10.01 (2b) Structural Concrete Class A-2-2 (PC Pier Heads of Y-Type Piers) PostTension M3
10.01 (2c) Structural Concrete Class A-2-3 (PC Pier Heads of T-Type Piers) Post Tension M3
10.01 (2d) Structural Concrete Class A-2-4 (PC Pier Heads of Portal Piers) Post Tension M3
10.01 (3a) Structural Concrete Class B-1-1a (RC Deck Slabs of PC U-Girders) M3
10.01 (3b) Structural Concrete Class B-1-1b (RC Deck Slabs of Steel Box Girders) M3
10.01 (4) Structural Concrete Class B-1-2 (Diaphragms of PC U-Girders) M3
10.01 (5) Structural Concrete Class B-1-3 (RC Pier Heads 2-Pier) M3
10.01 (6a) Structural Concrete Class B-1-4a (RC Columns of 2-Pier) M3
10.01 (6b) Structural Concrete Class B-1-4b (RC Columns of Y-Type Piers) M3
10.01 (6c) Structural Concrete Class B-1-4c (RC Columns of T-Type Piers) M3
10.01 (6d) Structural Concrete Class B-1-4d (RC Columns of Portal Piers) M3
10.02 (2)b Column kg
10.02 (2)c Pier Head kg
TOTAL
34060817046.2473
179,407,616,777
175
375,000,000
3,750,000,000
222,810,000 11,808,930,000
16845408150.0176
150,930,217,289
28,477,399,488
Q'tty Unit Price (IDR) Amount (IDR)
saving 28,799,288,829
3,500,000,000
Demolish 34,060,817,046
179,407,616,777
17.25
1040000000000
SUMMARY WORK OF REBAR
Vol Vol
NO RC Column 2-Pier Type NO RC Column Y - Type Pier
(m3) (m3)
1 P1R 32.912 1 P12 137.373
2 P1L 32.912 2 P13 137.370
3 P2R 45.144 3 P14 137.346
4 P2L 41.541 4 P15 137.338
5 P3R 55.445 5 P16 147.964
6 P3L 52.077 6 P17 153.327
7 P4R 55.404 7 P18 168.666
8 P4L 55.453 8 P19 147.961
9 P5R 62.173 9 P20 148.003
10 P5L 62.151 10 P21 147.909
11 P6R 68.911 11 P22 153.294
12 P6L 68.904 12 P23 153.262
13 P7R 79.008 13 P24 153.361
14 P7L 72.271 14 P25 153.788
15 P8R 82.381 15 P26 154.227
16 P8L 79.013 16 P27 154.647
17 P9R 82.381 17 P28 149.582
18 P9L 79.013 18 P29 149.792
19 P10R 82.374 19 P32 143.225
20 P10L 79.007 22 P36-1 155.078
21 P11R 82.374 23 P36-2 25.973
22 P11L 82.374 24 P48 148.158
23 P33R 181.466 25 P54 206.107
24 P33L 150.370 26 P55 187.013
25 P34R 181.466 27 P56 222.881
26 P34L 144.448 TOTAL 3773.645
27 P35R 165.625
28 P35L 125.271 Vol
NO RC Column Portal - Type Pier
29 P37L 145.409 (m3)
30 P37R 175.845 1 P30R 61.113
31 P38L 145.409 2 P50 73.426
32 P38R 182.507 3 P53L 139.038
TOTAL 3031.039 4 P53R 58.401
TOTAL 331.978
Vol Vol
NO RC 2-Pier - Pier Head NO RC Y-Pier - Pier Head
(m3) (m3)
1 P1L 98.701 1 P12 216.926
2 P1R 98.701 2 P13 216.926
3 P2L 98.701 3 P14 216.926
4 P2R 98.701 4 P15 216.926
5 P3L 98.701 5 P16 216.926
6 P3R 98.701 6 P17 216.926
7 P4L 98.889 7 P18 216.926
8 P4R 98.889 8 P19 216.926
9 P5L 98.449 9 P20 216.926
10 P5R 98.889 10 P21 216.926
11 P6L 98.136 11 P22 216.926
12 P6R 98.889 12 P23 216.926
13 P7L 98.532 13 P24 282.750
14 P7R 98.889 14 P25 291.172
15 P8L 98.460 15 P26 303.918
16 P8R 98.865 16 P27 303.918
17 P9L 98.460 17 P28 303.918
18 P9R 98.865 18 P29 303.918
19 P10L 98.460 19 P32 471.421
20 P10R 98.865 20 P36-1 323.156
21 P11L 98.460 21 P36-2 323.156
22 P11R 98.865 22 P48 471.421
23 P33L 104.047 23 P54 323.156
24 P33R 120.162 24 P55 326.899
25 P34L 104.047 25 P56 383.150
26 P34R 120.162 TOTAL 7015.065
27 P35L 48.875
28 P35R 56.755 Vol
NO RC Portal-Pier - Pier Head
29 P37L 100.157 (m3)
30 P37R 116.753 1 P30 247.915
31 P38L 100.157 2 P53 280.862
32 P38R 116.753 TOTAL 528.777
TOTAL 3158.936
Vol
NO Abutment
(m3)
1 A1R 60.000
2 A1L 65.000
TOTAL 125.000