2.00 240,000.00 480,000.00
Cross brace pcs 2.00 80,000.00 160,000.00
Connector pin pcs 4.00 15,000.00 60,000.00
Stair pcs 1.00 575,000.00 575,000.00
Catwalk pcs 1.00 375,000.00 375,000.00
Jumlah biaya operasi peralatan 1,990,000.00
Jumlah harga tenaga, bahan, peralatan, dan operasi
peralatan (A+B+C+D) 1,992,047.62
4 Pekerjaan Demolish menggunakan giant breaker 1 m3
1. Harga satuan pekerjaan Demolish menggunakan giant breaker 1 m3

I. URAIAN
Uraian Kode Koefisien Satuan Keterangan
Kondisi jalan : baik
Menggunakan alat secara mekanis
Lokasi : P21 - P17
Jam kerja efektif per hari Tk 7.00 jam
Excavator / Giant Breaker RpE10 359,890.11 jam
Tenaga Giant Breaker Pw 110.00 HP
Upah operator Giant Breaker U1 21,428.57 Rp/jam
Upah pembantu operator Giant Breaker U2 17,142.86 Rp/jam
Bahan bakar solar Ms 7,150.00 Liter

II. URUTAN KERJA


1. Giant Breaker

Uraian Kode Koefisien Satuan Keterangan


Kapasitas Produksi Cp 1.19 m3/jam
Faktor efisiensi alat Fa 0.83
Waktu siklus: Ts1 30.00 menit

Kap. Prod/jam:
=(𝐶𝑝×𝐹_𝑎×60)/𝑇_𝑠1 =(20×0.83×60)/420 Q1 1.975 m3/jam

Koefisien alat/m3 = 1 : Q1 (E10) 0.5062 jam

2. Upah untuk Mobilisasi

Uraian Kode Koefisien Satuan Keterangan


Produksi menentukan : Giant Breaker Q1 1.98 m3/jam
Produksi penghancuran/hari = Tk x Q1 Qt 13.83 m3
Kebutuhan tenaga
- Pekerja P 1.00 orang
- Mandor M 1.00 orang
Koefisien tenaga/m3
- Pekerja = (Tk x P) : Qt (L01) 0.5062 jam
- Mandor = (Tk x M) : Qt (L03) 0.5062 jam

3. Biaya Operasi

Uraian Kode Koefisien Satuan Keterangan


a) Giant Breaker
Bahan Bakar = (12%-15%) x Pwt x Ms H 102,245.00 Rupiah
Operator = (1 orang/jam) x U1 I 21,428.57 Rupiah
Biaya operasi per jam = H + I + J K 123,673.57 Rupiah
V. HARGA SATUAN PEKERJAAN
Pekerjaan Demolish Beton (per m3)

Uraian Satuan Koefisien Harga satuan Jumlah Harga


Tenaga

Pekerja jam 0.5062 17,142.86 8,678.17


Mandor jam 0.5062 20,000.00 10,124.53
Jumlah harga tenaga 18,802.70

Bahan
Jumlah harga bahan -

Peralatan
Giant Breaker jam 0.5062 350,000.00 177,179.31
Jumlah harga peralatan 177,179.31

Biaya Operasi Peralatan


Giant Breaker jam 0.5062 123,673.57 62,606.85
Jumlah biaya operasi peralatan 62,606.85

Jumlah harga tenaga, bahan, peralatan, dan operasi


peralatan (A+B+C+D) D 258,588.86
1 Cutting of PH Rebars 1 m3
1. Harga satuan pekerjaanCutting of Pier Head Rebar 1 m3

I. URAIAN
Uraian Kode Koefisien Satuan Keterangan
Kondisi jalan : baik
Menggunakan alat secara mekanis
Lokasi : P21 - P17
Jam kerja efektif per hari Tk 7.00 jam
Sky Lift 323,076.92 jam
Sky Lift 100.00 Hp
Hrga Operator Sky Lift 20,000.00 Rp/jam
Genset 60 Kva 180.00 Hp
Harga Genset jam 340,659.00 Rp/jam
Bahan bakar solar Ms 7,150.00 Liter

II. URUTAN KERJA


1. Genset

Uraian Kode Koefisien Satuan Keterangan


Kapasitas Produksi Genset = produktivitas pemotongan/jam Cp 3.89 m3/jam
Faktor efisiensi alat Fa 0.80
Waktu siklus: Ts1 60.00 menit

Kap. Prod/jam:
=(𝐶𝑝×𝐹_𝑎×60)/𝑇_𝑠1 Q1 3.11 m3/jam

Koefisien alat/m2 = 1 : Q1 (E10) 0.3215 jam


Sky Lift Cp 3.89 m3/jam
Faktor efisiensi alat Fa 0.80
Waktu siklus: Ts1 60.00 menit
Kap. Prod/jam:
=(𝐶𝑝×𝐹_𝑎×60)/𝑇_𝑠1 Q1 3.11 m3/jam

Koefisien alat/m2 = 1 : Q1 (E10) 0.3215 jam

2. Upah untuk Mobilisasi

Uraian Kode Koefisien Satuan Keterangan


Produksi menentukan : Sky Lift Q1 3.11 m3/jam
Produksi pemotongan/hari = Tk x Q1 Qt 21.77 m3
Kebutuhan tenaga
- Pekerja P 1.00 orang
- Mandor M - orang
Koefisien tenaga/m3
- Pekerja = (Tk x P) : Qt (L01) 0.3215 jam
- Mandor = (Tk x M) : Qt (L03) - jam
3. Biaya Operasi

Uraian Kode Koefisien Satuan Keterangan


a) Sky Lift
Bahan Bakar = (12%-15%) x Pwt x Ms H 92,950.00 Rupiah
Operator = (1 orang/jam) x U1 I 140,000.00 Rupiah
Biaya operasi per jam = H + I + J K 232,950.00 Rupiah
b) Genset 60 Kva
Bahan Bakar = (12%-15%) x Pwt x Ms H 167,310.00 Rupiah
Operator = (1 orang/jam) x U1 I - Rupiah
Biaya operasi per jam = H + I + J K 167,310.00 Rupiah

V. HARGA SATUAN PEKERJAAN


Pekerjaan Pemotongan Besi (per m3)

Uraian Satuan Koefisien Harga satuan Jumlah Harga


Tenaga

Pekerja jam 0.3215 17,142.86 5,512.27


Mandor jam - 20,000.00 -
Jumlah harga tenaga 5,512.27

Bahan
Jumlah harga bahan -

Peralatan
Sky Lift jam 0.3215 323,076.92 103,885.16
Genset jam 0.3215 340,659.00 109,538.67
Jumlah harga peralatan 213,423.83

Biaya Operasi Peralatan


Sky Lift jam 0.3215 232,950.00 74,904.91
Genset jam 0.3215 167,310.00 53,798.42
Jumlah biaya operasi peralatan 128,703.33

Jumlah harga tenaga, bahan, peralatan, dan operasi peralatan


(A+B+C+D) D 184,302.35
I. URAIAN
Uraian Kode Koefisien Satuan Keterangan
Kondisi jalan : baik
Menggunakan alat secara mekanis
Lokasi : P21 - P17
Jarak hauling 1.00 km
Jam kerja efektif per hari Tk 7.00 jam
Dump truck 20 m3 RpE10 200,000.00 jam
Tenaga dump truck Pw 110.00 HP
Upah driver dump truck U1 17,142.86 Rp/jam
Upah pembantu driver dump truck U2 15,714.29 Rp/jam
Bahan bakar solar Ms 7,150.00 Liter

II. URUTAN KERJA

1. Dump truck 20 m3

Uraian Kode Koefisien Satuan Keterangan


Kapasitas bak Pw 20.00 m3
Faktor koreksi Fb 0.77
Faktor efisiensi alat Fa 0.83
Faktor konversi (kedalaman <40%) Fv 0.97
Waktu siklus: Ts1 Sedang
Kecepatan Isi V1 25.00 km/jam
Kecepatan Kosong V2 35.00 km/jam
Loading T1 1,740.00 detik
Unloading T2 2,100.00 detik

Ts1 65.86 menit


Kap. Prod/jam:
=(0.93×1.1×0.83×60)/(0.42×0.7)
=(𝑃𝑤×𝐹_𝑏×𝐹_𝑎×60)/(𝑇_𝑠1×𝐹_𝑣 ) Q1 12.00 m3/jam

Koefisien alat/m3 = 1 : Q1 (E10) 0.0833 jam

2. Upah untuk Mobilisasi

Uraian Kode Koefisien Satuan Keterangan


Produksi menentukan : dumptruck Q1 12.00 m3/jam
Produksi galian/hari = Tk x Q1 Qt 84.03 ton
Kebutuhan tenaga
- Pekerja P 1.00 orang
- Mandor M 1.00 orang
Koefisien tenaga/m3
- Pekerja = (Tk x P) : Qt (L01) 0.0833 jam
- Mandor = (Tk x M) : Qt (L03) 0.0833 jam

3. Biaya Operasi

Uraian Kode Koefisien Satuan Keterangan


a) Trailer
Bahan Bakar = (12%-15%) x Pwt x Ms H 102,245.00 Rupiah
Operator = (1 orang/jam) x U1 I 17,142.86 Rupiah
Pembantu operator = (1 orang/jam) x U2 J 15,714.29 Rupiah
Biaya operasi per jam = H + I + J K 135,102.14 Rupiah

V. HARGA SATUAN PEKERJAAN


Pekerjaan Perataan Tanah Biasa (per m3)

Uraian Satuan Koefisien Harga satuan Jumlah Harga


Tenaga

Pekerja jam 0.0833 17,142.86 1,428.04


Mandor jam 0.0833 20,000.00 1,666.05
Jumlah harga tenaga 3,094.09

Bahan
Jumlah harga bahan -

Peralatan
Excavator jam 0.0833 359,890.11 29,979.68
Jumlah harga peralatan 29,979.68

Biaya Operasi Peralatan


Excavator jam 0.0833 123,673.57 10,302.29
Jumlah biaya operasi peralatan 10,302.29

Jumlah harga tenaga, bahan, peralatan, dan operasi


peralatan (A+B+C+D) D 43,376.06

total harga pekerjaan removal of embankment 66,260.23 /m3


6 Removal of embankment
Harga satuan pekerjaan removal of embankment 1 m3

I. URAIAN
Uraian Kode Koefisien Satuan Keterangan
Kondisi jalan : baik
Menggunakan alat secara mekanis
Lokasi : P21 - P17
Jarak hauling 2.00 km
Jam kerja efektif per hari Tk 7.00 jam
HSD sewa Excavator 110 HP, Komatsu PC 200-8 RpE10 359,890.11 jam
Tenaga excavator Pw 110.00 HP
Upah operator excavator U1 21,428.57 Rp/jam
Upah pembantu operator excavator U2 17,142.86 Rp/jam
Bahan bakar solar Ms 7,150.00 Liter

II. URUTAN KERJA


1. Excavator 110 HP, Komatsu PC 200-8

Uraian Kode Koefisien Satuan Keterangan


Kapasitas bucket Pw 0.93 m3
Faktor bucket Fb 1.10
Faktor efisiensi alat Fa 0.83
Faktor konversi (kedalaman <40%) Fv 0.97
Waktu siklus: Ts1 Sedang
- Waktu mengayun T1 0.01 menit
- Waktu menggali T2 2.00 menit
- Waktu mengayun penuh muatan T3 0.13 menit
- Waktu menuang ke dump truck T4 0.17 menit
Ts1 2.31 menit
Kap. Prod/jam:
=(0.93×1.1×0.83×60)/(0.42×0.7)
=(𝑃𝑤×𝐹_𝑏×𝐹_𝑎×60)/(𝑇_𝑠1×𝐹_𝑣 ) Q1 22.75 m3/jam

Koefisien alat/m3 = 1 : Q1 (E10) 0.0439 jam

2. Upah untuk Excavator

Uraian Kode Koefisien Satuan Keterangan


Produksi menentukan : excavator Q1 22.75 m3/jam
Produksi galian/hari = Tk x Q1 Qt 159.28 ton
Kebutuhan tenaga
- Pekerja P 1.00 orang
- Mandor M 1.00 orang
Koefisien tenaga/m3
- Pekerja = (Tk x P) : Qt (L01) 0.0439 jam
- Mandor = (Tk x M) : Qt (L03) 0.0439 jam
3. Biaya Operasi

Uraian Kode Koefisien Satuan Keterangan


a) Excavator
Bahan Bakar = (12%-15%) x Pwt x Ms H 102,245.00 Rupiah
Operator = (1 orang/jam) x U1 I 21,428.57 Rupiah
Biaya operasi per jam = H + I + J K 123,673.57 Rupiah

IV. HARGA SATUAN PEKERJAAN


Pekerjaan galian Tanah Biasa dengan excavator (per m3)

Uraian Satuan Koefisien Harga satuan Jumlah Harga


Tenaga

Pekerja jam 0.0439 17,142.86 753.40


Mandor jam 0.0439 20,000.00 878.97
Jumlah harga tenaga 1,632.37

Bahan
Jumlah harga bahan -

Peralatan
Excavator jam 0.0439 359,890.11 15,816.56
Jumlah harga peralatan 15,816.56

Biaya Operasi Peralatan


Excavator jam 0.0439 123,673.57 5,435.24
Jumlah biaya operasi peralatan 5,435.24

Jumlah harga tenaga, bahan, peralatan, dan operasi


peralatan (A+B+C+D) D 22,884.17
Pekerjaan Demolish Pier head dengan Giant Breaker
Lokasi yang
No Uraian Pekerjaan Volume Satuan Harga Satuan ditinjau Total Harga
1 Site Preparation 328 m2 14,524.65 5.00 23,820,430.19
2 embankment 319.113 m3 131,532.27 5.00 209,868,291.07
3 Scaffolding arrangement for protection sheet -
- Scafolding 420 set 1,992,047.62 1.00 836,660,000.00
- Protection Sheet 1374 m2 10,000.00 5.00 68,700,000.00
4 PH demolition by giant breaker 106.56 m3 258,588.86 5.00 137,776,143.13
5 Cutting of PH Rebars by sky lift 106.56 m3 184,302.35 5.00 98,196,292.64
6 Dismanting of scaffolding 420 set 2,047.62 5.00 4,300,000.00
7 Removal of embankment 319.113 m3 131,532.27 5.00 209,868,291.07

Jumlah 1,589,189,448.11
1 Embankment

1. Harga satuan pekerjaan Remove Embankment 1 m3

I. URAIAN
Uraian Kode Koefisien Satuan Keterangan
Kondisi jalan : baik
Menggunakan alat secara mekanis
Lokasi : P21 - P17
Jarak hauling 2.00 km
Jam kerja efektif per hari Tk 7.00 jam
HSD sewa Excavator 110 HP, Komatsu PC 200-8 359,890.11 jam
Tenaga excavator Pw 110.00 HP
Upah operator excavator U1 21,428.57 Rp/jam
Upah pembantu operator excavator U2 17,142.86 Rp/jam
Bahan bakar solar Ms 7,150.00 Liter

II. URUTAN KERJA

1. Excavator 110 HP, Komatsu PC 200-8

Uraian Kode Koefisien Satuan Keterangan


Kapasitas bucket Pw 0.93 m3
Faktor bucket Fb 1.10
Faktor efisiensi alat Fa 0.83
Faktor konversi (kedalaman <40%) Fv 0.97
Waktu siklus: Ts1 Sedang
- Menggali, meratakan T1 5.00 menit
- Lain - lain (waktu tunda dll) T2 5.00 menit
Ts1 10.00 menit
Kap. Prod/jam:
=(0.93×1.1×0.83×60)/(0.42×0.7)
=(𝑃𝑤×𝐹_𝑏×𝐹_𝑎×60)/(𝑇_𝑠1×𝐹_𝑣 ) Q1 5.25 m3/jam

Koefisien alat/m3 = 1 : Q1 (E10) 0.1904 jam

2. Upah untuk Mobilisasi

Uraian Kode Koefisien Satuan Keterangan


Produksi menentukan : excavator Q1 5.25 m3/jam
Produksi galian/hari = Tk x Q1 Qt 36.76 ton
Kebutuhan tenaga
- Pekerja P 1.00 orang
- Mandor M 1.00 orang
Koefisien tenaga/m3
- Pekerja = (Tk x P) : Qt (L01) 0.1904 jam
- Mandor = (Tk x M) : Qt (L03) 0.1904 jam
3. Biaya Operasi

Uraian Kode Koefisien Satuan Keterangan


a) Excavator
Bahan Bakar = (12%-15%) x Pwt x Ms H 102,245.00 Rupiah
Operator = (1 orang/jam) x U1 I 21,428.57 Rupiah
Pembantu operator = (1 orang/jam) x U2 J 17,142.86 Rupiah
Biaya operasi per jam = H + I + J K 140,816.43 Rupiah

III. HARGA SATUAN PEKERJAAN

Pekerjaan Removal Embankment (per m3)

Uraian Satuan Koefisien Harga satuan Jumlah Harga


Tenaga

Pekerja jam 0.1904 17,142.86 3,264.00


Mandor jam 0.1904 20,000.00 3,808.00
Jumlah harga tenaga 7,072.00

Bahan
Jumlah harga bahan -

Peralatan
Excavator jam 0.1904 350,000.00 66,639.97
Jumlah harga peralatan 66,639.97

Biaya Operasi Peralatan


Excavator jam 0.1904 140,816.43 26,811.44
Jumlah biaya operasi peralatan 26,811.44

Jumlah harga tenaga, bahan, peralatan, dan operasi


peralatan (A+B+C+D) D 100,523.40
2. Dump truck 20 m3
I. URAIAN
Uraian Kode Koefisien Satuan Keterangan
Kondisi jalan : baik
Menggunakan alat secara mekanis
Lokasi : P21 - P17
Jarak hauling 2.00 km
Jam kerja efektif per hari Tk 7.00 jam
Dump truck 20 m3 RpE10 200,000.00 jam
Tenaga dump truck Pw 110.00 HP
Upah driver dump truck U1 17,142.86 Rp/jam
Upah pembantu driver dump truck U2 15,714.29 Rp/jam
Bahan bakar solar Ms 7,150.00 Liter

II. URUTAN KERJA

1. Dump truck 20 m3

Uraian Kode Koefisien Satuan Keterangan


Kapasitas bak Pw 20.00 m3
Faktor koreksi Fb 0.77
Faktor efisiensi alat Fa 0.83
Faktor konversi (kedalaman <40%) Fv 0.97
Waktu siklus: Ts1 Sedang
Kecepatan Isi V1 25.00 km/jam
Kecepatan Kosong V2 35.00 km/jam
Loading T1 1,740.00 detik
Unloading T2 2,100.00 detik

Ts1 65.86 menit


Kap. Prod/jam:
=(0.93×1.1×0.83×60)/(0.42×0.7)
=(𝑃𝑤×𝐹_𝑏×𝐹_𝑎×60)/(𝑇_𝑠1×𝐹_𝑣 ) Q1 12.00 m3/jam

Koefisien alat/m3 = 1 : Q1 (E10) 0.0833 jam

2. Upah untuk Mobilisasi

Uraian Kode Koefisien Satuan Keterangan


Produksi menentukan : dumptruck Q1 12.00 m3/jam
Produksi galian/hari = Tk x Q1 Qt 84.03 ton
Kebutuhan tenaga
- Pekerja P 1.00 orang
- Mandor M 1.00 orang
Koefisien tenaga/m3
- Pekerja = (Tk x P) : Qt (L01) 0.0833 jam
- Mandor = (Tk x M) : Qt (L03) 0.0833 jam
3. Biaya Operasi

Uraian Kode Koefisien Satuan Keterangan


a) Dump truck
Bahan Bakar = (12%-15%) x Pwt x Ms H 102,245.00 Rupiah
Operator = (1 orang/jam) x U1 I 17,142.86 Rupiah
Pembantu operator = (1 orang/jam) x U2 J 15,714.29 Rupiah
Biaya operasi per jam = H + I + J K 135,102.14 Rupiah

IV. HARGA SATUAN PEKERJAAN

Pekerjaan Removal Embankment (per m3)

Uraian Satuan Koefisien Harga satuan Jumlah Harga


Tenaga

Pekerja jam 0.0833 17,142.86 1,428.04


Mandor jam 0.0833 20,000.00 1,666.05
Jumlah harga tenaga 3,094.09

Bahan
Jumlah harga bahan -

Peralatan
Dump truck jam 0.0833 200,000.00 16,660.46
Jumlah harga peralatan 16,660.46

Biaya Operasi Peralatan


Dump truck jam 0.0833 135,102.14 11,254.32
Jumlah biaya operasi peralatan 11,254.32

Jumlah harga tenaga, bahan, peralatan, dan operasi


peralatan (A+B+C+D) D 31,008.87