Curve S - Al
Curve S - Al
140
6 Rebar Concrete
140
60
10 Concrete
MAN POWER LOADING PLAN
11 Sand
320
ENGINEERING. PROCUREMENT AND CONSTRUCTION (EPC)
12 Fender Rubber
300
INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
Director
13 Soil for fill up
795
Gabriel D. Handrianto
0
Scale
Page 2 of 2
Page 1 of 2
EQUIPMENT LOADING PLAN
Monthly
Day 1 2 3 4 5 6 7
No. Description Total Remarks
Activity Weekly
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
Total 0 0 0 0 0 0 0 0 35 40 35 40 28 32 42 56 49 56 35 40 7 8 7 0 0 0 0 0
Gabriel D. Handrianto
Director
Scale
Page 2 of 2
EQUIPMENT LOADING PLAN
250
225
200
175
150
125
100
75
50
25
0
Days Activities Scale
140 140 140 140 140 140 210 210 60 105 105 105 60 60 60
13 Welding Transformer
8 Water Tank Truck
6 Concrete Vibrator
14 Vibro hammer
5 Generator Set
10 Jack Hammer
11 Trailer 20 ton
3 Dump Truck
1 Beton Mixer
4 Excavator
15 Fork Lift
9 Tamper
2 Crane
Gabriel D. Handrianto
Director
Page 1 of 2
EQUIPMENT LOADING PLAN
Monthly
Day 1 2 3 4 5 6 7
No. Description Total Remarks
Activity Weekly
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
Gabriel D. Handrianto
Director
Scale
Page 3 of 3
MAN POWER LOADING PLAN
TENDER NO.PCJ-3060-CA
500
450
400
350
300
250
200
150
100
50
0
Days Activities Scale
44 46 44 46 44 46 44 46 44 46 44 46 212 238 212 358 317 358 359 406 289 326 184 206 184 166 44 46
10 WEEK 10
11 WEEK 11
12 WEEK 12
13 WEEK 13
14 WEEK 14
15 WEEK 15
16 WEEK 16
17 WEEK 17
18 WEEK 18
19 WEEK 19
20 WEEK 20
21 WEEK 21
22 WEEK 22
23 WEEK 23
24 WEEK 24
25 WEEK 25
26 WEEK 26
27 WEEK 27
28 WEEK 28
2 WEEK 2
3 WEEK 3
4 WEEK 4
5 WEEK 5
6 WEEK 6
7 WEEK 7
8 WEEK 8
9 WEEK 9
1 WEEK1
Gabriel D. Handrianto
Director
Page 2 of 3
MAN POWER LOADING PLAN
TENDER NO.PCJ-3060-CA
900
800
700
600
500
400
300
200
100
0
Days Activities Scale
140 140 140 140 140 140 210 210 60 105 105 105 60 60 60 60 315 320 300 795 210 210 420
Procurement Manager
Construction Manager
Engineering Manager
Project Coordinator
HSE Coordinator
16 Craner Operator
13 Quality Control
15 Administration
HSE Manager
Civil Engineer
20 Civil Worker
12 HSE Officer
19 Piling Crew
Supervisor
Draftman
17 Operator
10 Foremen
11 Surveyor
Logistic
22 Welder
18 Driver
23 Helper
21 Fitter
14
1
Gabriel D. Handrianto
Director
Page 1 of 3
MAN POWER LOADING PLAN
Monthly
Day 1 2 3 4 5 6 7
No. Description Total Remarks
Activity Weekly
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
Total 44 46 44 46 44 46 44 46 44 46 44 46 212 238 212 358 317 358 359 406 289 326 184 206 184 166 44 46
Gabriel D. Handrianto
Director
Scale
LIST OF PROPOSED EQUIPMENTS / TOOLS
Gabriel D. Handrianto
Director
TIME SCHEDULE
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA ]
Monthly
Weight 1 2 3 4 5 6 7
Scale
No. Description Unit Qty Factor Weekly
(%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
Daily
(1 - 7) (8 - 15) (16 - 22) (23 - 30) (1 - 7) (8 - 15) (16 - 22) (23 - 30) (1 - 7) (8 - 15) (16 - 22) (23 - 30) (1 - 7) (8 - 15) (16 - 22) (23 - 30) (1 - 7) (8 - 15) (16 - 22) (23 - 30) (1 - 7) (8 - 15) (16 - 22) (23 - 30) (1 - 7) (8 - 15) (16 - 22) (23 - 30)
MOBILIZATION & DEMOBILIZATION Ls 1.00 2.791% 0.233% 0.233% 0.233% 0.233% 0.233% 0.233% 0.233% 0.233% 0.116% 0.349% 0.349% 0.116%
PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.714% 0.143% 0.143% 0.143% 0.143% 0.143%
PREPARATION WORK
a. Clean up area m2 1,237.50 0.062% 0.062%
b. Install Bowplank m' 134.00 0.091% 0.091%
STRUCTURE WORK
PROCUREMENT
a. Supply Sheet Pile W-450 A-1000 jt 67.00 23.159% 1.447% 1.447% 10.132% 10.132%
b. Supply Piling Steel Pipe Dia. 12" THK (anchor pilling) jt 30.00 7.825% 0.245% 0.245% 0.245% 0.245% 1.712% 1.712% 1.712% 1.712%
c. Supply Piling Steel Pipe Dia. 12" THK (mooring bollards pilling) jt 36.00 9.390% 0.293% 0.293% 0.293% 0.293% 2.054% 2.054% 2.054% 2.054%
d. Supply Piling Steel Pipe Dia. 12" THK (fender pilling) jt 18.00 4.695% 0.147% 0.147% 0.147% 0.147% 1.027% 1.027% 1.027% 1.027%
e. Steel Pile ø 18" ASTM A 252 jt 1.00 0.284% 0.009% 0.009% 0.009% 0.009% 0.062% 0.062% 0.062% 0.062%
f. Rebar Concrete kg 12,322.58 4.842% 1.211% 1.211% 1.211% 1.211%
g. Galvanized Sling ø 1 1/4" m' 311.65 0.450% 0.113% 0.113% 0.113% 0.113%
h. Galvanized Clamp ø 1 1/4" crossby clips G-450 ea 552.00 0.149% 0.037% 0.037% 0.037% 0.037%
i. Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145 ea 45.00 0.336% 0.084% 0.084% 0.084% 0.084%
j. Concrete m3 111.41 2.213% 0.553% 0.553% 0.553% 0.553%
k. Sand m3 293.04 0.760% 0.190% 0.190% 0.190% 0.190%
l. Fender Rubber ea 8.00 1.412% 0.706% 0.706%
m. Soil for fill up m3 679.05 0.615% 0.615%
CONSTRUCTION 0.32
A. PILING SHEET PILE AND STEEL PILE
a. Supply Sheet Pile (W-450 A -1000) jt 67.00 19.950% 4.987% 4.987% 4.987% 4.987%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.767% 1.44% 1.44% 1.44% 1.44%
A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.066% 0.066%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.041% 0.041%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.273% 0.09% 0.09% 0.09%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.083% 0.083%
e. Install Formwork for Mooring Bollard m2 14.40 0.026% 0.026%
C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.061% 0.061%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.034% 0.034%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.065% 0.065%
D. Install Rebar
a. Rebar for Deadment D16 (400/400) kg 647.81 0.109% 0.036% 0.036% 0.036%
b. Rebar for Deadment Ø8 (400/400) kg 175.28 0.030% 0.010% 0.010% 0.010%
c. Rebar for Pile Cap D16 (800/800) kg 1,527.34 0.257% 0.086% 0.086% 0.086%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.090% 0.030% 0.030% 0.030%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.011% 0.004% 0.004% 0.004%
f. Rebar for Capping Beam D16 (750/400) kg 3,423.98 0.577% 0.192% 0.192% 0.192%
g. Rebar for Capping Beam Ø8 (750/400) kg 692.01 0.117% 0.039% 0.039% 0.039%
h. Rebar for Rubber Fender Beam D16 (800/2500) kg 1,260.11 0.212% 0.212%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.087% 0.087%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012% 0.012%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.024% 0.024%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.002% 0.002%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.226% 0.226%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.175% 0.175%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.023% 0.023%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.124% 0.124%
E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.643% 0.643%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.212% 0.212%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.480% 0.480%
G. Sand Fill in to the stell pipe 12" 293.04 0.760% 0.253% 0.253% 0.253%
0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.00% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
Total Progress 100.000% 0.233% 0.233% 0.721% 0.721% 0.721% 0.721% 0.477% 0.619% 2.681% 2.528% 11.213% 11.213% 11.297% 11.297% 11.889% 12.120% 3.449% 3.734% 2.608% 3.004% 1.725% 1.718% 1.103% 1.477% 1.289% 0.724% 0.244% 0.244%
Total Cummulative Progress 0.000% 0.233% 0.465% 1.186% 1.906% 2.627% 3.348% 3.824% 4.444% 7.124% 9.652% 20.865% 32.077% 43.374% 54.671% 66.560% 78.681% 82.129% 85.863% 88.471% 91.475% 93.200% 94.918% 96.021% 97.498% 98.787% 99.512% 99.756% 100.000%
Gabriel D. Handrianto
Director
RECAPITULATION
JOB TITLE : ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
LOCATION : GERAGAI
Garbriel D. Handrianto
Director
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC)
INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
a b c d f = (c x d)
A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 35.84 m2 202,330.80 7,251,535.87
b. Install Formwork for Concrete Deadmant 400/400 22.30 m2 202,330.80 4,512,786.16
c. Install Formwork for Concrete Capping Beam 750/400 148.80 m2 202,330.80 30,106,823.04
d. Install Formwork for Concrete Fender 800/2000/2500 45.12 m2 202,330.80 9,129,165.70
e. Install Formwork for Mooring Bollard 14.40 m2 202,330.80 2,913,563.52
Sub Total 53,913,874.29
B. Supply and Install Concrete Sheet Pile Type Corrugated
a. Supply Sheet Pile (W-450 A -1000, L=20 m, W=9,18 ton) 67.0 jt
b. Install Sheet Pile (W-450 A -1000, L=20 m, W=9,18 ton) 67.0 jt 32,866,543.56 2,202,058,418.81
Sub Total 2,202,058,418.81
C. Supply and Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" - 12 MM THK (mooring bollards) 1.0 jt 6,757,428.00 6,757,428.00
e. Install Piling Steel Pipe Dia. 12" - 12 MM THK 28.0 point 22,735,242.09 636,586,778.38
f. Supply & Install Steel Pipe Dia. 18" - 12 MM THK 1.0 jt 3,806,400.00 3,806,400.00
g. Supply & Install Steel Plate 12 MM THK 2.0 sheet 3,584,519.00 7,169,038.00
Sub Total 654,319,644.38
D. Install Rebar
a. Rebar for Deadment D16 (400/400) 647.81 kg 18,589.50 12,042,395.59
b. Rebar for Deadment Ø8 (400/400) 175.28 kg 18,589.50 3,258,315.77
c. Rebar for Pile Cap D16 (800/800) 1,527.34 kg 18,589.50 28,392,519.65
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) 533.00 kg 18,589.50 9,908,268.94
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) 67.54 kg 18,589.50 1,255,582.27
f. Rebar for Capping Beam D16 (750/400) 3,423.98 kg 18,589.50 63,650,018.95
g. Rebar for Capping Beam Ø8 (750/400) 692.01 kg 18,589.50 12,864,195.18
h. Rebar for Rubber Fender Beam D16 (800/2500) 1,260.11 kg 18,589.50 23,424,815.59
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") 518.40 kg 18,589.50 9,636,877.11
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") 69.23 kg 18,589.50 1,286,956.49
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") 140.15 kg 18,589.50 2,605,361.55
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") 14.34 kg 18,589.50 266,642.47
m. Rebar for Mooring Bollards Pile Cap D19 1,339.34 kg 18,589.50 24,897,623.75
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") 1,036.81 kg 18,589.50 19,273,754.21
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") 138.46 kg 18,589.50 2,573,912.97
p. Anchor Bar Ø1" (capping beam and pile cap deadment) 738.77 kg 18,589.50 13,733,306.82
12,322.58 kg Sub Total 229,070,547.31
E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" 311.65 m' 227,857.00 71,011,634.05
b. Galvanized Clamp Ø1--1/4" 552.00 ea 42,428.00 23,420,256.00
c. Galvanized Turnbuckle Eye & Eye 45.00 ea 1,178,571.00 53,035,695.00
Sub Total 147,467,585.05
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC)
INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
a b c d f = (c x d)
TOTAL 11,038,000,000.00
TIME SCHEDULE
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA
]
Monthly
Weight 1 2 3 4 5 6 7
Scale
No. Description Unit Qty Factor Weekly
(%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
Daily
(1 - 7) (8 - 15) (16 - 22) (23 - 30) (1 - 7) (8 - 15) (16 - 22) (23 - 30) (1 - 7) (8 - 15) (16 - 22) (23 - 30) (1 - 7) (8 - 15) (16 - 22) (23 - 30) (1 - 7) (8 - 15) (16 - 22) (23 - 30) (1 - 7) (8 - 15) (16 - 22) (23 - 30) (1 - 7) (8 - 15) (16 - 22) (23 - 30)
MOBILIZATION & DEMOBILIZATION Ls 1.00 2.791% 0.233% 0.233% 0.233% 0.233% 0.233% 0.233% 0.233% 0.233% 0.116% 0.349% 0.349% 0.116%
PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.714% 0.143% 0.143% 0.143% 0.143% 0.143%
PREPARATION WORK
a. Clean up area m2 1,237.50 0.062% 0.062%
b. Install Bowplank m' 134.00 0.091% 0.091%
STRUCTURE WORK
PROCUREMENT
a. Supply Sheet Pile W-450 A-1000 jt 67.00 23.159% 1.447% 1.447% 10.132% 10.132%
b. Supply Piling Steel Pipe Dia. 12" THK (anchor pilling) jt 30.00 7.825% 0.245% 0.245% 0.245% 0.245% 1.712% 1.712% 1.712% 1.712%
c. Supply Piling Steel Pipe Dia. 12" THK (mooring bollards pilling) jt 36.00 9.390% 0.293% 0.293% 0.293% 0.293% 2.054% 2.054% 2.054% 2.054%
d. Supply Piling Steel Pipe Dia. 12" THK (fender pilling) jt 18.00 4.695% 0.147% 0.147% 0.147% 0.147% 1.027% 1.027% 1.027% 1.027%
e. Steel Pile ø 18" ASTM A 252 jt 1.00 0.284% 0.009% 0.009% 0.009% 0.009% 0.062% 0.062% 0.062% 0.062%
f. Rebar Concrete kg 12,322.58 4.842% 1.211% 1.211% 1.211% 1.211%
g. Galvanized Sling ø 1 1/4" m' 311.65 0.450% 0.113% 0.113% 0.113% 0.113%
h. Galvanized Clamp ø 1 1/4" crossby clips G-450 ea 552.00 0.149% 0.037% 0.037% 0.037% 0.037%
i. Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145 ea 45.00 0.336% 0.084% 0.084% 0.084% 0.084%
j. Concrete m3 111.41 2.213% 0.553% 0.553% 0.553% 0.553%
k. Sand m3 293.04 0.760% 0.190% 0.190% 0.190% 0.190%
l. Fender Rubber ea 8.00 1.412% 0.706% 0.706%
m. Soil for fill up m3 679.05 0.615% 0.615%
CONSTRUCTION 0.32
A. PILING SHEET PILE AND STEEL PILE
a. Supply Sheet Pile (W-450 A -1000) jt 67.00 19.950% 4.987% 4.987% 4.987% 4.987%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.767% 1.44% 1.44% 1.44% 1.44%
A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.066% 0.066%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.041% 0.041%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.273% 0.09% 0.09% 0.09%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.083% 0.083%
e. Install Formwork for Mooring Bollard m2 14.40 0.026% 0.026%
C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.061% 0.061%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.034% 0.034%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.065% 0.065%
D. Install Rebar
a. Rebar for Deadment D16 (400/400) kg 647.81 0.109% 0.036% 0.036% 0.036%
b. Rebar for Deadment Ø8 (400/400) kg 175.28 0.030% 0.010% 0.010% 0.010%
c. Rebar for Pile Cap D16 (800/800) kg 1,527.34 0.257% 0.086% 0.086% 0.086%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.090% 0.030% 0.030% 0.030%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.011% 0.004% 0.004% 0.004%
f. Rebar for Capping Beam D16 (750/400) kg 3,423.98 0.577% 0.192% 0.192% 0.192%
g. Rebar for Capping Beam Ø8 (750/400) kg 692.01 0.117% 0.039% 0.039% 0.039%
h. Rebar for Rubber Fender Beam D16 (800/2500) kg 1,260.11 0.212% 0.212%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.087% 0.087%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012% 0.012%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.024% 0.024%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.002% 0.002%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.226% 0.226%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.175% 0.175%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.023% 0.023%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.124% 0.124%
E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.643% 0.643%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.212% 0.212%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.480% 0.480%
G. Sand Fill in to the stell pipe 12" 293.04 0.760% 0.253% 0.253% 0.253%
0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.00% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
Total Progress 100.000% 0.233% 0.233% 0.721% 0.721% 0.721% 0.721% 0.477% 0.619% 2.681% 2.528% 11.213% 11.213% 11.297% 11.297% 11.889% 12.120% 3.449% 3.734% 2.608% 3.004% 1.725% 1.718% 1.103% 1.477% 1.289% 0.724% 0.244% 0.244%
Total Cummulative Progress 0.000% 0.233% 0.465% 1.186% 1.906% 2.627% 3.348% 3.824% 4.444% 7.124% 9.652% 20.865% 32.077% 43.374% 54.671% 66.560% 78.681% 82.129% 85.863% 88.471% 91.475% 93.200% 94.918% 96.021% 97.498% 98.787% 99.512% 99.756% 100.000%
ENINEERING 8.385%
PROCURUMENT 56.131%
CONSTRUCTION 35.483%
TOTAL 100.000%
Attachment "C-3"
Commercial Bid Data Sheets
Page 1 of 2
PROPOSED RATES OF SERVICES
Seluruh nilai dalam Rupiah
All amounts in Indonesia Rupiah
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT
LAGAN STAGING RIVER
3 Cost to arrange Permit for Concrete Sheet Pile Mobilization 78,826,299.64 0.714%
• PERUSAHAAN akan melakukan pembayaran • Upon property documented written request (s)
hanya untuk pekerjaan yang telah diselasaikan from CONTRACTOR, COMPANY may make
mengacu ke ketentuan yang tertera pada progress payments for completed work according
kontrak ini setelah penyelesaian pekerjaan : to the terms of this Agreement once the work progress:
−25% akan dibayarkan jika progress −25% will be paid if progress reaches 25%
mencapai 25% 25%
−50% akan dibayar jika progress −50% will be paid if progress reaches 50%
mencapai 50% 50%
−75% akan dibayar jika progress −75% will be paid if progress reaches 75%
mencapai 75% 75%
−100% akan dibayar jika progress −100% will be paid if progress reaches 100%
mencapai 100% 100%
Tagihan KONTRAKTOR akan dibayarkan jika CONTRACTOR invoices will be paid if progress
progress pekerjaan telah diterima oleh is accepted by COMPANY's
perwakilan PERUSAHAAN. designated representative
Attachment "C-3"
Commercial Bid Data Sheets
Page 2 of 2
• Seluruh biaya peralatan, base camp, tenaga kerja/personil, • All equipment, manpower / personel, materials, mobilization &
barang material, mobilisasi & demobilisasi dan hal-hal lainya demobilization fees and other miscellaneous cost required to complete
yang diperlukan dalam penyelesaian Jasa (tidak termasuk yang the Services (exclude COMAPNY provided) as specified in Exhibit "A",
ditanggung oleh PERUSAHAAN) seperti yang dijelaskan di COMPANY's specification / suply and all CONTRACTOR's responsibilities
dalam Lampiran "A", Spesifikasi PERUSAHAAN dan seluruh as stated in Exhibit "A" there to are included in the total contract value.
tanggung jawab KONTRAKTOR sesuai yang diatur di dalam CONTARCTOR guarantees that there will be no additional charges to
Lampiran "A" adalah sudah termasuk di dalam total nilai complete said Services, other than agreed change order for variance of
keseluruhan kontrak. KONTRAKTOR menjamin bahwa tidak ada work outside the Scope of Services.
biaya tambahan untuk menyelesaikan pekerjaan kecuali adanya
persetujuan perintah perubahan untuk pekerjaan berbeda di
luar lingkup pekerjaan.
• Harga-harga tersebut tidak termasuk Pajak Pertambahan Nilai • The above rates exclude Value Added Tax (VAT).
(PPN).
• Bilamana total Harga Penawaran lebih dari Rp. 2.500.000.000,- • If total of Bid Value more than IDR. 2.500.000.000,- (Two billion five
(Dua miliar lima ratus juta rupiah) atau lebih dari USD. hundred million Indonesian Rupiahs) or more than USD. 250.000,- (Two
250.000,- (Dua ratus lima puluh ribu Dollar Amerika Serikat) hunderd fifty thousand United States Dollar), hen BIDDER must attach
maka PESERTA TENDER harus melampirkan Jaminan the Bid Bond in its Commercial Bid Proposal (Envelope II) in the
Penawaran di dalam Pengajuan Penawaran Harganya (Sampul amounth of which is mentioned in Article 5 page 12 in the Tender
II) sebesar yang disebutkan di Artikel 5 halaman 12 dalam Document.
Dokumen Tender.
The BIDDER hereby certifies that having examined the standard Contract and other documents in these ITB No. PCJ-3047-CA, that proposed
compensation totaling IDR. 4.800.000.000,- (in words, Four Billion Eight Hundred Million Indonesian Rupiahs) have been carefully checked
and submitted as correct and final, representing the BIDDER's commercial proposal and fixed for full term of the Contract.
Materai
GABRIEL D. HANDRIANTO
DIREKTUR
Catatan / Note :
Jika mengajukan diri sebagai Konsorsium maka Surat Penawaran ini harus ditandatangani oleh seluruh anggota Konsorsium yang berwenang.
If bidding as a Consortium, this offering letter must be signed by the entire authorized consortium members.
ENGINEERING, PROCUREMENT AND
]
PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.714% 0.714% 100.000%
CONSTRUCTION 0.32
A. PILING SHEET PILE AND STEEL PILE 31.779%
a. Install Sheet Pile (W-500 A -1000) jt 67.00 19.950% 62.776%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.767% 18.148%
B. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.066% 0.207%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.041% 0.129%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.273% 0.858%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.083% 0.260%
e. Install Formwork for Mooring Bollard m2 14.40 0.026% 0.083%
C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.061% 0.193%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.034% 0.109%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.065% 0.204%
D. Install Rebar
a. Rebar for Deadment D16 (400/400) kg 647.81 0.109% 0.343%
b. Rebar for Deadment Ø8 (400/400) kg 175.28 0.030% 0.093%
c. Rebar for Pile Cap D16 (800/800) kg 1,527.34 0.257% 0.809%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.090% 0.282%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.011% 0.036%
f. Rebar for Capping Beam D16 (750/400) kg 3,423.98 0.577% 1.815%
g. Rebar for Capping Beam Ø8 (750/400) kg 692.01 0.117% 0.367%
h. Rebar for Rubber Fender Beam D16 (800/2500) kg 1,260.11 0.212% 0.668%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.087% 0.275%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012% 0.037%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.024% 0.074%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.002% 0.008%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.226% 0.710%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.175% 0.549%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.023% 0.073%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.124% 0.392%
E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.643% 2.024%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.212% 0.668%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.480% 1.512%
Monthly
Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20
Weekly
No. Description Unit Qty Weight Factor (%) Remark
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Daily
(5 - 11) (12 - 18) (19 - 25) (26 - 02) (3 - 9) (4 - 16) (17 - 23) (24 - 30) (31 - 6) (7 - 13) (14 - 20) (21 - 27) (28 - 4) (5 - 11) (12 - 18) (19 - 25) (26 - 1) (2 - 8) (09 - 15) (16 - 22) (23 - 29) (30 - 05) (06 - 12) (13 - 19) (20 - 26) (27 - 04) (05 - 11) (12 - 18) (19 -25) (26 - 1) (2 - 5)
MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0.126% 0.126% 0.126% 0.126% 0.126% 0.126% 0.126% 0.126% 0.063% 0.189% 0.189% 0.063%
PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0.092% 0.092% 0.092% 0.092% 0.092%
CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 5.179% 5.179% 5.179% 5.179%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 2.99% 2.99%
B. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0.034% 0.034%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0.021% 0.021%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0.142% 0.142%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0.043% 0.043%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0.014% 0.014%
C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0.064%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0.036%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0.067%
D. Install Rebar
a. Rebar for Deadment D16 (400/400) kg 647.81 0.113% 0.038% 0.038% 0.038%
b. Rebar for Deadment Ø8 (400/400) kg 175.28 0.031% 0.010% 0.010% 0.010%
c. Rebar for Pile Cap D16 (800/800) kg 1,527.34 0.267% 0.067% 0.067% 0.067% 0.067%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.093% 0.031% 0.031% 0.031%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.012% 0.012%
f. Rebar for Capping Beam D16 (750/400) kg 3,423.98 0.599% 0.120% 0.120% 0.120% 0.120% 0.120%
g. Rebar for Capping Beam Ø8 (750/400) kg 692.01 0.121% 0.024% 0.024% 0.024% 0.024% 0.024%
h. Rebar for Rubber Fender Beam D16 (800/2500) kg 1,260.11 0.220% 0.073% 0.073% 0.073%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.091% 0.045% 0.045%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012% 0.012%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.025% 0.025%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.003% 0.003%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.234% 0.117% 0.117%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.181% 0.091% 0.091%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.024% 0.024%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.129% 0.065% 0.065%
E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0.668%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0.220%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0.499%
G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0.395% 0.395%
Total Progress 100.000% 100.000% 0.207% 0.207% 0.207% 0.207% 0.124% 0.124% 0.201% 0.124% 2.654% 2.780% 2.832% 2.872% 9.890% 9.890% 13.067% 13.067% 7.197% 7.071% 5.566% 5.633% 3.901% 4.267% 2.213% 1.951% 1.789% 1.127% 0.332% 0.249% 0.166% 0.066% 0.017%
Total Cummulative Progress 0.000% 0.207% 0.415% 0.622% 0.830% 0.954% 1.078% 1.279% 1.404% 4.058% 6.837% 9.669% 12.541% 22.431% 32.322% 45.389% 58.456% 65.653% 72.724% 78.290% 83.923% 87.823% 92.090% 94.303% 96.254% 98.044% 99.170% 99.502% 99.751% 99.917% 99.983% 100.000%
Monthly
Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20
Weekly
No. Description Unit Qty Weight Factor (%) Remark
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
Daily
(5 - 11) (12-18) (19-26) (27-04) (5-11) (12-19) (20-27) (28-04) (05-11) (12-18) (19-26) (27-04) (05-11) (12-19) (20-27) (28-04) (05-11) (12-19) (20-27) (28-04) (05-11) (12-18) (19-25) (26-04) (05-11) (12-19) (20-27) (28-04)
PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0.229% 0.229%
CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 5.179% 5.179% 5.179% 5.179%
b. Install Piling Steel Pipe Dia. 12 3/4" THK point 28.00 5.989% 2.99% 2.99%
B. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0.034% 0.034%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0.021% 0.021%
c. Install Formwork for Concrete Capping Beam 1000/500 m2 148.80 0.283% 0.142% 0.142%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0.043% 0.043%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0.014% 0.014%
C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0.064%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0.036%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0.067%
E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling ɸ1 - 3/4 m' 311.65 0.668% 0.668%
b. Galvanized Sling ɸ1 - 3/4 ea 552.00 0.220% 0.220%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0.499%
G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0.592% 0.197%
Total Progress 100.000% 100.000% 0.207% 0.207% 0.207% 0.332% 0.124% 0.124% 0.201% 0.249% 2.654% 2.706% 2.654% 2.654% 2.654% 2.654% 3.426% 8.993% 10.198% 10.955% 16.192% 5.566% 5.323% 5.414% 4.114% 3.983% 2.199% 2.013% 2.102% 1.895%
Total Cummulative Progress 0.000% 0.207% 0.415% 0.622% 0.954% 1.078% 1.203% 1.404% 1.653% 4.306% 7.012% 9.666% 12.320% 14.974% 17.628% 21.053% 30.046% 40.244% 51.199% 67.391% 72.957% 78.280% 83.695% 87.809% 91.791% 93.990% 96.003% 98.105% 100.000%
Monthly
Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20
Weekly
No. Description Unit Qty Cost (Rp) Weight Factor (%) Remark
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Daily
(5 - 11) (12 - 18) (19 - 25) (26 - 02) (3 - 9) (4 - 16) (17 - 23) (24 - 30) (31 - 6) (7 - 13) (14 - 20) (21 - 27) (28 - 4) (5 - 11) (12 - 18) (19 - 25) (26 - 1) (2 - 8) (09 - 15) (16 - 22) (23 - 29) (30 - 05) (06 - 12) (13 - 19) (20 - 26) (27 - 04) (05 - 11) (12 - 18) (19 -25) (26 - 1) (2 - 5)
PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 ### 0.458% 0.458% 0.229% 0.229%
B. Formwork
a. Install Formwork for Concrete Pile Cap m2 35.84 0.068% 0.034% 0.034%
b. Install Formwork for Concrete Deadment m2 22.30 0.042% 0.021% 0.021%
c. Install Formwork for Concrete Capping Beam m2 148.80 0.283% 0.142% 0.142%
d. Install Formwork for Concrete Fender m2 45.12 0.086% 0.043% 0.043%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0.014% 0.014%
C. Install Steel Pipe 4", 12-3/4" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0.064%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0.036%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0.067%
E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling ɸ1 - 5/8 m' 311.65 0.668% 0.668%
b. Galvanized Sling ɸ1 - 5/8 ea 552.00 0.220% 0.220%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0.499%
G. Sand Fill to the Steel Pipe 12-3/4" 293.04 0.790% 0.395% 0.395%
Total Progress ### 100.000% 100.000% 0.207% 0.207% 0.207% 0.207% 0.124% 0.124% 0.201% 0.124% 0.249% 2.654% 2.706% 2.654% 2.654% 2.654% 2.654% 3.426% 8.993% 10.198% 10.955% 10.869% 5.566% 5.323% 5.347% 5.406% 3.901% 4.180% 2.339% 2.011% 1.892% 1.949% 0.017%
Total Cummulative Progress 0.000% 0.207% 0.415% 0.622% 0.830% 0.954% 1.078% 1.279% 1.404% 1.653% 4.306% 7.012% 9.666% 12.320% 14.974% 17.628% 21.053% 30.046% 40.244% 51.199% 62.068% 67.634% 72.957% 78.305% 83.711% 87.611% 91.791% 94.131% 96.142% 98.034% 99.983% 100.000%
TIME SCHEDULE
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA
]
Monthly
Weight Sep-19 Oct-19 Nov-19 Dec-19 Jan-19 Feb-19 Mar-19 Apr-19
No. Description Unit Qty Factor Weekly
Scale
(%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Daily
(5 - 11) (12 - 18) (19 - 25) (26 - 02) (3 - 9) (10 - 16) (17 - 23) (24 - 30) (31 - 6) (7 - 13) (14 - 20) (21 - 27) (28 - 4) (5 - 11) (12 - 18) (19 - 25) (26 - 1) (2 - 8) (09 - 15) (16 - 22) (23 - 29) (30 - 05) (06 - 12) (13 - 19) (20 - 26) (27 - 04) (05 - 11) (12 - 18) (19 -25) (26 - 1) (2 - 5)
PREPARATION WORK
a. Clean up Area m2 1,237.50 0.052% 0.076%
b. Stake Out Survey Ls 1.00 0.076%
STRUCTURE WORK
PROCUREMENT
a. Supply Sheet Pile W-500 A-1000 jt 67.00 24.050% 7.215%
b. Supply Piling Steel Pipe Dia. 12" THK (anchor pilling) jt 30.00 8.126% 2.438%
c. Supply Piling Steel Pipe Dia. 12" THK (mooring bollards pilling) jt 36.00 9.751% 2.925%
d. Supply Piling Steel Pipe Dia. 12" THK (fender pilling) jt 18.00 4.875% 1.463%
e. Steel Pile ø 18" ASTM A 252 jt 1.00 0.295%
f. Rebar Concrete kg 12,322.58 5.028%
g. Galvanized Sling ø 1 1/4" m' 311.65 0.468%
h. Galvanized Clamp ø 1 1/4" crossby clips G-450 ea 552.00 0.154%
i. Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145 ea 45.00 0.349%
j. Concrete m3 111.41 2.298%
k. Sand m3 293.04 0.790%
l. Fender Rubber ea 8.00 1.466%
m. Soil for fill up m3 679.05 0.639%
A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086%
e. Install Formwork for Mooring Bollard m2 14.40 0.027%
C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067%
D. Install Rebar
a. Rebar for Deadment D16 (400/400) kg 647.81 0.113%
b. Rebar for Deadment Ø8 (400/400) kg 175.28 0.031%
c. Rebar for Pile Cap D16 (800/800) kg 1,527.34 0.267%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.093%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.012%
f. Rebar for Capping Beam D16 (750/400) kg 3,423.98 0.599%
g. Rebar for Capping Beam Ø8 (750/400) kg 692.01 0.121%
h. Rebar for Rubber Fender Beam D16 (800/2500) kg 1,260.11 0.220%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.091%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.025%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.003%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.234%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.181%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.024%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.129%
E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499%
FINISHING WORK
a. Plestering (1 : 3) for Capping Beam 750/400 m2 110.40 0.047%
b. Supply & Install Rubber Fender 400 x 2300 ea 8.00 0.625%
c. Install Ancor Bolt dia 19mm for Rubber Fender (@550 Length) ea 128.00 0.267%
d. Supply Soil Fill Up m3 679.05 1.196%
100.000%
Plan 0.207% 0.207% 0.207% 0.207% 0.124% 0.124% 0.201% 0.124% 2.654% 2.780% 2.832% 2.872% 9.890% 9.890% 13.067% 13.067% 7.197% 7.071% 5.566% 5.633% 3.901% 4.267% 2.213% 1.951% 1.789% 1.127% 0.332% 0.249% 0.166% 0.066% 0.017%
Cummulative Plan 0.207% 0.415% 0.622% 0.830% 0.954% 1.078% 1.279% 1.404% 4.058% 6.837% 9.669% 12.541% 22.431% 32.322% 45.389% 58.456% 65.653% 72.724% 78.290% 83.923% 87.823% 92.090% 94.303% 96.254% 98.044% 99.170% 99.502% 99.751% 99.917% 99.983% 100.000%
Actual 0.207% 0.207% 0.207% 0.284% 0.000% 0.000% 0.109% 0.427% 0.034% 0.034% 7.341% 7.060% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
Cumulative Actual 0.207% 0.415% 0.622% 0.906% 0.906% 0.906% 1.015% 1.442% 1.476% 1.509% 8.850% 15.910% 15.910% 15.910% 15.910% 15.910% 15.910% 15.910% 15.910% 15.910% 15.910% 15.910% 15.910% 15.910% 15.910% 15.910% 15.910% 15.910% 15.910% 15.910% 15.910%
Deviation 0.000% 0.000% 0.000% 0.076% -0.048% -0.172% -0.264% 0.039% -2.582% -5.328% -0.819% 3.369% - - - - - - - - - - - - - - - - - - -
TIME SCHEDULE
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA
Monthly
Weight Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20
No. Description Unit Qty Factor Weekly
Remark
(%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Daily
(5 - 11) (12 - 18) (19 - 25) (26 - 02) (3 - 9) (10 - 16) (17 - 23) (24 - 30) (31 - 6) (7 - 13) (14 - 20) (21 - 27) (28 - 4) (5 - 11) (12 - 18) (19 - 25) (26 - 1) (2 - 8) (09 - 15) (16 - 22) (23 - 29) (30 - 05) (06 - 12) (13 - 19) (20 - 26) (27 - 04) (05 - 11) (12 - 18) (19 -25) (26 - 1) (2 - 5)
7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989%
A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086%
e. Install Formwork for Mooring Bollard m2 14.40 0.027%
C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067%
E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499%
351.52% 100.000%
Plan 0.207% 0.207% 0.207% 0.207% 0.124% 0.124% 0.201% 0.124% 0.249% 2.654% 2.706% 2.654% 2.654% 2.654% 2.654% 3.426% 8.993% 10.198% 10.955% 10.869% 5.566% 5.323% 5.347% 5.406% 3.901% 4.180% 2.339% 2.011% 1.892% 1.949% 0.017%
Cummulative Plan 0.207% 0.415% 0.622% 0.830% 0.954% 1.078% 1.279% 1.404% 1.653% 4.306% 7.012% 9.666% 12.320% 14.974% 17.628% 21.053% 30.046% 40.244% 51.199% 62.068% 67.634% 72.957% 78.305% 83.711% 87.611% 91.791% 94.131% 96.142% 98.034% 99.983% 100.000%
Actual 0.207% 0.207% 0.207% 0.284% 0.017% 0.000% 0.092% 0.444% 0.017% 0.042% 7.248% 7.127% 4.041% 6.672% 9.501% 6.998% 0.025% 2.917% 0.773%
Cumulative Actual 0.207% 0.415% 0.622% 0.906% 0.923% 0.923% 1.015% 1.459% 1.476% 1.518% 8.766% 15.893% 19.934% 26.606% 36.107% 43.105% 43.130% 46.047% 46.820%
Deviation 0.000% 0.000% 0.000% 0.076% -0.031% -0.156% -0.264% 0.055% -0.177% -2.789% 1.754% 6.227% 7.614% 11.632% 18.479% 22.052% 13.084% 5.803% -4.379% - - - - - - - - - - - - -
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA
Progress
Weight
No. Description Unit Qty Factor
Last Month This Month Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)
2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0 0.000% 0 0.000% 1 1.513% 0.000%
3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%
7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%
A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%
C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%
E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%
G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA
Progress
Weight
No. Description Unit Qty Factor
Last Month This Month Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA
Progress
Weight
No. Description Unit Qty Factor
Last Month This Month Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)
2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0 0.000% 0 0.000% 1 1.513% 0.000%
3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%
0 0.000%
4 PREPARATION WORK 0.128%
a. Clean up Area m2 1,237.50 0.052% 0 0.000% 0 0.000% 0 0.000% 1237.5 0.052% 0.000%
b. Stake Out Survey Ls 1.00 0.076% 1 0.076% 0 0.000% 1 0.076% 0 0.000% 100.000%
7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%
A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%
C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%
E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%
G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA
Progress
Weight
No. Description Unit Qty Factor
Last Month This Month Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)
2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0 0.000% 0 0.000% 1 1.513% 0.000%
3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%
7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%
A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%
C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%
E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%
G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA
Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)
2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0 0.000% 0 0.000% 1 1.513% 0.000%
3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%
7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%
A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%
C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%
E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%
G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA
Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)
2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0 0.000% 0 0.000% 1 1.513% 0.000%
3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%
7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%
A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%
C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%
E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%
G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA
Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)
2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0 0.000% 0 0.000% 1 1.513% 0.000%
3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%
7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%
A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%
C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%
E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%
G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
0.000%
H. Pouring Concrete K-300
a. Pouring Concrete Deadment 400/400 m3 5.32 0.061% 0 0.000% 0 0.000% 0 0.000% 5.32 0.061% 0.000%
b. Pouring Concrete Pile Cap 800/800 m3 6.14 0.070% 0 0.000% 0 0.000% 0 0.000% 6.144 0.070% 0.000%
c. Pouring Concrete Capping Beam 750/400 m3 20.16 0.231% 0 0.000% 0 0.000% 0 0.000% 20.16 0.231% 0.000%
d. Pouring Concrete Rubber Fender 800/2500 m3 12.80 0.147% 0 0.000% 0 0.000% 0 0.000% 12.8 0.147% 0.000%
e. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (rubber fender) m3 10.18 0.117% 0 0.000% 0 0.000% 0 0.000% 10.18 0.117% 0.000%
f. Pouring Concrete in to Steel Pipe Dia 12" Length 5 M (deadment) m3 22.63 0.259% 0 0.000% 0 0.000% 0 0.000% 22.63 0.259% 0.000%
g. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (mooring bollards) m3 20.37 0.233% 0 0.000% 0 0.000% 0 0.000% 20.37 0.233% 0.000%
h. Pouring Concrete in to Steel Pipe Dia 18" Length 1.6 M (mooring bollards) m3 4.20 0.048% 0 0.000% 0 0.000% 0 0.000% 4.20 0.048% 0.000%
i. Pouring Concrete Pile Cap 2000/2000 (mooring bollards) m3 9.60 0.110% 0 0.000% 0 0.000% 0 0.000% 9.6 0.110% 0.000%
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA
Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)
2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0 0.000% 0 0.000% 1 1.513% 0.000%
3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%
7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%
A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%
C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%
E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%
G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA
Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)
2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0 0.000% 0 0.000% 1 1.513% 0.000%
0 0.000%
3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%
7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%
A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%
C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%
E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%
G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA
Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)
2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0 0.000% 0 0.000% 1 1.513% 0.000%
3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%
7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%
A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%
C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%
E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA
Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)
2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0 0.000% 0 0.000% 1 1.513% 0.000%
3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%
7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%
A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%
C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%
E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%
G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA
Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)
2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0 0.000% 0 0.000% 1 1.513% 0.000%
3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%
7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%
A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%
C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%
E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%
G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA
Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)
2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0 0.000% 0 0.000% 1 1.513% 0.000%
3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%
7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%
A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%
C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%
E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%
G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA
Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)
2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0 0.000% 0 0.000% 1 1.513% 0.000%
3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%
7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%
A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%
C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%
E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%
G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA
Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)
2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0 0.000% 0 0.000% 1 1.513% 0.000%
3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%
7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%
A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%
C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%
E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%
G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA
Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)
2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0 0.000% 0 0.000% 1 1.513% 0.000%
3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%
7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%
A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%
C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%
E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%
G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA
Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)
2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0 0.000% 0 0.000% 1 1.513% 0.000%
3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%
7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%
A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%
C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%
E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%
G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA
Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)
2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0 0.000% 0 0.000% 1 1.513% 0.000%
0 0.000%
3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%
7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%
A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%
C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%
E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%
G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA
Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)
2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0.3 0.454% 0.3 0.454% 0.7 1.059% 30.000%
3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%
7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%
A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%
C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%
E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%
G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA
Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)
2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0.3 0.454% 0 0.000% 0.3 0.454% 0.7 1.059% 30.000%
3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%
7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%
A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%
C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%
E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%
G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA
Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)
2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0.3 0.454% 0 0.000% 0.3 0.454% 0.7 1.059% 30.000%
3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%
7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%
A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%
C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%
E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%
G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA
Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)
2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0.3 0.454% 0 0.000% 0.3 0.454% 0.7 1.059% 30.000%
3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%
7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%
A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%
C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%
E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%
G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA
Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)
2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0.3 0.454% 0 0.000% 0.3 0.454% 0.7 1.059% 30.000%
3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%
7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 5 1.069% 0 0.000% 5 1.069% 23 4.920% 17.857%
A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 111.6 0.212% 0 0.000% 111.6 0.212% 37.2 0.071% 75.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%
C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 1 0.064% 0 0.000% 1 0.064% 0 0.000% 100.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 1 0.036% 0 0.000% 1 0.036% 0 0.000% 100.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 2 0.067% 0 0.000% 2 0.067% 0 0.000% 100.000%
E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%
G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%