1 Sheet Pile W-450 A-1000

140

2 Piling Steel Pipe Dia. 12" THK (anchor pilling)


140

3 Piling Steel Pipe Dia. 12" THK (mooring bollards pilling)


140

4 Piling Steel Pipe Dia. 12" THK (fender pilling)


140

5 Steel Pile ø 18" ASTM A 252


140

6 Rebar Concrete
140

7 Galvanized Sling ø 1 1/4"


210
Days Activities

8 Galvanized Clamp ø 1 1/4" crossby clips G-450


210
60

9 Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145


TENDER NO.PCJ-3060-CA

60

10 Concrete
MAN POWER LOADING PLAN

11 Sand
320
ENGINEERING. PROCUREMENT AND CONSTRUCTION (EPC)

12 Fender Rubber
300
INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

Director
13 Soil for fill up
795

Jambi, 28 Mei 2019

Gabriel D. Handrianto
0

PT. Ade Konstruksi Abadi


100
200
300
400
500
600
700
800
900

Scale
Page 2 of 2
Page 1 of 2
EQUIPMENT LOADING PLAN

ENGINEERING. PROCUREMENT AND CONSTRUCTION (EPC)


INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA

Monthly
Day 1 2 3 4 5 6 7
No. Description Total Remarks
Activity Weekly
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

1 Sheet Pile W-450 A-1000 Unit 30 7 8 7 8


2 Piling Steel Pipe Dia. 12" THK (anchor pilling) Unit 60 7 8 7 8 7 8 7 8
3 Piling Steel Pipe Dia. 12" THK (mooring bollards pilling) Unit 60 7 8 7 8 7 8 7 8
4 Piling Steel Pipe Dia. 12" THK (fender pilling) Unit 60 7 8 7 8 7 8 7 8
5 Steel Pile ø 18" ASTM A 252 Unit 60 7 8 7 8 7 8 7 8
6 Rebar Concrete Unit 38 8 7 8 7 8
7 Galvanized Sling ø 1 1/4" Unit 30 7 8 7 8
8 Galvanized Clamp ø 1 1/4" crossby clips G-450 Unit 30 7 8 7 8
9 Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145 Unit 30 7 8 7 8
10 Concrete Unit 60 7 8 7 8 7 8 7 8
11 Sand Unit 30 7 8 7 8
12 Fender Rubber Unit 15 7 8
13 Soil for fill up Unit 7 7

Total 0 0 0 0 0 0 0 0 35 40 35 40 28 32 42 56 49 56 35 40 7 8 7 0 0 0 0 0

Jambi, 28 Mei 2019


PT. Ade Konstruksi Abadi

Gabriel D. Handrianto
Director
Scale
Page 2 of 2
EQUIPMENT LOADING PLAN

ENGINEERING. PROCUREMENT AND CONSTRUCTION (EPC)


INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA

250

225

200

175

150

125

100

75

50

25

0
Days Activities Scale

140 140 140 140 140 140 210 210 60 105 105 105 60 60 60

12 Pile Driver + Hammer

13 Welding Transformer
8 Water Tank Truck
6 Concrete Vibrator

7 Mesin Pompa Air

14 Vibro hammer
5 Generator Set

10 Jack Hammer

11 Trailer 20 ton
3 Dump Truck
1 Beton Mixer

4 Excavator

15 Fork Lift
9 Tamper
2 Crane

Jambi, 28 Mei 2019


PT. Ade Konstruksi Abadi

Gabriel D. Handrianto
Director
Page 1 of 2
EQUIPMENT LOADING PLAN

ENGINEERING. PROCUREMENT AND CONSTRUCTION (EPC)


INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA

Monthly
Day 1 2 3 4 5 6 7
No. Description Total Remarks
Activity Weekly
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

1 Beton Mixer 1 Unit 37 7 8 7 8 7


2 Crane 1 Unit 60 7 8 7 8 7 8 7 8
3 Dump Truck 5 Unit 375 35 40 35 40 35 40 35 40 35 40
4 Excavator 1 Unit 75 7 8 7 8 7 8 7 8 7 8
5 Generator Set 1 Unit 135 7 8 7 8 7 8 7 8 7 8 7 8 7 8 7 8 7 8
6 Concrete Vibrator 1 Unit 30 7 8 7 8
7 Mesin Pompa Air 1 Unit 135 7 8 7 8 7 8 7 8 7 8 7 8 7 8 7 8 7 8
8 Water Tank Truck 1 Unit 30 7 8 7 8
9 Tamper 1 Unit 15 7 8
10 Jack Hammer 1 Unit 105 7 8 7 8 7 8 7 8 7 8 7 8 7 8
11 Trailer 20 ton 1 Unit 60 7 8 7 8 7 8 7 8
12 Pile Driver + Hammer 1 Unit 60 7 8 7 8 7 8 7 8
13 Welding Transformer 4 Unit 420 28 32 28 32 28 32 28 32 28 32 28 32 28 32
14 Vibro hammer 1 Unit 60 7 8 7 8 7 8 7 8
15 Fork Lift 1 Unit 90 7 8 7 8 7 8 7 8 7 8 7 8

Total 0 0 0 0 0 0 0 0 84 96 84 96 84 96 84 96 98 112 119 136 105 120 70 72 63 72 0 0

Jambi, 28 Mei 2019


PT. Ade Konstruksi Abadi

Gabriel D. Handrianto
Director
Scale
Page 3 of 3
MAN POWER LOADING PLAN

ENGINEERING. PROCUREMENT AND CONSTRUCTION (EPC)


INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

TENDER NO.PCJ-3060-CA

500

450

400

350

300

250

200

150

100

50

0
Days Activities Scale

44 46 44 46 44 46 44 46 44 46 44 46 212 238 212 358 317 358 359 406 289 326 184 206 184 166 44 46
10 WEEK 10

11 WEEK 11

12 WEEK 12

13 WEEK 13

14 WEEK 14

15 WEEK 15

16 WEEK 16

17 WEEK 17

18 WEEK 18

19 WEEK 19

20 WEEK 20

21 WEEK 21

22 WEEK 22

23 WEEK 23

24 WEEK 24

25 WEEK 25

26 WEEK 26

27 WEEK 27

28 WEEK 28
2 WEEK 2

3 WEEK 3

4 WEEK 4

5 WEEK 5

6 WEEK 6

7 WEEK 7

8 WEEK 8

9 WEEK 9
1 WEEK1

Jambi, 28 Mei 2019


PT. Ade Konstruksi Abadi

Gabriel D. Handrianto
Director
Page 2 of 3
MAN POWER LOADING PLAN

ENGINEERING. PROCUREMENT AND CONSTRUCTION (EPC)


INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

TENDER NO.PCJ-3060-CA

900

800

700

600

500

400

300

200

100

0
Days Activities Scale

140 140 140 140 140 140 210 210 60 105 105 105 60 60 60 60 315 320 300 795 210 210 420
Procurement Manager
Construction Manager
Engineering Manager
Project Coordinator

HSE Coordinator

16 Craner Operator
13 Quality Control

15 Administration
HSE Manager

Civil Engineer

20 Civil Worker
12 HSE Officer

19 Piling Crew
Supervisor
Draftman

17 Operator
10 Foremen

11 Surveyor

Logistic

22 Welder
18 Driver

23 Helper
21 Fitter
14
1

Jambi, 28 Mei 2019


PT. Ade Konstruksi Abadi

Gabriel D. Handrianto
Director
Page 1 of 3
MAN POWER LOADING PLAN

ENGINEERING. PROCUREMENT AND CONSTRUCTION (EPC)


INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA

Monthly
Day 1 2 3 4 5 6 7
No. Description Total Remarks
Activity Weekly
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

1 Project Manager 1 Person 140 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5


2 Engineering Manager 1 Person 140 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
3 Construction Manager 1 Person 140 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
4 Procurement Manager 1 Person 140 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
5 HSE Manager 1 Person 140 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
6 HSE Coordinator 1 Person 140 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
7 Civil Engineer 1 Person 210 7 8 7 8 7 8 7 8 7 8 7 8 7 8 7 8 7 8 7 8 7 8 7 8 7 8 7 8
8 Draftman 1 Person 210 7 8 7 8 7 8 7 8 7 8 7 8 7 8 7 8 7 8 7 8 7 8 7 8 7 8 7 8
9 Supervisor 1 Person 60 7 8 7 8 7 8 7 8
10 Foremen 1 Person 105 7 8 7 8 7 8 7 8 7 8 7 8 7 8
11 Surveyor 1 Person 105 7 8 7 8 7 8 7 8 7 8 7 8 7 8
12 HSE Officer 1 Person 105 7 8 7 8 7 8 7 8 7 8 7 8 7 8
13 Quality Control 1 Person 60 7 8 7 8 7 8 7 8
14 Logistic 1 Person 60 7 8 7 8 7 8 7 8
15 Administration 1 Person 60 7 8 7 8 7 8 7 8
16 Craner Operator 1 Person 60 7 8 7 8 7 8 7 8
17 Operator 3 Person 315 21 24 21 24 21 24 21 24 21 24 21 24 21 24
18 Driver 6 Person 320 42 48 42 48 42 48 42 8
19 Piling Crew 5 Person 300 35 40 35 40 35 40 35 40
20 Civil Worker 15 Person 795 120 105 120 105 120 105 120
21 Fitter 2 Person 210 14 16 14 16 14 16 14 16 14 16 14 16 14 16
22 Welder 2 Person 210 14 16 14 16 14 16 14 16 14 16 14 16 14 16
23 Helper 4 Person 420 28 32 28 32 28 32 28 32 28 32 28 32 28 32

Total 44 46 44 46 44 46 44 46 44 46 44 46 212 238 212 358 317 358 359 406 289 326 184 206 184 166 44 46

Jambi, 28 Mei 2019


PT. Ade Konstruksi Abadi

Gabriel D. Handrianto
Director
Scale
LIST OF PROPOSED EQUIPMENTS / TOOLS

ENGINEERING. PROCUREMENT AND CONSTRUCTION (EPC)


INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA

Merk & Manufactur


No. Description Unit Owned Leased
Type Year

1 Beton Mixer 3 Unit Mitsubisihi & Nissan - Leased 2006


2 Crane 1 Unit KOBELCO BM 600 - Leased 2012
3 Dump Truck 5 Unit Mitsubishi PS 125 HD Owned - 2012
4 Excavator 1 Unit Komatsu Owned - 2009
5 Generator Set 1 Unit Hargen , Kiprok Owned - 2018
6 Concrete Vibrator 2 Unit Matsumoto Owned - 2018
7 Mesin Pompa Air 2 Unit Evergush Owned - 2018
8 Water Tank Truck 1 Unit Mitsubishi 527 ML (6x4) M/T Owned - 2013
9 Tamper 1 Unit TIGON Owned - 2018
10 Jack Hammer 2 Unit NGK Owned - 2018
11 Trailer 20 ton 1 Unit Scania Owned - 2012
12 Pile Driver + Hammer 1 Unit NH 70 - Leased 2009
13 Welding Transformer 4 Unit MILLER Owned - 2017
14 Vibro hammer 1 Unit - Leased 2008
15 Fork Lift 1 Unit Diesel 60-9FD30 Owned - 2013
16 Total Station 1 Unit Sokkia Owned 2017
17 Auto Level 1 Unit Sokkia Owned 2017
18 Mini Concrete mixer 2 Unit Tiger Owned 2018

Jambi, 28 Mei 2019


PT. Ade Konstruksi Abadi

Gabriel D. Handrianto
Director
TIME SCHEDULE
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA ]

Monthly
Weight 1 2 3 4 5 6 7
Scale
No. Description Unit Qty Factor Weekly
(%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
Daily
(1 - 7) (8 - 15) (16 - 22) (23 - 30) (1 - 7) (8 - 15) (16 - 22) (23 - 30) (1 - 7) (8 - 15) (16 - 22) (23 - 30) (1 - 7) (8 - 15) (16 - 22) (23 - 30) (1 - 7) (8 - 15) (16 - 22) (23 - 30) (1 - 7) (8 - 15) (16 - 22) (23 - 30) (1 - 7) (8 - 15) (16 - 22) (23 - 30)

INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

TECHNICAL PLANNING DESIGN CONSULTANT FOR CONSTRUCTION


a Soil investigation Ls 1.00 0.976% 0.244% 0.244% 0.244% 0.244%
b Design and Calculation Ls 1.00 0.976% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081%
c Design drawing Ls 1.00 0.976% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081%
d Construction Engineering Ls 1.00 0.976% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081%
e Final document Ls 1.00 0.976% 0.244% 0.244% 0.244% 0.244%

MOBILIZATION & DEMOBILIZATION Ls 1.00 2.791% 0.233% 0.233% 0.233% 0.233% 0.233% 0.233% 0.233% 0.233% 0.116% 0.349% 0.349% 0.116%

PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.714% 0.143% 0.143% 0.143% 0.143% 0.143%

PREPARATION WORK
a. Clean up area m2 1,237.50 0.062% 0.062%
b. Install Bowplank m' 134.00 0.091% 0.091%

EXCAVATION AND BACKFILL WORK


a. Excavation Deadment 400/400 m3 2.23 0.001% 0.001% 0.000%
b. Excavation Pile Cap 800/800 m3 6.14 0.003% 0.002% 0.001%
c. Excavation for Line Tie Rod m3 95.33 0.048% 0.029% 0.019%
d. Backfill for Excavation m3 34.57 0.019% 0.011% 0.008%
e. Backfill Area (Compacted) m3 679.05 0.507% 0.304% 0.203%

STRUCTURE WORK
PROCUREMENT
a. Supply Sheet Pile W-450 A-1000 jt 67.00 23.159% 1.447% 1.447% 10.132% 10.132%
b. Supply Piling Steel Pipe Dia. 12" THK (anchor pilling) jt 30.00 7.825% 0.245% 0.245% 0.245% 0.245% 1.712% 1.712% 1.712% 1.712%
c. Supply Piling Steel Pipe Dia. 12" THK (mooring bollards pilling) jt 36.00 9.390% 0.293% 0.293% 0.293% 0.293% 2.054% 2.054% 2.054% 2.054%
d. Supply Piling Steel Pipe Dia. 12" THK (fender pilling) jt 18.00 4.695% 0.147% 0.147% 0.147% 0.147% 1.027% 1.027% 1.027% 1.027%
e. Steel Pile ø 18" ASTM A 252 jt 1.00 0.284% 0.009% 0.009% 0.009% 0.009% 0.062% 0.062% 0.062% 0.062%
f. Rebar Concrete kg 12,322.58 4.842% 1.211% 1.211% 1.211% 1.211%
g. Galvanized Sling ø 1 1/4" m' 311.65 0.450% 0.113% 0.113% 0.113% 0.113%
h. Galvanized Clamp ø 1 1/4" crossby clips G-450 ea 552.00 0.149% 0.037% 0.037% 0.037% 0.037%
i. Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145 ea 45.00 0.336% 0.084% 0.084% 0.084% 0.084%
j. Concrete m3 111.41 2.213% 0.553% 0.553% 0.553% 0.553%
k. Sand m3 293.04 0.760% 0.190% 0.190% 0.190% 0.190%
l. Fender Rubber ea 8.00 1.412% 0.706% 0.706%
m. Soil for fill up m3 679.05 0.615% 0.615%

CONSTRUCTION 0.32
A. PILING SHEET PILE AND STEEL PILE
a. Supply Sheet Pile (W-450 A -1000) jt 67.00 19.950% 4.987% 4.987% 4.987% 4.987%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.767% 1.44% 1.44% 1.44% 1.44%

A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.066% 0.066%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.041% 0.041%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.273% 0.09% 0.09% 0.09%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.083% 0.083%
e. Install Formwork for Mooring Bollard m2 14.40 0.026% 0.026%

C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.061% 0.061%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.034% 0.034%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.065% 0.065%

D. Install Rebar
a. Rebar for Deadment D16 (400/400) kg 647.81 0.109% 0.036% 0.036% 0.036%
b. Rebar for Deadment Ø8 (400/400) kg 175.28 0.030% 0.010% 0.010% 0.010%
c. Rebar for Pile Cap D16 (800/800) kg 1,527.34 0.257% 0.086% 0.086% 0.086%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.090% 0.030% 0.030% 0.030%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.011% 0.004% 0.004% 0.004%
f. Rebar for Capping Beam D16 (750/400) kg 3,423.98 0.577% 0.192% 0.192% 0.192%
g. Rebar for Capping Beam Ø8 (750/400) kg 692.01 0.117% 0.039% 0.039% 0.039%
h. Rebar for Rubber Fender Beam D16 (800/2500) kg 1,260.11 0.212% 0.212%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.087% 0.087%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012% 0.012%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.024% 0.024%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.002% 0.002%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.226% 0.226%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.175% 0.175%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.023% 0.023%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.124% 0.124%

E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.643% 0.643%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.212% 0.212%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.480% 0.480%

F. Install Plastic Sheet


a. Install Plastic Sheet for Capping Beam m2 152.16 0.006% 0.002% 0.002% 0.002%
b. Install Plastic Sheet for Pile Cap and Deadment m2 80.86 0.003% 0.003%
c. Install Plastic Sheet for Rubber Fender m2 37.12 0.001% 0.001%
c. Install Plastic Sheet for Mooring Bollards m2 35.20 0.001% 0.001%

G. Sand Fill in to the stell pipe 12" 293.04 0.760% 0.253% 0.253% 0.253%

H. Pouring Concrete K-300


a. Pouring Concrete Deadment 400/400 m3 5.32 0.059% 0.059%
b. Pouring Concrete Pile Cap 800/800 m3 6.14 0.068% 0.068%
c. Pouring Concrete Capping Beam 750/400 m3 20.16 0.222% 0.222%
d. Pouring Concrete Rubber Fender 800/2500 m3 12.80 0.141% 0.141%
e. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (rubber fender) m3 10.18 0.112% 0.112%
f. Pouring Concrete in to Steel Pipe Dia 12" Length 5 M (deadment) m3 22.63 0.250% 0.250%
g. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (mooring bollards) m3 20.37 0.225% 0.225%
h. Pouring Concrete in to Steel Pipe Dia 18" Length 1.6 M (mooring bollards) m3 4.20 0.046% 0.046%
i. Pouring Concrete Pile Cap 2000/2000 (mooring bollards) m3 9.60 0.106% 0.106%

FINISHING WORK 0.03


a. Plestering (1 : 3) for Capping Beam 750/400 m2 110.40 0.065% 0.065%
b. Supply & Install Rubber Fender 400 x 2300 ea 8.00 0.871% 0.871%
c. Install Ancor Bolt dia 19mm for Rubber Fender (@550 Length) ea 128.00 0.372% 0.372%
d. Supply Soil Fill Up m3 679.05 1.667% 0.833% 0.833%

0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.00% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

Total Progress 100.000% 0.233% 0.233% 0.721% 0.721% 0.721% 0.721% 0.477% 0.619% 2.681% 2.528% 11.213% 11.213% 11.297% 11.297% 11.889% 12.120% 3.449% 3.734% 2.608% 3.004% 1.725% 1.718% 1.103% 1.477% 1.289% 0.724% 0.244% 0.244%

Total Cummulative Progress 0.000% 0.233% 0.465% 1.186% 1.906% 2.627% 3.348% 3.824% 4.444% 7.124% 9.652% 20.865% 32.077% 43.374% 54.671% 66.560% 78.681% 82.129% 85.863% 88.471% 91.475% 93.200% 94.918% 96.021% 97.498% 98.787% 99.512% 99.756% 100.000%

Jambi, 28 Mei 2019


PT. Ade Konstruksi Abadi

Gabriel D. Handrianto
Director
RECAPITULATION

JOB TITLE : ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

LOCATION : GERAGAI

AMOUNT PRICE AMOUNT PRICE


N0 DESCRIPTION JOBS
( US$ ) ( Rp )

1 TECHNICAL PLANNING DESIGN CONSULTANT FOR CONSTRUCTION 39,320.29 538,688,016.67

2 MOBILIZATION & DEMOBILIZATION 22,487.01 308,072,000.00

3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION 5,753.74 78,826,299.64

4 PREPARATION WORK 1,230.26 16,854,593.88

5 EXCAVATION AND BACKFILL WORK 4,654.36 63,764,681.89

6 STRUCTURE WORK 708,288.12 9,703,547,206.92

7 FINISHING WORK 23,959.65 328,247,201.00

TOTAL 805,693.43 11,038,000,000.00

Note : Total Price Exclude PPn 10 %

Jambi, 2 Juli 2018

Garbriel D. Handrianto
Director
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC)
INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

UNIT PRICE AMOUNT PRICE


N0 VOLUME
( RP) ( RP )

a b c d f = (c x d)

I. INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

1 TECHNICAL PLANNING DESIGN CONSULTANT FOR CONSTRUCTION 1.00 Ls 538,688,016.67 538,688,016.67

2 MOBILIZATION & DEMOBILIZATION


a. Mobilization & Demobilization 1.00 Ls 291,572,000.00 291,572,000.00
b. Concrete Pump Rent 1.00 Ls 16,500,000.00 16,500,000.00
Sub Total 308,072,000.00

3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION


a. Port Clearence Permit, Others Permit 1.00 Ls 78,826,299.64 78,826,299.64
Sub Total 78,826,299.64
4 PREPARATION WORK
a. Clean up area 1,237.50 m2 5,512.00 6,821,100.00
b. Install Bowplank 134.00 m' 74,876.82 10,033,493.88
Sub Total 16,854,593.88
5 EXCAVATION AND BACKFILL WORK
a. Excavation Deadment 400/400 2.23 m3 55,520.00 123,831.81
b. Excavation Pile Cap 800/800 6.14 m3 55,520.00 341,114.88
c. Excavation for Line Tie Rod 95.33 m3 55,520.00 5,292,721.60
d. Backfill for Excavation 34.57 m3 60,153.56 2,079,396.28
e. Backfill Area (Compacted) 679.05 m3 82,361.56 55,927,617.32
Sub Total 63,764,681.89
6 STRUCTURE WORK
PROCUREMENT
a. Sheet Pile W-450 A-1000 67.00 jt 38,154,285.00 2,556,337,095.00
b. Supply Piling Steel Pipe Dia. 12" - 12 MM THK (anchor pilling) 30.0 jt 28,790,857.00 863,725,710.00
c. Supply Piling Steel Pipe Dia. 12" - 12 MM THK (mooring bollards pilling) 36.0 jt 28,790,857.00 1,036,470,852.00
d. Supply Piling Steel Pipe Dia. 12" - 12 MM THK (fender pilling) 18.0 jt 28,790,857.00 518,235,426.00
e. Steel Pile ø 18" ASTM A 252 1.00 jt 31,342,113.14 31,342,113.14
f. Rebar Concrete 12,322.58 kg 43,375.50 534,497,943.72
g. Galvanized Sling ø 1 1/4" 311.65 m' 159,499.90 49,708,143.84
h. Galvanized Clamp ø 1 1/4" crossby clips G-450 552.00 ea 29,699.60 16,394,179.20
i. Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145 45.00 ea 824,999.70 37,124,986.50
j. Concrete 111.41 m3 2,192,142.60 244,217,112.92
k. Sand 293.04 m3 286,445.60 83,940,018.62
l. Fender Rubber 8.00 ea 19,482,556.93 155,860,455.45
m. Soil for fill up 679.05 m3 100,000.00 67,905,000.00
Sub Total 6,195,759,036.38

A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 35.84 m2 202,330.80 7,251,535.87
b. Install Formwork for Concrete Deadmant 400/400 22.30 m2 202,330.80 4,512,786.16
c. Install Formwork for Concrete Capping Beam 750/400 148.80 m2 202,330.80 30,106,823.04
d. Install Formwork for Concrete Fender 800/2000/2500 45.12 m2 202,330.80 9,129,165.70
e. Install Formwork for Mooring Bollard 14.40 m2 202,330.80 2,913,563.52
Sub Total 53,913,874.29
B. Supply and Install Concrete Sheet Pile Type Corrugated
a. Supply Sheet Pile (W-450 A -1000, L=20 m, W=9,18 ton) 67.0 jt
b. Install Sheet Pile (W-450 A -1000, L=20 m, W=9,18 ton) 67.0 jt 32,866,543.56 2,202,058,418.81
Sub Total 2,202,058,418.81
C. Supply and Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" - 12 MM THK (mooring bollards) 1.0 jt 6,757,428.00 6,757,428.00
e. Install Piling Steel Pipe Dia. 12" - 12 MM THK 28.0 point 22,735,242.09 636,586,778.38
f. Supply & Install Steel Pipe Dia. 18" - 12 MM THK 1.0 jt 3,806,400.00 3,806,400.00
g. Supply & Install Steel Plate 12 MM THK 2.0 sheet 3,584,519.00 7,169,038.00
Sub Total 654,319,644.38
D. Install Rebar
a. Rebar for Deadment D16 (400/400) 647.81 kg 18,589.50 12,042,395.59
b. Rebar for Deadment Ø8 (400/400) 175.28 kg 18,589.50 3,258,315.77
c. Rebar for Pile Cap D16 (800/800) 1,527.34 kg 18,589.50 28,392,519.65
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) 533.00 kg 18,589.50 9,908,268.94
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) 67.54 kg 18,589.50 1,255,582.27
f. Rebar for Capping Beam D16 (750/400) 3,423.98 kg 18,589.50 63,650,018.95
g. Rebar for Capping Beam Ø8 (750/400) 692.01 kg 18,589.50 12,864,195.18
h. Rebar for Rubber Fender Beam D16 (800/2500) 1,260.11 kg 18,589.50 23,424,815.59
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") 518.40 kg 18,589.50 9,636,877.11
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") 69.23 kg 18,589.50 1,286,956.49
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") 140.15 kg 18,589.50 2,605,361.55
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") 14.34 kg 18,589.50 266,642.47
m. Rebar for Mooring Bollards Pile Cap D19 1,339.34 kg 18,589.50 24,897,623.75
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") 1,036.81 kg 18,589.50 19,273,754.21
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") 138.46 kg 18,589.50 2,573,912.97
p. Anchor Bar Ø1" (capping beam and pile cap deadment) 738.77 kg 18,589.50 13,733,306.82
12,322.58 kg Sub Total 229,070,547.31
E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" 311.65 m' 227,857.00 71,011,634.05
b. Galvanized Clamp Ø1--1/4" 552.00 ea 42,428.00 23,420,256.00
c. Galvanized Turnbuckle Eye & Eye 45.00 ea 1,178,571.00 53,035,695.00
Sub Total 147,467,585.05
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC)
INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

UNIT PRICE AMOUNT PRICE


N0 VOLUME
( RP) ( RP )

a b c d f = (c x d)

F. Install Plastic Sheet


a. Install Plastic Sheet for Capping Beam 152.16 m2 4,394.80 668,712.77
b. Install Plastic Sheet for Pile Cap and Deadment 80.86 m2 4,394.80 355,363.53
c. Install Plastic Sheet for Rubber Fender 37.12 m2 4,394.80 163,134.98
c. Install Plastic Sheet for Mooring Bollards 35.20 m2 4,394.80 154,696.96
Sub Total 1,341,908.23

G. Sand Fill in to the stell pipe 12" 293.04 m3 286,445.60 83,940,018.62


Sub Total 83,940,018.62
H. Pouring Concrete K-300
a. Pouring Concrete Deadment 400/400 5.32 m3 1,217,857.00 6,478,999.24
b. Pouring Concrete Pile Cap 800/800 6.14 m3 1,217,857.00 7,482,513.41
c. Pouring Concrete Capping Beam 750/400 20.16 m3 1,217,857.00 24,551,997.12
d. Pouring Concrete Rubber Fender 800/2500 12.80 m3 1,217,857.00 15,588,569.60
e. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (rubber fender) 10.18 m3 1,217,857.00 12,401,263.85
f. Pouring Concrete in to Steel Pipe Dia 12" Length 5 M (deadment) 22.63 m3 1,217,857.00 27,558,364.11
g. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (mooring bollards) 20.37 m3 1,217,857.00 24,802,527.70
h. Pouring Concrete in to Steel Pipe Dia 18" Length 1.6 M (mooring bollards) 4.20 m3 1,217,857.00 5,120,511.61
i. Pouring Concrete Pile Cap 2000/2000 (mooring bollards) 9.60 m3 1,217,857.00 11,691,427.20
111.41 m3 Sub Total 135,676,173.84

Grand Total 9,703,547,206.92


7 FINISHING WORK
a. Plestering (1 : 3) for Capping Beam 750/400 110.40 m2 64,837.50 7,158,060.00
b. Supply & Install Rubber Fender 400 x 2300 8.00 ea 12,014,196.00 96,113,568.00
c. Install Ancor Bolt dia 19mm for Rubber Fender (@550 Length) 128.00 ea 320,476.00 41,020,928.00
d. Supply Soil Fill Up 679.05 m3 270,900.00 183,954,645.00
Sub Total 328,247,201.00

TOTAL 11,038,000,000.00
TIME SCHEDULE
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA
]

Monthly
Weight 1 2 3 4 5 6 7
Scale
No. Description Unit Qty Factor Weekly
(%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
Daily
(1 - 7) (8 - 15) (16 - 22) (23 - 30) (1 - 7) (8 - 15) (16 - 22) (23 - 30) (1 - 7) (8 - 15) (16 - 22) (23 - 30) (1 - 7) (8 - 15) (16 - 22) (23 - 30) (1 - 7) (8 - 15) (16 - 22) (23 - 30) (1 - 7) (8 - 15) (16 - 22) (23 - 30) (1 - 7) (8 - 15) (16 - 22) (23 - 30)

INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

TECHNICAL PLANNING DESIGN CONSULTANT FOR CONSTRUCTION


a Soil investigation Ls 1.00 0.976% 0.244% 0.244% 0.244% 0.244%
b Design and Calculation Ls 1.00 0.976% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081%
c Design drawing Ls 1.00 0.976% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081%
d Construction Engineering Ls 1.00 0.976% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081% 0.081%
e Final document Ls 1.00 0.976% 0.244% 0.244% 0.244% 0.244%

MOBILIZATION & DEMOBILIZATION Ls 1.00 2.791% 0.233% 0.233% 0.233% 0.233% 0.233% 0.233% 0.233% 0.233% 0.116% 0.349% 0.349% 0.116%

PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.714% 0.143% 0.143% 0.143% 0.143% 0.143%

PREPARATION WORK
a. Clean up area m2 1,237.50 0.062% 0.062%
b. Install Bowplank m' 134.00 0.091% 0.091%

EXCAVATION AND BACKFILL WORK


a. Excavation Deadment 400/400 m3 2.23 0.001% 0.001% 0.000%
b. Excavation Pile Cap 800/800 m3 6.14 0.003% 0.002% 0.001%
c. Excavation for Line Tie Rod m3 95.33 0.048% 0.029% 0.019%
d. Backfill for Excavation m3 34.57 0.019% 0.011% 0.008%
e. Backfill Area (Compacted) m3 679.05 0.507% 0.304% 0.203%

STRUCTURE WORK
PROCUREMENT
a. Supply Sheet Pile W-450 A-1000 jt 67.00 23.159% 1.447% 1.447% 10.132% 10.132%
b. Supply Piling Steel Pipe Dia. 12" THK (anchor pilling) jt 30.00 7.825% 0.245% 0.245% 0.245% 0.245% 1.712% 1.712% 1.712% 1.712%
c. Supply Piling Steel Pipe Dia. 12" THK (mooring bollards pilling) jt 36.00 9.390% 0.293% 0.293% 0.293% 0.293% 2.054% 2.054% 2.054% 2.054%
d. Supply Piling Steel Pipe Dia. 12" THK (fender pilling) jt 18.00 4.695% 0.147% 0.147% 0.147% 0.147% 1.027% 1.027% 1.027% 1.027%
e. Steel Pile ø 18" ASTM A 252 jt 1.00 0.284% 0.009% 0.009% 0.009% 0.009% 0.062% 0.062% 0.062% 0.062%
f. Rebar Concrete kg 12,322.58 4.842% 1.211% 1.211% 1.211% 1.211%
g. Galvanized Sling ø 1 1/4" m' 311.65 0.450% 0.113% 0.113% 0.113% 0.113%
h. Galvanized Clamp ø 1 1/4" crossby clips G-450 ea 552.00 0.149% 0.037% 0.037% 0.037% 0.037%
i. Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145 ea 45.00 0.336% 0.084% 0.084% 0.084% 0.084%
j. Concrete m3 111.41 2.213% 0.553% 0.553% 0.553% 0.553%
k. Sand m3 293.04 0.760% 0.190% 0.190% 0.190% 0.190%
l. Fender Rubber ea 8.00 1.412% 0.706% 0.706%
m. Soil for fill up m3 679.05 0.615% 0.615%

CONSTRUCTION 0.32
A. PILING SHEET PILE AND STEEL PILE
a. Supply Sheet Pile (W-450 A -1000) jt 67.00 19.950% 4.987% 4.987% 4.987% 4.987%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.767% 1.44% 1.44% 1.44% 1.44%

A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.066% 0.066%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.041% 0.041%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.273% 0.09% 0.09% 0.09%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.083% 0.083%
e. Install Formwork for Mooring Bollard m2 14.40 0.026% 0.026%

C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.061% 0.061%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.034% 0.034%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.065% 0.065%

D. Install Rebar
a. Rebar for Deadment D16 (400/400) kg 647.81 0.109% 0.036% 0.036% 0.036%
b. Rebar for Deadment Ø8 (400/400) kg 175.28 0.030% 0.010% 0.010% 0.010%
c. Rebar for Pile Cap D16 (800/800) kg 1,527.34 0.257% 0.086% 0.086% 0.086%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.090% 0.030% 0.030% 0.030%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.011% 0.004% 0.004% 0.004%
f. Rebar for Capping Beam D16 (750/400) kg 3,423.98 0.577% 0.192% 0.192% 0.192%
g. Rebar for Capping Beam Ø8 (750/400) kg 692.01 0.117% 0.039% 0.039% 0.039%
h. Rebar for Rubber Fender Beam D16 (800/2500) kg 1,260.11 0.212% 0.212%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.087% 0.087%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012% 0.012%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.024% 0.024%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.002% 0.002%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.226% 0.226%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.175% 0.175%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.023% 0.023%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.124% 0.124%

E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.643% 0.643%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.212% 0.212%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.480% 0.480%

F. Install Plastic Sheet


a. Install Plastic Sheet for Capping Beam m2 152.16 0.006% 0.002% 0.002% 0.002%
b. Install Plastic Sheet for Pile Cap and Deadment m2 80.86 0.003% 0.003%
c. Install Plastic Sheet for Rubber Fender m2 37.12 0.001% 0.001%
c. Install Plastic Sheet for Mooring Bollards m2 35.20 0.001% 0.001%

G. Sand Fill in to the stell pipe 12" 293.04 0.760% 0.253% 0.253% 0.253%

H. Pouring Concrete K-300


a. Pouring Concrete Deadment 400/400 m3 5.32 0.059% 0.059%
b. Pouring Concrete Pile Cap 800/800 m3 6.14 0.068% 0.068%
c. Pouring Concrete Capping Beam 750/400 m3 20.16 0.222% 0.222%
d. Pouring Concrete Rubber Fender 800/2500 m3 12.80 0.141% 0.141%
e. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (rubber fender) m3 10.18 0.112% 0.112%
f. Pouring Concrete in to Steel Pipe Dia 12" Length 5 M (deadment) m3 22.63 0.250% 0.250%
g. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (mooring bollards) m3 20.37 0.225% 0.225%
h. Pouring Concrete in to Steel Pipe Dia 18" Length 1.6 M (mooring bollards) m3 4.20 0.046% 0.046%
i. Pouring Concrete Pile Cap 2000/2000 (mooring bollards) m3 9.60 0.106% 0.106%

FINISHING WORK 0.03


a. Plestering (1 : 3) for Capping Beam 750/400 m2 110.40 0.065% 0.065%
b. Supply & Install Rubber Fender 400 x 2300 ea 8.00 0.871% 0.871%
c. Install Ancor Bolt dia 19mm for Rubber Fender (@550 Length) ea 128.00 0.372% 0.372%
d. Supply Soil Fill Up m3 679.05 1.667% 0.833% 0.833%

0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.00% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

Total Progress 100.000% 0.233% 0.233% 0.721% 0.721% 0.721% 0.721% 0.477% 0.619% 2.681% 2.528% 11.213% 11.213% 11.297% 11.297% 11.889% 12.120% 3.449% 3.734% 2.608% 3.004% 1.725% 1.718% 1.103% 1.477% 1.289% 0.724% 0.244% 0.244%

Total Cummulative Progress 0.000% 0.233% 0.465% 1.186% 1.906% 2.627% 3.348% 3.824% 4.444% 7.124% 9.652% 20.865% 32.077% 43.374% 54.671% 66.560% 78.681% 82.129% 85.863% 88.471% 91.475% 93.200% 94.918% 96.021% 97.498% 98.787% 99.512% 99.756% 100.000%

ENINEERING 8.385%

PROCURUMENT 56.131%

CONSTRUCTION 35.483%

TOTAL 100.000%
Attachment "C-3"
Commercial Bid Data Sheets
Page 1 of 2
PROPOSED RATES OF SERVICES
Seluruh nilai dalam Rupiah
All amounts in Indonesia Rupiah

ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT
LAGAN STAGING RIVER

Total cost Weight


No Description IDR

1 Technical Planning Design Consultant for Construction 538,688,016.67 4.880%

2 Mobilization & Demobilization 308,072,000.00 2.791%

3 Cost to arrange Permit for Concrete Sheet Pile Mobilization 78,826,299.64 0.714%

4 Preparation Work 16,854,593.88 0.153%

5 Excavation and Back Fill 63,764,681.89 0.578%

6 Structure Work 9,703,547,206.92 87.910%

7 Finishing Work 328,247,201.00 2.974%

Total Price 11,038,000,000.00 100.000%

(in word : Eleven Billion Thirty Eight Million Indonesian Rupiahs)


`
Catatan : Notes :

• PERUSAHAAN akan melakukan pembayaran • Upon property documented written request (s)
hanya untuk pekerjaan yang telah diselasaikan from CONTRACTOR, COMPANY may make
mengacu ke ketentuan yang tertera pada progress payments for completed work according
kontrak ini setelah penyelesaian pekerjaan : to the terms of this Agreement once the work progress:
−25% akan dibayarkan jika progress −25% will be paid if progress reaches 25%
mencapai 25% 25%
−50% akan dibayar jika progress −50% will be paid if progress reaches 50%
mencapai 50% 50%
−75% akan dibayar jika progress −75% will be paid if progress reaches 75%
mencapai 75% 75%
−100% akan dibayar jika progress −100% will be paid if progress reaches 100%
mencapai 100% 100%
Tagihan KONTRAKTOR akan dibayarkan jika CONTRACTOR invoices will be paid if progress
progress pekerjaan telah diterima oleh is accepted by COMPANY's
perwakilan PERUSAHAAN. designated representative
Attachment "C-3"
Commercial Bid Data Sheets
Page 2 of 2

• Seluruh biaya peralatan, base camp, tenaga kerja/personil, • All equipment, manpower / personel, materials, mobilization &
barang material, mobilisasi & demobilisasi dan hal-hal lainya demobilization fees and other miscellaneous cost required to complete
yang diperlukan dalam penyelesaian Jasa (tidak termasuk yang the Services (exclude COMAPNY provided) as specified in Exhibit "A",
ditanggung oleh PERUSAHAAN) seperti yang dijelaskan di COMPANY's specification / suply and all CONTRACTOR's responsibilities
dalam Lampiran "A", Spesifikasi PERUSAHAAN dan seluruh as stated in Exhibit "A" there to are included in the total contract value.
tanggung jawab KONTRAKTOR sesuai yang diatur di dalam CONTARCTOR guarantees that there will be no additional charges to
Lampiran "A" adalah sudah termasuk di dalam total nilai complete said Services, other than agreed change order for variance of
keseluruhan kontrak. KONTRAKTOR menjamin bahwa tidak ada work outside the Scope of Services.
biaya tambahan untuk menyelesaikan pekerjaan kecuali adanya
persetujuan perintah perubahan untuk pekerjaan berbeda di
luar lingkup pekerjaan.

• Harga-harga tersebut tidak termasuk Pajak Pertambahan Nilai • The above rates exclude Value Added Tax (VAT).
(PPN).

• Bilamana total Harga Penawaran lebih dari Rp. 2.500.000.000,- • If total of Bid Value more than IDR. 2.500.000.000,- (Two billion five
(Dua miliar lima ratus juta rupiah) atau lebih dari USD. hundred million Indonesian Rupiahs) or more than USD. 250.000,- (Two
250.000,- (Dua ratus lima puluh ribu Dollar Amerika Serikat) hunderd fifty thousand United States Dollar), hen BIDDER must attach
maka PESERTA TENDER harus melampirkan Jaminan the Bid Bond in its Commercial Bid Proposal (Envelope II) in the
Penawaran di dalam Pengajuan Penawaran Harganya (Sampul amounth of which is mentioned in Article 5 page 12 in the Tender
II) sebesar yang disebutkan di Artikel 5 halaman 12 dalam Document.
Dokumen Tender.

The BIDDER hereby certifies that having examined the standard Contract and other documents in these ITB No. PCJ-3047-CA, that proposed
compensation totaling IDR. 4.800.000.000,- (in words, Four Billion Eight Hundred Million Indonesian Rupiahs) have been carefully checked
and submitted as correct and final, representing the BIDDER's commercial proposal and fixed for full term of the Contract.

Jambi, 28 Mei 2019


PT. ADE KONSTRUKSI ABADI

Materai

GABRIEL D. HANDRIANTO
DIREKTUR

Catatan / Note :

Jika mengajukan diri sebagai Konsorsium maka Surat Penawaran ini harus ditandatangani oleh seluruh anggota Konsorsium yang berwenang.
If bidding as a Consortium, this offering letter must be signed by the entire authorized consortium members.
ENGINEERING, PROCUREMENT AND
]

No. Description Unit Qty Weight Factor (%)

INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

TECHNICAL PLANNING DESIGN CONSULTANT FOR CONSTRUCTION 4.880%


a Soil investigation Ls 1.00 0.976% 20.000%
b Design and Calculation Ls 1.00 0.976% 20.000%
c Design drawing Ls 1.00 0.976% 20.000%
d Construction Engineering Ls 1.00 0.976% 20.000%
e Final document Ls 1.00 0.976% 20.000%

MOBILIZATION & DEMOBILIZATION Ls 1.00 2.791% 2.791% 100.000%

PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.714% 0.714% 100.000%

PREPARATION WORK 0.153%


a. Clean up area m2 1,237.50 0.062% 40.470%
b. Stake out Survey Ls 1.00 0.091% 59.530%

EXCAVATION AND BACKFILL WORK 0.578%


a. Excavation Deadment 400/400 m3 2.23 0.001% 0.194%
b. Excavation Pile Cap 800/800 m3 6.14 0.003% 0.535%
c. Excavation for Line Tie Rod m3 95.33 0.048% 8.300%
d. Backfill for Excavation m3 34.57 0.019% 3.261%
e. Backfill Area (Compacted) m3 679.05 0.507% 87.709%

STRUCTURE WORK 87.910% 63.850%


PROCUREMENT 36.150% 56.131%
a. Supply Sheet Pile W-500 A-1000 jt 67.00 23.159% 41.259%
b. Supply Piling Steel Pipe Dia. 12" THK (anchor pilling) jt 30.00 7.825% 13.941%
c. Supply Piling Steel Pipe Dia. 12" THK (mooring bollards pilling) jt 36.00 9.390% 16.729%
d. Supply Piling Steel Pipe Dia. 12" THK (fender pilling) jt 18.00 4.695% 8.364%
e. Steel Pile ø 18" ASTM A 252 jt 1.00 0.284% 0.506%
f. Rebar Concrete kg 12,322.58 4.842% 8.627%
g. Galvanized Sling ø 1 1/4" m' 311.65 0.450% 0.802%
h. Galvanized Clamp ø 1 1/4" crossby clips G-450 ea 552.00 0.149% 0.265%
i. Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145 ea 45.00 0.336% 0.599%
j. Concrete m3 111.41 2.213% 3.942%
k. Sand m3 293.04 0.760% 1.355%
l. Fender Rubber ea 8.00 1.412% 2.516%
m. Soil for fill up m3 679.05 0.615% 1.096%

CONSTRUCTION 0.32
A. PILING SHEET PILE AND STEEL PILE 31.779%
a. Install Sheet Pile (W-500 A -1000) jt 67.00 19.950% 62.776%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.767% 18.148%

B. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.066% 0.207%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.041% 0.129%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.273% 0.858%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.083% 0.260%
e. Install Formwork for Mooring Bollard m2 14.40 0.026% 0.083%

C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.061% 0.193%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.034% 0.109%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.065% 0.204%

D. Install Rebar
a. Rebar for Deadment D16 (400/400) kg 647.81 0.109% 0.343%
b. Rebar for Deadment Ø8 (400/400) kg 175.28 0.030% 0.093%
c. Rebar for Pile Cap D16 (800/800) kg 1,527.34 0.257% 0.809%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.090% 0.282%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.011% 0.036%
f. Rebar for Capping Beam D16 (750/400) kg 3,423.98 0.577% 1.815%
g. Rebar for Capping Beam Ø8 (750/400) kg 692.01 0.117% 0.367%
h. Rebar for Rubber Fender Beam D16 (800/2500) kg 1,260.11 0.212% 0.668%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.087% 0.275%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012% 0.037%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.024% 0.074%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.002% 0.008%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.226% 0.710%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.175% 0.549%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.023% 0.073%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.124% 0.392%

E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.643% 2.024%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.212% 0.668%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.480% 1.512%

F. Install Plastic Sheet


a. Install Plastic Sheet for Capping Beam m2 152.16 0.006% 0.019%
b. Install Plastic Sheet for Pile Cap and Deadment m2 80.86 0.003% 0.010%
c. Install Plastic Sheet for Rubber Fender m2 37.12 0.001% 0.005%
c. Install Plastic Sheet for Mooring Bollards m2 35.20 0.001% 0.004%

G. Sand Fill in to the stell pipe 12" 293.04 0.760% 2.393%

H. Pouring Concrete K-300


a. Pouring Concrete Deadment 400/400 m3 5.32 0.059% 0.185%
b. Pouring Concrete Pile Cap 800/800 m3 6.14 0.068% 0.213%
c. Pouring Concrete Capping Beam 750/400 m3 20.16 0.222% 0.700%
d. Pouring Concrete Rubber Fender 800/2500 m3 12.80 0.141% 0.444%
e. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (rubber fender) m3 10.18 0.112% 0.354%
f. Pouring Concrete in to Steel Pipe Dia 12" Length 5 M (deadment) m3 22.63 0.250% 0.786%
g. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (mooring bollards) m3 20.37 0.225% 0.707%
h. Pouring Concrete in to Steel Pipe Dia 18" Length 1.6 M (mooring bollards) m3 4.20 0.046% 0.146%
i. Pouring Concrete Pile Cap 2000/2000 (mooring bollards) m3 9.60 0.106% 0.333%

FINISHING WORK 2.974%


a. Plestering (1 : 3) for Capping Beam 750/400 m2 110.40 0.065% 2.181%
b. Supply & Install Rubber Fender 400 x 2300 ea 8.00 0.871% 29.281%
c. Install Ancor Bolt dia 19mm for Rubber Fender (@550 Length) ea 128.00 0.372% 12.497%
d. Supply Soil Fill Up m3 679.05 1.667% 56.041%

Total Progress 100.000% 100.000% 800.000%

Total Cummulative Progress 0.000%


TIME SCHEDULE
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA

Monthly
Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20
Weekly
No. Description Unit Qty Weight Factor (%) Remark
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Daily
(5 - 11) (12 - 18) (19 - 25) (26 - 02) (3 - 9) (4 - 16) (17 - 23) (24 - 30) (31 - 6) (7 - 13) (14 - 20) (21 - 27) (28 - 4) (5 - 11) (12 - 18) (19 - 25) (26 - 1) (2 - 8) (09 - 15) (16 - 22) (23 - 29) (30 - 05) (06 - 12) (13 - 19) (20 - 26) (27 - 04) (05 - 11) (12 - 18) (19 -25) (26 - 1) (2 - 5)

INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

TECHNICAL PLANNING DESIGN CONSULTANT FOR CONSTRUCTION 4.148%


a Soil investigation Ls 1.00 0.830% 0.207% 0.207% 0.207% 0.207%
b Design and Calculation Ls 1.00 0.830% 0.041% 0.041% 0.041% 0.041% 0.083% 0.083% 0.083% 0.083% 0.083% 0.083% 0.083% 0.083%
c Design drawing Ls 1.00 0.830% 0.041% 0.041% 0.041% 0.041% 0.083% 0.083% 0.083% 0.083% 0.083% 0.083% 0.083% 0.083%
d Construction Engineering Ls 1.00 0.830% 0.041% 0.041% 0.041% 0.041% 0.083% 0.083% 0.083% 0.083% 0.083% 0.083% 0.083% 0.083%
e Final document Ls 1.00 0.830% 0.332% 0.249% 0.166% 0.066% 0.017%

MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0.126% 0.126% 0.126% 0.126% 0.126% 0.126% 0.126% 0.126% 0.063% 0.189% 0.189% 0.063%

PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0.092% 0.092% 0.092% 0.092% 0.092%

PREPARATION WORK 0.128%


a. Clean up area m2 1,237.50 0.052% 0.052%
b. Stake out Survey Ls 1.00 0.076% 0.076%

EXCAVATION AND BACKFILL WORK 0.328%


a. Excavation Deadment 400/400 m3 2.23 0.001% 0.000% 0.0003%
b. Excavation Pile Cap 800/800 m3 6.14 0.002% 0.001% 0.001%
c. Excavation for Line Tie Rod m3 95.33 0.027% 0.016% 0.011%
d. Backfill for Excavation m3 34.57 0.011% 0.006% 0.004%
e. Backfill Area (Compacted) m3 679.05 0.288% 0.173% 0.115%

STRUCTURE WORK 58.288%


PROCUREMENT
a. Supply Sheet Pile W-500 A-1000 jt 67.00 24.050% 2.405% 2.405% 2.405% 2.405% 2.405% 2.405% 4.810% 4.810%
b. Supply Piling Steel Pipe Dia. 12" THK (anchor pilling) jt 30.00 8.126% 2.031% 2.031% 2.031% 2.031%
c. Supply Piling Steel Pipe Dia. 12" THK (mooring bollards pilling) jt 36.00 9.751% 2.438% 2.438% 2.438% 2.438%
d. Supply Piling Steel Pipe Dia. 12" THK (fender pilling) jt 18.00 4.875% 1.219% 1.219% 1.219% 1.219%
e. Steel Pile ø 18" ASTM A 252 jt 1.00 0.295% 0.074% 0.074% 0.074% 0.074%
f. Rebar Concrete kg 12,322.58 5.028% 1.257% 1.257% 1.257% 1.257%
g. Galvanized Sling ø 1 1/4" m' 311.65 0.468% 0.117% 0.117% 0.117% 0.117%
h. Galvanized Clamp ø 1 1/4" crossby clips G-450 ea 552.00 0.154% 0.039% 0.039% 0.039% 0.039%
i. Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145 ea 45.00 0.349% 0.087% 0.087% 0.087% 0.087%
j. Concrete m3 111.41 2.298% 0.574% 0.574% 0.574% 0.574%
k. Sand m3 293.04 0.790% 0.197% 0.197% 0.197% 0.197%
l. Fender Rubber ea 8.00 1.466% 0.733% 0.733%
m. Soil for fill up m3 679.05 0.639% 0.639%

CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 5.179% 5.179% 5.179% 5.179%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 2.99% 2.99%

B. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0.034% 0.034%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0.021% 0.021%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0.142% 0.142%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0.043% 0.043%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0.014% 0.014%

C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0.064%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0.036%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0.067%

D. Install Rebar
a. Rebar for Deadment D16 (400/400) kg 647.81 0.113% 0.038% 0.038% 0.038%
b. Rebar for Deadment Ø8 (400/400) kg 175.28 0.031% 0.010% 0.010% 0.010%
c. Rebar for Pile Cap D16 (800/800) kg 1,527.34 0.267% 0.067% 0.067% 0.067% 0.067%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.093% 0.031% 0.031% 0.031%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.012% 0.012%
f. Rebar for Capping Beam D16 (750/400) kg 3,423.98 0.599% 0.120% 0.120% 0.120% 0.120% 0.120%
g. Rebar for Capping Beam Ø8 (750/400) kg 692.01 0.121% 0.024% 0.024% 0.024% 0.024% 0.024%
h. Rebar for Rubber Fender Beam D16 (800/2500) kg 1,260.11 0.220% 0.073% 0.073% 0.073%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.091% 0.045% 0.045%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012% 0.012%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.025% 0.025%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.003% 0.003%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.234% 0.117% 0.117%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.181% 0.091% 0.091%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.024% 0.024%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.129% 0.065% 0.065%

E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0.668%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0.220%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0.499%

F. Install Plastic Sheet


a. Install Plastic Sheet for Capping Beam m2 152.16 0.006% 0.006%
b. Install Plastic Sheet for Pile Cap and Deadment m2 80.86 0.003% 0.003%
c. Install Plastic Sheet for Rubber Fender m2 37.12 0.002% 0.002%
c. Install Plastic Sheet for Mooring Bollards m2 35.20 0.001% 0.001%

G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0.395% 0.395%

H. Pouring Concrete K-300


a. Pouring Concrete Deadment 400/400 m3 5.32 0.061% 0.030% 0.030%
b. Pouring Concrete Pile Cap 800/800 m3 6.14 0.070% 0.035% 0.035%
c. Pouring Concrete Capping Beam 750/400 m3 20.16 0.231% 0.115% 0.115%
d. Pouring Concrete Rubber Fender 800/2500 m3 12.80 0.147% 0.073% 0.073%
e. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (rubber fender) m3 10.18 0.117% 0.058% 0.058%
f. Pouring Concrete in to Steel Pipe Dia 12" Length 5 M (deadment) m3 22.63 0.259% 0.130% 0.130%
g. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (mooring bollards) m3 20.37 0.233% 0.117% 0.117%
h. Pouring Concrete in to Steel Pipe Dia 18" Length 1.6 M (mooring bollards) m3 4.20 0.048% 0.024% 0.024%
i. Pouring Concrete Pile Cap 2000/2000 (mooring bollards) m3 9.60 0.110% 0.055% 0.055%

FINISHING WORK 2.135%


a. Plestering (1 : 3) for Capping Beam 750/400 m2 110.40 0.047% 0.047%
b. Supply & Install Rubber Fender 400 x 2300 ea 8.00 0.625% 0.625%
c. Install Ancor Bolt dia 19mm for Rubber Fender (@550 Length) ea 128.00 0.267% 0.267%
d. Supply Soil Fill Up m3 679.05 1.196% 0.957% 0.120% 0.120%

Total Progress 100.000% 100.000% 0.207% 0.207% 0.207% 0.207% 0.124% 0.124% 0.201% 0.124% 2.654% 2.780% 2.832% 2.872% 9.890% 9.890% 13.067% 13.067% 7.197% 7.071% 5.566% 5.633% 3.901% 4.267% 2.213% 1.951% 1.789% 1.127% 0.332% 0.249% 0.166% 0.066% 0.017%

Total Cummulative Progress 0.000% 0.207% 0.415% 0.622% 0.830% 0.954% 1.078% 1.279% 1.404% 4.058% 6.837% 9.669% 12.541% 22.431% 32.322% 45.389% 58.456% 65.653% 72.724% 78.290% 83.923% 87.823% 92.090% 94.303% 96.254% 98.044% 99.170% 99.502% 99.751% 99.917% 99.983% 100.000%

Prepared by, Approved by,


PT. Ade Konstruksi Abadi PetroChina International Jabung Ltd

M.Siwa Kumar Ekawati Masri / Setiaandhika


Project Manager Construction Superintendent
TIME SCHEDULE
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA

Monthly
Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20
Weekly
No. Description Unit Qty Weight Factor (%) Remark
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
Daily
(5 - 11) (12-18) (19-26) (27-04) (5-11) (12-19) (20-27) (28-04) (05-11) (12-18) (19-26) (27-04) (05-11) (12-19) (20-27) (28-04) (05-11) (12-19) (20-27) (28-04) (05-11) (12-18) (19-25) (26-04) (05-11) (12-19) (20-27) (28-04)

INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

TECHNICAL PLANNING DESIGN CONSULTANT FOR CONSTRUCTION 4.148%


a Soil investigation Ls 1.00 0.830% 0.207% 0.207% 0.207% 0.207%
b Design and Calculation Ls 1.00 0.830% 0.041% 0.041% 0.041% 0.041% 0.083% 0.083% 0.083% 0.083% 0.083% 0.083% 0.083% 0.083%
c Design drawing Ls 1.00 0.830% 0.041% 0.041% 0.041% 0.041% 0.083% 0.083% 0.083% 0.083% 0.083% 0.083% 0.083% 0.083%
d Construction Engineering Ls 1.00 0.830% 0.041% 0.041% 0.041% 0.041% 0.083% 0.083% 0.083% 0.083% 0.083% 0.083% 0.083% 0.083%
e Final document Ls 1.00 0.830% 0.415% 0.249% 0.166%

MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0.756% 0.756%

PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0.229% 0.229%

PREPARATION WORK 0.128%


a. Clean up area m2 1,237.50 0.052% 0.052%
b. Stake out Survey Ls 1.00 0.076% 0.076%

EXCAVATION AND BACKFILL WORK 0.328%


a. Excavation Deadment 400/400 m3 2.23 0.001% 0.000% 0.0003%
b. Excavation Pile Cap 800/800 m3 6.14 0.002% 0.001% 0.001%
c. Excavation for Line Tie Rod m3 95.33 0.027% 0.016% 0.011%
d. Backfill for Excavation m3 34.57 0.011% 0.006% 0.004%
e. Backfill Area (Compacted) m3 679.05 0.288% 0.288%

STRUCTURE WORK 58.288%


PROCUREMENT
a. Supply Sheet Pile W-500 A-1000 jt 67.00 24.050% 2.405% 2.405% 2.405% 2.405% 2.405% 2.405% 2.405% 1.202% 1.202% 1.202% 3.607%
b. Supply Piling Steel Pipe Dia. 12 3/4" THK (anchor pilling) jt 30.00 8.126% 2.031% 2.031% 2.031% 2.031%
c. Supply Piling Steel Pipe Dia. 12 3/4" THK (mooring bollards pilling) jt 36.00 9.751% 2.438% 2.438% 2.438% 2.438%
d. Supply Piling Steel Pipe Dia. 12 3/4" THK (fender pilling) jt 18.00 4.875% 1.219% 1.219% 1.219% 1.219%
e. Steel Pile ø 18" ASTM A 252 jt 1.00 0.295% 0.074% 0.074% 0.074% 0.074%
f. Rebar Concrete kg 12,322.58 5.028% 1.257% 1.257% 1.257% 1.257%
g. Galvanized Sling ø 1 3/4" m' 311.65 0.468% 0.117% 0.117% 0.117% 0.117%
h. Galvanized Clamp ø 1 3/4" crossby clips G-450 ea 552.00 0.154% 0.039% 0.039% 0.039% 0.039%
i. Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145 ea 45.00 0.349% 0.087% 0.087% 0.087% 0.087%
j. Concrete m3 111.41 2.298% 0.574% 0.574% 0.574% 0.574%
k. Sand m3 293.04 0.790% 0.197% 0.197% 0.197% 0.197%
l. Fender Rubber ea 8.00 1.466% 0.733% 0.733%
m. Soil for fill up m3 679.05 0.639% 0.639%

CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 5.179% 5.179% 5.179% 5.179%
b. Install Piling Steel Pipe Dia. 12 3/4" THK point 28.00 5.989% 2.99% 2.99%

B. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0.034% 0.034%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0.021% 0.021%
c. Install Formwork for Concrete Capping Beam 1000/500 m2 148.80 0.283% 0.142% 0.142%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0.043% 0.043%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0.014% 0.014%

C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0.064%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0.036%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0.067%

D. Fabricating & Installing ReBar


a. Rebar for Deadment D16 (400/400) kg 647.81 0.113% 0.038% 0.038% 0.038%
b. Rebar for Deadment Ø8 (400/400) kg 175.28 0.031% 0.010% 0.010% 0.010%
c. Rebar for Pile Cap D16 (800/800) kg 1,527.34 0.267% 0.067% 0.067% 0.067% 0.067%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.093% 0.031% 0.031% 0.031%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.012% 0.012%
f. Rebar for Capping Beam D16 (750/400) kg 3,423.98 0.599% 0.120% 0.120% 0.120% 0.120% 0.120%
g. Rebar for Capping Beam Ø8 (750/400) kg 692.01 0.121% 0.024% 0.024% 0.024% 0.024% 0.024%
h. Rebar for Rubber Fender Beam D16 (800/2500) kg 1,260.11 0.220% 0.073% 0.073% 0.073%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.091% 0.045% 0.045%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012% 0.012%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.025% 0.025%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.003% 0.003%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.234% 0.117% 0.117%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.181% 0.091% 0.091%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.024% 0.024%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.129% 0.065% 0.065%

E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling ɸ1 - 3/4 m' 311.65 0.668% 0.668%
b. Galvanized Sling ɸ1 - 3/4 ea 552.00 0.220% 0.220%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0.499%

F. Install Plastic Sheet


a. Install Plastic Sheet for Capping Beam m2 152.16 0.006% 0.006%
b. Install Plastic Sheet for Pile Cap and Deadment m2 80.86 0.003% 0.003%
c. Install Plastic Sheet for Rubber Fender m2 37.12 0.002% 0.002%
c. Install Plastic Sheet for Mooring Bollards m2 35.20 0.001% 0.001%

G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0.592% 0.197%

H. Pouring Concrete K-300


a. Pouring Concrete Deadment 400/400 m3 5.32 0.061% 0.040% 0.021%
b. Pouring Concrete Pile Cap 800/800 m3 6.14 0.070% 0.046% 0.025%
c. Pouring Concrete Capping Beam 750/400 m3 20.16 0.231% 0.150% 0.081%
d. Pouring Concrete Rubber Fender 800/2500 m3 12.80 0.147% 0.095% 0.051%
e. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (rubber fender) m3 10.18 0.117% 0.076% 0.041%
f. Pouring Concrete in to Steel Pipe Dia 12" Length 5 M (deadment) m3 22.63 0.259% 0.169% 0.091%
g. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (mooring bollards) m3 20.37 0.233% 0.152% 0.082%
h. Pouring Concrete in to Steel Pipe Dia 18" Length 1.6 M (mooring bollards) m3 4.20 0.048% 0.031% 0.017%
i. Pouring Concrete Pile Cap 2000/2000 (mooring bollards) m3 9.60 0.110% 0.071% 0.038%

FINISHING WORK 2.135%


a. Plastering (1:3) for Capping Beaam m2 110.40 0.047% 0.047%
b. Supply & Install Rubber Fender 400H x 2000 ea 8.00 0.625% 0.625%
c. Install Ancor Bolt dia 19mm for Rubber Fender (@550 Length) ea 128.00 0.267% 0.267%
d. Supply Soil Fill Up m3 679.05 1.196% 0.718% 0.419% 0.060%

Total Progress 100.000% 100.000% 0.207% 0.207% 0.207% 0.332% 0.124% 0.124% 0.201% 0.249% 2.654% 2.706% 2.654% 2.654% 2.654% 2.654% 3.426% 8.993% 10.198% 10.955% 16.192% 5.566% 5.323% 5.414% 4.114% 3.983% 2.199% 2.013% 2.102% 1.895%

Total Cummulative Progress 0.000% 0.207% 0.415% 0.622% 0.954% 1.078% 1.203% 1.404% 1.653% 4.306% 7.012% 9.666% 12.320% 14.974% 17.628% 21.053% 30.046% 40.244% 51.199% 67.391% 72.957% 78.280% 83.695% 87.809% 91.791% 93.990% 96.003% 98.105% 100.000%

Prepared by, Approved by,


PT. Ade Konstruksi Abadi PetroChina International Jabung Ltd

M.Siwa Kumar Ekawati Masri / Setiaandhika


Project Manager Construction Superintendent
TIME SCHEDULE
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA

Monthly
Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20
Weekly
No. Description Unit Qty Cost (Rp) Weight Factor (%) Remark
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Daily
(5 - 11) (12 - 18) (19 - 25) (26 - 02) (3 - 9) (4 - 16) (17 - 23) (24 - 30) (31 - 6) (7 - 13) (14 - 20) (21 - 27) (28 - 4) (5 - 11) (12 - 18) (19 - 25) (26 - 1) (2 - 8) (09 - 15) (16 - 22) (23 - 29) (30 - 05) (06 - 12) (13 - 19) (20 - 26) (27 - 04) (05 - 11) (12 - 18) (19 -25) (26 - 1) (2 - 5)

INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

TECHNICAL PLANNING DESIGN CONSULTANT FOR CONSTRUCTION ### 4.148%


a Soil investigation Ls 1.00 0.830% 0.207% 0.207% 0.207% 0.207%
b Design and Calculation Ls 1.00 0.830% 0.041% 0.041% 0.041% 0.041% 0.083% 0.083% 0.083% 0.083% 0.083% 0.083% 0.083% 0.083%
c Design drawing Ls 1.00 0.830% 0.041% 0.041% 0.041% 0.041% 0.083% 0.083% 0.083% 0.083% 0.083% 0.083% 0.083% 0.083%
d Construction Engineering Ls 1.00 0.830% 0.041% 0.041% 0.041% 0.041% 0.083% 0.083% 0.083% 0.083% 0.083% 0.083% 0.083% 0.083%
e Final document Ls 1.00 0.830% 0.332% 0.249% 0.166% 0.066% 0.017%

MOBILIZATION & DEMOBILIZATION Ls 1.00 ### 1.513% 1.513% 0.756% 0.756%

PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 ### 0.458% 0.458% 0.229% 0.229%

PREPARATION WORK ### 0.128%


a. Clean up area m2 1,237.50 0.052% 0.052%
b. Stake out Survey Ls 1.00 0.076% 0.076%

EXCAVATION AND BACKFILL WORK ### 0.328%


a. Excavation Deadment 400/400 m3 2.23 0.001% 0.000% 0.0003%
b. Excavation Pile Cap 800/800 m3 6.14 0.002% 0.001% 0.001%
c. Excavation for Line Tie Rod m3 95.33 0.027% 0.016% 0.011%
d. Backfill for Excavation m3 34.57 0.011% 0.006% 0.004%
e. Backfill Area (Compacted) m3 679.05 0.288% 0.173% 0.115%

STRUCTURE WORK ### 58.288%


PROCUREMENT
a. Supply Sheet Pile W-500 A-1000 jt 67.00 24.050% 2.405% 2.405% 2.405% 2.405% 2.405% 2.405% 2.405% 1.202% 1.202% 1.202% 3.607%
b. Supply Piling Steel Pipe Dia. 12-3/4" THK (anchor pilling) jt 30.00 8.126% 2.031% 2.031% 2.031% 2.031%
c. Supply Piling Steel Pipe Dia. 12-3/4" THK (mooring bollards pilling) jt 36.00 9.751% 2.438% 2.438% 2.438% 2.438%
d. Supply Piling Steel Pipe Dia. 12-3/4" THK (fender pilling) jt 18.00 4.875% 1.219% 1.219% 1.219% 1.219%
e. Steel Pile ø 18" ASTM A 252 jt 1.00 0.295% 0.074% 0.074% 0.074% 0.074%
f. Rebar Concrete kg 12,323 5.028% 1.257% 1.257% 1.257% 1.257%
g. Galvanized Sling ø 1-5/8" m' 311.65 0.468% 0.117% 0.117% 0.117% 0.117%
h. Galvanized Clamp ø 1 -5/8" crossby clips G-450 ea 552.00 0.154% 0.039% 0.039% 0.039% 0.039%
i. Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145 ea 45.00 0.349% 0.087% 0.087% 0.087% 0.087%
j. Concrete m3 111.41 2.298% 0.574% 0.574% 0.574% 0.574%
k. Sand m3 293.04 0.790% 0.197% 0.197% 0.197% 0.197%
l. Fender Rubber ea 8.00 1.466% 0.733% 0.733%
m. Soil for fill up m3 679.05 0.639% 0.639%

CONSTRUCTION ### 33.001%


A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 5.179% 5.179% 5.179% 5.179%
b. Install Piling Steel Pipe Dia. 12-3/4" THK point 28.00 5.989% 2.99% 2.99%

B. Formwork
a. Install Formwork for Concrete Pile Cap m2 35.84 0.068% 0.034% 0.034%
b. Install Formwork for Concrete Deadment m2 22.30 0.042% 0.021% 0.021%
c. Install Formwork for Concrete Capping Beam m2 148.80 0.283% 0.142% 0.142%
d. Install Formwork for Concrete Fender m2 45.12 0.086% 0.043% 0.043%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0.014% 0.014%

C. Install Steel Pipe 4", 12-3/4" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0.064%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0.036%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0.067%

D. Fabricating & Installing ReBar


a. Rebar for Deadment D16 kg 647.81 0.113% 0.038% 0.038% 0.038%
b. Rebar for Deadment D10 kg 175.28 0.031% 0.010% 0.010% 0.010%
c. Rebar for Pile Cap D16 kg 1,527.34 0.267% 0.067% 0.067% 0.067% 0.067%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.093% 0.031% 0.031% 0.031%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.012% 0.012%
f. Rebar for Capping Beam D16 kg 3,423.98 0.599% 0.120% 0.120% 0.120% 0.120% 0.120%
g. Rebar for Capping Beam D10 kg 692.01 0.121% 0.024% 0.024% 0.024% 0.024% 0.024%
h. Rebar for Rubber Fender D16 kg 1,260.11 0.220% 0.073% 0.073% 0.073%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.091% 0.045% 0.045%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012% 0.012%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.025% 0.025%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.003% 0.003%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.234% 0.117% 0.117%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.181% 0.091% 0.091%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.024% 0.024%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.129% 0.065% 0.065%

E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling ɸ1 - 5/8 m' 311.65 0.668% 0.668%
b. Galvanized Sling ɸ1 - 5/8 ea 552.00 0.220% 0.220%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0.499%

F. Install Plastic Sheet


a. Install Plastic Sheet for Capping Beam m2 152.16 0.006% 0.006%
b. Install Plastic Sheet for Pile Cap and Deadment m2 80.86 0.003% 0.003%
c. Install Plastic Sheet for Rubber Fender m2 37.12 0.002% 0.002%
c. Install Plastic Sheet for Mooring Bollards m2 35.20 0.001% 0.001%

G. Sand Fill to the Steel Pipe 12-3/4" 293.04 0.790% 0.395% 0.395%

H. Pouring Concrete K-300


a. Pouring Concrete Deadment m3 5.32 0.061% 0.030% 0.030%
b. Pouring Concrete Pile Cap m3 6.14 0.070% 0.035% 0.035%
c. Pouring Concrete Capping Beam m3 20.16 0.231% 0.115% 0.115%
d. Pouring Concrete Rubber Fender m3 12.80 0.147% 0.073% 0.073%
e. Pouring Concrete in to Steel Pipe Dia 12- 3/4" (Rubber Febder) m3 10.18 0.117% 0.058% 0.058%
f. Pouring Concrete in to Steel Pipe Dia 12-3/4" (Deadment) m3 22.63 0.259% 0.130% 0.130%
g. Pouring Concrete in to Steel Pipe Dia 12-3/4" (Mooring Bollard) m3 20.37 0.233% 0.117% 0.117%
h. Pouring Concrete in to Steel Pipe Dia 18" (Mooring Bollard) m3 4.20 0.048% 0.024% 0.024%
i. Pouring Concrete Pile Cap 2000/2000 (mooring bollards) m3 9.60 0.110% 0.055% 0.055%

FINISHING WORK ### 2.135%


a. Plastering (1:3) for Capping Beaam m2 110.40 0.047% 0.047%
b. Supply & Install Rubber Fender KVF 400H ea 8.00 0.625% 0.625%
c. Install Ancor Bolt dia 19mm for Rubber Fender (@550 Length) ea 128.00 0.267% 0.267%
d. Supply Soil Fill Up m3 679.05 1.196% 0.957% 0.120% 0.120%

Total Progress ### 100.000% 100.000% 0.207% 0.207% 0.207% 0.207% 0.124% 0.124% 0.201% 0.124% 0.249% 2.654% 2.706% 2.654% 2.654% 2.654% 2.654% 3.426% 8.993% 10.198% 10.955% 10.869% 5.566% 5.323% 5.347% 5.406% 3.901% 4.180% 2.339% 2.011% 1.892% 1.949% 0.017%

Total Cummulative Progress 0.000% 0.207% 0.415% 0.622% 0.830% 0.954% 1.078% 1.279% 1.404% 1.653% 4.306% 7.012% 9.666% 12.320% 14.974% 17.628% 21.053% 30.046% 40.244% 51.199% 62.068% 67.634% 72.957% 78.305% 83.711% 87.611% 91.791% 94.131% 96.142% 98.034% 99.983% 100.000%
TIME SCHEDULE
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA
]

Monthly
Weight Sep-19 Oct-19 Nov-19 Dec-19 Jan-19 Feb-19 Mar-19 Apr-19
No. Description Unit Qty Factor Weekly
Scale
(%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Daily
(5 - 11) (12 - 18) (19 - 25) (26 - 02) (3 - 9) (10 - 16) (17 - 23) (24 - 30) (31 - 6) (7 - 13) (14 - 20) (21 - 27) (28 - 4) (5 - 11) (12 - 18) (19 - 25) (26 - 1) (2 - 8) (09 - 15) (16 - 22) (23 - 29) (30 - 05) (06 - 12) (13 - 19) (20 - 26) (27 - 04) (05 - 11) (12 - 18) (19 -25) (26 - 1) (2 - 5)

INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

TECHNICAL PLANNING DESIGN CONSULTANT FOR CONSTRUCTION


a Soil investigation Ls 1.00 0.830% 0.207% 0.207% 0.207% 0.207%
b Design and Calculation
1. Issued for Review ea 3.00 0.277% 0.092% 0.184%
2. Issued for Approval ea 3.00 0.277% 0.092%
3. Approved for Construction ea 3.00 0.277% 0.092%
c Design drawing
1. Issued for Review ea 7.00 0.277% 0.277%
2. Issued for Approval ea 7.00 0.277%
3. Approved for Construction ea 7.00 0.277%
d Construction Engineering
1. Issued for Review ea 33.00 0.277% 0.017% 0.059% 0.017% 0.017% 0.017% 0.025%
2. Issued for Approval ea 33.00 0.277% 0.017% 0.017% 0.017% 0.017%
3. Approved for Construction ea 33.00 0.277% 0.008%
e Final document Ls 1.00 0.830%

MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513%

PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458%

PREPARATION WORK
a. Clean up Area m2 1,237.50 0.052% 0.076%
b. Stake Out Survey Ls 1.00 0.076%

EXCAVATION AND BACKFILL WORK


a. Excavation Deadment 400/600 m3 2.23 0.001%
b. Excavation Pile Cap 800/800 m3 6.14 0.002%
c. Excavation for Line Tie Rod m3 95.33 0.027%
d. Backfill for Excavation m3 34.57 0.011%
e. Backfill Area (Compacted) m3 679.05 0.288%

STRUCTURE WORK
PROCUREMENT
a. Supply Sheet Pile W-500 A-1000 jt 67.00 24.050% 7.215%
b. Supply Piling Steel Pipe Dia. 12" THK (anchor pilling) jt 30.00 8.126% 2.438%
c. Supply Piling Steel Pipe Dia. 12" THK (mooring bollards pilling) jt 36.00 9.751% 2.925%
d. Supply Piling Steel Pipe Dia. 12" THK (fender pilling) jt 18.00 4.875% 1.463%
e. Steel Pile ø 18" ASTM A 252 jt 1.00 0.295%
f. Rebar Concrete kg 12,322.58 5.028%
g. Galvanized Sling ø 1 1/4" m' 311.65 0.468%
h. Galvanized Clamp ø 1 1/4" crossby clips G-450 ea 552.00 0.154%
i. Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145 ea 45.00 0.349%
j. Concrete m3 111.41 2.298%
k. Sand m3 293.04 0.790%
l. Fender Rubber ea 8.00 1.466%
m. Soil for fill up m3 679.05 0.639%

CONSTRUCTION 0.33 0.000%


A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989%

A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086%
e. Install Formwork for Mooring Bollard m2 14.40 0.027%

C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067%

D. Install Rebar
a. Rebar for Deadment D16 (400/400) kg 647.81 0.113%
b. Rebar for Deadment Ø8 (400/400) kg 175.28 0.031%
c. Rebar for Pile Cap D16 (800/800) kg 1,527.34 0.267%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.093%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.012%
f. Rebar for Capping Beam D16 (750/400) kg 3,423.98 0.599%
g. Rebar for Capping Beam Ø8 (750/400) kg 692.01 0.121%
h. Rebar for Rubber Fender Beam D16 (800/2500) kg 1,260.11 0.220%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.091%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.025%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.003%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.234%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.181%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.024%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.129%

E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499%

F. Install Plastic Sheet


a. Install Plastic Sheet for Capping Beam m2 152.16 0.006%
b. Install Plastic Sheet for Pile Cap and Deadment m2 80.86 0.003%
c. Install Plastic Sheet for Rubber Fender m2 37.12 0.002%
c. Install Plastic Sheet for Mooring Bollards m2 35.20 0.001%

G. Sand Fill in to the stell pipe 12" 293.04 0.790%


0.000%
H. Pouring Concrete K-300
a. Pouring Concrete Deadment 400/400 m3 5.32 0.061%
b. Pouring Concrete Pile Cap 800/800 m3 6.14 0.070%
c. Pouring Concrete Capping Beam 750/400 m3 20.16 0.231%
d. Pouring Concrete Rubber Fender 800/2500 m3 12.80 0.147%
e. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (rubber fender) m3 10.18 0.117%
f. Pouring Concrete in to Steel Pipe Dia 12" Length 5 M (deadment) m3 22.63 0.259%
g. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (mooring bollards) m3 20.37 0.233%
h. Pouring Concrete in to Steel Pipe Dia 18" Length 1.6 M (mooring bollards) m3 4.20 0.048%
i. Pouring Concrete Pile Cap 2000/2000 (mooring bollards) m3 9.60 0.110%

FINISHING WORK
a. Plestering (1 : 3) for Capping Beam 750/400 m2 110.40 0.047%
b. Supply & Install Rubber Fender 400 x 2300 ea 8.00 0.625%
c. Install Ancor Bolt dia 19mm for Rubber Fender (@550 Length) ea 128.00 0.267%
d. Supply Soil Fill Up m3 679.05 1.196%

100.000%

Plan 0.207% 0.207% 0.207% 0.207% 0.124% 0.124% 0.201% 0.124% 2.654% 2.780% 2.832% 2.872% 9.890% 9.890% 13.067% 13.067% 7.197% 7.071% 5.566% 5.633% 3.901% 4.267% 2.213% 1.951% 1.789% 1.127% 0.332% 0.249% 0.166% 0.066% 0.017%

Cummulative Plan 0.207% 0.415% 0.622% 0.830% 0.954% 1.078% 1.279% 1.404% 4.058% 6.837% 9.669% 12.541% 22.431% 32.322% 45.389% 58.456% 65.653% 72.724% 78.290% 83.923% 87.823% 92.090% 94.303% 96.254% 98.044% 99.170% 99.502% 99.751% 99.917% 99.983% 100.000%

Actual 0.207% 0.207% 0.207% 0.284% 0.000% 0.000% 0.109% 0.427% 0.034% 0.034% 7.341% 7.060% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

Cumulative Actual 0.207% 0.415% 0.622% 0.906% 0.906% 0.906% 1.015% 1.442% 1.476% 1.509% 8.850% 15.910% 15.910% 15.910% 15.910% 15.910% 15.910% 15.910% 15.910% 15.910% 15.910% 15.910% 15.910% 15.910% 15.910% 15.910% 15.910% 15.910% 15.910% 15.910% 15.910%

Deviation 0.000% 0.000% 0.000% 0.076% -0.048% -0.172% -0.264% 0.039% -2.582% -5.328% -0.819% 3.369% - - - - - - - - - - - - - - - - - - -
TIME SCHEDULE
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA

Monthly
Weight Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20
No. Description Unit Qty Factor Weekly
Remark
(%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Daily
(5 - 11) (12 - 18) (19 - 25) (26 - 02) (3 - 9) (10 - 16) (17 - 23) (24 - 30) (31 - 6) (7 - 13) (14 - 20) (21 - 27) (28 - 4) (5 - 11) (12 - 18) (19 - 25) (26 - 1) (2 - 8) (09 - 15) (16 - 22) (23 - 29) (30 - 05) (06 - 12) (13 - 19) (20 - 26) (27 - 04) (05 - 11) (12 - 18) (19 -25) (26 - 1) (2 - 5)

INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

1 TECHNICAL PLANNING DESIGN CONSULTANT FOR CONSTRUCTION 4.148%


a Soil investigation Ls 1.00 0.830% 0.207% 0.207% 0.207% 0.207%
b Design and Calculation
1. Issued for Review ea 3.00 0.277% 0.092% 0.184%
2. Issued for Approval ea 3.00 0.277% 0.092% 0.184%
3. Approved for Construction ea 3.00 0.277% 0.092% 0.184%
c Design drawing
1. Issued for Review ea 7.00 0.277% 0.277%
2. Issued for Approval ea 7.00 0.277% 0.079% 0.198%
3. Approved for Construction ea 7.00 0.277% 0.277%
d Construction Engineering
1. Issued for Review ea 33.00 90.91% 0.277% 0.017% 0.075% 0.034% 0.025% 0.017% 0.017% 0.017% 0.03% 0.017% 0.008%
2. Issued for Approval ea 33.00 81.82% 0.277% 0.017% 0.042% 0.059% 0.059% 0.008% 0.008% 0.034%
3. Approved for Construction ea 33.00 78.79% 0.277% 0.067% 0.101% 0.008% 0.042%
e Final document Ls 1.00 0.830%

2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0.454%

3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458%

4 PREPARATION WORK 0.128%


a. Clean up Area m2 1,237.50 0.052%
b. Stake Out Survey Ls 1.00 0.076% 0.076%

5 EXCAVATION AND BACKFILL WORK 0.328%


a. Excavation Deadment 400/600 m3 2.23 0.001%
b. Excavation Pile Cap 800/800 m3 6.14 0.002%
c. Excavation for Line Tie Rod m3 95.33 0.027%
d. Backfill for Excavation m3 34.57 0.011%
e. Backfill Area (Compacted) m3 679.05 0.288%

6 STRUCTURE WORK 58.288%


PROCUREMENT
a. Supply Sheet Pile W-500 A-1000
1. Purchased Order jt 67.00 7.215% 7.215%
2. Manufacturing jt 67.00 9.620% 3.877% 1.292% 2.154% 2.297%
3. Delivery jt 67.00 7.215%
b. Supply Piling Steel Pipe Dia. 12" THK (anchor pilling)
1. Purcahsed Order jt 30.00 2.438% 2.438%
2. Manufacturing jt 30.00 3.250% 1.625% 1.625%
3. Delivery jt 30.00 2.438% 2.438% est 16-20 jan 2020
c. Supply Piling Steel Pipe Dia. 12" THK (mooring bollards pilling)
1. Purchased Order jt 36.00 2.925% 2.925%
2. Manufacturing jt 36.00 3.900% 1.950% 1.950%
3. Delivery jt 36.00 2.925% 2.925%
d. Supply Piling Steel Pipe Dia. 12" THK (fender pilling)
1. Purchased Order jt 18.00 1.463% 1.463%
2. Manufacturing jt 18.00 1.950% 0.975% 0.975%
3. Delivery jt 18.00 1.463% 1.463%
e. Steel Pile ø 18" ASTM A 252
1. Purcahsed Order jt 1.00 0.147% 0.147%
2. Delivery jt 1.00 0.147% 0.147%
f. Rebar Concrete
1. Purchased Order kg 12,322.58 1.509% 1.509%
2. Delivery kg 12,322.58 3.520%
g. Galvanized Sling ø 1 3/4"
1. Purchased Order m' 311.65 0.140%
2. Manufacturing m' 311.65 0.187%
3. Delivery m' 311.65 0.140%
h. Galvanized Clamp ø 1 3/4" crossby clips G-450
1. Purcahsed Order ea 365.00 0.046%
2. Manufacturing ea 365.00 0.062%
3. Delivery ea 365.00 0.046%
i. Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145
1. Purcahsed Order ea 45.00 0.105%
2. Manufacturing ea 45.00 0.140%
3. Delivery ea 45.00 0.105%
j. Concrete
1. Purcahsed Order m 3
111.41 2.298%
k. Sand
1. Purchased Order m3 293.04 0.790%
l. Fender Rubber
1. Purchased Order ea 8.00 0.440% 0.440%
2. Manufacturing ea 8.00 0.587% 0.587%
3. Delivery ea 8.00 0.440%
m. Soil for fill up m3 679.05
1. Purchased Order m3 679.05 0.639%

7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989%

A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086%
e. Install Formwork for Mooring Bollard m2 14.40 0.027%

C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067%

D. Fabricating & Install Rebar


a. Rebar for Deadment D16 (400/400) kg 647.81 0.113% 0.057%
b. Rebar for Deadment Ø8 (400/400) kg 175.28 0.031% 0.015%
c. Rebar for Pile Cap D16 (800/800) kg 1,527.34 0.267% 0.134%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.093% 0.047%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.012% 0.006%
f. Rebar for Capping Beam D16 (750/400) kg 3,423.98 0.599%
g. Rebar for Capping Beam Ø8 (750/400) kg 692.01 0.121% 0.061%
h. Rebar for Rubber Fender Beam D16 (800/2500) kg 1,260.11 0.220% 0.110%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.091% 0.045%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012% 0.006%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.025% 0.012%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.003%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.234% 0.094%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.181% 0.091%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.024% 0.012%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.129%

E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499%

F. Install Plastic Sheet


a. Install Plastic Sheet for Capping Beam m2 152.16 0.006%
b. Install Plastic Sheet for Pile Cap and Deadment m2 80.86 0.003%
c. Install Plastic Sheet for Rubber Fender m2 37.12 0.002%
c. Install Plastic Sheet for Mooring Bollards m2 35.20 0.001%

G. Sand Fill in to the stell pipe 12" 293.04 0.790%


0.000%
H. Pouring Concrete K-300
a. Pouring Concrete Deadment 400/400 m3 5.32 0.061%
b. Pouring Concrete Pile Cap 800/800 m3 6.14 0.070%
c. Pouring Concrete Capping Beam 750/400 m3 20.16 0.231%
d. Pouring Concrete Rubber Fender 800/2500 m3 12.80 0.147%
e. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (rubber fender) m3 10.18 0.117%
f. Pouring Concrete in to Steel Pipe Dia 12" Length 5 M (deadment) m3 22.63 0.259%
g. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (mooring bollards) m3 20.37 0.233%
h. Pouring Concrete in to Steel Pipe Dia 18" Length 1.6 M (mooring bollards) m3 4.20 0.048%
i. Pouring Concrete Pile Cap 2000/2000 (mooring bollards) m3 9.60 0.110%

8 FINISHING WORK 2.135%


a. Plestering (1 : 3) for Capping Beam 750/400 m2 110.40 0.047%
b. Supply & Install Rubber Fender 400 x 2300 ea 8.00 0.625%
c. Install Ancor Bolt dia 19mm for Rubber Fender (@550 Length) ea 128.00 0.267%
d. Supply Soil Fill Up m3 679.05 1.196%

351.52% 100.000%

Plan 0.207% 0.207% 0.207% 0.207% 0.124% 0.124% 0.201% 0.124% 0.249% 2.654% 2.706% 2.654% 2.654% 2.654% 2.654% 3.426% 8.993% 10.198% 10.955% 10.869% 5.566% 5.323% 5.347% 5.406% 3.901% 4.180% 2.339% 2.011% 1.892% 1.949% 0.017%

Cummulative Plan 0.207% 0.415% 0.622% 0.830% 0.954% 1.078% 1.279% 1.404% 1.653% 4.306% 7.012% 9.666% 12.320% 14.974% 17.628% 21.053% 30.046% 40.244% 51.199% 62.068% 67.634% 72.957% 78.305% 83.711% 87.611% 91.791% 94.131% 96.142% 98.034% 99.983% 100.000%

Actual 0.207% 0.207% 0.207% 0.284% 0.017% 0.000% 0.092% 0.444% 0.017% 0.042% 7.248% 7.127% 4.041% 6.672% 9.501% 6.998% 0.025% 2.917% 0.773%

Cumulative Actual 0.207% 0.415% 0.622% 0.906% 0.923% 0.923% 1.015% 1.459% 1.476% 1.518% 8.766% 15.893% 19.934% 26.606% 36.107% 43.105% 43.130% 46.047% 46.820%

Deviation 0.000% 0.000% 0.000% 0.076% -0.031% -0.156% -0.264% 0.055% -0.177% -2.789% 1.754% 6.227% 7.614% 11.632% 18.479% 22.052% 13.084% 5.803% -4.379% - - - - - - - - - - - - -

Prepared by, Checked & Reviewed by,


PetroChina International Jabung Ltd Approved by,
PT. Ade Konstruksi Abadi PetroChina International Jabung Ltd

M.Siwa Kumar Chawarie / Jacoob ET


Project Manager HEO & Facilities Supv. Setiandika P / Ekawati M
HEO & Facilities Supv.
MONTHLY PROGRESS REPORT

ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA

Status Month : 1 Period : 5-Sep-19


Rest Month : 6 Up to : 2-Oct-19

Progress
Weight
No. Description Unit Qty Factor
Last Month This Month Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)

INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

1 TECHNICAL PLANNING DESIGN CONSULTANT FOR CONSTRUCTION 4.148%


a Soil investigation Ls 1.00 0.830% 0 0.000% 1 0.830% 1 0.830% 0 0.000% 100.000%
b Design and Calculation
1. Issued for Review ea 3.00 0.277% 0 0.000% 0 0.000% 0 0.000% 3 0.277% 0.000%
2. Issued for Approval ea 3.00 0.277% 0 0.000% 0 0.000% 0 0.000% 3 0.277% 0.000%
3. Approved for Construction ea 3.00 0.277% 0 0.000% 0 0.000% 0 0.000% 3 0.277% 0.000%
c Design drawing
1. Issued for Review ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
2. Issued for Approval ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
3. Approved for Construction ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
d Construction Engineering
1. Issued for Review ea 33.00 0.277% 0 0.000% 0 0.000% 0 0.000% 33 0.277% 0.000%
2. Issued for Approval ea 33.00 0.277% 0 0.000% 0 0.000% 0 0.000% 33 0.277% 0.000%
3. Approved for Construction ea 33.00 0.277% 0 0.000% 0 0.000% 0 0.000% 33 0.277% 0.000%
e Final document Ls 1.00 0.830% 0 0.000% 0 0.000% 0 0.000% 1 0.830% 0.000%

2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0 0.000% 0 0.000% 1 1.513% 0.000%

3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%

4 PREPARATION WORK 0.128%


a. Clean up Area m2 1,237.50 0.052% 0 0.000% 0 0.000% 0 0.000% 1237.5 0.052% 0.000%
b. Stake Out Survey Ls 1.00 0.076% 0 0.000% 1 0.076% 1 0.076% 0 0.000% 100.000%

5 EXCAVATION AND BACKFILL WORK 0.328%


a. Excavation Deadment 400/600 m3 2.23 0.001% 0 0.000% 0 0.000% 0 0.000% 2.2304 0.001% 0.000%
b. Excavation Pile Cap 800/800 m3 6.14 0.002% 0 0.000% 0 0.000% 0 0.000% 6.144 0.002% 0.000%
c. Excavation for Line Tie Rod m3 95.33 0.027% 0 0.000% 0 0.000% 0 0.000% 95.33 0.027% 0.000%
d. Backfill for Excavation m3 34.57 0.011% 0 0.000% 0 0.000% 0 0.000% 34.57 0.011% 0.000%
e. Backfill Area (Compacted) m3 679.05 0.288% 0 0.000% 0 0.000% 0 0.000% 679.05 0.288% 0.000%

6 STRUCTURE WORK 58.288%


PROCUREMENT
a. Supply Sheet Pile W-500 A-1000
1. Purchased Order jt 67.00 7.215% 0 0.000% 0 0.000% 0 0.000% 67 7.215% 0.000%
2. Manufacturing jt 67.00 9.620% 0 0.000% 0 0.000% 0 0.000% 67 9.620% 0.000%
3. Delivery jt 67.00 7.215% 0 0.000% 0 0.000% 0 0.000% 67 7.215% 0.000%
b. Supply Piling Steel Pipe Dia. 12" THK (anchor pilling)
1. Purchased Order jt 30.00 2.438% 0 0.000% 0 0.000% 0 0.000% 30 2.438% 0.000%
2. Manufacturing jt 30.00 3.250% 0 0.000% 0 0.000% 0 0.000% 30 3.250% 0.000%
3. Delivery jt 30.00 2.438% 0 0.000% 0 0.000% 0 0.000% 30 2.438% 0.000%
c. Supply Piling Steel Pipe Dia. 12" THK (mooring bollards pilling)
1. Purchased Order jt 36.00 2.925% 0 0.000% 0 0.000% 0 0.000% 36 2.925% 0.000%
2. Manufacturing jt 36.00 3.900% 0 0.000% 0 0.000% 0 0.000% 36 3.900% 0.000%
3. Delivery jt 36.00 2.925% 0 0.000% 0 0.000% 0 0.000% 36 2.925% 0.000%
d. Supply Piling Steel Pipe Dia. 12" THK (fender pilling)
1. Purchased Order jt 18.00 1.463% 0 0.000% 0 0.000% 0 0.000% 18 1.463% 0.000%
2. Manufacturing jt 18.00 1.950% 0 0.000% 0 0.000% 0 0.000% 18 1.950% 0.000%
3. Delivery jt 18.00 1.463% 0 0.000% 0 0.000% 0 0.000% 18 1.463% 0.000%
e. Steel Pile ø 18" ASTM A 252
1. Purchased Order jt 1.00 0.147% 0 0.000% 0 0.000% 0 0.000% 1 0.147% 0.000%
2. Delivery jt 1.00 0.147% 0 0.000% 0 0.000% 0 0.000% 1 0.147% 0.000%
f. Rebar Concrete
1. Purchased Order kg 12,322.58 1.509% 0 0.000% 0 0.000% 0 0.000% 12322.58 1.509% 0.000%
2. Delivery kg 12,322.58 3.520% 0 0.000% 0 0.000% 0 0.000% 12322.58 3.520% 0.000%
g. Galvanized Sling ø 1 3/4"
1. Purcahsed Order m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
2. Manufacturing m' 311.65 0.187% 0 0.000% 0 0.000% 0 0.000% 311.65 0.187% 0.000%
3. Delivery m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
h. Galvanized Clamp ø 1 3/4" crossby clips G-450
1. Purchased Order ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
2. Manufacturing ea 365.00 0.062% 0 0.000% 0 0.000% 0 0.000% 365 0.062% 0.000%
3. Delivery ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
i. Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145
1. Purchased Order ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
2. Manufacturing ea 45.00 0.140% 0 0.000% 0 0.000% 0 0.000% 45 0.140% 0.000%
3. Delivery ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
j. Concrete
1. Purchased Order m3 111.41 2.298% 0 0.000% 0 0.000% 0 0.000% 111.405669010286 2.298% 0.000%
k. Sand
1. Purchased Order m3 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
l. Fender Rubber
1. Purchased Order ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
2. Manufacturing ea 8.00 0.587% 0 0.000% 0 0.000% 0 0.000% 8 0.587% 0.000%
3. Delivery ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
m. Soil for fill up 0
1. Purchased Order m3 679.05 0.639% 0 0.000% 0 0.000% 0 0.000% 679.05 0.639% 0.000%

7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%

A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%

C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%

D. Fabricating & Installing Rebar


a. Rebar for Deadment D16 (400/400) kg 647.81 0.113% 0 0.000% 0 0.000% 0 0.000% 647.81 0.113% 0.000%
b. Rebar for Deadment Ø8 (400/400) kg 175.28 0.031% 0 0.000% 0 0.000% 0 0.000% 175.28 0.031% 0.000%
c. Rebar for Pile Cap D16 (800/800) kg 1,527.34 0.267% 0 0.000% 0 0.000% 0 0.000% 1527.34 0.267% 0.000%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.093% 0 0.000% 0 0.000% 0 0.000% 533.00 0.093% 0.000%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.012% 0 0.000% 0 0.000% 0 0.000% 67.54 0.012% 0.000%
f. Rebar for Capping Beam D16 (750/400) kg 3,423.98 0.599% 0 0.000% 0 0.000% 0 0.000% 3423.98 0.599% 0.000%
g. Rebar for Capping Beam Ø8 (750/400) kg 692.01 0.121% 0 0.000% 0 0.000% 0 0.000% 692.01 0.121% 0.000%
h. Rebar for Rubber Fender Beam D16 (800/2500) kg 1,260.11 0.220% 0 0.000% 0 0.000% 0 0.000% 1260.11 0.220% 0.000%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.091% 0 0.000% 0 0.000% 0 0.000% 518.40 0.091% 0.000%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012% 0 0.000% 0 0.000% 0 0.000% 69.23 0.012% 0.000%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.025% 0 0.000% 0 0.000% 0 0.000% 140.15 0.025% 0.000%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.003% 0 0.000% 0 0.000% 0 0.000% 14.34 0.003% 0.000%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.234% 0 0.000% 0 0.000% 0 0.000% 1339.34 0.234% 0.000%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.181% 0 0.000% 0 0.000% 0 0.000% 1036.81 0.181% 0.000%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.024% 0 0.000% 0 0.000% 0 0.000% 138.46 0.024% 0.000%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.129% 0 0.000% 0 0.000% 0 0.000% 738.77 0.129% 0.000%

E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%

F. Install Plastic Sheet


a. Install Plastic Sheet for Capping Beam m2 152.16 0.006% 0 0.000% 0 0.000% 0 0.000% 152.16 0.006% 0.000%
b. Install Plastic Sheet for Pile Cap and Deadment m2 80.86 0.003% 0 0.000% 0 0.000% 0 0.000% 80.86 0.003% 0.000%
c. Install Plastic Sheet for Rubber Fender m2 37.12 0.002% 0 0.000% 0 0.000% 0 0.000% 37.12 0.002% 0.000%
c. Install Plastic Sheet for Mooring Bollards m2 35.20 0.001% 0 0.000% 0 0.000% 0 0.000% 35.2 0.001% 0.000%

G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%

H. Pouring Concrete K-300


a. Pouring Concrete Deadment 400/400 m3 5.32 0.061% 0 0.000% 0 0.000% 0 0.000% 5.32 0.061% 0.000%
b. Pouring Concrete Pile Cap 800/800 m3 6.14 0.070% 0 0.000% 0 0.000% 0 0.000% 6.144 0.070% 0.000%
c. Pouring Concrete Capping Beam 750/400 m3 20.16 0.231% 0 0.000% 0 0.000% 0 0.000% 20.16 0.231% 0.000%
d. Pouring Concrete Rubber Fender 800/2500 m3 12.80 0.147% 0 0.000% 0 0.000% 0 0.000% 12.8 0.147% 0.000%
e. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (rubber fender) m3 10.18 0.117% 0 0.000% 0 0.000% 0 0.000% 10.18 0.117% 0.000%
f. Pouring Concrete in to Steel Pipe Dia 12" Length 5 M (deadment) m3 22.63 0.259% 0 0.000% 0 0.000% 0 0.000% 22.63 0.259% 0.000%
g. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (mooring bollards) m3 20.37 0.233% 0 0.000% 0 0.000% 0 0.000% 20.37 0.233% 0.000%
h. Pouring Concrete in to Steel Pipe Dia 18" Length 1.6 M (mooring bollards) m3 4.20 0.048% 0 0.000% 0 0.000% 0 0.000% 4.20 0.048% 0.000%
i. Pouring Concrete Pile Cap 2000/2000 (mooring bollards) m3 9.60 0.110% 0 0.000% 0 0.000% 0 0.000% 9.6 0.110% 0.000%

8 FINISHING WORK 2.135%


a. Plestering (1 : 3) for Capping Beam 750/400 m2 110.40 0.047% 0 0.000% 0 0.000% 0 0.000% 110.4 0.047% 0.000%
b. Supply & Install Rubber Fender 400 x 2300 ea 8.00 0.625% 0 0.000% 0 0.000% 0 0.000% 8 0.625% 0.000%
c. Install Ancor Bolt dia 19mm for Rubber Fender (@550 Length) ea 128.00 0.267% 0 0.000% 0 0.000% 0 0.000% 128 0.267% 0.000%
d. Supply Soil Fill Up m3 679.05 1.196% 0 0.000% 0 0.000% 0 0.000% 679.05 1.196% 0.000%

TOTAL 100.000% 100.000% 0.000% 0.906% 0.906% 99.094%

Prepared by, Checked & Reviewed by,


PT. Ade Konstruksi Abadi PetroChina International Jabung Ltd Approved by,
PetroChina International Jabung Ltd

M.Siwa Kumar Chawarie / Jacoob ET


Project Manager HEO & Facilities Supv. Setiandika P / Ekawati M
HEO & Const. Supt.
MONTHLY PROGRESS REPORT

ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA

Status Month : 2 Period : 3-Oct-19


Rest Month : 5 Up to : 30-Oct-19

Progress
Weight
No. Description Unit Qty Factor
Last Month This Month Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)

INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

1 TECHNICAL PLANNING DESIGN CONSULTANT FOR CONSTRUCTION 4.148%


a Soil investigation Ls 1.00 0.830% 1 0.830% 0 0.000% 1 0.830% 0 0.000% 100.000%
b Design and Calculation 0.000%
1. Issued for Review ea 3.00 0.277% 0 0.000% 1 0.092% 1 0.092% 2 0.184% 33.333%
2. Issued for Approval ea 3.00 0.277% 0 0.000% 1 0.092% 1 0.092% 2 0.184% 33.333%
3. Approved for Construction ea 3.00 0.277% 0 0.000% 0 0.000% 0 0.000% 3 0.277% 0.000%
c Design drawing 0.000%
1. Issued for Review ea 7.00 0.277% 0 0.000% 7 0.277% 7 0.277% 0 0.000% 100.000%
2. Issued for Approval ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
3. Approved for Construction ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
d Construction Engineering 0.000%
1. Issued for Review ea 33.00 0.277% 0 0.000% 11 0.092% 11 0.092% 22 0.184% 33.333%
2. Issued for Approval ea 33.00 0.277% 0 0.000% 0 0.000% 0 0.000% 33 0.277% 0.000%
3. Approved for Construction ea 33.00 0.277% 0 0.000% 0 0.000% 0 0.000% 33 0.277% 0.000%
e Final document Ls 1.00 0.830% 0 0.000% 0 0.000% 0 0.000% 1 0.830% 0.000%
0.000%
2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0 0.000% 0 0.000% 1 1.513% 0.000%
0.000%
3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%
0.000%
4 PREPARATION WORK 0.128% 0.000%
a. Clean up Area m2 1,237.50 0.052% 0 0.000% 0 0.000% 0 0.000% 1237.5 0.052% 0.000%
b. Stake Out Survey Ls 1.00 0.076% 1 0.076% 0 0.000% 1 0.076% 0 0.000% 100.000%
0.000%
5 EXCAVATION AND BACKFILL WORK 0.328% 0.000%
a. Excavation Deadment 400/600 m3 2.23 0.001% 0 0.000% 0 0.000% 0 0.000% 2.2304 0.001% 0.000%
b. Excavation Pile Cap 800/800 m3 6.14 0.002% 0 0.000% 0 0.000% 0 0.000% 6.144 0.002% 0.000%
c. Excavation for Line Tie Rod m3 95.33 0.027% 0 0.000% 0 0.000% 0 0.000% 95.33 0.027% 0.000%
d. Backfill for Excavation m3 34.57 0.011% 0 0.000% 0 0.000% 0 0.000% 34.57 0.011% 0.000%
e. Backfill Area (Compacted) m3 679.05 0.288% 0 0.000% 0 0.000% 0 0.000% 679.05 0.288% 0.000%
0.000%
6 STRUCTURE WORK 58.288% 0.000%
PROCUREMENT 0.000%
a. Supply Sheet Pile W-500 A-1000 0.000%
1. Purchased Order jt 67.00 7.215% 0 0.000% 0 0.000% 0 0.000% 67 7.215% 0.000%
2. Manufacturing jt 67.00 9.620% 0 0.000% 0 0.000% 0 0.000% 67 9.620% 0.000%
3. Delivery jt 67.00 7.215% 0 0.000% 0 0.000% 0 0.000% 67 7.215% 0.000%
b. Supply Piling Steel Pipe Dia. 12" THK (anchor pilling) 0.000%
1. Purchased Order jt 30.00 2.438% 0 0.000% 0 0.000% 0 0.000% 30 2.438% 0.000%
2. Manufacturing jt 30.00 3.250% 0 0.000% 0 0.000% 0 0.000% 30 3.250% 0.000%
3. Delivery jt 30.00 2.438% 0 0.000% 0 0.000% 0 0.000% 30 2.438% 0.000%
c. Supply Piling Steel Pipe Dia. 12" THK (mooring bollards pilling) 0.000%
1. Purchased Order jt 36.00 2.925% 0 0.000% 0 0.000% 0 0.000% 36 2.925% 0.000%
2. Manufacturing jt 36.00 3.900% 0 0.000% 0 0.000% 0 0.000% 36 3.900% 0.000%
3. Delivery jt 36.00 2.925% 0 0.000% 0 0.000% 0 0.000% 36 2.925% 0.000%
d. Supply Piling Steel Pipe Dia. 12" THK (fender pilling) 0.000%
1. Purchased Order jt 18.00 1.463% 0 0.000% 0 0.000% 0 0.000% 18 1.463% 0.000%
2. Manufacturing jt 18.00 1.950% 0 0.000% 0 0.000% 0 0.000% 18 1.950% 0.000%
3. Delivery jt 18.00 1.463% 0 0.000% 0 0.000% 0 0.000% 18 1.463% 0.000%
e. Steel Pile ø 18" ASTM A 252 0.000%
1. Purchased Order jt 1.00 0.147% 0 0.000% 0 0.000% 0 0.000% 1 0.147% 0.000%
2. Delivery jt 1.00 0.147% 0 0.000% 0 0.000% 0 0.000% 1 0.147% 0.000%
f. Rebar Concrete 0.000%
1. Purchased Order kg 12,322.58 1.509% 0 0.000% 0 0.000% 0 0.000% 12322.58 1.509% 0.000%
2. Delivery kg 12,322.58 3.520% 0 0.000% 0 0.000% 0 0.000% 12322.58 3.520% 0.000%
g. Galvanized Sling ø 1 3/4" 0.000%
1. Purcahsed Order m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
2. Manufacturing m' 311.65 0.187% 0 0.000% 0 0.000% 0 0.000% 311.65 0.187% 0.000%
3. Delivery m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
h. Galvanized Clamp ø 1 3/4" crossby clips G-450 0.000%
1. Purchased Order ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
2. Manufacturing ea 365.00 0.062% 0 0.000% 0 0.000% 0 0.000% 365 0.062% 0.000%
3. Delivery ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
i. Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145 0 0.000% 0.000%
1. Purchased Order ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
2. Manufacturing ea 45.00 0.140% 0 0.000% 0 0.000% 0 0.000% 45 0.140% 0.000%
3. Delivery ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
j. Concrete 0.000%
1. Purchased Order m3 111.41 2.298% 0 0.000% 0 0.000% 0 0.000% 111.405669010286 2.298% 0.000%
k. Sand 0.000%
1. Purchased Order m3 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
l. Fender Rubber 0.000%
1. Purchased Order ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
2. Manufacturing ea 8.00 0.587% 0 0.000% 0 0.000% 0 0.000% 8 0.587% 0.000%
3. Delivery ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
m. Soil for fill up 0.000% 0
1. Purchased Order m3 679.05 0.639% 0 0.000% 0 0.000% 0 0.000% 679.05 0.639% 0.000%
0.000%
7 CONSTRUCTION 33.001% 0.000%
A. PILING SHEET PILE AND STEEL PILE 0.000%
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%
0.000%
A. Formwork 0.000%
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%
0.000%
C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk 0.000%
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%
0.000%
D. Fabricating & Installing Rebar 0.000%
a. Rebar for Deadment D16 (400/400) kg 647.81 0.113% 0 0.000% 0 0.000% 0 0.000% 647.81 0.113% 0.000%
b. Rebar for Deadment Ø8 (400/400) kg 175.28 0.031% 0 0.000% 0 0.000% 0 0.000% 175.28 0.031% 0.000%
c. Rebar for Pile Cap D16 (800/800) kg 1,527.34 0.267% 0 0.000% 0 0.000% 0 0.000% 1527.34 0.267% 0.000%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.093% 0 0.000% 0 0.000% 0 0.000% 533.00 0.093% 0.000%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.012% 0 0.000% 0 0.000% 0 0.000% 67.54 0.012% 0.000%
f. Rebar for Capping Beam D16 (750/400) kg 3,423.98 0.599% 0 0.000% 0 0.000% 0 0.000% 3423.98 0.599% 0.000%
g. Rebar for Capping Beam Ø8 (750/400) kg 692.01 0.121% 0 0.000% 0 0.000% 0 0.000% 692.01 0.121% 0.000%
h. Rebar for Rubber Fender Beam D16 (800/2500) kg 1,260.11 0.220% 0 0.000% 0 0.000% 0 0.000% 1260.11 0.220% 0.000%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.091% 0 0.000% 0 0.000% 0 0.000% 518.40 0.091% 0.000%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012% 0 0.000% 0 0.000% 0 0.000% 69.23 0.012% 0.000%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.025% 0 0.000% 0 0.000% 0 0.000% 140.15 0.025% 0.000%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.003% 0 0.000% 0 0.000% 0 0.000% 14.34 0.003% 0.000%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.234% 0 0.000% 0 0.000% 0 0.000% 1339.34 0.234% 0.000%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.181% 0 0.000% 0 0.000% 0 0.000% 1036.81 0.181% 0.000%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.024% 0 0.000% 0 0.000% 0 0.000% 138.46 0.024% 0.000%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.129% 0 0.000% 0 0.000% 0 0.000% 738.77 0.129% 0.000%
0.000%
E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle) 0.000%
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%
0.000%
F. Install Plastic Sheet 0.000%
a. Install Plastic Sheet for Capping Beam m2 152.16 0.006% 0 0.000% 0 0.000% 0 0.000% 152.16 0.006% 0.000%
b. Install Plastic Sheet for Pile Cap and Deadment m2 80.86 0.003% 0 0.000% 0 0.000% 0 0.000% 80.86 0.003% 0.000%
c. Install Plastic Sheet for Rubber Fender m2 37.12 0.002% 0 0.000% 0 0.000% 0 0.000% 37.12 0.002% 0.000%
c. Install Plastic Sheet for Mooring Bollards m2 35.20 0.001% 0 0.000% 0 0.000% 0 0.000% 35.2 0.001% 0.000%
0.000%
G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
0.000%
H. Pouring Concrete K-300 0.000%
a. Pouring Concrete Deadment 400/400 m3 5.32 0.061% 0 0.000% 0 0.000% 0 0.000% 5.32 0.061% 0.000%
b. Pouring Concrete Pile Cap 800/800 m3 6.14 0.070% 0 0.000% 0 0.000% 0 0.000% 6.144 0.070% 0.000%
c. Pouring Concrete Capping Beam 750/400 m3 20.16 0.231% 0 0.000% 0 0.000% 0 0.000% 20.16 0.231% 0.000%
d. Pouring Concrete Rubber Fender 800/2500 m3 12.80 0.147% 0 0.000% 0 0.000% 0 0.000% 12.8 0.147% 0.000%
e. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (rubber fender) m3 10.18 0.117% 0 0.000% 0 0.000% 0 0.000% 10.18 0.117% 0.000%
f. Pouring Concrete in to Steel Pipe Dia 12" Length 5 M (deadment) m3 22.63 0.259% 0 0.000% 0 0.000% 0 0.000% 22.63 0.259% 0.000%
g. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (mooring bollards) m3 20.37 0.233% 0 0.000% 0 0.000% 0 0.000% 20.37 0.233% 0.000%
h. Pouring Concrete in to Steel Pipe Dia 18" Length 1.6 M (mooring bollards) m3 4.20 0.048% 0 0.000% 0 0.000% 0 0.000% 4.20 0.048% 0.000%
i. Pouring Concrete Pile Cap 2000/2000 (mooring bollards) m3 9.60 0.110% 0 0.000% 0 0.000% 0 0.000% 9.6 0.110% 0.000%
0.000%
8 FINISHING WORK 2.135% 0.000%
a. Plestering (1 : 3) for Capping Beam 750/400 m2 110.40 0.047% 0 0.000% 0 0.000% 0 0.000% 110.4 0.047% 0.000%
b. Supply & Install Rubber Fender 400 x 2300 ea 8.00 0.625% 0 0.000% 0 0.000% 0 0.000% 8 0.625% 0.000%
c. Install Ancor Bolt dia 19mm for Rubber Fender (@550 Length) ea 128.00 0.267% 0 0.000% 0 0.000% 0 0.000% 128 0.267% 0.000%
d. Supply Soil Fill Up m3 679.05 1.196% 0 0.000% 0 0.000% 0 0.000% 679.05 1.196% 0.000%

TOTAL 100.000% 100.000% 0.906% 0.553% 1.459% 98.541%

Prepared by, Checked & Reviewed by,


PT. Ade Konstruksi Abadi PetroChina International Jabung Ltd Approved by,
PetroChina International Jabung Ltd

M.Siwa Kumar Chawarie / Jacoob ET


Project Manager HEO & Facilities Supv. Setiandika P / Ekawati M
HEO & Const. Supt.
MONTHLY PROGRESS REPORT

ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA

Status Month : 3 Period : 31-Oct-19


Rest Month : 4 Up to : 27-Nov-19

Progress
Weight
No. Description Unit Qty Factor
Last Month This Month Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)

INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

1 TECHNICAL PLANNING DESIGN CONSULTANT FOR CONSTRUCTION 4.148%


a Soil investigation Ls 1.00 0.830% 1 0.830% 0 0.000% 1 0.830% 0 0.000% 100.000%
b Design and Calculation
1. Issued for Review ea 3.00 0.277% 1 0.092% 2 0.184% 3 0.277% 0 0.000% 100.000%
2. Issued for Approval ea 3.00 0.277% 1 0.092% 0 0.000% 1 0.092% 2 0.184% 33.333%
3. Approved for Construction ea 3.00 0.277% 0 0.000% 1 0.092% 1 0.092% 2 0.184% 33.333%
c Design drawing
1. Issued for Review ea 7.00 0.277% 7 0.277% 0 0.000% 7 0.277% 0 0.000% 100.000%
2. Issued for Approval ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
3. Approved for Construction ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
d Construction Engineering
1. Issued for Review ea 33.00 0.277% 11 0.092% 7 0.059% 18 0.151% 15 0.126% 54.545%
2. Issued for Approval ea 33.00 0.277% 0 0.000% 7 0.059% 7 0.059% 26 0.218% 21.212%
3. Approved for Construction ea 33.00 0.277% 0 0.000% 0 0.000% 0 0.000% 33 0.277% 0.000%
e Final document Ls 1.00 0.830% 0 0.000% 0 0.000% 0 0.000% 1 0.830% 0.000%

2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0 0.000% 0 0.000% 1 1.513% 0.000%

3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%
0 0.000%
4 PREPARATION WORK 0.128%
a. Clean up Area m2 1,237.50 0.052% 0 0.000% 0 0.000% 0 0.000% 1237.5 0.052% 0.000%
b. Stake Out Survey Ls 1.00 0.076% 1 0.076% 0 0.000% 1 0.076% 0 0.000% 100.000%

5 EXCAVATION AND BACKFILL WORK 0.328%


a. Excavation Deadment 400/600 m3 2.23 0.001% 0 0.000% 0 0.000% 0 0.000% 2.2304 0.001% 0.000%
b. Excavation Pile Cap 800/800 m3 6.14 0.002% 0 0.000% 0 0.000% 0 0.000% 6.144 0.002% 0.000%
c. Excavation for Line Tie Rod m3 95.33 0.027% 0 0.000% 0 0.000% 0 0.000% 95.33 0.027% 0.000%
d. Backfill for Excavation m3 34.57 0.011% 0 0.000% 0 0.000% 0 0.000% 34.57 0.011% 0.000%
e. Backfill Area (Compacted) m3 679.05 0.288% 0 0.000% 0 0.000% 0 0.000% 679.05 0.288% 0.000%

6 STRUCTURE WORK 58.288%


PROCUREMENT
a. Supply Sheet Pile W-500 A-1000
1. Purchased Order jt 67.00 7.215% 0 0.000% 67 7.215% 67 7.215% 0 0.000% 100.000%
2. Manufacturing jt 67.00 9.620% 0 0.000% 0 0.000% 0 0.000% 67 9.620% 0.000%
3. Delivery jt 67.00 7.215% 0 0.000% 0 0.000% 0 0.000% 67 7.215% 0.000%
b. Supply Piling Steel Pipe Dia. 12" THK (anchor pilling)
1. Purchased Order jt 30.00 2.438% 0 0.000% 30 2.438% 30 2.438% 0 0.000% 100.000%
2. Manufacturing jt 30.00 3.250% 0 0.000% 0 0.000% 0 0.000% 30 3.250% 0.000%
3. Delivery jt 30.00 2.438% 0 0.000% 0 0.000% 0 0.000% 30 2.438% 0.000%
c. Supply Piling Steel Pipe Dia. 12" THK (mooring bollards pilling)
1. Purchased Order jt 36.00 2.925% 0 0.000% 36 2.925% 36 2.925% 0 0.000% 100.000%
2. Manufacturing jt 36.00 3.900% 0 0.000% 0 0.000% 0 0.000% 36 3.900% 0.000%
3. Delivery jt 36.00 2.925% 0 0.000% 0 0.000% 0 0.000% 36 2.925% 0.000%
d. Supply Piling Steel Pipe Dia. 12" THK (fender pilling)
1. Purchased Order jt 18.00 1.463% 0 0.000% 18 1.463% 18 1.463% 0 0.000% 100.000%
2. Manufacturing jt 18.00 1.950% 0 0.000% 0 0.000% 0 0.000% 18 1.950% 0.000%
3. Delivery jt 18.00 1.463% 0 0.000% 0 0.000% 0 0.000% 18 1.463% 0.000%
e. Steel Pile ø 18" ASTM A 252
1. Purchased Order jt 1.00 0.147% 0 0.000% 0 0.000% 0 0.000% 1 0.147% 0.000%
2. Delivery jt 1.00 0.147% 0 0.000% 0 0.000% 0 0.000% 1 0.147% 0.000%
f. Rebar Concrete
1. Purchased Order kg 12,322.58 1.509% 0 0.000% 0 0.000% 0 0.000% 12322.58 1.509% 0.000%
2. Delivery kg 12,322.58 3.520% 0 0.000% 0 0.000% 0 0.000% 12322.58 3.520% 0.000%
g. Galvanized Sling ø 1 3/4"
1. Purcahsed Order m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
2. Manufacturing m' 311.65 0.187% 0 0.000% 0 0.000% 0 0.000% 311.65 0.187% 0.000%
3. Delivery m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
h. Galvanized Clamp ø 1 3/4" crossby clips G-450
1. Purchased Order ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
2. Manufacturing ea 365.00 0.062% 0 0.000% 0 0.000% 0 0.000% 365 0.062% 0.000%
3. Delivery ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
i. Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145
1. Purchased Order ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
2. Manufacturing ea 45.00 0.140% 0 0.000% 0 0.000% 0 0.000% 45 0.140% 0.000%
3. Delivery ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
j. Concrete
1. Purchased Order m3 111.41 2.298% 0 0.000% 0 0.000% 0 0.000% 111.405669010286 2.298% 0.000%
k. Sand
1. Purchased Order m3 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
l. Fender Rubber
1. Purchased Order ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
2. Manufacturing ea 8.00 0.587% 0 0.000% 0 0.000% 0 0.000% 8 0.587% 0.000%
3. Delivery ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
m. Soil for fill up 0
1. Purchased Order m3 679.05 0.639% 0 0.000% 0 0.000% 0 0.000% 679.05 0.639% 0.000%

7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%

A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%

C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%

D. Fabricating & Installing Rebar


a. Rebar for Deadment D16 (400/400) kg 647.81 0.113% 0 0.000% 0 0.000% 0 0.000% 647.81 0.113% 0.000%
b. Rebar for Deadment Ø8 (400/400) kg 175.28 0.031% 0 0.000% 0 0.000% 0 0.000% 175.28 0.031% 0.000%
c. Rebar for Pile Cap D16 (800/800) kg 1,527.34 0.267% 0 0.000% 0 0.000% 0 0.000% 1527.34 0.267% 0.000%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.093% 0 0.000% 0 0.000% 0 0.000% 533.00 0.093% 0.000%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.012% 0 0.000% 0 0.000% 0 0.000% 67.54 0.012% 0.000%
f. Rebar for Capping Beam D16 (750/400) kg 3,423.98 0.599% 0 0.000% 0 0.000% 0 0.000% 3423.98 0.599% 0.000%
g. Rebar for Capping Beam Ø8 (750/400) kg 692.01 0.121% 0 0.000% 0 0.000% 0 0.000% 692.01 0.121% 0.000%
h. Rebar for Rubber Fender Beam D16 (800/2500) kg 1,260.11 0.220% 0 0.000% 0 0.000% 0 0.000% 1260.11 0.220% 0.000%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.091% 0 0.000% 0 0.000% 0 0.000% 518.40 0.091% 0.000%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012% 0 0.000% 0 0.000% 0 0.000% 69.23 0.012% 0.000%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.025% 0 0.000% 0 0.000% 0 0.000% 140.15 0.025% 0.000%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.003% 0 0.000% 0 0.000% 0 0.000% 14.34 0.003% 0.000%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.234% 0 0.000% 0 0.000% 0 0.000% 1339.34 0.234% 0.000%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.181% 0 0.000% 0 0.000% 0 0.000% 1036.81 0.181% 0.000%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.024% 0 0.000% 0 0.000% 0 0.000% 138.46 0.024% 0.000%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.129% 0 0.000% 0 0.000% 0 0.000% 738.77 0.129% 0.000%

E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%

F. Install Plastic Sheet


a. Install Plastic Sheet for Capping Beam m2 152.16 0.006% 0 0.000% 0 0.000% 0 0.000% 152.16 0.006% 0.000%
b. Install Plastic Sheet for Pile Cap and Deadment m2 80.86 0.003% 0 0.000% 0 0.000% 0 0.000% 80.86 0.003% 0.000%
c. Install Plastic Sheet for Rubber Fender m2 37.12 0.002% 0 0.000% 0 0.000% 0 0.000% 37.12 0.002% 0.000%
c. Install Plastic Sheet for Mooring Bollards m2 35.20 0.001% 0 0.000% 0 0.000% 0 0.000% 35.2 0.001% 0.000%

G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%

H. Pouring Concrete K-300


a. Pouring Concrete Deadment 400/400 m3 5.32 0.061% 0 0.000% 0 0.000% 0 0.000% 5.32 0.061% 0.000%
b. Pouring Concrete Pile Cap 800/800 m3 6.14 0.070% 0 0.000% 0 0.000% 0 0.000% 6.144 0.070% 0.000%
c. Pouring Concrete Capping Beam 750/400 m3 20.16 0.231% 0 0.000% 0 0.000% 0 0.000% 20.16 0.231% 0.000%
d. Pouring Concrete Rubber Fender 800/2500 m3 12.80 0.147% 0 0.000% 0 0.000% 0 0.000% 12.8 0.147% 0.000%
e. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (rubber fender) m3 10.18 0.117% 0 0.000% 0 0.000% 0 0.000% 10.18 0.117% 0.000%
f. Pouring Concrete in to Steel Pipe Dia 12" Length 5 M (deadment) m3 22.63 0.259% 0 0.000% 0 0.000% 0 0.000% 22.63 0.259% 0.000%
g. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (mooring bollards) m3 20.37 0.233% 0 0.000% 0 0.000% 0 0.000% 20.37 0.233% 0.000%
h. Pouring Concrete in to Steel Pipe Dia 18" Length 1.6 M (mooring bollards) m3 4.20 0.048% 0 0.000% 0 0.000% 0 0.000% 4.20 0.048% 0.000%
i. Pouring Concrete Pile Cap 2000/2000 (mooring bollards) m3 9.60 0.110% 0 0.000% 0 0.000% 0 0.000% 9.6 0.110% 0.000%

8 FINISHING WORK 2.135%


a. Plestering (1 : 3) for Capping Beam 750/400 m2 110.40 0.047% 0 0.000% 0 0.000% 0 0.000% 110.4 0.047% 0.000%
b. Supply & Install Rubber Fender 400 x 2300 ea 8.00 0.625% 0 0.000% 0 0.000% 0 0.000% 8 0.625% 0.000%
c. Install Ancor Bolt dia 19mm for Rubber Fender (@550 Length) ea 128.00 0.267% 0 0.000% 0 0.000% 0 0.000% 128 0.267% 0.000%
d. Supply Soil Fill Up m3 679.05 1.196% 0 0.000% 0 0.000% 0 0.000% 679.05 1.196% 0.000%

TOTAL 100.000% 100.000% 1.459% 14.434% 15.893% 84.107%

Prepared by, Checked & Reviewed by,


PT. Ade Konstruksi Abadi PetroChina International Jabung Ltd Approved by,
PetroChina International Jabung Ltd

M.Siwa Kumar Chawarie / Jacoob ET


Project Manager HEO & Facilities Supv. Setiandika P / Ekawati M
HEO & Const. Supt.
MONTHLY PROGRESS REPORT

ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA

Status Month : 4 Period : 28-Oct-19


Rest Month : 3 Up to : 11-Dec-19

Progress
Weight
No. Description Unit Qty Factor
Last Month This Month Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)

INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

1 TECHNICAL PLANNING DESIGN CONSULTANT FOR CONSTRUCTION 4.148%


a Soil investigation Ls 1.00 0.830% 1 0.830% 0 0.000% 1 0.830% 0 0.000% 100.000%
b Design and Calculation
1. Issued for Review ea 3.00 0.277% 3 0.277% 0 0.000% 3 0.277% 0 0.000% 100.000%
2. Issued for Approval ea 3.00 0.277% 1 0.092% 2 0.184% 3 0.277% 0 0.000% 100.000%
3. Approved for Construction ea 3.00 0.277% 1 0.092% 0 0.000% 1 0.092% 2 0.184% 33.333%
c Design drawing
1. Issued for Review ea 7.00 0.277% 7 0.277% 0 0.000% 7 0.277% 0 0.000% 100.000%
2. Issued for Approval ea 7.00 0.277% 0 0.000% 2 0.079% 2 0.079% 5 0.198% 28.571%
3. Approved for Construction ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
d Construction Engineering
1. Issued for Review ea 33.00 0.277% 18 0.151% 2 0.017% 20 0.168% 13 0.109% 60.606%
2. Issued for Approval ea 33.00 0.277% 7 0.059% 7 0.059% 14 0.117% 19 0.159% 42.424%
3. Approved for Construction ea 33.00 0.277% 0 0.000% 8 0.067% 8 0.067% 25 0.209% 24.242%
e Final document Ls 1.00 0.830% 0 0.000% 0 0.000% 0 0.000% 1 0.830% 0.000%

2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0 0.000% 0 0.000% 1 1.513% 0.000%

3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%

4 PREPARATION WORK 0.128%


a. Clean up Area m2 1,237.50 0.052% 0 0.000% 0 0.000% 0 0.000% 1237.5 0.052% 0.000%
b. Stake Out Survey Ls 1.00 0.076% 1 0.076% 0 0.000% 1 0.076% 0 0.000% 100.000%

5 EXCAVATION AND BACKFILL WORK 0.328%


a. Excavation Deadment 400/600 m3 2.23 0.001% 0 0.000% 0 0.000% 0 0.000% 2.2304 0.001% 0.000%
b. Excavation Pile Cap 800/800 m3 6.14 0.002% 0 0.000% 0 0.000% 0 0.000% 6.144 0.002% 0.000%
c. Excavation for Line Tie Rod m3 95.33 0.027% 0 0.000% 0 0.000% 0 0.000% 95.33 0.027% 0.000%
d. Backfill for Excavation m3 34.57 0.011% 0 0.000% 0 0.000% 0 0.000% 34.57 0.011% 0.000%
e. Backfill Area (Compacted) m3 679.05 0.288% 0 0.000% 0 0.000% 0 0.000% 679.05 0.288% 0.000%

6 STRUCTURE WORK 58.288%


PROCUREMENT
a. Supply Sheet Pile W-500 A-1000
1. Purchased Order jt 67.00 7.215% 67 7.215% 0 0.000% 67 7.215% 0 0.000% 100.000%
2. Manufacturing jt 67.00 9.620% 0 0.000% 36 5.169% 36 5.169% 31 4.451% 53.731%
3. Delivery jt 67.00 7.215% 0 0.000% 0 0.000% 0 0.000% 67 7.215% 0.000%
b. Supply Piling Steel Pipe Dia. 12" THK (anchor pilling)
1. Purchased Order jt 30.00 2.438% 30 2.438% 0 0.000% 30 2.438% 0 0.000% 100.000%
2. Manufacturing jt 30.00 3.250% 0 0.000% 15 1.625% 15 1.625% 15 1.625% 50.000%
3. Delivery jt 30.00 2.438% 0 0.000% 0 0.000% 0 0.000% 30 2.438% 0.000%
c. Supply Piling Steel Pipe Dia. 12" THK (mooring bollards pilling)
1. Purchased Order jt 36.00 2.925% 36 2.925% 0 0.000% 36 2.925% 0 0.000% 100.000%
2. Manufacturing jt 36.00 3.900% 0 0.000% 18 1.950% 18 1.950% 18 1.950% 50.000%
3. Delivery jt 36.00 2.925% 0 0.000% 0 0.000% 0 0.000% 36 2.925% 0.000%
d. Supply Piling Steel Pipe Dia. 12" THK (fender pilling)
1. Purchased Order jt 18.00 1.463% 18 1.463% 0 0.000% 18 1.463% 0 0.000% 100.000%
2. Manufacturing jt 18.00 1.950% 0 0.000% 9 0.975% 9 0.975% 9 0.975% 50.000%
3. Delivery jt 18.00 1.463% 0 0.000% 0 0.000% 0 0.000% 18 1.463% 0.000%
e. Steel Pile ø 18" ASTM A 252
1. Purchased Order jt 1.00 0.147% 0 0.000% 1 0.147% 1 0.147% 0 0.000% 100.000%
2. Delivery jt 1.00 0.147% 0 0.000% 0 0.000% 0 0.000% 1 0.147% 0.000%
f. Rebar Concrete
1. Purchased Order kg 12,322.58 1.509% 0 0.000% 0 0.000% 0 0.000% 12322.58 1.509% 0.000%
2. Delivery kg 12,322.58 3.520% 0 0.000% 0 0.000% 0 0.000% 12322.58 3.520% 0.000%
g. Galvanized Sling ø 1 3/4"
1. Purcahsed Order m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
2. Manufacturing m' 311.65 0.187% 0 0.000% 0 0.000% 0 0.000% 311.65 0.187% 0.000%
3. Delivery m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
h. Galvanized Clamp ø 1 3/4" crossby clips G-450
1. Purchased Order ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
2. Manufacturing ea 365.00 0.062% 0 0.000% 0 0.000% 0 0.000% 365 0.062% 0.000%
3. Delivery ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
i. Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145
1. Purchased Order ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
2. Manufacturing ea 45.00 0.140% 0 0.000% 0 0.000% 0 0.000% 45 0.140% 0.000%
3. Delivery ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
j. Concrete
1. Purchased Order m3 111.41 2.298% 0 0.000% 0 0.000% 0 0.000% 111.405669010286 2.298% 0.000%
k. Sand
1. Purchased Order m3 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
l. Fender Rubber
1. Purchased Order ea 8.00 0.440% 0 0.000% 8 0.440% 8 0.440% 0 0.000% 100.000%
2. Manufacturing ea 8.00 0.587% 0 0.000% 0 0.000% 0 0.000% 8 0.587% 0.000%
3. Delivery ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
m. Soil for fill up 0
1. Purchased Order m3 679.05 0.639% 0 0.000% 0 0.000% 0 0.000% 679.05 0.639% 0.000%

7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%

A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%

C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%

D. Fabricating & Installing Rebar


a. Rebar for Deadment D16 (400/400) kg 647.81 0.113% 0 0.000% 0 0.000% 0 0.000% 647.81 0.113% 0.000%
b. Rebar for Deadment Ø8 (400/400) kg 175.28 0.031% 0 0.000% 0 0.000% 0 0.000% 175.28 0.031% 0.000%
c. Rebar for Pile Cap D16 (800/800) kg 1,527.34 0.267% 0 0.000% 0 0.000% 0 0.000% 1527.34 0.267% 0.000%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.093% 0 0.000% 0 0.000% 0 0.000% 533.00 0.093% 0.000%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.012% 0 0.000% 0 0.000% 0 0.000% 67.54 0.012% 0.000%
f. Rebar for Capping Beam D16 (750/400) kg 3,423.98 0.599% 0 0.000% 0 0.000% 0 0.000% 3423.98 0.599% 0.000%
g. Rebar for Capping Beam Ø8 (750/400) kg 692.01 0.121% 0 0.000% 0 0.000% 0 0.000% 692.01 0.121% 0.000%
h. Rebar for Rubber Fender Beam D16 (800/2500) kg 1,260.11 0.220% 0 0.000% 0 0.000% 0 0.000% 1260.11 0.220% 0.000%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.091% 0 0.000% 0 0.000% 0 0.000% 518.40 0.091% 0.000%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012% 0 0.000% 0 0.000% 0 0.000% 69.23 0.012% 0.000%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.025% 0 0.000% 0 0.000% 0 0.000% 140.15 0.025% 0.000%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.003% 0 0.000% 0 0.000% 0 0.000% 14.34 0.003% 0.000%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.234% 0 0.000% 0 0.000% 0 0.000% 1339.34 0.234% 0.000%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.181% 0 0.000% 0 0.000% 0 0.000% 1036.81 0.181% 0.000%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.024% 0 0.000% 0 0.000% 0 0.000% 138.46 0.024% 0.000%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.129% 0 0.000% 0 0.000% 0 0.000% 738.77 0.129% 0.000%

E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%

F. Install Plastic Sheet


a. Install Plastic Sheet for Capping Beam m2 152.16 0.006% 0 0.000% 0 0.000% 0 0.000% 152.16 0.006% 0.000%
b. Install Plastic Sheet for Pile Cap and Deadment m2 80.86 0.003% 0 0.000% 0 0.000% 0 0.000% 80.86 0.003% 0.000%
c. Install Plastic Sheet for Rubber Fender m2 37.12 0.002% 0 0.000% 0 0.000% 0 0.000% 37.12 0.002% 0.000%
c. Install Plastic Sheet for Mooring Bollards m2 35.20 0.001% 0 0.000% 0 0.000% 0 0.000% 35.2 0.001% 0.000%

G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%

H. Pouring Concrete K-300


a. Pouring Concrete Deadment 400/400 m3 5.32 0.061% 0 0.000% 0 0.000% 0 0.000% 5.32 0.061% 0.000%
b. Pouring Concrete Pile Cap 800/800 m3 6.14 0.070% 0 0.000% 0 0.000% 0 0.000% 6.144 0.070% 0.000%
c. Pouring Concrete Capping Beam 750/400 m3 20.16 0.231% 0 0.000% 0 0.000% 0 0.000% 20.16 0.231% 0.000%
d. Pouring Concrete Rubber Fender 800/2500 m3 12.80 0.147% 0 0.000% 0 0.000% 0 0.000% 12.8 0.147% 0.000%
e. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (rubber fender) m3 10.18 0.117% 0 0.000% 0 0.000% 0 0.000% 10.18 0.117% 0.000%
f. Pouring Concrete in to Steel Pipe Dia 12" Length 5 M (deadment) m3 22.63 0.259% 0 0.000% 0 0.000% 0 0.000% 22.63 0.259% 0.000%
g. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (mooring bollards) m3 20.37 0.233% 0 0.000% 0 0.000% 0 0.000% 20.37 0.233% 0.000%
h. Pouring Concrete in to Steel Pipe Dia 18" Length 1.6 M (mooring bollards) m3 4.20 0.048% 0 0.000% 0 0.000% 0 0.000% 4.20 0.048% 0.000%
i. Pouring Concrete Pile Cap 2000/2000 (mooring bollards) m3 9.60 0.110% 0 0.000% 0 0.000% 0 0.000% 9.6 0.110% 0.000%

8 FINISHING WORK 2.135%


a. Plestering (1 : 3) for Capping Beam 750/400 m2 110.40 0.047% 0 0.000% 0 0.000% 0 0.000% 110.4 0.047% 0.000%
b. Supply & Install Rubber Fender 400 x 2300 ea 8.00 0.625% 0 0.000% 0 0.000% 0 0.000% 8 0.625% 0.000%
c. Install Ancor Bolt dia 19mm for Rubber Fender (@550 Length) ea 128.00 0.267% 0 0.000% 0 0.000% 0 0.000% 128 0.267% 0.000%
d. Supply Soil Fill Up m3 679.05 1.196% 0 0.000% 0 0.000% 0 0.000% 679.05 1.196% 0.000%

TOTAL 100.000% 100.000% 15.893% 10.712% 26.606% 73.394%

Prepared by, Checked & Reviewed by,


PT. Ade Konstruksi Abadi PetroChina International Jabung Ltd Approved by,
PetroChina International Jabung Ltd

M.Siwa Kumar Chawarie / Jacoob ET


Project Manager HEO & Facilities Supv. Setiandika P / Ekawati M
HEO & Const. Supt.
WEEKLY PROGRESS REPORT

ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA

Status Week : 1 Period : 5-Sep-19


Rest Week : 30 Up to : 11-Sep-19

Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)

INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

1 TECHNICAL PLANNING DESIGN CONSULTANT FOR CONSTRUCTION 4.148%


a Soil investigation Ls 1.00 0.830% 0 0.000% 0.25 0.207% 0.25 0.207% 0.75 0.622% 25.000%
b Design and Calculation
1. Issued for Review ea 3.00 0.277% 0 0.000% 0 0.000% 0 0.000% 3 0.277% 0.000%
2. Issued for Approval ea 3.00 0.277% 0 0.000% 0 0.000% 0 0.000% 3 0.277% 0.000%
3. Approved for Construction ea 3.00 0.277% 0 0.000% 0 0.000% 0 0.000% 3 0.277% 0.000%
c Design drawing
1. Issued for Review ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
2. Issued for Approval ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
3. Approved for Construction ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
d Construction Engineering
1. Issued for Review ea 33.00 0.277% 0 0.000% 0 0.000% 0 0.000% 33 0.277% 0.000%
2. Issued for Approval ea 33.00 0.277% 0 0.000% 0 0.000% 0 0.000% 33 0.277% 0.000%
3. Approved for Construction ea 33.00 0.277% 0 0.000% 0 0.000% 0 0.000% 33 0.277% 0.000%
e Final document Ls 1.00 0.830% 0 0.000% 0 0.000% 0 0.000% 1 0.830% 0.000%

2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0 0.000% 0 0.000% 1 1.513% 0.000%

3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%

4 PREPARATION WORK 0.128%


a. Clean up Area m2 1,237.50 0.052% 0 0.000% 0 0.000% 0 0.000% 1237.5 0.052% 0.000%
b. Stake Out Survey Ls 1.00 0.076% 0 0.000% 0 0.000% 0 0.000% 1 0.076% 0.000%

5 EXCAVATION AND BACKFILL WORK 0.328%


a. Excavation Deadment 400/600 m3 2.23 0.001% 0 0.000% 0 0.000% 0 0.000% 2.2304 0.001% 0.000%
b. Excavation Pile Cap 800/800 m3 6.14 0.002% 0 0.000% 0 0.000% 0 0.000% 6.144 0.002% 0.000%
c. Excavation for Line Tie Rod m3 95.33 0.027% 0 0.000% 0 0.000% 0 0.000% 95.33 0.027% 0.000%
d. Backfill for Excavation m3 34.57 0.011% 0 0.000% 0 0.000% 0 0.000% 34.57 0.011% 0.000%
e. Backfill Area (Compacted) m3 679.05 0.288% 0 0.000% 0 0.000% 0 0.000% 679.05 0.288% 0.000%

6 STRUCTURE WORK 58.288%


PROCUREMENT
a. Supply Sheet Pile W-500 A-1000
1. Purchased Order jt 67.00 7.215% 0 0.000% 0 0.000% 0 0.000% 67 7.215% 0.000%
2. Manufacturing jt 67.00 9.620% 0 0.000% 0 0.000% 0 0.000% 67 9.620% 0.000%
3. Delivery jt 67.00 7.215% 0 0.000% 0 0.000% 0 0.000% 67 7.215% 0.000%
b. Supply Piling Steel Pipe Dia. 12" THK (anchor pilling)
1. Purchased Order jt 30.00 2.438% 0 0.000% 0 0.000% 0 0.000% 30 2.438% 0.000%
2. Manufacturing jt 30.00 3.250% 0 0.000% 0 0.000% 0 0.000% 30 3.250% 0.000%
3. Delivery jt 30.00 2.438% 0 0.000% 0 0.000% 0 0.000% 30 2.438% 0.000%
c. Supply Piling Steel Pipe Dia. 12" THK (mooring bollards pilling)
1. Purchased Order jt 36.00 2.925% 0 0.000% 0 0.000% 0 0.000% 36 2.925% 0.000%
2. Manufacturing jt 36.00 3.900% 0 0.000% 0 0.000% 0 0.000% 36 3.900% 0.000%
3. Delivery jt 36.00 2.925% 0 0.000% 0 0.000% 0 0.000% 36 2.925% 0.000%
d. Supply Piling Steel Pipe Dia. 12" THK (fender pilling)
1. Purchased Order jt 18.00 1.463% 0 0.000% 0 0.000% 0 0.000% 18 1.463% 0.000%
2. Manufacturing jt 18.00 1.950% 0 0.000% 0 0.000% 0 0.000% 18 1.950% 0.000%
3. Delivery jt 18.00 1.463% 0 0.000% 0 0.000% 0 0.000% 18 1.463% 0.000%
e. Steel Pile ø 18" ASTM A 252
1. Purchased Order jt 1.00 0.147% 0 0.000% 0 0.000% 0 0.000% 1 0.147% 0.000%
2. Delivery jt 1.00 0.147% 0 0.000% 0 0.000% 0 0.000% 1 0.147% 0.000%
f. Rebar Concrete
1. Purchased Order kg 12,322.58 1.509% 0 0.000% 0 0.000% 0 0.000% 12322.58 1.509% 0.000%
2. Delivery kg 12,322.58 3.520% 0 0.000% 0 0.000% 0 0.000% 12322.58 3.520% 0.000%
g. Galvanized Sling ø 1 3/4"
1. Purcahsed Order m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
2. Manufacturing m' 311.65 0.187% 0 0.000% 0 0.000% 0 0.000% 311.65 0.187% 0.000%
3. Delivery m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
h. Galvanized Clamp ø 1 3/4" crossby clips G-450
1. Purchased Order ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
2. Manufacturing ea 365.00 0.062% 0 0.000% 0 0.000% 0 0.000% 365 0.062% 0.000%
3. Delivery ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
i. Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145
1. Purchased Order ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
2. Manufacturing ea 45.00 0.140% 0 0.000% 0 0.000% 0 0.000% 45 0.140% 0.000%
3. Delivery ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
j. Concrete
1. Purchased Order m3 111.41 2.298% 0 0.000% 0 0.000% 0 0.000% 111.405669010286 2.298% 0.000%
k. Sand
1. Purchased Order m3 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
l. Fender Rubber
1. Purchased Order ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
2. Manufacturing ea 8.00 0.587% 0 0.000% 0 0.000% 0 0.000% 8 0.587% 0.000%
3. Delivery ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
m. Soil for fill up 0
1. Purchased Order m3 679.05 0.639% 0 0.000% 0 0.000% 0 0.000% 679.05 0.639% 0.000%

7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%

A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%

C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%

D. Fabricating & Installing Rebar


a. Rebar for Deadment D16 (400/400) kg 647.81 0.113% 0 0.000% 0 0.000% 0 0.000% 647.81 0.113% 0.000%
b. Rebar for Deadment Ø8 (400/400) kg 175.28 0.031% 0 0.000% 0 0.000% 0 0.000% 175.28 0.031% 0.000%
c. Rebar for Pile Cap D16 (800/800) kg 1,527.34 0.267% 0 0.000% 0 0.000% 0 0.000% 1527.34 0.267% 0.000%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.093% 0 0.000% 0 0.000% 0 0.000% 533.00 0.093% 0.000%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.012% 0 0.000% 0 0.000% 0 0.000% 67.54 0.012% 0.000%
f. Rebar for Capping Beam D16 (750/400) kg 3,423.98 0.599% 0 0.000% 0 0.000% 0 0.000% 3423.98 0.599% 0.000%
g. Rebar for Capping Beam Ø8 (750/400) kg 692.01 0.121% 0 0.000% 0 0.000% 0 0.000% 692.01 0.121% 0.000%
h. Rebar for Rubber Fender Beam D16 (800/2500) kg 1,260.11 0.220% 0 0.000% 0 0.000% 0 0.000% 1260.11 0.220% 0.000%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.091% 0 0.000% 0 0.000% 0 0.000% 518.40 0.091% 0.000%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012% 0 0.000% 0 0.000% 0 0.000% 69.23 0.012% 0.000%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.025% 0 0.000% 0 0.000% 0 0.000% 140.15 0.025% 0.000%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.003% 0 0.000% 0 0.000% 0 0.000% 14.34 0.003% 0.000%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.234% 0 0.000% 0 0.000% 0 0.000% 1339.34 0.234% 0.000%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.181% 0 0.000% 0 0.000% 0 0.000% 1036.81 0.181% 0.000%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.024% 0 0.000% 0 0.000% 0 0.000% 138.46 0.024% 0.000%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.129% 0 0.000% 0 0.000% 0 0.000% 738.77 0.129% 0.000%

E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%

F. Install Plastic Sheet


a. Install Plastic Sheet for Capping Beam m2 152.16 0.006% 0 0.000% 0 0.000% 0 0.000% 152.16 0.006% 0.000%
b. Install Plastic Sheet for Pile Cap and Deadment m2 80.86 0.003% 0 0.000% 0 0.000% 0 0.000% 80.86 0.003% 0.000%
c. Install Plastic Sheet for Rubber Fender m2 37.12 0.002% 0 0.000% 0 0.000% 0 0.000% 37.12 0.002% 0.000%
c. Install Plastic Sheet for Mooring Bollards m2 35.20 0.001% 0 0.000% 0 0.000% 0 0.000% 35.2 0.001% 0.000%

G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%

H. Pouring Concrete K-300


a. Pouring Concrete Deadment 400/400 m3 5.32 0.061% 0 0.000% 0 0.000% 0 0.000% 5.32 0.061% 0.000%
b. Pouring Concrete Pile Cap 800/800 m3 6.14 0.070% 0 0.000% 0 0.000% 0 0.000% 6.144 0.070% 0.000%
c. Pouring Concrete Capping Beam 750/400 m3 20.16 0.231% 0 0.000% 0 0.000% 0 0.000% 20.16 0.231% 0.000%
d. Pouring Concrete Rubber Fender 800/2500 m3 12.80 0.147% 0 0.000% 0 0.000% 0 0.000% 12.8 0.147% 0.000%
e. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (rubber fender) m3 10.18 0.117% 0 0.000% 0 0.000% 0 0.000% 10.18 0.117% 0.000%
f. Pouring Concrete in to Steel Pipe Dia 12" Length 5 M (deadment) m3 22.63 0.259% 0 0.000% 0 0.000% 0 0.000% 22.63 0.259% 0.000%
g. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (mooring bollards) m3 20.37 0.233% 0 0.000% 0 0.000% 0 0.000% 20.37 0.233% 0.000%
h. Pouring Concrete in to Steel Pipe Dia 18" Length 1.6 M (mooring bollards) m3 4.20 0.048% 0 0.000% 0 0.000% 0 0.000% 4.20 0.048% 0.000%
i. Pouring Concrete Pile Cap 2000/2000 (mooring bollards) m3 9.60 0.110% 0 0.000% 0 0.000% 0 0.000% 9.6 0.110% 0.000%

8 FINISHING WORK 2.135%


a. Plestering (1 : 3) for Capping Beam 750/400 m2 110.40 0.047% 0 0.000% 0 0.000% 0 0.000% 110.4 0.047% 0.000%
b. Supply & Install Rubber Fender 400 x 2300 ea 8.00 0.625% 0 0.000% 0 0.000% 0 0.000% 8 0.625% 0.000%
c. Install Ancor Bolt dia 19mm for Rubber Fender (@550 Length) ea 128.00 0.267% 0 0.000% 0 0.000% 0 0.000% 128 0.267% 0.000%
d. Supply Soil Fill Up m3 679.05 1.196% 0 0.000% 0 0.000% 0 0.000% 679.05 1.196% 0.000%

TOTAL 100.000% 100.000% 0.000% 0.207% 0.207% 99.793%

Prepared by, Checked & Reviewed by,


PT. Ade Konstruksi Abadi PetroChina International Jabung Ltd Approved by,
PetroChina International Jabung Ltd

M.Siwa Kumar Isrokdin / Dwi Utama / M. Ihsan A


Project Manager HEO Planner & Estimator Chawarie / Jacoob ET
HEO & Facilities Supv.
WEEKLY PROGRESS REPORT

ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA

Status Week : 2 Period : 12-Sep-19


Rest Week : 29 Up to : 18-Sep-19

Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)

INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

1 TECHNICAL PLANNING DESIGN CONSULTANT FOR CONSTRUCTION 4.148%


a Soil investigation Ls 1.00 0.830% 0.25 0.207% 0.25 0.207% 0.5 0.415% 0.5 0.415% 50.000%
b Design and Calculation
1. Issued for Review ea 3.00 0.277% 0 0.000% 0 0.000% 0 0.000% 3 0.277% 0.000%
2. Issued for Approval ea 3.00 0.277% 0 0.000% 0 0.000% 0 0.000% 3 0.277% 0.000%
3. Approved for Construction ea 3.00 0.277% 0 0.000% 0 0.000% 0 0.000% 3 0.277% 0.000%
c Design drawing
1. Issued for Review ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
2. Issued for Approval ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
3. Approved for Construction ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
d Construction Engineering
1. Issued for Review ea 33.00 0.277% 0 0.000% 0 0.000% 0 0.000% 33 0.277% 0.000%
2. Issued for Approval ea 33.00 0.277% 0 0.000% 0 0.000% 0 0.000% 33 0.277% 0.000%
3. Approved for Construction ea 33.00 0.277% 0 0.000% 0 0.000% 0 0.000% 33 0.277% 0.000%
e Final document Ls 1.00 0.830% 0 0.000% 0 0.000% 0 0.000% 1 0.830% 0.000%

2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0 0.000% 0 0.000% 1 1.513% 0.000%

3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%

4 PREPARATION WORK 0.128%


a. Clean up Area m2 1,237.50 0.052% 0 0.000% 0 0.000% 0 0.000% 1237.5 0.052% 0.000%
b. Stake Out Survey Ls 1.00 0.076% 0 0.000% 0 0.000% 0 0.000% 1 0.076% 0.000%

5 EXCAVATION AND BACKFILL WORK 0.328%


a. Excavation Deadment 400/600 m3 2.23 0.001% 0 0.000% 0 0.000% 0 0.000% 2.2304 0.001% 0.000%
b. Excavation Pile Cap 800/800 m3 6.14 0.002% 0 0.000% 0 0.000% 0 0.000% 6.144 0.002% 0.000%
c. Excavation for Line Tie Rod m3 95.33 0.027% 0 0.000% 0 0.000% 0 0.000% 95.33 0.027% 0.000%
d. Backfill for Excavation m3 34.57 0.011% 0 0.000% 0 0.000% 0 0.000% 34.57 0.011% 0.000%
e. Backfill Area (Compacted) m3 679.05 0.288% 0 0.000% 0 0.000% 0 0.000% 679.05 0.288% 0.000%

6 STRUCTURE WORK 58.288%


PROCUREMENT
a. Supply Sheet Pile W-500 A-1000
1. Purchased Order jt 67.00 7.215% 0 0.000% 0 0.000% 0 0.000% 67 7.215% 0.000%
2. Manufacturing jt 67.00 9.620% 0 0.000% 0 0.000% 0 0.000% 67 9.620% 0.000%
3. Delivery jt 67.00 7.215% 0 0.000% 0 0.000% 0 0.000% 67 7.215% 0.000%
b. Supply Piling Steel Pipe Dia. 12" THK (anchor pilling)
1. Purchased Order jt 30.00 2.438% 0 0.000% 0 0.000% 0 0.000% 30 2.438% 0.000%
2. Manufacturing jt 30.00 3.250% 0 0.000% 0 0.000% 0 0.000% 30 3.250% 0.000%
3. Delivery jt 30.00 2.438% 0 0.000% 0 0.000% 0 0.000% 30 2.438% 0.000%
c. Supply Piling Steel Pipe Dia. 12" THK (mooring bollards pilling)
1. Purchased Order jt 36.00 2.925% 0 0.000% 0 0.000% 0 0.000% 36 2.925% 0.000%
2. Manufacturing jt 36.00 3.900% 0 0.000% 0 0.000% 0 0.000% 36 3.900% 0.000%
3. Delivery jt 36.00 2.925% 0 0.000% 0 0.000% 0 0.000% 36 2.925% 0.000%
d. Supply Piling Steel Pipe Dia. 12" THK (fender pilling)
1. Purchased Order jt 18.00 1.463% 0 0.000% 0 0.000% 0 0.000% 18 1.463% 0.000%
2. Manufacturing jt 18.00 1.950% 0 0.000% 0 0.000% 0 0.000% 18 1.950% 0.000%
3. Delivery jt 18.00 1.463% 0 0.000% 0 0.000% 0 0.000% 18 1.463% 0.000%
e. Steel Pile ø 18" ASTM A 252
1. Purchased Order jt 1.00 0.147% 0 0.000% 0 0.000% 0 0.000% 1 0.147% 0.000%
2. Delivery jt 1.00 0.147% 0 0.000% 0 0.000% 0 0.000% 1 0.147% 0.000%
f. Rebar Concrete
1. Purchased Order kg 12,322.58 1.509% 0 0.000% 0 0.000% 0 0.000% 12322.58 1.509% 0.000%
2. Delivery kg 12,322.58 3.520% 0 0.000% 0 0.000% 0 0.000% 12322.58 3.520% 0.000%
g. Galvanized Sling ø 1 3/4"
1. Purcahsed Order m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
2. Manufacturing m' 311.65 0.187% 0 0.000% 0 0.000% 0 0.000% 311.65 0.187% 0.000%
3. Delivery m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
h. Galvanized Clamp ø 1 3/4" crossby clips G-450
1. Purchased Order ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
2. Manufacturing ea 365.00 0.062% 0 0.000% 0 0.000% 0 0.000% 365 0.062% 0.000%
3. Delivery ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
i. Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145
1. Purchased Order ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
2. Manufacturing ea 45.00 0.140% 0 0.000% 0 0.000% 0 0.000% 45 0.140% 0.000%
3. Delivery ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
j. Concrete
1. Purchased Order m3 111.41 2.298% 0 0.000% 0 0.000% 0 0.000% 111.41 2.298% 0.000%
k. Sand
1. Purchased Order m3 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
l. Fender Rubber
1. Purchased Order ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
2. Manufacturing ea 8.00 0.587% 0 0.000% 0 0.000% 0 0.000% 8 0.587% 0.000%
3. Delivery ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
m. Soil for fill up
1. Purchased Order m3 679.05 0.639% 0 0.000% 0 0.000% 0 0.000% 679.05 0.639% 0.000%

7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%

A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%

C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%

D. Fabricating & Installing Rebar


a. Rebar for Deadment D16 (400/400) kg 647.81 0.113% 0 0.000% 0 0.000% 0 0.000% 647.81 0.113% 0.000%
b. Rebar for Deadment Ø8 (400/400) kg 175.28 0.031% 0 0.000% 0 0.000% 0 0.000% 175.28 0.031% 0.000%
c. Rebar for Pile Cap D16 (800/800) kg 1,527.34 0.267% 0 0.000% 0 0.000% 0 0.000% 1527.34 0.267% 0.000%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.093% 0 0.000% 0 0.000% 0 0.000% 533.00 0.093% 0.000%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.012% 0 0.000% 0 0.000% 0 0.000% 67.54 0.012% 0.000%
f. Rebar for Capping Beam D16 (750/400) kg 3,423.98 0.599% 0 0.000% 0 0.000% 0 0.000% 3423.98 0.599% 0.000%
g. Rebar for Capping Beam Ø8 (750/400) kg 692.01 0.121% 0 0.000% 0 0.000% 0 0.000% 692.01 0.121% 0.000%
h. Rebar for Rubber Fender Beam D16 (800/2500) kg 1,260.11 0.220% 0 0.000% 0 0.000% 0 0.000% 1260.11 0.220% 0.000%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.091% 0 0.000% 0 0.000% 0 0.000% 518.40 0.091% 0.000%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012% 0 0.000% 0 0.000% 0 0.000% 69.23 0.012% 0.000%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.025% 0 0.000% 0 0.000% 0 0.000% 140.15 0.025% 0.000%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.003% 0 0.000% 0 0.000% 0 0.000% 14.34 0.003% 0.000%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.234% 0 0.000% 0 0.000% 0 0.000% 1339.34 0.234% 0.000%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.181% 0 0.000% 0 0.000% 0 0.000% 1036.81 0.181% 0.000%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.024% 0 0.000% 0 0.000% 0 0.000% 138.46 0.024% 0.000%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.129% 0 0.000% 0 0.000% 0 0.000% 738.77 0.129% 0.000%

E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%

F. Install Plastic Sheet


a. Install Plastic Sheet for Capping Beam m2 152.16 0.006% 0 0.000% 0 0.000% 0 0.000% 152.16 0.006% 0.000%
b. Install Plastic Sheet for Pile Cap and Deadment m2 80.86 0.003% 0 0.000% 0 0.000% 0 0.000% 80.86 0.003% 0.000%
c. Install Plastic Sheet for Rubber Fender m2 37.12 0.002% 0 0.000% 0 0.000% 0 0.000% 37.12 0.002% 0.000%
c. Install Plastic Sheet for Mooring Bollards m2 35.20 0.001% 0 0.000% 0 0.000% 0 0.000% 35.2 0.001% 0.000%

G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%

H. Pouring Concrete K-300


a. Pouring Concrete Deadment 400/400 m3 5.32 0.061% 0 0.000% 0 0.000% 0 0.000% 5.32 0.061% 0.000%
b. Pouring Concrete Pile Cap 800/800 m3 6.14 0.070% 0 0.000% 0 0.000% 0 0.000% 6.144 0.070% 0.000%
c. Pouring Concrete Capping Beam 750/400 m3 20.16 0.231% 0 0.000% 0 0.000% 0 0.000% 20.16 0.231% 0.000%
d. Pouring Concrete Rubber Fender 800/2500 m3 12.80 0.147% 0 0.000% 0 0.000% 0 0.000% 12.8 0.147% 0.000%
e. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (rubber fender) m3 10.18 0.117% 0 0.000% 0 0.000% 0 0.000% 10.18 0.117% 0.000%
f. Pouring Concrete in to Steel Pipe Dia 12" Length 5 M (deadment) m3 22.63 0.259% 0 0.000% 0 0.000% 0 0.000% 22.63 0.259% 0.000%
g. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (mooring bollards) m3 20.37 0.233% 0 0.000% 0 0.000% 0 0.000% 20.37 0.233% 0.000%
h. Pouring Concrete in to Steel Pipe Dia 18" Length 1.6 M (mooring bollards) m3 4.20 0.048% 0 0.000% 0 0.000% 0 0.000% 4.20 0.048% 0.000%
i. Pouring Concrete Pile Cap 2000/2000 (mooring bollards) m3 9.60 0.110% 0 0.000% 0 0.000% 0 0.000% 9.6 0.110% 0.000%

8 FINISHING WORK 2.135%


a. Plestering (1 : 3) for Capping Beam 750/400 m2 110.40 0.047% 0 0.000% 0 0.000% 0 0.000% 110.4 0.047% 0.000%
b. Supply & Install Rubber Fender 400 x 2300 ea 8.00 0.625% 0 0.000% 0 0.000% 0 0.000% 8 0.625% 0.000%
c. Install Ancor Bolt dia 19mm for Rubber Fender (@550 Length) ea 128.00 0.267% 0 0.000% 0 0.000% 0 0.000% 128 0.267% 0.000%
d. Supply Soil Fill Up m3 679.05 1.196% 0 0.000% 0 0.000% 0 0.000% 679.05 1.196% 0.000%

TOTAL 100.000% 100.000% 0.207% 0.207% 0.415% 99.585%

Prepared by, Checked & Reviewed by,


PT. Ade Konstruksi Abadi PetroChina International Jabung Ltd Approved by,
PetroChina International Jabung Ltd

M.Siwa Kumar Isrokdin / Dwi Utama / M. Ihsan A


Project Manager HEO Planner & Estimator Chawarie / Jacoob ET
HEO & Facilities Supv.
WEEKLY PROGRESS REPORT

ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA

Status Week : 3 Period : 19-Sep-19


Rest Week : 28 Up to : 25-Sep-19

Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)

INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

1 TECHNICAL PLANNING DESIGN CONSULTANT FOR CONSTRUCTION 4.148%


a Soil investigation Ls 1.00 0.830% 0.5 0.415% 0.25 0.207% 0.75 0.622% 0.25 0.207% 75.000%
b Design and Calculation
1. Issued for Review ea 3.00 0.277% 0 0.000% 0 0.000% 0 0.000% 3 0.277% 0.000%
2. Issued for Approval ea 3.00 0.277% 0 0.000% 0 0.000% 0 0.000% 3 0.277% 0.000%
3. Approved for Construction ea 3.00 0.277% 0 0.000% 0 0.000% 0 0.000% 3 0.277% 0.000%
c Design drawing
1. Issued for Review ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
2. Issued for Approval ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
3. Approved for Construction ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
d Construction Engineering
1. Issued for Review ea 33.00 0.277% 0 0.000% 0 0.000% 0 0.000% 33 0.277% 0.000%
2. Issued for Approval ea 33.00 0.277% 0 0.000% 0 0.000% 0 0.000% 33 0.277% 0.000%
3. Approved for Construction ea 33.00 0.277% 0 0.000% 0 0.000% 0 0.000% 33 0.277% 0.000%
e Final document Ls 1.00 0.830% 0 0.000% 0 0.000% 0 0.000% 1 0.830% 0.000%

2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0 0.000% 0 0.000% 1 1.513% 0.000%

3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%

4 PREPARATION WORK 0.128%


a. Clean up Area m2 1,237.50 0.052% 0 0.000% 0 0.000% 0 0.000% 1237.5 0.052% 0.000%
b. Stake Out Survey Ls 1.00 0.076% 0 0.000% 0 0.000% 0 0.000% 1 0.076% 0.000%

5 EXCAVATION AND BACKFILL WORK 0.328%


a. Excavation Deadment 400/600 m3 2.23 0.001% 0 0.000% 0 0.000% 0 0.000% 2.2304 0.001% 0.000%
b. Excavation Pile Cap 800/800 m3 6.14 0.002% 0 0.000% 0 0.000% 0 0.000% 6.144 0.002% 0.000%
c. Excavation for Line Tie Rod m3 95.33 0.027% 0 0.000% 0 0.000% 0 0.000% 95.33 0.027% 0.000%
d. Backfill for Excavation m3 34.57 0.011% 0 0.000% 0 0.000% 0 0.000% 34.57 0.011% 0.000%
e. Backfill Area (Compacted) m3 679.05 0.288% 0 0.000% 0 0.000% 0 0.000% 679.05 0.288% 0.000%

6 STRUCTURE WORK 58.288%


PROCUREMENT
a. Supply Sheet Pile W-500 A-1000
1. Purchased Order jt 67.00 7.215% 0 0.000% 0 0.000% 0 0.000% 67 7.215% 0.000%
2. Manufacturing jt 67.00 9.620% 0 0.000% 0 0.000% 0 0.000% 67 9.620% 0.000%
3. Delivery jt 67.00 7.215% 0 0.000% 0 0.000% 0 0.000% 67 7.215% 0.000%
b. Supply Piling Steel Pipe Dia. 12" THK (anchor pilling)
1. Purchased Order jt 30.00 2.438% 0 0.000% 0 0.000% 0 0.000% 30 2.438% 0.000%
2. Manufacturing jt 30.00 3.250% 0 0.000% 0 0.000% 0 0.000% 30 3.250% 0.000%
3. Delivery jt 30.00 2.438% 0 0.000% 0 0.000% 0 0.000% 30 2.438% 0.000%
c. Supply Piling Steel Pipe Dia. 12" THK (mooring bollards pilling)
1. Purchased Order jt 36.00 2.925% 0 0.000% 0 0.000% 0 0.000% 36 2.925% 0.000%
2. Manufacturing jt 36.00 3.900% 0 0.000% 0 0.000% 0 0.000% 36 3.900% 0.000%
3. Delivery jt 36.00 2.925% 0 0.000% 0 0.000% 0 0.000% 36 2.925% 0.000%
d. Supply Piling Steel Pipe Dia. 12" THK (fender pilling)
1. Purchased Order jt 18.00 1.463% 0 0.000% 0 0.000% 0 0.000% 18 1.463% 0.000%
2. Manufacturing jt 18.00 1.950% 0 0.000% 0 0.000% 0 0.000% 18 1.950% 0.000%
3. Delivery jt 18.00 1.463% 0 0.000% 0 0.000% 0 0.000% 18 1.463% 0.000%
e. Steel Pile ø 18" ASTM A 252
1. Purchased Order jt 1.00 0.147% 0 0.000% 0 0.000% 0 0.000% 1 0.147% 0.000%
2. Delivery jt 1.00 0.147% 0 0.000% 0 0.000% 0 0.000% 1 0.147% 0.000%
f. Rebar Concrete
1. Purchased Order kg 12,322.58 1.509% 0 0.000% 0 0.000% 0 0.000% 12322.58 1.509% 0.000%
2. Delivery kg 12,322.58 3.520% 0 0.000% 0 0.000% 0 0.000% 12322.58 3.520% 0.000%
g. Galvanized Sling ø 1 3/4"
1. Purcahsed Order m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
2. Manufacturing m' 311.65 0.187% 0 0.000% 0 0.000% 0 0.000% 311.65 0.187% 0.000%
3. Delivery m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
h. Galvanized Clamp ø 1 3/4" crossby clips G-450
1. Purchased Order ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
2. Manufacturing ea 365.00 0.062% 0 0.000% 0 0.000% 0 0.000% 365 0.062% 0.000%
3. Delivery ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
i. Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145
1. Purchased Order ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
2. Manufacturing ea 45.00 0.140% 0 0.000% 0 0.000% 0 0.000% 45 0.140% 0.000%
3. Delivery ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
j. Concrete
1. Purchased Order m3 111.41 2.298% 0 0.000% 0 0.000% 0 0.000% 111.41 2.298% 0.000%
k. Sand 0.000%
1. Purchased Order m3 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
l. Fender Rubber
1. Purchased Order ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
2. Manufacturing ea 8.00 0.587% 0 0.000% 0 0.000% 0 0.000% 8 0.587% 0.000%
3. Delivery ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
m. Soil for fill up
1. Purchased Order m3 679.05 0.639% 0 0.000% 0 0.000% 0 0.000% 679.05 0.639% 0.000%

7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%

A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%

C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%

D. Fabricating & Installing Rebar


a. Rebar for Deadment D16 (400/400) kg 647.81 0.113% 0 0.000% 0 0.000% 0 0.000% 647.81 0.113% 0.000%
b. Rebar for Deadment Ø8 (400/400) kg 175.28 0.031% 0 0.000% 0 0.000% 0 0.000% 175.28 0.031% 0.000%
c. Rebar for Pile Cap D16 (800/800) kg 1,527.34 0.267% 0 0.000% 0 0.000% 0 0.000% 1527.34 0.267% 0.000%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.093% 0 0.000% 0 0.000% 0 0.000% 533.00 0.093% 0.000%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.012% 0 0.000% 0 0.000% 0 0.000% 67.54 0.012% 0.000%
f. Rebar for Capping Beam D16 (750/400) kg 3,423.98 0.599% 0 0.000% 0 0.000% 0 0.000% 3423.98 0.599% 0.000%
g. Rebar for Capping Beam Ø8 (750/400) kg 692.01 0.121% 0 0.000% 0 0.000% 0 0.000% 692.01 0.121% 0.000%
h. Rebar for Rubber Fender Beam D16 (800/2500) kg 1,260.11 0.220% 0 0.000% 0 0.000% 0 0.000% 1260.11 0.220% 0.000%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.091% 0 0.000% 0 0.000% 0 0.000% 518.40 0.091% 0.000%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012% 0 0.000% 0 0.000% 0 0.000% 69.23 0.012% 0.000%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.025% 0 0.000% 0 0.000% 0 0.000% 140.15 0.025% 0.000%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.003% 0 0.000% 0 0.000% 0 0.000% 14.34 0.003% 0.000%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.234% 0 0.000% 0 0.000% 0 0.000% 1339.34 0.234% 0.000%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.181% 0 0.000% 0 0.000% 0 0.000% 1036.81 0.181% 0.000%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.024% 0 0.000% 0 0.000% 0 0.000% 138.46 0.024% 0.000%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.129% 0 0.000% 0 0.000% 0 0.000% 738.77 0.129% 0.000%

E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%

F. Install Plastic Sheet


a. Install Plastic Sheet for Capping Beam m2 152.16 0.006% 0 0.000% 0 0.000% 0 0.000% 152.16 0.006% 0.000%
b. Install Plastic Sheet for Pile Cap and Deadment m2 80.86 0.003% 0 0.000% 0 0.000% 0 0.000% 80.86 0.003% 0.000%
c. Install Plastic Sheet for Rubber Fender m2 37.12 0.002% 0 0.000% 0 0.000% 0 0.000% 37.12 0.002% 0.000%
c. Install Plastic Sheet for Mooring Bollards m2 35.20 0.001% 0 0.000% 0 0.000% 0 0.000% 35.2 0.001% 0.000%

G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
0.000%
H. Pouring Concrete K-300
a. Pouring Concrete Deadment 400/400 m3 5.32 0.061% 0 0.000% 0 0.000% 0 0.000% 5.32 0.061% 0.000%
b. Pouring Concrete Pile Cap 800/800 m3 6.14 0.070% 0 0.000% 0 0.000% 0 0.000% 6.144 0.070% 0.000%
c. Pouring Concrete Capping Beam 750/400 m3 20.16 0.231% 0 0.000% 0 0.000% 0 0.000% 20.16 0.231% 0.000%
d. Pouring Concrete Rubber Fender 800/2500 m3 12.80 0.147% 0 0.000% 0 0.000% 0 0.000% 12.8 0.147% 0.000%
e. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (rubber fender) m3 10.18 0.117% 0 0.000% 0 0.000% 0 0.000% 10.18 0.117% 0.000%
f. Pouring Concrete in to Steel Pipe Dia 12" Length 5 M (deadment) m3 22.63 0.259% 0 0.000% 0 0.000% 0 0.000% 22.63 0.259% 0.000%
g. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (mooring bollards) m3 20.37 0.233% 0 0.000% 0 0.000% 0 0.000% 20.37 0.233% 0.000%
h. Pouring Concrete in to Steel Pipe Dia 18" Length 1.6 M (mooring bollards) m3 4.20 0.048% 0 0.000% 0 0.000% 0 0.000% 4.20 0.048% 0.000%
i. Pouring Concrete Pile Cap 2000/2000 (mooring bollards) m3 9.60 0.110% 0 0.000% 0 0.000% 0 0.000% 9.6 0.110% 0.000%

8 FINISHING WORK 2.135%


a. Plestering (1 : 3) for Capping Beam 750/400 m2 110.40 0.047% 0 0.000% 0 0.000% 0 0.000% 110.4 0.047% 0.000%
b. Supply & Install Rubber Fender 400 x 2300 ea 8.00 0.625% 0 0.000% 0 0.000% 0 0.000% 8 0.625% 0.000%
c. Install Ancor Bolt dia 19mm for Rubber Fender (@550 Length) ea 128.00 0.267% 0 0.000% 0 0.000% 0 0.000% 128 0.267% 0.000%
d. Supply Soil Fill Up m3 679.05 1.196% 0 0.000% 0 0.000% 0 0.000% 679.05 1.196% 0.000%

TOTAL 100.000% 100.000% 0.415% 0.207% 0.622% 99.378%

Prepared by, Checked & Reviewed by,


PT. Ade Konstruksi Abadi PetroChina International Jabung Ltd Approved by,
PetroChina International Jabung Ltd

M.Siwa Kumar Isrokdin / Dwi Utama / M. Ihsan A


Project Manager HEO Planner & Estimator Chawarie / Jacoob ET
HEO & Facilities Supv.
WEEKLY PROGRESS REPORT

ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA

Status Week : 4 Period : 26-Sep-19


Rest Week : 27 Up to : 2-Oct-19

Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)

INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

1 TECHNICAL PLANNING DESIGN CONSULTANT FOR CONSTRUCTION 4.148%


a Soil investigation Ls 1.00 0.830% 0.75 0.622% 0.25 0.207% 1 0.830% 0 0.000% 100.000%
b Design and Calculation
1. Issued for Review ea 3.00 0.277% 0 0.000% 0 0.000% 0 0.000% 3 0.277% 0.000%
2. Issued for Approval ea 3.00 0.277% 0 0.000% 0 0.000% 0 0.000% 3 0.277% 0.000%
3. Approved for Construction ea 3.00 0.277% 0 0.000% 0 0.000% 0 0.000% 3 0.277% 0.000%
c Design drawing
1. Issued for Review ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
2. Issued for Approval ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
3. Approved for Construction ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
d Construction Engineering
1. Issued for Review ea 33.00 0.277% 0 0.000% 0 0.000% 0 0.000% 33 0.277% 0.000%
2. Issued for Approval ea 33.00 0.277% 0 0.000% 0 0.000% 0 0.000% 33 0.277% 0.000%
3. Approved for Construction ea 33.00 0.277% 0 0.000% 0 0.000% 0 0.000% 33 0.277% 0.000%
e Final document Ls 1.00 0.830% 0 0.000% 0 0.000% 0 0.000% 1 0.830% 0.000%

2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0 0.000% 0 0.000% 1 1.513% 0.000%

3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%

4 PREPARATION WORK 0.128%


a. Clean up Area m2 1,237.50 0.052% 0 0.000% 0 0.000% 0 0.000% 1237.5 0.052% 0.000%
b. Stake Out Survey Ls 1.00 0.076% 0 0.000% 1 0.076% 1 0.076% 0 0.000% 100.000%

5 EXCAVATION AND BACKFILL WORK 0.328%


a. Excavation Deadment 400/600 m3 2.23 0.001% 0 0.000% 0 0.000% 0 0.000% 2.2304 0.001% 0.000%
b. Excavation Pile Cap 800/800 m3 6.14 0.002% 0 0.000% 0 0.000% 0 0.000% 6.144 0.002% 0.000%
c. Excavation for Line Tie Rod m3 95.33 0.027% 0 0.000% 0 0.000% 0 0.000% 95.33 0.027% 0.000%
d. Backfill for Excavation m3 34.57 0.011% 0 0.000% 0 0.000% 0 0.000% 34.57 0.011% 0.000%
e. Backfill Area (Compacted) m3 679.05 0.288% 0 0.000% 0 0.000% 0 0.000% 679.05 0.288% 0.000%

6 STRUCTURE WORK 58.288%


PROCUREMENT
a. Supply Sheet Pile W-500 A-1000
1. Purchased Order jt 67.00 7.215% 0 0.000% 0 0.000% 0 0.000% 67 7.215% 0.000%
2. Manufacturing jt 67.00 9.620% 0 0.000% 0 0.000% 0 0.000% 67 9.620% 0.000%
3. Delivery jt 67.00 7.215% 0 0.000% 0 0.000% 0 0.000% 67 7.215% 0.000%
b. Supply Piling Steel Pipe Dia. 12" THK (anchor pilling)
1. Purchased Order jt 30.00 2.438% 0 0.000% 0 0.000% 0 0.000% 30 2.438% 0.000%
2. Manufacturing jt 30.00 3.250% 0 0.000% 0 0.000% 0 0.000% 30 3.250% 0.000%
3. Delivery jt 30.00 2.438% 0 0.000% 0 0.000% 0 0.000% 30 2.438% 0.000%
c. Supply Piling Steel Pipe Dia. 12" THK (mooring bollards pilling)
1. Purchased Order jt 36.00 2.925% 0 0.000% 0 0.000% 0 0.000% 36 2.925% 0.000%
2. Manufacturing jt 36.00 3.900% 0 0.000% 0 0.000% 0 0.000% 36 3.900% 0.000%
3. Delivery jt 36.00 2.925% 0 0.000% 0 0.000% 0 0.000% 36 2.925% 0.000%
d. Supply Piling Steel Pipe Dia. 12" THK (fender pilling)
1. Purchased Order jt 18.00 1.463% 0 0.000% 0 0.000% 0 0.000% 18 1.463% 0.000%
2. Manufacturing jt 18.00 1.950% 0 0.000% 0 0.000% 0 0.000% 18 1.950% 0.000%
3. Delivery jt 18.00 1.463% 0 0.000% 0 0.000% 0 0.000% 18 1.463% 0.000%
e. Steel Pile ø 18" ASTM A 252
1. Purchased Order jt 1.00 0.147% 0 0.000% 0 0.000% 0 0.000% 1 0.147% 0.000%
2. Delivery jt 1.00 0.147% 0 0.000% 0 0.000% 0 0.000% 1 0.147% 0.000%
f. Rebar Concrete
1. Purchased Order kg 12,322.58 1.509% 0 0.000% 0 0.000% 0 0.000% 12322.58 1.509% 0.000%
2. Delivery kg 12,322.58 3.520% 0 0.000% 0 0.000% 0 0.000% 12322.58 3.520% 0.000%
g. Galvanized Sling ø 1 3/4"
1. Purcahsed Order m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
2. Manufacturing m' 311.65 0.187% 0 0.000% 0 0.000% 0 0.000% 311.65 0.187% 0.000%
3. Delivery m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
h. Galvanized Clamp ø 1 3/4" crossby clips G-450
1. Purchased Order ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
2. Manufacturing ea 365.00 0.062% 0 0.000% 0 0.000% 0 0.000% 365 0.062% 0.000%
3. Delivery ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
i. Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145
1. Purchased Order ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
2. Manufacturing ea 45.00 0.140% 0 0.000% 0 0.000% 0 0.000% 45 0.140% 0.000%
3. Delivery ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
j. Concrete
1. Purchased Order m3 111.41 2.298% 0 0.000% 0 0.000% 0 0.000% 111.41 2.298% 0.000%
k. Sand 0 0.000%
1. Purchased Order m3 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
l. Fender Rubber
1. Purchased Order ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
2. Manufacturing ea 8.00 0.587% 0 0.000% 0 0.000% 0 0.000% 8 0.587% 0.000%
3. Delivery ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
m. Soil for fill up
1. Purchased Order m3 679.05 0.639% 0 0.000% 0 0.000% 0 0.000% 679.05 0.639% 0.000%

7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%

A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%

C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%

D. Fabricating & Installing Rebar


a. Rebar for Deadment D16 (400/400) kg 647.81 0.113% 0 0.000% 0 0.000% 0 0.000% 647.81 0.113% 0.000%
b. Rebar for Deadment Ø8 (400/400) kg 175.28 0.031% 0 0.000% 0 0.000% 0 0.000% 175.28 0.031% 0.000%
c. Rebar for Pile Cap D16 (800/800) kg 1,527.34 0.267% 0 0.000% 0 0.000% 0 0.000% 1527.34 0.267% 0.000%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.093% 0 0.000% 0 0.000% 0 0.000% 533.00 0.093% 0.000%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.012% 0 0.000% 0 0.000% 0 0.000% 67.54 0.012% 0.000%
f. Rebar for Capping Beam D16 (750/400) kg 3,423.98 0.599% 0 0.000% 0 0.000% 0 0.000% 3423.98 0.599% 0.000%
g. Rebar for Capping Beam Ø8 (750/400) kg 692.01 0.121% 0 0.000% 0 0.000% 0 0.000% 692.01 0.121% 0.000%
h. Rebar for Rubber Fender Beam D16 (800/2500) kg 1,260.11 0.220% 0 0.000% 0 0.000% 0 0.000% 1260.11 0.220% 0.000%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.091% 0 0.000% 0 0.000% 0 0.000% 518.40 0.091% 0.000%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012% 0 0.000% 0 0.000% 0 0.000% 69.23 0.012% 0.000%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.025% 0 0.000% 0 0.000% 0 0.000% 140.15 0.025% 0.000%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.003% 0 0.000% 0 0.000% 0 0.000% 14.34 0.003% 0.000%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.234% 0 0.000% 0 0.000% 0 0.000% 1339.34 0.234% 0.000%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.181% 0 0.000% 0 0.000% 0 0.000% 1036.81 0.181% 0.000%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.024% 0 0.000% 0 0.000% 0 0.000% 138.46 0.024% 0.000%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.129% 0 0.000% 0 0.000% 0 0.000% 738.77 0.129% 0.000%

E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%

F. Install Plastic Sheet


a. Install Plastic Sheet for Capping Beam m2 152.16 0.006% 0 0.000% 0 0.000% 0 0.000% 152.16 0.006% 0.000%
b. Install Plastic Sheet for Pile Cap and Deadment m2 80.86 0.003% 0 0.000% 0 0.000% 0 0.000% 80.86 0.003% 0.000%
c. Install Plastic Sheet for Rubber Fender m2 37.12 0.002% 0 0.000% 0 0.000% 0 0.000% 37.12 0.002% 0.000%
c. Install Plastic Sheet for Mooring Bollards m2 35.20 0.001% 0 0.000% 0 0.000% 0 0.000% 35.2 0.001% 0.000%

G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%

H. Pouring Concrete K-300


a. Pouring Concrete Deadment 400/400 m3 5.32 0.061% 0 0.000% 0 0.000% 0 0.000% 5.32 0.061% 0.000%
b. Pouring Concrete Pile Cap 800/800 m3 6.14 0.070% 0 0.000% 0 0.000% 0 0.000% 6.144 0.070% 0.000%
c. Pouring Concrete Capping Beam 750/400 m3 20.16 0.231% 0 0.000% 0 0.000% 0 0.000% 20.16 0.231% 0.000%
d. Pouring Concrete Rubber Fender 800/2500 m3 12.80 0.147% 0 0.000% 0 0.000% 0 0.000% 12.8 0.147% 0.000%
e. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (rubber fender) m3 10.18 0.117% 0 0.000% 0 0.000% 0 0.000% 10.18 0.117% 0.000%
f. Pouring Concrete in to Steel Pipe Dia 12" Length 5 M (deadment) m3 22.63 0.259% 0 0.000% 0 0.000% 0 0.000% 22.63 0.259% 0.000%
g. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (mooring bollards) m3 20.37 0.233% 0 0.000% 0 0.000% 0 0.000% 20.37 0.233% 0.000%
h. Pouring Concrete in to Steel Pipe Dia 18" Length 1.6 M (mooring bollards) m3 4.20 0.048% 0 0.000% 0 0.000% 0 0.000% 4.20 0.048% 0.000%
i. Pouring Concrete Pile Cap 2000/2000 (mooring bollards) m3 9.60 0.110% 0 0.000% 0 0.000% 0 0.000% 9.6 0.110% 0.000%

8 FINISHING WORK 2.135%


a. Plestering (1 : 3) for Capping Beam 750/400 m2 110.40 0.047% 0 0.000% 0 0.000% 0 0.000% 110.4 0.047% 0.000%
b. Supply & Install Rubber Fender 400 x 2300 ea 8.00 0.625% 0 0.000% 0 0.000% 0 0.000% 8 0.625% 0.000%
c. Install Ancor Bolt dia 19mm for Rubber Fender (@550 Length) ea 128.00 0.267% 0 0.000% 0 0.000% 0 0.000% 128 0.267% 0.000%
d. Supply Soil Fill Up m3 679.05 1.196% 0 0.000% 0 0.000% 0 0.000% 679.05 1.196% 0.000%

TOTAL 100.000% 100.000% 0.622% 0.284% 0.906% 99.094%

Prepared by, Checked & Reviewed by,


PT. Ade Konstruksi Abadi PetroChina International Jabung Ltd Approved by,
PetroChina International Jabung Ltd

M.Siwa Kumar Isrokdin / Dwi Utama / M. Ihsan A


Project Manager HEO Planner & Estimator Chawarie / Jacoob ET
HEO & Facilities Supv.
WEEKLY PROGRESS REPORT

ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA

Status Week : 5 Period : 3-Oct-19


Rest Week : 26 Up to : 9-Oct-19

Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)

INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

1 TECHNICAL PLANNING DESIGN CONSULTANT FOR CONSTRUCTION 4.148%


a Soil investigation Ls 1.00 0.830% 1 0.830% 0 0.000% 1 0.830% 0 0.000% 100.000%
b Design and Calculation
1. Issued for Review ea 3.00 0.277% 0 0.000% 0 0.000% 0 0.000% 3 0.277% 0.000%
2. Issued for Approval ea 3.00 0.277% 0 0.000% 0 0.000% 0 0.000% 3 0.277% 0.000%
3. Approved for Construction ea 3.00 0.277% 0 0.000% 0 0.000% 0 0.000% 3 0.277% 0.000%
c Design drawing
1. Issued for Review ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
2. Issued for Approval ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
3. Approved for Construction ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
d Construction Engineering
1. Issued for Review ea 33.00 0.277% 0 0.000% 2 0.017% 2 0.017% 31 0.260% 6.061%
2. Issued for Approval ea 33.00 0.277% 0 0.000% 0 0.000% 0 0.000% 33 0.277% 0.000%
3. Approved for Construction ea 33.00 0.277% 0 0.000% 0 0.000% 0 0.000% 33 0.277% 0.000%
e Final document Ls 1.00 0.830% 0 0.000% 0 0.000% 0 0.000% 1 0.830% 0.000%

2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0 0.000% 0 0.000% 1 1.513% 0.000%
0 0.000%
3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%

4 PREPARATION WORK 0.128% 0 0.000%


a. Clean up Area m2 1,237.50 0.052% 0 0.000% 0 0.000% 0 0.000% 1237.5 0.052% 0.000%
b. Stake Out Survey Ls 1.00 0.076% 1 0.076% 0 0.000% 1 0.076% 0 0.000% 100.000%

5 EXCAVATION AND BACKFILL WORK 0.328% 0 0.000%


a. Excavation Deadment 400/600 m3 2.23 0.001% 0 0.000% 0 0.000% 0 0.000% 2.2304 0.001% 0.000%
b. Excavation Pile Cap 800/800 m3 6.14 0.002% 0 0.000% 0 0.000% 0 0.000% 6.144 0.002% 0.000%
c. Excavation for Line Tie Rod m3 95.33 0.027% 0 0.000% 0 0.000% 0 0.000% 95.33 0.027% 0.000%
d. Backfill for Excavation m3 34.57 0.011% 0 0.000% 0 0.000% 0 0.000% 34.57 0.011% 0.000%
e. Backfill Area (Compacted) m3 679.05 0.288% 0 0.000% 0 0.000% 0 0.000% 679.05 0.288% 0.000%

6 STRUCTURE WORK 58.288%


PROCUREMENT
a. Supply Sheet Pile W-500 A-1000
1. Purchased Order jt 67.00 7.215% 0 0.000% 0 0.000% 0 0.000% 67 7.215% 0.000%
2. Manufacturing jt 67.00 9.620% 0 0.000% 0 0.000% 0 0.000% 67 9.620% 0.000%
3. Delivery jt 67.00 7.215% 0 0.000% 0 0.000% 0 0.000% 67 7.215% 0.000%
b. Supply Piling Steel Pipe Dia. 12" THK (anchor pilling)
1. Purchased Order jt 30.00 2.438% 0 0.000% 0 0.000% 0 0.000% 30 2.438% 0.000%
2. Manufacturing jt 30.00 3.250% 0 0.000% 0 0.000% 0 0.000% 30 3.250% 0.000%
3. Delivery jt 30.00 2.438% 0 0.000% 0 0.000% 0 0.000% 30 2.438% 0.000%
c. Supply Piling Steel Pipe Dia. 12" THK (mooring bollards pilling)
1. Purchased Order jt 36.00 2.925% 0 0.000% 0 0.000% 0 0.000% 36 2.925% 0.000%
2. Manufacturing jt 36.00 3.900% 0 0.000% 0 0.000% 0 0.000% 36 3.900% 0.000%
3. Delivery jt 36.00 2.925% 0 0.000% 0 0.000% 0 0.000% 36 2.925% 0.000%
d. Supply Piling Steel Pipe Dia. 12" THK (fender pilling)
1. Purchased Order jt 18.00 1.463% 0 0.000% 0 0.000% 0 0.000% 18 1.463% 0.000%
2. Manufacturing jt 18.00 1.950% 0 0.000% 0 0.000% 0 0.000% 18 1.950% 0.000%
3. Delivery jt 18.00 1.463% 0 0.000% 0 0.000% 0 0.000% 18 1.463% 0.000%
e. Steel Pile ø 18" ASTM A 252
1. Purchased Order jt 1.00 0.147% 0 0.000% 0 0.000% 0 0.000% 1 0.147% 0.000%
2. Delivery jt 1.00 0.147% 0 0.000% 0 0.000% 0 0.000% 1 0.147% 0.000%
f. Rebar Concrete
1. Purchased Order kg 12,322.58 1.509% 0 0.000% 0 0.000% 0 0.000% 12322.58 1.509% 0.000%
2. Delivery kg 12,322.58 3.520% 0 0.000% 0 0.000% 0 0.000% 12322.58 3.520% 0.000%
g. Galvanized Sling ø 1 3/4"
1. Purcahsed Order m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
2. Manufacturing m' 311.65 0.187% 0 0.000% 0 0.000% 0 0.000% 311.65 0.187% 0.000%
3. Delivery m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
h. Galvanized Clamp ø 1 3/4" crossby clips G-450
1. Purchased Order ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
2. Manufacturing ea 365.00 0.062% 0 0.000% 0 0.000% 0 0.000% 365 0.062% 0.000%
3. Delivery ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
i. Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145
1. Purchased Order ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
2. Manufacturing ea 45.00 0.140% 0 0.000% 0 0.000% 0 0.000% 45 0.140% 0.000%
3. Delivery ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
j. Concrete
1. Purchased Order m3 111.41 2.298% 0 0.000% 0 0.000% 0 0.000% 111.41 2.298% 0.000%
k. Sand
1. Purchased Order m3 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
l. Fender Rubber
1. Purchased Order ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
2. Manufacturing ea 8.00 0.587% 0 0.000% 0 0.000% 0 0.000% 8 0.587% 0.000%
3. Delivery ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
m. Soil for fill up
1. Purchased Order m3 679.05 0.639% 0 0.000% 0 0.000% 0 0.000% 679.05 0.639% 0.000%

7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%

A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%

C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%

D. Fabricating & Installing Rebar


a. Rebar for Deadment D16 (400/400) kg 647.81 0.113% 0 0.000% 0 0.000% 0 0.000% 647.81 0.113% 0.000%
b. Rebar for Deadment Ø8 (400/400) kg 175.28 0.031% 0 0.000% 0 0.000% 0 0.000% 175.28 0.031% 0.000%
c. Rebar for Pile Cap D16 (800/800) kg 1,527.34 0.267% 0 0.000% 0 0.000% 0 0.000% 1527.34 0.267% 0.000%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.093% 0 0.000% 0 0.000% 0 0.000% 533.00 0.093% 0.000%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.012% 0 0.000% 0 0.000% 0 0.000% 67.54 0.012% 0.000%
f. Rebar for Capping Beam D16 (750/400) kg 3,423.98 0.599% 0 0.000% 0 0.000% 0 0.000% 3423.98 0.599% 0.000%
g. Rebar for Capping Beam Ø8 (750/400) kg 692.01 0.121% 0 0.000% 0 0.000% 0 0.000% 692.01 0.121% 0.000%
h. Rebar for Rubber Fender Beam D16 (800/2500) kg 1,260.11 0.220% 0 0.000% 0 0.000% 0 0.000% 1260.11 0.220% 0.000%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.091% 0 0.000% 0 0.000% 0 0.000% 518.40 0.091% 0.000%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012% 0 0.000% 0 0.000% 0 0.000% 69.23 0.012% 0.000%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.025% 0 0.000% 0 0.000% 0 0.000% 140.15 0.025% 0.000%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.003% 0 0.000% 0 0.000% 0 0.000% 14.34 0.003% 0.000%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.234% 0 0.000% 0 0.000% 0 0.000% 1339.34 0.234% 0.000%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.181% 0 0.000% 0 0.000% 0 0.000% 1036.81 0.181% 0.000%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.024% 0 0.000% 0 0.000% 0 0.000% 138.46 0.024% 0.000%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.129% 0 0.000% 0 0.000% 0 0.000% 738.77 0.129% 0.000%

E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%

F. Install Plastic Sheet


a. Install Plastic Sheet for Capping Beam m2 152.16 0.006% 0 0.000% 0 0.000% 0 0.000% 152.16 0.006% 0.000%
b. Install Plastic Sheet for Pile Cap and Deadment m2 80.86 0.003% 0 0.000% 0 0.000% 0 0.000% 80.86 0.003% 0.000%
c. Install Plastic Sheet for Rubber Fender m2 37.12 0.002% 0 0.000% 0 0.000% 0 0.000% 37.12 0.002% 0.000%
c. Install Plastic Sheet for Mooring Bollards m2 35.20 0.001% 0 0.000% 0 0.000% 0 0.000% 35.2 0.001% 0.000%

G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%

H. Pouring Concrete K-300


a. Pouring Concrete Deadment 400/400 m3 5.32 0.061% 0 0.000% 0 0.000% 0 0.000% 5.32 0.061% 0.000%
b. Pouring Concrete Pile Cap 800/800 m3 6.14 0.070% 0 0.000% 0 0.000% 0 0.000% 6.144 0.070% 0.000%
c. Pouring Concrete Capping Beam 750/400 m3 20.16 0.231% 0 0.000% 0 0.000% 0 0.000% 20.16 0.231% 0.000%
d. Pouring Concrete Rubber Fender 800/2500 m3 12.80 0.147% 0 0.000% 0 0.000% 0 0.000% 12.8 0.147% 0.000%
e. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (rubber fender) m3 10.18 0.117% 0 0.000% 0 0.000% 0 0.000% 10.18 0.117% 0.000%
f. Pouring Concrete in to Steel Pipe Dia 12" Length 5 M (deadment) m3 22.63 0.259% 0 0.000% 0 0.000% 0 0.000% 22.63 0.259% 0.000%
g. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (mooring bollards) m3 20.37 0.233% 0 0.000% 0 0.000% 0 0.000% 20.37 0.233% 0.000%
h. Pouring Concrete in to Steel Pipe Dia 18" Length 1.6 M (mooring bollards) m3 4.20 0.048% 0 0.000% 0 0.000% 0 0.000% 4.20 0.048% 0.000%
i. Pouring Concrete Pile Cap 2000/2000 (mooring bollards) m3 9.60 0.110% 0 0.000% 0 0.000% 0 0.000% 9.6 0.110% 0.000%

8 FINISHING WORK 2.135%


a. Plestering (1 : 3) for Capping Beam 750/400 m2 110.40 0.047% 0 0.000% 0 0.000% 0 0.000% 110.4 0.047% 0.000%
b. Supply & Install Rubber Fender 400 x 2300 ea 8.00 0.625% 0 0.000% 0 0.000% 0 0.000% 8 0.625% 0.000%
c. Install Ancor Bolt dia 19mm for Rubber Fender (@550 Length) ea 128.00 0.267% 0 0.000% 0 0.000% 0 0.000% 128 0.267% 0.000%
d. Supply Soil Fill Up m3 679.05 1.196% 0 0.000% 0 0.000% 0 0.000% 679.05 1.196% 0.000%

TOTAL 100.000% 100.000% 0.906% 0.017% 0.923% 99.077%

Prepared by, Checked & Reviewed by,


PT. Ade Konstruksi Abadi PetroChina International Jabung Ltd Approved by,
PetroChina International Jabung Ltd

M.Siwa Kumar Isrokdin / Dwi Utama / M. Ihsan A


Project Manager HEO Planner & Estimator Chawarie / Jacoob ET
HEO & Facilities Supv.
WEEKLY PROGRESS REPORT

ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA

Status Week : 6 Period : 10-Oct-19


Rest Week : 25 Up to : 16-Oct-19

Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)

INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

1 TECHNICAL PLANNING DESIGN CONSULTANT FOR CONSTRUCTION 4.148%


a Soil investigation Ls 1.00 0.830% 1 0.830% 0 0.000% 1 0.830% 0 0.000% 100.000%
b Design and Calculation
1. Issued for Review ea 3.00 0.277% 0 0.000% 0 0.000% 0 0.000% 3 0.277% 0.000%
2. Issued for Approval ea 3.00 0.277% 0 0.000% 0 0.000% 0 0.000% 3 0.277% 0.000%
3. Approved for Construction ea 3.00 0.277% 0 0.000% 0 0.000% 0 0.000% 3 0.277% 0.000%
c Design drawing
1. Issued for Review ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
2. Issued for Approval ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
3. Approved for Construction ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
d Construction Engineering
1. Issued for Review ea 33.00 0.277% 2 0.017% 0 0.000% 2 0.017% 31 0.260% 6.061%
2. Issued for Approval ea 33.00 0.277% 0 0.000% 0 0.000% 0 0.000% 33 0.277% 0.000%
3. Approved for Construction ea 33.00 0.277% 0 0.000% 0 0.000% 0 0.000% 33 0.277% 0.000%
e Final document Ls 1.00 0.830% 0 0.000% 0 0.000% 0 0.000% 1 0.830% 0.000%

2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0 0.000% 0 0.000% 1 1.513% 0.000%

3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%

4 PREPARATION WORK 0.128%


a. Clean up Area m2 1,237.50 0.052% 0 0.000% 0 0.000% 0 0.000% 1237.5 0.052% 0.000%
b. Stake Out Survey Ls 1.00 0.076% 1 0.076% 0 0.000% 1 0.076% 0 0.000% 100.000%

5 EXCAVATION AND BACKFILL WORK 0.328%


a. Excavation Deadment 400/600 m3 2.23 0.001% 0 0.000% 0 0.000% 0 0.000% 2.2304 0.001% 0.000%
b. Excavation Pile Cap 800/800 m3 6.14 0.002% 0 0.000% 0 0.000% 0 0.000% 6.144 0.002% 0.000%
c. Excavation for Line Tie Rod m3 95.33 0.027% 0 0.000% 0 0.000% 0 0.000% 95.33 0.027% 0.000%
d. Backfill for Excavation m3 34.57 0.011% 0 0.000% 0 0.000% 0 0.000% 34.57 0.011% 0.000%
e. Backfill Area (Compacted) m3 679.05 0.288% 0 0.000% 0 0.000% 0 0.000% 679.05 0.288% 0.000%

6 STRUCTURE WORK 58.288%


PROCUREMENT
a. Supply Sheet Pile W-500 A-1000
1. Purchased Order jt 67.00 7.215% 0 0.000% 0 0.000% 0 0.000% 67 7.215% 0.000%
2. Manufacturing jt 67.00 9.620% 0 0.000% 0 0.000% 0 0.000% 67 9.620% 0.000%
3. Delivery jt 67.00 7.215% 0 0.000% 0 0.000% 0 0.000% 67 7.215% 0.000%
b. Supply Piling Steel Pipe Dia. 12" THK (anchor pilling)
1. Purchased Order jt 30.00 2.438% 0 0.000% 0 0.000% 0 0.000% 30 2.438% 0.000%
2. Manufacturing jt 30.00 3.250% 0 0.000% 0 0.000% 0 0.000% 30 3.250% 0.000%
3. Delivery jt 30.00 2.438% 0 0.000% 0 0.000% 0 0.000% 30 2.438% 0.000%
c. Supply Piling Steel Pipe Dia. 12" THK (mooring bollards pilling)
1. Purchased Order jt 36.00 2.925% 0 0.000% 0 0.000% 0 0.000% 36 2.925% 0.000%
2. Manufacturing jt 36.00 3.900% 0 0.000% 0 0.000% 0 0.000% 36 3.900% 0.000%
3. Delivery jt 36.00 2.925% 0 0.000% 0 0.000% 0 0.000% 36 2.925% 0.000%
d. Supply Piling Steel Pipe Dia. 12" THK (fender pilling)
1. Purchased Order jt 18.00 1.463% 0 0.000% 0 0.000% 0 0.000% 18 1.463% 0.000%
2. Manufacturing jt 18.00 1.950% 0 0.000% 0 0.000% 0 0.000% 18 1.950% 0.000%
3. Delivery jt 18.00 1.463% 0 0.000% 0 0.000% 0 0.000% 18 1.463% 0.000%
e. Steel Pile ø 18" ASTM A 252
1. Purchased Order jt 1.00 0.147% 0 0.000% 0 0.000% 0 0.000% 1 0.147% 0.000%
2. Delivery jt 1.00 0.147% 0 0.000% 0 0.000% 0 0.000% 1 0.147% 0.000%
f. Rebar Concrete
1. Purchased Order kg 12,322.58 1.509% 0 0.000% 0 0.000% 0 0.000% 12322.58 1.509% 0.000%
2. Delivery kg 12,322.58 3.520% 0 0.000% 0 0.000% 0 0.000% 12322.58 3.520% 0.000%
g. Galvanized Sling ø 1 3/4"
1. Purcahsed Order m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
2. Manufacturing m' 311.65 0.187% 0 0.000% 0 0.000% 0 0.000% 311.65 0.187% 0.000%
3. Delivery m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
h. Galvanized Clamp ø 1 3/4" crossby clips G-450
1. Purchased Order ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
2. Manufacturing ea 365.00 0.062% 0 0.000% 0 0.000% 0 0.000% 365 0.062% 0.000%
3. Delivery ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
i. Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145
1. Purchased Order ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
2. Manufacturing ea 45.00 0.140% 0 0.000% 0 0.000% 0 0.000% 45 0.140% 0.000%
3. Delivery ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
j. Concrete
1. Purchased Order m3 111.41 2.298% 0 0.000% 0 0.000% 0 0.000% 111.41 2.298% 0.000%
k. Sand 0 0.000%
1. Purchased Order m3 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
l. Fender Rubber 0 0.000%
1. Purchased Order ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
2. Manufacturing ea 8.00 0.587% 0 0.000% 0 0.000% 0 0.000% 8 0.587% 0.000%
3. Delivery ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
m. Soil for fill up
1. Purchased Order m3 679.05 0.639% 0 0.000% 0 0.000% 0 0.000% 679.05 0.639% 0.000%

7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%

A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%

C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%

D. Fabricating & Installing Rebar


a. Rebar for Deadment D16 (400/400) kg 647.81 0.113% 0 0.000% 0 0.000% 0 0.000% 647.81 0.113% 0.000%
b. Rebar for Deadment Ø8 (400/400) kg 175.28 0.031% 0 0.000% 0 0.000% 0 0.000% 175.28 0.031% 0.000%
c. Rebar for Pile Cap D16 (800/800) kg 1,527.34 0.267% 0 0.000% 0 0.000% 0 0.000% 1527.34 0.267% 0.000%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.093% 0 0.000% 0 0.000% 0 0.000% 533.00 0.093% 0.000%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.012% 0 0.000% 0 0.000% 0 0.000% 67.54 0.012% 0.000%
f. Rebar for Capping Beam D16 (750/400) kg 3,423.98 0.599% 0 0.000% 0 0.000% 0 0.000% 3423.98 0.599% 0.000%
g. Rebar for Capping Beam Ø8 (750/400) kg 692.01 0.121% 0 0.000% 0 0.000% 0 0.000% 692.01 0.121% 0.000%
h. Rebar for Rubber Fender Beam D16 (800/2500) kg 1,260.11 0.220% 0 0.000% 0 0.000% 0 0.000% 1260.11 0.220% 0.000%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.091% 0 0.000% 0 0.000% 0 0.000% 518.40 0.091% 0.000%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012% 0 0.000% 0 0.000% 0 0.000% 69.23 0.012% 0.000%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.025% 0 0.000% 0 0.000% 0 0.000% 140.15 0.025% 0.000%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.003% 0 0.000% 0 0.000% 0 0.000% 14.34 0.003% 0.000%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.234% 0 0.000% 0 0.000% 0 0.000% 1339.34 0.234% 0.000%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.181% 0 0.000% 0 0.000% 0 0.000% 1036.81 0.181% 0.000%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.024% 0 0.000% 0 0.000% 0 0.000% 138.46 0.024% 0.000%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.129% 0 0.000% 0 0.000% 0 0.000% 738.77 0.129% 0.000%

E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%

F. Install Plastic Sheet


a. Install Plastic Sheet for Capping Beam m2 152.16 0.006% 0 0.000% 0 0.000% 0 0.000% 152.16 0.006% 0.000%
b. Install Plastic Sheet for Pile Cap and Deadment m2 80.86 0.003% 0 0.000% 0 0.000% 0 0.000% 80.86 0.003% 0.000%
c. Install Plastic Sheet for Rubber Fender m2 37.12 0.002% 0 0.000% 0 0.000% 0 0.000% 37.12 0.002% 0.000%
c. Install Plastic Sheet for Mooring Bollards m2 35.20 0.001% 0 0.000% 0 0.000% 0 0.000% 35.2 0.001% 0.000%
0 0.000%
G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%

H. Pouring Concrete K-300


a. Pouring Concrete Deadment 400/400 m3 5.32 0.061% 0 0.000% 0 0.000% 0 0.000% 5.32 0.061% 0.000%
b. Pouring Concrete Pile Cap 800/800 m3 6.14 0.070% 0 0.000% 0 0.000% 0 0.000% 6.144 0.070% 0.000%
c. Pouring Concrete Capping Beam 750/400 m3 20.16 0.231% 0 0.000% 0 0.000% 0 0.000% 20.16 0.231% 0.000%
d. Pouring Concrete Rubber Fender 800/2500 m3 12.80 0.147% 0 0.000% 0 0.000% 0 0.000% 12.8 0.147% 0.000%
e. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (rubber fender) m3 10.18 0.117% 0 0.000% 0 0.000% 0 0.000% 10.18 0.117% 0.000%
f. Pouring Concrete in to Steel Pipe Dia 12" Length 5 M (deadment) m3 22.63 0.259% 0 0.000% 0 0.000% 0 0.000% 22.63 0.259% 0.000%
g. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (mooring bollards) m3 20.37 0.233% 0 0.000% 0 0.000% 0 0.000% 20.37 0.233% 0.000%
h. Pouring Concrete in to Steel Pipe Dia 18" Length 1.6 M (mooring bollards) m3 4.20 0.048% 0 0.000% 0 0.000% 0 0.000% 4.20 0.048% 0.000%
i. Pouring Concrete Pile Cap 2000/2000 (mooring bollards) m3 9.60 0.110% 0 0.000% 0 0.000% 0 0.000% 9.6 0.110% 0.000%

8 FINISHING WORK 2.135%


a. Plestering (1 : 3) for Capping Beam 750/400 m2 110.40 0.047% 0 0.000% 0 0.000% 0 0.000% 110.4 0.047% 0.000%
b. Supply & Install Rubber Fender 400 x 2300 ea 8.00 0.625% 0 0.000% 0 0.000% 0 0.000% 8 0.625% 0.000%
c. Install Ancor Bolt dia 19mm for Rubber Fender (@550 Length) ea 128.00 0.267% 0 0.000% 0 0.000% 0 0.000% 128 0.267% 0.000%
d. Supply Soil Fill Up m3 679.05 1.196% 0 0.000% 0 0.000% 0 0.000% 679.05 1.196% 0.000%

TOTAL 100.000% 100.000% 0.923% 0.000% 0.923% 99.077%

Prepared by, Checked & Reviewed by,


PT. Ade Konstruksi Abadi PetroChina International Jabung Ltd Approved by,
PetroChina International Jabung Ltd

M.Siwa Kumar Isrokdin / Dwi Utama / M. Ihsan A


Project Manager HEO Planner & Estimator Chawarie / Jacoob ET
HEO & Facilities Supv.
WEEKLY PROGRESS REPORT

ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA

Status Week : 7 Period : 17-Oct-19


Rest Week : 24 Up to : 23-Oct-19

Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)

INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

1 TECHNICAL PLANNING DESIGN CONSULTANT FOR CONSTRUCTION 4.148%


a Soil investigation Ls 1.00 0.830% 1 0.830% 0 0.000% 1 0.830% 0 0.000% 100.000%
b Design and Calculation
1. Issued for Review ea 3.00 0.277% 0 0.000% 1 0.092% 1 0.092% 2 0.184% 33.333%
2. Issued for Approval ea 3.00 0.277% 0 0.000% 0 0.000% 0 0.000% 3 0.277% 0.000%
3. Approved for Construction ea 3.00 0.277% 0 0.000% 0 0.000% 0 0.000% 3 0.277% 0.000%
c Design drawing 0 0.000%
1. Issued for Review ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
2. Issued for Approval ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
3. Approved for Construction ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
d Construction Engineering
1. Issued for Review ea 33.00 0.277% 2 0.017% 0 0.000% 2 0.017% 31 0.260% 6.061%
2. Issued for Approval ea 33.00 0.277% 0 0.000% 0 0.000% 0 0.000% 33 0.277% 0.000%
3. Approved for Construction ea 33.00 0.277% 0 0.000% 0 0.000% 0 0.000% 33 0.277% 0.000%
e Final document Ls 1.00 0.830% 0 0.000% 0 0.000% 0 0.000% 1 0.830% 0.000%

2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0 0.000% 0 0.000% 1 1.513% 0.000%

3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%

4 PREPARATION WORK 0.128%


a. Clean up Area m2 1,237.50 0.052% 0 0.000% 0 0.000% 0 0.000% 1237.5 0.052% 0.000%
b. Stake Out Survey Ls 1.00 0.076% 1 0.076% 0 0.000% 1 0.076% 0 0.000% 100.000%

5 EXCAVATION AND BACKFILL WORK 0.328%


a. Excavation Deadment 400/600 m3 2.23 0.001% 0 0.000% 0 0.000% 0 0.000% 2.2304 0.001% 0.000%
b. Excavation Pile Cap 800/800 m3 6.14 0.002% 0 0.000% 0 0.000% 0 0.000% 6.144 0.002% 0.000%
c. Excavation for Line Tie Rod m3 95.33 0.027% 0 0.000% 0 0.000% 0 0.000% 95.33 0.027% 0.000%
d. Backfill for Excavation m3 34.57 0.011% 0 0.000% 0 0.000% 0 0.000% 34.57 0.011% 0.000%
e. Backfill Area (Compacted) m3 679.05 0.288% 0 0.000% 0 0.000% 0 0.000% 679.05 0.288% 0.000%

6 STRUCTURE WORK 58.288%


PROCUREMENT
a. Supply Sheet Pile W-500 A-1000
1. Purchased Order jt 67.00 7.215% 0 0.000% 0 0.000% 0 0.000% 67 7.215% 0.000%
2. Manufacturing jt 67.00 9.620% 0 0.000% 0 0.000% 0 0.000% 67 9.620% 0.000%
3. Delivery jt 67.00 7.215% 0 0.000% 0 0.000% 0 0.000% 67 7.215% 0.000%
b. Supply Piling Steel Pipe Dia. 12" THK (anchor pilling)
1. Purchased Order jt 30.00 2.438% 0 0.000% 0 0.000% 0 0.000% 30 2.438% 0.000%
2. Manufacturing jt 30.00 3.250% 0 0.000% 0 0.000% 0 0.000% 30 3.250% 0.000%
3. Delivery jt 30.00 2.438% 0 0.000% 0 0.000% 0 0.000% 30 2.438% 0.000%
c. Supply Piling Steel Pipe Dia. 12" THK (mooring bollards pilling)
1. Purchased Order jt 36.00 2.925% 0 0.000% 0 0.000% 0 0.000% 36 2.925% 0.000%
2. Manufacturing jt 36.00 3.900% 0 0.000% 0 0.000% 0 0.000% 36 3.900% 0.000%
3. Delivery jt 36.00 2.925% 0 0.000% 0 0.000% 0 0.000% 36 2.925% 0.000%
d. Supply Piling Steel Pipe Dia. 12" THK (fender pilling)
1. Purchased Order jt 18.00 1.463% 0 0.000% 0 0.000% 0 0.000% 18 1.463% 0.000%
2. Manufacturing jt 18.00 1.950% 0 0.000% 0 0.000% 0 0.000% 18 1.950% 0.000%
3. Delivery jt 18.00 1.463% 0 0.000% 0 0.000% 0 0.000% 18 1.463% 0.000%
e. Steel Pile ø 18" ASTM A 252
1. Purchased Order jt 1.00 0.147% 0 0.000% 0 0.000% 0 0.000% 1 0.147% 0.000%
2. Delivery jt 1.00 0.147% 0 0.000% 0 0.000% 0 0.000% 1 0.147% 0.000%
f. Rebar Concrete
1. Purchased Order kg 12,322.58 1.509% 0 0.000% 0 0.000% 0 0.000% 12322.58 1.509% 0.000%
2. Delivery kg 12,322.58 3.520% 0 0.000% 0 0.000% 0 0.000% 12322.58 3.520% 0.000%
g. Galvanized Sling ø 1 3/4"
1. Purcahsed Order m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
2. Manufacturing m' 311.65 0.187% 0 0.000% 0 0.000% 0 0.000% 311.65 0.187% 0.000%
3. Delivery m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
h. Galvanized Clamp ø 1 3/4" crossby clips G-450
1. Purchased Order ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
2. Manufacturing ea 365.00 0.062% 0 0.000% 0 0.000% 0 0.000% 365 0.062% 0.000%
3. Delivery ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
i. Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145
1. Purchased Order ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
2. Manufacturing ea 45.00 0.140% 0 0.000% 0 0.000% 0 0.000% 45 0.140% 0.000%
3. Delivery ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
j. Concrete
1. Purchased Order m3 111.41 2.298% 0 0.000% 0 0.000% 0 0.000% 111.41 2.298% 0.000%
k. Sand
1. Purchased Order m3 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
l. Fender Rubber
1. Purchased Order ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
2. Manufacturing ea 8.00 0.587% 0 0.000% 0 0.000% 0 0.000% 8 0.587% 0.000%
3. Delivery ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
m. Soil for fill up
1. Purchased Order m3 679.05 0.639% 0 0.000% 0 0.000% 0 0.000% 679.05 0.639% 0.000%

7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%

A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%

C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%

D. Fabricating & Installing Rebar


a. Rebar for Deadment D16 (400/400) kg 647.81 0.113% 0 0.000% 0 0.000% 0 0.000% 647.81 0.113% 0.000%
b. Rebar for Deadment Ø8 (400/400) kg 175.28 0.031% 0 0.000% 0 0.000% 0 0.000% 175.28 0.031% 0.000%
c. Rebar for Pile Cap D16 (800/800) kg 1,527.34 0.267% 0 0.000% 0 0.000% 0 0.000% 1527.34 0.267% 0.000%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.093% 0 0.000% 0 0.000% 0 0.000% 533.00 0.093% 0.000%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.012% 0 0.000% 0 0.000% 0 0.000% 67.54 0.012% 0.000%
f. Rebar for Capping Beam D16 (750/400) kg 3,423.98 0.599% 0 0.000% 0 0.000% 0 0.000% 3423.98 0.599% 0.000%
g. Rebar for Capping Beam Ø8 (750/400) kg 692.01 0.121% 0 0.000% 0 0.000% 0 0.000% 692.01 0.121% 0.000%
h. Rebar for Rubber Fender Beam D16 (800/2500) kg 1,260.11 0.220% 0 0.000% 0 0.000% 0 0.000% 1260.11 0.220% 0.000%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.091% 0 0.000% 0 0.000% 0 0.000% 518.40 0.091% 0.000%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012% 0 0.000% 0 0.000% 0 0.000% 69.23 0.012% 0.000%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.025% 0 0.000% 0 0.000% 0 0.000% 140.15 0.025% 0.000%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.003% 0 0.000% 0 0.000% 0 0.000% 14.34 0.003% 0.000%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.234% 0 0.000% 0 0.000% 0 0.000% 1339.34 0.234% 0.000%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.181% 0 0.000% 0 0.000% 0 0.000% 1036.81 0.181% 0.000%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.024% 0 0.000% 0 0.000% 0 0.000% 138.46 0.024% 0.000%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.129% 0 0.000% 0 0.000% 0 0.000% 738.77 0.129% 0.000%

E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%

F. Install Plastic Sheet


a. Install Plastic Sheet for Capping Beam m2 152.16 0.006% 0 0.000% 0 0.000% 0 0.000% 152.16 0.006% 0.000%
b. Install Plastic Sheet for Pile Cap and Deadment m2 80.86 0.003% 0 0.000% 0 0.000% 0 0.000% 80.86 0.003% 0.000%
c. Install Plastic Sheet for Rubber Fender m2 37.12 0.002% 0 0.000% 0 0.000% 0 0.000% 37.12 0.002% 0.000%
c. Install Plastic Sheet for Mooring Bollards m2 35.20 0.001% 0 0.000% 0 0.000% 0 0.000% 35.2 0.001% 0.000%

G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%

H. Pouring Concrete K-300


a. Pouring Concrete Deadment 400/400 m3 5.32 0.061% 0 0.000% 0 0.000% 0 0.000% 5.32 0.061% 0.000%
b. Pouring Concrete Pile Cap 800/800 m3 6.14 0.070% 0 0.000% 0 0.000% 0 0.000% 6.144 0.070% 0.000%
c. Pouring Concrete Capping Beam 750/400 m3 20.16 0.231% 0 0.000% 0 0.000% 0 0.000% 20.16 0.231% 0.000%
d. Pouring Concrete Rubber Fender 800/2500 m3 12.80 0.147% 0 0.000% 0 0.000% 0 0.000% 12.8 0.147% 0.000%
e. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (rubber fender) m3 10.18 0.117% 0 0.000% 0 0.000% 0 0.000% 10.18 0.117% 0.000%
f. Pouring Concrete in to Steel Pipe Dia 12" Length 5 M (deadment) m3 22.63 0.259% 0 0.000% 0 0.000% 0 0.000% 22.63 0.259% 0.000%
g. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (mooring bollards) m3 20.37 0.233% 0 0.000% 0 0.000% 0 0.000% 20.37 0.233% 0.000%
h. Pouring Concrete in to Steel Pipe Dia 18" Length 1.6 M (mooring bollards) m3 4.20 0.048% 0 0.000% 0 0.000% 0 0.000% 4.20 0.048% 0.000%
i. Pouring Concrete Pile Cap 2000/2000 (mooring bollards) m3 9.60 0.110% 0 0.000% 0 0.000% 0 0.000% 9.6 0.110% 0.000%

8 FINISHING WORK 2.135%


a. Plestering (1 : 3) for Capping Beam 750/400 m2 110.40 0.047% 0 0.000% 0 0.000% 0 0.000% 110.4 0.047% 0.000%
b. Supply & Install Rubber Fender 400 x 2300 ea 8.00 0.625% 0 0.000% 0 0.000% 0 0.000% 8 0.625% 0.000%
c. Install Ancor Bolt dia 19mm for Rubber Fender (@550 Length) ea 128.00 0.267% 0 0.000% 0 0.000% 0 0.000% 128 0.267% 0.000%
d. Supply Soil Fill Up m3 679.05 1.196% 0 0.000% 0 0.000% 0 0.000% 679.05 1.196% 0.000%

TOTAL 100.000% 100.000% 0.923% 0.092% 1.015% 98.985%

Prepared by, Checked & Reviewed by,


PT. Ade Konstruksi Abadi PetroChina International Jabung Ltd Approved by,
PetroChina International Jabung Ltd

M.Siwa Kumar Isrokdin / Dwi Utama / M. Ihsan A


Project Manager HEO Planner & Estimator Chawarie / Jacoob ET
HEO & Facilities Supv.
WEEKLY PROGRESS REPORT

ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA

Status Week : 8 Period : 24-Oct-19


Rest Week : 23 Up to : 30-Oct-19

Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)

INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

1 TECHNICAL PLANNING DESIGN CONSULTANT FOR CONSTRUCTION 4.148%


a Soil investigation Ls 1.00 0.830% 1 0.830% 0 0.000% 1 0.830% 0 0.000% 100.000%
b Design and Calculation
1. Issued for Review ea 3.00 0.277% 1 0.092% 0 0.000% 1 0.092% 2 0.184% 33.333%
2. Issued for Approval ea 3.00 0.277% 0 0.000% 1 0.092% 1 0.092% 2 0.184% 33.333%
3. Approved for Construction ea 3.00 0.277% 0 0.000% 0 0.000% 0 0.000% 3 0.277% 0.000%
c Design drawing
1. Issued for Review ea 7.00 0.277% 0 0.000% 7 0.277% 7 0.277% 0 0.000% 100.000%
2. Issued for Approval ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
3. Approved for Construction ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
d Construction Engineering
1. Issued for Review ea 33.00 0.277% 2 0.017% 9 0.075% 11 0.092% 22 0.184% 33.333%
2. Issued for Approval ea 33.00 0.277% 0 0.000% 0 0.000% 0 0.000% 33 0.277% 0.000%
3. Approved for Construction ea 33.00 0.277% 0 0.000% 0 0.000% 0 0.000% 33 0.277% 0.000%
e Final document Ls 1.00 0.830% 0 0.000% 0 0.000% 0 0.000% 1 0.830% 0.000%

2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0 0.000% 0 0.000% 1 1.513% 0.000%

3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%

4 PREPARATION WORK 0.128%


a. Clean up Area m2 1,237.50 0.052% 0 0.000% 0 0.000% 0 0.000% 1237.5 0.052% 0.000%
b. Stake Out Survey Ls 1.00 0.076% 1 0.076% 0 0.000% 1 0.076% 0 0.000% 100.000%

5 EXCAVATION AND BACKFILL WORK 0.328%


a. Excavation Deadment 400/600 m3 2.23 0.001% 0 0.000% 0 0.000% 0 0.000% 2.2304 0.001% 0.000%
b. Excavation Pile Cap 800/800 m3 6.14 0.002% 0 0.000% 0 0.000% 0 0.000% 6.144 0.002% 0.000%
c. Excavation for Line Tie Rod m3 95.33 0.027% 0 0.000% 0 0.000% 0 0.000% 95.33 0.027% 0.000%
d. Backfill for Excavation m3 34.57 0.011% 0 0.000% 0 0.000% 0 0.000% 34.57 0.011% 0.000%
e. Backfill Area (Compacted) m3 679.05 0.288% 0 0.000% 0 0.000% 0 0.000% 679.05 0.288% 0.000%

6 STRUCTURE WORK 58.288%


PROCUREMENT
a. Supply Sheet Pile W-500 A-1000
1. Purchased Order jt 67.00 7.215% 0 0.000% 0 0.000% 0 0.000% 67 7.215% 0.000%
2. Manufacturing jt 67.00 9.620% 0 0.000% 0 0.000% 0 0.000% 67 9.620% 0.000%
3. Delivery jt 67.00 7.215% 0 0.000% 0 0.000% 0 0.000% 67 7.215% 0.000%
b. Supply Piling Steel Pipe Dia. 12" THK (anchor pilling)
1. Purchased Order jt 30.00 2.438% 0 0.000% 0 0.000% 0 0.000% 30 2.438% 0.000%
2. Manufacturing jt 30.00 3.250% 0 0.000% 0 0.000% 0 0.000% 30 3.250% 0.000%
3. Delivery jt 30.00 2.438% 0 0.000% 0 0.000% 0 0.000% 30 2.438% 0.000%
c. Supply Piling Steel Pipe Dia. 12" THK (mooring bollards pilling)
1. Purchased Order jt 36.00 2.925% 0 0.000% 0 0.000% 0 0.000% 36 2.925% 0.000%
2. Manufacturing jt 36.00 3.900% 0 0.000% 0 0.000% 0 0.000% 36 3.900% 0.000%
3. Delivery jt 36.00 2.925% 0 0.000% 0 0.000% 0 0.000% 36 2.925% 0.000%
d. Supply Piling Steel Pipe Dia. 12" THK (fender pilling)
1. Purchased Order jt 18.00 1.463% 0 0.000% 0 0.000% 0 0.000% 18 1.463% 0.000%
2. Manufacturing jt 18.00 1.950% 0 0.000% 0 0.000% 0 0.000% 18 1.950% 0.000%
3. Delivery jt 18.00 1.463% 0 0.000% 0 0.000% 0 0.000% 18 1.463% 0.000%
e. Steel Pile ø 18" ASTM A 252
1. Purchased Order jt 1.00 0.147% 0 0.000% 0 0.000% 0 0.000% 1 0.147% 0.000%
2. Delivery jt 1.00 0.147% 0 0.000% 0 0.000% 0 0.000% 1 0.147% 0.000%
f. Rebar Concrete
1. Purchased Order kg 12,322.58 1.509% 0 0.000% 0 0.000% 0 0.000% 12322.58 1.509% 0.000%
2. Delivery kg 12,322.58 3.520% 0 0.000% 0 0.000% 0 0.000% 12322.58 3.520% 0.000%
g. Galvanized Sling ø 1 3/4"
1. Purcahsed Order m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
2. Manufacturing m' 311.65 0.187% 0 0.000% 0 0.000% 0 0.000% 311.65 0.187% 0.000%
3. Delivery m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
h. Galvanized Clamp ø 1 3/4" crossby clips G-450
1. Purchased Order ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
2. Manufacturing ea 365.00 0.062% 0 0.000% 0 0.000% 0 0.000% 365 0.062% 0.000%
3. Delivery ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
i. Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145 0 0.000%
1. Purchased Order ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
2. Manufacturing ea 45.00 0.140% 0 0.000% 0 0.000% 0 0.000% 45 0.140% 0.000%
3. Delivery ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
j. Concrete
1. Purchased Order m3 111.41 2.298% 0 0.000% 0 0.000% 0 0.000% 111.41 2.298% 0.000%
k. Sand
1. Purchased Order m3 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
l. Fender Rubber
1. Purchased Order ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
2. Manufacturing ea 8.00 0.587% 0 0.000% 0 0.000% 0 0.000% 8 0.587% 0.000%
3. Delivery ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
m. Soil for fill up
1. Purchased Order m3 679.05 0.639% 0 0.000% 0 0.000% 0 0.000% 679.05 0.639% 0.000%

7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%

A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%

C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%

D. Fabricating & Installing Rebar


a. Rebar for Deadment D16 (400/400) kg 647.81 0.113% 0 0.000% 0 0.000% 0 0.000% 647.81 0.113% 0.000%
b. Rebar for Deadment Ø8 (400/400) kg 175.28 0.031% 0 0.000% 0 0.000% 0 0.000% 175.28 0.031% 0.000%
c. Rebar for Pile Cap D16 (800/800) kg 1,527.34 0.267% 0 0.000% 0 0.000% 0 0.000% 1527.34 0.267% 0.000%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.093% 0 0.000% 0 0.000% 0 0.000% 533.00 0.093% 0.000%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.012% 0 0.000% 0 0.000% 0 0.000% 67.54 0.012% 0.000%
f. Rebar for Capping Beam D16 (750/400) kg 3,423.98 0.599% 0 0.000% 0 0.000% 0 0.000% 3423.98 0.599% 0.000%
g. Rebar for Capping Beam Ø8 (750/400) kg 692.01 0.121% 0 0.000% 0 0.000% 0 0.000% 692.01 0.121% 0.000%
h. Rebar for Rubber Fender Beam D16 (800/2500) kg 1,260.11 0.220% 0 0.000% 0 0.000% 0 0.000% 1260.11 0.220% 0.000%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.091% 0 0.000% 0 0.000% 0 0.000% 518.40 0.091% 0.000%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012% 0 0.000% 0 0.000% 0 0.000% 69.23 0.012% 0.000%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.025% 0 0.000% 0 0.000% 0 0.000% 140.15 0.025% 0.000%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.003% 0 0.000% 0 0.000% 0 0.000% 14.34 0.003% 0.000%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.234% 0 0.000% 0 0.000% 0 0.000% 1339.34 0.234% 0.000%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.181% 0 0.000% 0 0.000% 0 0.000% 1036.81 0.181% 0.000%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.024% 0 0.000% 0 0.000% 0 0.000% 138.46 0.024% 0.000%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.129% 0 0.000% 0 0.000% 0 0.000% 738.77 0.129% 0.000%

E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%

F. Install Plastic Sheet


a. Install Plastic Sheet for Capping Beam m2 152.16 0.006% 0 0.000% 0 0.000% 0 0.000% 152.16 0.006% 0.000%
b. Install Plastic Sheet for Pile Cap and Deadment m2 80.86 0.003% 0 0.000% 0 0.000% 0 0.000% 80.86 0.003% 0.000%
c. Install Plastic Sheet for Rubber Fender m2 37.12 0.002% 0 0.000% 0 0.000% 0 0.000% 37.12 0.002% 0.000%
c. Install Plastic Sheet for Mooring Bollards m2 35.20 0.001% 0 0.000% 0 0.000% 0 0.000% 35.2 0.001% 0.000%

G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%

H. Pouring Concrete K-300


a. Pouring Concrete Deadment 400/400 m3 5.32 0.061% 0 0.000% 0 0.000% 0 0.000% 5.32 0.061% 0.000%
b. Pouring Concrete Pile Cap 800/800 m3 6.14 0.070% 0 0.000% 0 0.000% 0 0.000% 6.144 0.070% 0.000%
c. Pouring Concrete Capping Beam 750/400 m3 20.16 0.231% 0 0.000% 0 0.000% 0 0.000% 20.16 0.231% 0.000%
d. Pouring Concrete Rubber Fender 800/2500 m3 12.80 0.147% 0 0.000% 0 0.000% 0 0.000% 12.8 0.147% 0.000%
e. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (rubber fender) m3 10.18 0.117% 0 0.000% 0 0.000% 0 0.000% 10.18 0.117% 0.000%
f. Pouring Concrete in to Steel Pipe Dia 12" Length 5 M (deadment) m3 22.63 0.259% 0 0.000% 0 0.000% 0 0.000% 22.63 0.259% 0.000%
g. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (mooring bollards) m3 20.37 0.233% 0 0.000% 0 0.000% 0 0.000% 20.37 0.233% 0.000%
h. Pouring Concrete in to Steel Pipe Dia 18" Length 1.6 M (mooring bollards) m3 4.20 0.048% 0 0.000% 0 0.000% 0 0.000% 4.20 0.048% 0.000%
i. Pouring Concrete Pile Cap 2000/2000 (mooring bollards) m3 9.60 0.110% 0 0.000% 0 0.000% 0 0.000% 9.6 0.110% 0.000%

8 FINISHING WORK 2.135%


a. Plestering (1 : 3) for Capping Beam 750/400 m2 110.40 0.047% 0 0.000% 0 0.000% 0 0.000% 110.4 0.047% 0.000%
b. Supply & Install Rubber Fender 400 x 2300 ea 8.00 0.625% 0 0.000% 0 0.000% 0 0.000% 8 0.625% 0.000%
c. Install Ancor Bolt dia 19mm for Rubber Fender (@550 Length) ea 128.00 0.267% 0 0.000% 0 0.000% 0 0.000% 128 0.267% 0.000%
d. Supply Soil Fill Up m3 679.05 1.196% 0 0.000% 0 0.000% 0 0.000% 679.05 1.196% 0.000%

TOTAL 100.000% 100.000% 1.015% 0.444% 1.459% 98.541%

Prepared by, Checked & Reviewed by,


PT. Ade Konstruksi Abadi PetroChina International Jabung Ltd Approved by,
PetroChina International Jabung Ltd

M.Siwa Kumar Isrokdin / Dwi Utama / M. Ihsan A


Project Manager HEO Planner & Estimator Chawarie / Jacoob ET
HEO & Facilities Supv.
WEEKLY PROGRESS REPORT

ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA

Status Week : 9 Period : 31-Oct-19


Rest Week : 22 Up to : 6-Nov-19

Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)

INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

1 TECHNICAL PLANNING DESIGN CONSULTANT FOR CONSTRUCTION 4.148%


a Soil investigation Ls 1.00 0.830% 1 0.830% 0 0.000% 1 0.830% 0 0.000% 100.000%
b Design and Calculation
1. Issued for Review ea 3.00 0.277% 1 0.092% 0 0.000% 1 0.092% 2 0.184% 33.333%
2. Issued for Approval ea 3.00 0.277% 1 0.092% 0 0.000% 1 0.092% 2 0.184% 33.333%
3. Approved for Construction ea 3.00 0.277% 0 0.000% 0 0.000% 0 0.000% 3 0.277% 0.000%
c Design drawing
1. Issued for Review ea 7.00 0.277% 7 0.277% 0 0.000% 7 0.277% 0 0.000% 100.000%
2. Issued for Approval ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
3. Approved for Construction ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
d Construction Engineering
1. Issued for Review ea 33.00 0.277% 11 0.092% 0 0.000% 11 0.092% 22 0.184% 33.333%
2. Issued for Approval ea 33.00 0.277% 0 0.000% 2 0.017% 2 0.017% 31 0.260% 6.061%
3. Approved for Construction ea 33.00 0.277% 0 0.000% 0 0.000% 0 0.000% 33 0.277% 0.000%
e Final document Ls 1.00 0.830% 0 0.000% 0 0.000% 0 0.000% 1 0.830% 0.000%

2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0 0.000% 0 0.000% 1 1.513% 0.000%

3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%

4 PREPARATION WORK 0.128% 0 0.000%


a. Clean up Area m2 1,237.50 0.052% 0 0.000% 0 0.000% 0 0.000% 1237.5 0.052% 0.000%
b. Stake Out Survey Ls 1.00 0.076% 1 0.076% 0 0.000% 1 0.076% 0 0.000% 100.000%

5 EXCAVATION AND BACKFILL WORK 0.328%


a. Excavation Deadment 400/600 m3 2.23 0.001% 0 0.000% 0 0.000% 0 0.000% 2.2304 0.001% 0.000%
b. Excavation Pile Cap 800/800 m3 6.14 0.002% 0 0.000% 0 0.000% 0 0.000% 6.144 0.002% 0.000%
c. Excavation for Line Tie Rod m3 95.33 0.027% 0 0.000% 0 0.000% 0 0.000% 95.33 0.027% 0.000%
d. Backfill for Excavation m3 34.57 0.011% 0 0.000% 0 0.000% 0 0.000% 34.57 0.011% 0.000%
e. Backfill Area (Compacted) m3 679.05 0.288% 0 0.000% 0 0.000% 0 0.000% 679.05 0.288% 0.000%

6 STRUCTURE WORK 58.288%


PROCUREMENT
a. Supply Sheet Pile W-500 A-1000
1. Purchased Order jt 67.00 7.215% 0 0.000% 0 0.000% 0 0.000% 67 7.215% 0.000%
2. Manufacturing jt 67.00 9.620% 0 0.000% 0 0.000% 0 0.000% 67 9.620% 0.000%
3. Delivery jt 67.00 7.215% 0 0.000% 0 0.000% 0 0.000% 67 7.215% 0.000%
b. Supply Piling Steel Pipe Dia. 12" THK (anchor pilling)
1. Purchased Order jt 30.00 2.438% 0 0.000% 0 0.000% 0 0.000% 30 2.438% 0.000%
2. Manufacturing jt 30.00 3.250% 0 0.000% 0 0.000% 0 0.000% 30 3.250% 0.000%
3. Delivery jt 30.00 2.438% 0 0.000% 0 0.000% 0 0.000% 30 2.438% 0.000%
c. Supply Piling Steel Pipe Dia. 12" THK (mooring bollards pilling)
1. Purchased Order jt 36.00 2.925% 0 0.000% 0 0.000% 0 0.000% 36 2.925% 0.000%
2. Manufacturing jt 36.00 3.900% 0 0.000% 0 0.000% 0 0.000% 36 3.900% 0.000%
3. Delivery jt 36.00 2.925% 0 0.000% 0 0.000% 0 0.000% 36 2.925% 0.000%
d. Supply Piling Steel Pipe Dia. 12" THK (fender pilling)
1. Purchased Order jt 18.00 1.463% 0 0.000% 0 0.000% 0 0.000% 18 1.463% 0.000%
2. Manufacturing jt 18.00 1.950% 0 0.000% 0 0.000% 0 0.000% 18 1.950% 0.000%
3. Delivery jt 18.00 1.463% 0 0.000% 0 0.000% 0 0.000% 18 1.463% 0.000%
e. Steel Pile ø 18" ASTM A 252
1. Purchased Order jt 1.00 0.147% 0 0.000% 0 0.000% 0 0.000% 1 0.147% 0.000%
2. Delivery jt 1.00 0.147% 0 0.000% 0 0.000% 0 0.000% 1 0.147% 0.000%
f. Rebar Concrete
1. Purchased Order kg 12,322.58 1.509% 0 0.000% 0 0.000% 0 0.000% 12322.58 1.509% 0.000%
2. Delivery kg 12,322.58 3.520% 0 0.000% 0 0.000% 0 0.000% 12322.58 3.520% 0.000%
g. Galvanized Sling ø 1 3/4"
1. Purcahsed Order m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
2. Manufacturing m' 311.65 0.187% 0 0.000% 0 0.000% 0 0.000% 311.65 0.187% 0.000%
3. Delivery m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
h. Galvanized Clamp ø 1 3/4" crossby clips G-450
1. Purchased Order ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
2. Manufacturing ea 365.00 0.062% 0 0.000% 0 0.000% 0 0.000% 365 0.062% 0.000%
3. Delivery ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
i. Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145
1. Purchased Order ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
2. Manufacturing ea 45.00 0.140% 0 0.000% 0 0.000% 0 0.000% 45 0.140% 0.000%
3. Delivery ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
j. Concrete
1. Purchased Order m3 111.41 2.298% 0 0.000% 0 0.000% 0 0.000% 111.41 2.298% 0.000%
k. Sand
1. Purchased Order m3 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
l. Fender Rubber
1. Purchased Order ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
2. Manufacturing ea 8.00 0.587% 0 0.000% 0 0.000% 0 0.000% 8 0.587% 0.000%
3. Delivery ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
m. Soil for fill up
1. Purchased Order m3 679.05 0.639% 0 0.000% 0 0.000% 0 0.000% 679.05 0.639% 0.000%

7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%

A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%

C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%

D. Fabricating & Installing Rebar


a. Rebar for Deadment D16 (400/400) kg 647.81 0.113% 0 0.000% 0 0.000% 0 0.000% 647.81 0.113% 0.000%
b. Rebar for Deadment Ø8 (400/400) kg 175.28 0.031% 0 0.000% 0 0.000% 0 0.000% 175.28 0.031% 0.000%
c. Rebar for Pile Cap D16 (800/800) kg 1,527.34 0.267% 0 0.000% 0 0.000% 0 0.000% 1527.34 0.267% 0.000%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.093% 0 0.000% 0 0.000% 0 0.000% 533.00 0.093% 0.000%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.012% 0 0.000% 0 0.000% 0 0.000% 67.54 0.012% 0.000%
f. Rebar for Capping Beam D16 (750/400) kg 3,423.98 0.599% 0 0.000% 0 0.000% 0 0.000% 3423.98 0.599% 0.000%
g. Rebar for Capping Beam Ø8 (750/400) kg 692.01 0.121% 0 0.000% 0 0.000% 0 0.000% 692.01 0.121% 0.000%
h. Rebar for Rubber Fender Beam D16 (800/2500) kg 1,260.11 0.220% 0 0.000% 0 0.000% 0 0.000% 1260.11 0.220% 0.000%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.091% 0 0.000% 0 0.000% 0 0.000% 518.40 0.091% 0.000%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012% 0 0.000% 0 0.000% 0 0.000% 69.23 0.012% 0.000%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.025% 0 0.000% 0 0.000% 0 0.000% 140.15 0.025% 0.000%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.003% 0 0.000% 0 0.000% 0 0.000% 14.34 0.003% 0.000%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.234% 0 0.000% 0 0.000% 0 0.000% 1339.34 0.234% 0.000%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.181% 0 0.000% 0 0.000% 0 0.000% 1036.81 0.181% 0.000%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.024% 0 0.000% 0 0.000% 0 0.000% 138.46 0.024% 0.000%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.129% 0 0.000% 0 0.000% 0 0.000% 738.77 0.129% 0.000%

E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%

F. Install Plastic Sheet


a. Install Plastic Sheet for Capping Beam m2 152.16 0.006% 0 0.000% 0 0.000% 0 0.000% 152.16 0.006% 0.000%
b. Install Plastic Sheet for Pile Cap and Deadment m2 80.86 0.003% 0 0.000% 0 0.000% 0 0.000% 80.86 0.003% 0.000%
c. Install Plastic Sheet for Rubber Fender m2 37.12 0.002% 0 0.000% 0 0.000% 0 0.000% 37.12 0.002% 0.000%
c. Install Plastic Sheet for Mooring Bollards m2 35.20 0.001% 0 0.000% 0 0.000% 0 0.000% 35.2 0.001% 0.000%

G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%

H. Pouring Concrete K-300


a. Pouring Concrete Deadment 400/400 m3 5.32 0.061% 0 0.000% 0 0.000% 0 0.000% 5.32 0.061% 0.000%
b. Pouring Concrete Pile Cap 800/800 m3 6.14 0.070% 0 0.000% 0 0.000% 0 0.000% 6.144 0.070% 0.000%
c. Pouring Concrete Capping Beam 750/400 m3 20.16 0.231% 0 0.000% 0 0.000% 0 0.000% 20.16 0.231% 0.000%
d. Pouring Concrete Rubber Fender 800/2500 m3 12.80 0.147% 0 0.000% 0 0.000% 0 0.000% 12.8 0.147% 0.000%
e. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (rubber fender) m3 10.18 0.117% 0 0.000% 0 0.000% 0 0.000% 10.18 0.117% 0.000%
f. Pouring Concrete in to Steel Pipe Dia 12" Length 5 M (deadment) m3 22.63 0.259% 0 0.000% 0 0.000% 0 0.000% 22.63 0.259% 0.000%
g. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (mooring bollards) m3 20.37 0.233% 0 0.000% 0 0.000% 0 0.000% 20.37 0.233% 0.000%
h. Pouring Concrete in to Steel Pipe Dia 18" Length 1.6 M (mooring bollards) m3 4.20 0.048% 0 0.000% 0 0.000% 0 0.000% 4.20 0.048% 0.000%
i. Pouring Concrete Pile Cap 2000/2000 (mooring bollards) m3 9.60 0.110% 0 0.000% 0 0.000% 0 0.000% 9.6 0.110% 0.000%

8 FINISHING WORK 2.135%


a. Plestering (1 : 3) for Capping Beam 750/400 m2 110.40 0.047% 0 0.000% 0 0.000% 0 0.000% 110.4 0.047% 0.000%
b. Supply & Install Rubber Fender 400 x 2300 ea 8.00 0.625% 0 0.000% 0 0.000% 0 0.000% 8 0.625% 0.000%
c. Install Ancor Bolt dia 19mm for Rubber Fender (@550 Length) ea 128.00 0.267% 0 0.000% 0 0.000% 0 0.000% 128 0.267% 0.000%
d. Supply Soil Fill Up m3 679.05 1.196% 0 0.000% 0 0.000% 0 0.000% 679.05 1.196% 0.000%

TOTAL 100.000% 100.000% 1.459% 0.017% 1.476% 98.524%

Prepared by, Checked & Reviewed by,


PT. Ade Konstruksi Abadi PetroChina International Jabung Ltd Approved by,
PetroChina International Jabung Ltd

M.Siwa Kumar Isrokdin / Dwi Utama / M. Ihsan A


Project Manager HEO Planner & Estimator Chawarie / Jacoob ET
HEO & Facilities Supv.
WEEKLY PROGRESS REPORT

ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA

Status Week : 10 Period : 7-Nov-19


Rest Week : 21 Up to : 13-Nov-19

Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)

INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

1 TECHNICAL PLANNING DESIGN CONSULTANT FOR CONSTRUCTION 4.148%


a Soil investigation Ls 1.00 0.830% 1 0.830% 0 0.000% 1 0.830% 0 0.000% 100.000%
b Design and Calculation
1. Issued for Review ea 3.00 0.277% 1 0.092% 0 0.000% 1 0.092% 2 0.184% 33.333%
2. Issued for Approval ea 3.00 0.277% 1 0.092% 0 0.000% 1 0.092% 2 0.184% 33.333%
3. Approved for Construction ea 3.00 0.277% 0 0.000% 0 0.000% 0 0.000% 3 0.277% 0.000%
c Design drawing
1. Issued for Review ea 7.00 0.277% 7 0.277% 0 0.000% 7 0.277% 0 0.000% 100.000%
2. Issued for Approval ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
3. Approved for Construction ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
d Construction Engineering
1. Issued for Review ea 33.00 0.277% 11 0.092% 0 0.000% 11 0.092% 22 0.184% 33.333%
2. Issued for Approval ea 33.00 0.277% 2 0.017% 5 0.042% 7 0.059% 26 0.218% 21.212%
3. Approved for Construction ea 33.00 0.277% 0 0.000% 0 0.000% 0 0.000% 33 0.277% 0.000%
e Final document Ls 1.00 0.830% 0 0.000% 0 0.000% 0 0.000% 1 0.830% 0.000%

2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0 0.000% 0 0.000% 1 1.513% 0.000%

3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%

4 PREPARATION WORK 0.128%


a. Clean up Area m2 1,237.50 0.052% 0 0.000% 0 0.000% 0 0.000% 1237.5 0.052% 0.000%
b. Stake Out Survey Ls 1.00 0.076% 1 0.076% 0 0.000% 1 0.076% 0 0.000% 100.000%

5 EXCAVATION AND BACKFILL WORK 0.328%


a. Excavation Deadment 400/600 m3 2.23 0.001% 0 0.000% 0 0.000% 0 0.000% 2.2304 0.001% 0.000%
b. Excavation Pile Cap 800/800 m3 6.14 0.002% 0 0.000% 0 0.000% 0 0.000% 6.144 0.002% 0.000%
c. Excavation for Line Tie Rod m3 95.33 0.027% 0 0.000% 0 0.000% 0 0.000% 95.33 0.027% 0.000%
d. Backfill for Excavation m3 34.57 0.011% 0 0.000% 0 0.000% 0 0.000% 34.57 0.011% 0.000%
e. Backfill Area (Compacted) m3 679.05 0.288% 0 0.000% 0 0.000% 0 0.000% 679.05 0.288% 0.000%

6 STRUCTURE WORK 58.288%


PROCUREMENT
a. Supply Sheet Pile W-500 A-1000
1. Purchased Order jt 67.00 7.215% 0 0.000% 0 0.000% 0 0.000% 67 7.215% 0.000%
2. Manufacturing jt 67.00 9.620% 0 0.000% 0 0.000% 0 0.000% 67 9.620% 0.000%
3. Delivery jt 67.00 7.215% 0 0.000% 0 0.000% 0 0.000% 67 7.215% 0.000%
b. Supply Piling Steel Pipe Dia. 12" THK (anchor pilling)
1. Purchased Order jt 30.00 2.438% 0 0.000% 0 0.000% 0 0.000% 30 2.438% 0.000%
2. Manufacturing jt 30.00 3.250% 0 0.000% 0 0.000% 0 0.000% 30 3.250% 0.000%
3. Delivery jt 30.00 2.438% 0 0.000% 0 0.000% 0 0.000% 30 2.438% 0.000%
c. Supply Piling Steel Pipe Dia. 12" THK (mooring bollards pilling)
1. Purchased Order jt 36.00 2.925% 0 0.000% 0 0.000% 0 0.000% 36 2.925% 0.000%
2. Manufacturing jt 36.00 3.900% 0 0.000% 0 0.000% 0 0.000% 36 3.900% 0.000%
3. Delivery jt 36.00 2.925% 0 0.000% 0 0.000% 0 0.000% 36 2.925% 0.000%
d. Supply Piling Steel Pipe Dia. 12" THK (fender pilling)
1. Purchased Order jt 18.00 1.463% 0 0.000% 0 0.000% 0 0.000% 18 1.463% 0.000%
2. Manufacturing jt 18.00 1.950% 0 0.000% 0 0.000% 0 0.000% 18 1.950% 0.000%
3. Delivery jt 18.00 1.463% 0 0.000% 0 0.000% 0 0.000% 18 1.463% 0.000%
e. Steel Pile ø 18" ASTM A 252
1. Purchased Order jt 1.00 0.147% 0 0.000% 0 0.000% 0 0.000% 1 0.147% 0.000%
2. Delivery jt 1.00 0.147% 0 0.000% 0 0.000% 0 0.000% 1 0.147% 0.000%
f. Rebar Concrete
1. Purchased Order kg 12,322.58 1.509% 0 0.000% 0 0.000% 0 0.000% 12322.58 1.509% 0.000%
2. Delivery kg 12,322.58 3.520% 0 0.000% 0 0.000% 0 0.000% 12322.58 3.520% 0.000%
g. Galvanized Sling ø 1 3/4"
1. Purcahsed Order m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
2. Manufacturing m' 311.65 0.187% 0 0.000% 0 0.000% 0 0.000% 311.65 0.187% 0.000%
3. Delivery m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
h. Galvanized Clamp ø 1 3/4" crossby clips G-450
1. Purchased Order ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
2. Manufacturing ea 365.00 0.062% 0 0.000% 0 0.000% 0 0.000% 365 0.062% 0.000%
3. Delivery ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
i. Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145
1. Purchased Order ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
2. Manufacturing ea 45.00 0.140% 0 0.000% 0 0.000% 0 0.000% 45 0.140% 0.000%
3. Delivery ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
j. Concrete
1. Purchased Order m3 111.41 2.298% 0 0.000% 0 0.000% 0 0.000% 111.41 2.298% 0.000%
k. Sand
1. Purchased Order m3 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
l. Fender Rubber
1. Purchased Order ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
2. Manufacturing ea 8.00 0.587% 0 0.000% 0 0.000% 0 0.000% 8 0.587% 0.000%
3. Delivery ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
m. Soil for fill up 0 0.000%
1. Purchased Order m3 679.05 0.639% 0 0.000% 0 0.000% 0 0.000% 679.05 0.639% 0.000%

7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%

A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%

C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%

D. Fabricating & Installing Rebar


a. Rebar for Deadment D16 (400/400) kg 647.81 0.113% 0 0.000% 0 0.000% 0 0.000% 647.81 0.113% 0.000%
b. Rebar for Deadment Ø8 (400/400) kg 175.28 0.031% 0 0.000% 0 0.000% 0 0.000% 175.28 0.031% 0.000%
c. Rebar for Pile Cap D16 (800/800) kg 1,527.34 0.267% 0 0.000% 0 0.000% 0 0.000% 1527.34 0.267% 0.000%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.093% 0 0.000% 0 0.000% 0 0.000% 533.00 0.093% 0.000%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.012% 0 0.000% 0 0.000% 0 0.000% 67.54 0.012% 0.000%
f. Rebar for Capping Beam D16 (750/400) kg 3,423.98 0.599% 0 0.000% 0 0.000% 0 0.000% 3423.98 0.599% 0.000%
g. Rebar for Capping Beam Ø8 (750/400) kg 692.01 0.121% 0 0.000% 0 0.000% 0 0.000% 692.01 0.121% 0.000%
h. Rebar for Rubber Fender Beam D16 (800/2500) kg 1,260.11 0.220% 0 0.000% 0 0.000% 0 0.000% 1260.11 0.220% 0.000%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.091% 0 0.000% 0 0.000% 0 0.000% 518.40 0.091% 0.000%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012% 0 0.000% 0 0.000% 0 0.000% 69.23 0.012% 0.000%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.025% 0 0.000% 0 0.000% 0 0.000% 140.15 0.025% 0.000%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.003% 0 0.000% 0 0.000% 0 0.000% 14.34 0.003% 0.000%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.234% 0 0.000% 0 0.000% 0 0.000% 1339.34 0.234% 0.000%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.181% 0 0.000% 0 0.000% 0 0.000% 1036.81 0.181% 0.000%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.024% 0 0.000% 0 0.000% 0 0.000% 138.46 0.024% 0.000%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.129% 0 0.000% 0 0.000% 0 0.000% 738.77 0.129% 0.000%

E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%

F. Install Plastic Sheet


a. Install Plastic Sheet for Capping Beam m2 152.16 0.006% 0 0.000% 0 0.000% 0 0.000% 152.16 0.006% 0.000%
b. Install Plastic Sheet for Pile Cap and Deadment m2 80.86 0.003% 0 0.000% 0 0.000% 0 0.000% 80.86 0.003% 0.000%
c. Install Plastic Sheet for Rubber Fender m2 37.12 0.002% 0 0.000% 0 0.000% 0 0.000% 37.12 0.002% 0.000%
c. Install Plastic Sheet for Mooring Bollards m2 35.20 0.001% 0 0.000% 0 0.000% 0 0.000% 35.2 0.001% 0.000%

G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%

H. Pouring Concrete K-300


a. Pouring Concrete Deadment 400/400 m3 5.32 0.061% 0 0.000% 0 0.000% 0 0.000% 5.32 0.061% 0.000%
b. Pouring Concrete Pile Cap 800/800 m3 6.14 0.070% 0 0.000% 0 0.000% 0 0.000% 6.144 0.070% 0.000%
c. Pouring Concrete Capping Beam 750/400 m3 20.16 0.231% 0 0.000% 0 0.000% 0 0.000% 20.16 0.231% 0.000%
d. Pouring Concrete Rubber Fender 800/2500 m3 12.80 0.147% 0 0.000% 0 0.000% 0 0.000% 12.8 0.147% 0.000%
e. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (rubber fender) m3 10.18 0.117% 0 0.000% 0 0.000% 0 0.000% 10.18 0.117% 0.000%
f. Pouring Concrete in to Steel Pipe Dia 12" Length 5 M (deadment) m3 22.63 0.259% 0 0.000% 0 0.000% 0 0.000% 22.63 0.259% 0.000%
g. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (mooring bollards) m3 20.37 0.233% 0 0.000% 0 0.000% 0 0.000% 20.37 0.233% 0.000%
h. Pouring Concrete in to Steel Pipe Dia 18" Length 1.6 M (mooring bollards) m3 4.20 0.048% 0 0.000% 0 0.000% 0 0.000% 4.20 0.048% 0.000%
i. Pouring Concrete Pile Cap 2000/2000 (mooring bollards) m3 9.60 0.110% 0 0.000% 0 0.000% 0 0.000% 9.6 0.110% 0.000%

8 FINISHING WORK 2.135%


a. Plestering (1 : 3) for Capping Beam 750/400 m2 110.40 0.047% 0 0.000% 0 0.000% 0 0.000% 110.4 0.047% 0.000%
b. Supply & Install Rubber Fender 400 x 2300 ea 8.00 0.625% 0 0.000% 0 0.000% 0 0.000% 8 0.625% 0.000%
c. Install Ancor Bolt dia 19mm for Rubber Fender (@550 Length) ea 128.00 0.267% 0 0.000% 0 0.000% 0 0.000% 128 0.267% 0.000%
d. Supply Soil Fill Up m3 679.05 1.196% 0 0.000% 0 0.000% 0 0.000% 679.05 1.196% 0.000%

TOTAL 100.000% 100.000% 1.476% 0.042% 1.518% 98.482%

Prepared by, Checked & Reviewed by,


PT. Ade Konstruksi Abadi PetroChina International Jabung Ltd Approved by,
PetroChina International Jabung Ltd

M.Siwa Kumar Isrokdin / Dwi Utama / M. Ihsan A


Project Manager HEO Planner & Estimator Chawarie / Jacoob ET
HEO & Facilities Supv.
WEEKLY PROGRESS REPORT

ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA

Status Week : 11 Period : 14-Nov-19


Rest Week : 20 Up to : 20-Nov-19

Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)

INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

1 TECHNICAL PLANNING DESIGN CONSULTANT FOR CONSTRUCTION 4.148%


a Soil investigation Ls 1.00 0.830% 1 0.830% 0 0.000% 1 0.830% 0 0.000% 100.000%
b Design and Calculation
1. Issued for Review ea 3.00 0.277% 1 0.092% 0 0.000% 1 0.092% 2 0.184% 33.333%
2. Issued for Approval ea 3.00 0.277% 1 0.092% 0 0.000% 1 0.092% 2 0.184% 33.333%
3. Approved for Construction ea 3.00 0.277% 0 0.000% 0 0.000% 0 0.000% 3 0.277% 0.000%
c Design drawing
1. Issued for Review ea 7.00 0.277% 7 0.277% 0 0.000% 7 0.277% 0 0.000% 100.000%
2. Issued for Approval ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
3. Approved for Construction ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
d Construction Engineering
1. Issued for Review ea 33.00 0.277% 11 0.092% 4 0.034% 15 0.126% 18 0.151% 45.455%
2. Issued for Approval ea 33.00 0.277% 7 0.059% 0 0.000% 7 0.059% 26 0.218% 21.212%
3. Approved for Construction ea 33.00 0.277% 0 0.000% 0 0.000% 0 0.000% 33 0.277% 0.000%
e Final document Ls 1.00 0.830% 0 0.000% 0 0.000% 0 0.000% 1 0.830% 0.000%

2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0 0.000% 0 0.000% 1 1.513% 0.000%

3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%

4 PREPARATION WORK 0.128% 0 0.000%


a. Clean up Area m2 1,237.50 0.052% 0 0.000% 0 0.000% 0 0.000% 1237.5 0.052% 0.000%
b. Stake Out Survey Ls 1.00 0.076% 1 0.076% 0 0.000% 1 0.076% 0 0.000% 100.000%

5 EXCAVATION AND BACKFILL WORK 0.328%


a. Excavation Deadment 400/600 m3 2.23 0.001% 0 0.000% 0 0.000% 0 0.000% 2.2304 0.001% 0.000%
b. Excavation Pile Cap 800/800 m3 6.14 0.002% 0 0.000% 0 0.000% 0 0.000% 6.144 0.002% 0.000%
c. Excavation for Line Tie Rod m3 95.33 0.027% 0 0.000% 0 0.000% 0 0.000% 95.33 0.027% 0.000%
d. Backfill for Excavation m3 34.57 0.011% 0 0.000% 0 0.000% 0 0.000% 34.57 0.011% 0.000%
e. Backfill Area (Compacted) m3 679.05 0.288% 0 0.000% 0 0.000% 0 0.000% 679.05 0.288% 0.000%

6 STRUCTURE WORK 58.288%


PROCUREMENT
a. Supply Sheet Pile W-500 A-1000
1. Purchased Order jt 67.00 7.215% 0 0.000% 67 7.215% 67 7.215% 0 0.000% 100.000%
2. Manufacturing jt 67.00 9.620% 0 0.000% 0 0.000% 0 0.000% 67 9.620% 0.000%
3. Delivery jt 67.00 7.215% 0 0.000% 0 0.000% 0 0.000% 67 7.215% 0.000%
b. Supply Piling Steel Pipe Dia. 12" THK (anchor pilling)
1. Purchased Order jt 30.00 2.438% 0 0.000% 0 0.000% 0 0.000% 30 2.438% 0.000%
2. Manufacturing jt 30.00 3.250% 0 0.000% 0 0.000% 0 0.000% 30 3.250% 0.000%
3. Delivery jt 30.00 2.438% 0 0.000% 0 0.000% 0 0.000% 30 2.438% 0.000%
c. Supply Piling Steel Pipe Dia. 12" THK (mooring bollards pilling)
1. Purchased Order jt 36.00 2.925% 0 0.000% 0 0.000% 0 0.000% 36 2.925% 0.000%
2. Manufacturing jt 36.00 3.900% 0 0.000% 0 0.000% 0 0.000% 36 3.900% 0.000%
3. Delivery jt 36.00 2.925% 0 0.000% 0 0.000% 0 0.000% 36 2.925% 0.000%
d. Supply Piling Steel Pipe Dia. 12" THK (fender pilling)
1. Purchased Order jt 18.00 1.463% 0 0.000% 0 0.000% 0 0.000% 18 1.463% 0.000%
2. Manufacturing jt 18.00 1.950% 0 0.000% 0 0.000% 0 0.000% 18 1.950% 0.000%
3. Delivery jt 18.00 1.463% 0 0.000% 0 0.000% 0 0.000% 18 1.463% 0.000%
e. Steel Pile ø 18" ASTM A 252
1. Purchased Order jt 1.00 0.147% 0 0.000% 0 0.000% 0 0.000% 1 0.147% 0.000%
2. Delivery jt 1.00 0.147% 0 0.000% 0 0.000% 0 0.000% 1 0.147% 0.000%
f. Rebar Concrete
1. Purchased Order kg 12,322.58 1.509% 0 0.000% 0 0.000% 0 0.000% 12322.58 1.509% 0.000%
2. Delivery kg 12,322.58 3.520% 0 0.000% 0 0.000% 0 0.000% 12322.58 3.520% 0.000%
g. Galvanized Sling ø 1 3/4"
1. Purcahsed Order m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
2. Manufacturing m' 311.65 0.187% 0 0.000% 0 0.000% 0 0.000% 311.65 0.187% 0.000%
3. Delivery m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
h. Galvanized Clamp ø 1 3/4" crossby clips G-450
1. Purchased Order ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
2. Manufacturing ea 365.00 0.062% 0 0.000% 0 0.000% 0 0.000% 365 0.062% 0.000%
3. Delivery ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
i. Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145
1. Purchased Order ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
2. Manufacturing ea 45.00 0.140% 0 0.000% 0 0.000% 0 0.000% 45 0.140% 0.000%
3. Delivery ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
j. Concrete
1. Purchased Order m3 111.41 2.298% 0 0.000% 0 0.000% 0 0.000% 111.41 2.298% 0.000%
k. Sand 0 0.000%
1. Purchased Order m3 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
l. Fender Rubber
1. Purchased Order ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
2. Manufacturing ea 8.00 0.587% 0 0.000% 0 0.000% 0 0.000% 8 0.587% 0.000%
3. Delivery ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
m. Soil for fill up
1. Purchased Order m3 679.05 0.639% 0 0.000% 0 0.000% 0 0.000% 679.05 0.639% 0.000%

7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%

A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%

C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%

D. Fabricating & Installing Rebar


a. Rebar for Deadment D16 (400/400) kg 647.81 0.113% 0 0.000% 0 0.000% 0 0.000% 647.81 0.113% 0.000%
b. Rebar for Deadment Ø8 (400/400) kg 175.28 0.031% 0 0.000% 0 0.000% 0 0.000% 175.28 0.031% 0.000%
c. Rebar for Pile Cap D16 (800/800) kg 1,527.34 0.267% 0 0.000% 0 0.000% 0 0.000% 1527.34 0.267% 0.000%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.093% 0 0.000% 0 0.000% 0 0.000% 533.00 0.093% 0.000%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.012% 0 0.000% 0 0.000% 0 0.000% 67.54 0.012% 0.000%
f. Rebar for Capping Beam D16 (750/400) kg 3,423.98 0.599% 0 0.000% 0 0.000% 0 0.000% 3423.98 0.599% 0.000%
g. Rebar for Capping Beam Ø8 (750/400) kg 692.01 0.121% 0 0.000% 0 0.000% 0 0.000% 692.01 0.121% 0.000%
h. Rebar for Rubber Fender Beam D16 (800/2500) kg 1,260.11 0.220% 0 0.000% 0 0.000% 0 0.000% 1260.11 0.220% 0.000%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.091% 0 0.000% 0 0.000% 0 0.000% 518.40 0.091% 0.000%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012% 0 0.000% 0 0.000% 0 0.000% 69.23 0.012% 0.000%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.025% 0 0.000% 0 0.000% 0 0.000% 140.15 0.025% 0.000%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.003% 0 0.000% 0 0.000% 0 0.000% 14.34 0.003% 0.000%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.234% 0 0.000% 0 0.000% 0 0.000% 1339.34 0.234% 0.000%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.181% 0 0.000% 0 0.000% 0 0.000% 1036.81 0.181% 0.000%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.024% 0 0.000% 0 0.000% 0 0.000% 138.46 0.024% 0.000%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.129% 0 0.000% 0 0.000% 0 0.000% 738.77 0.129% 0.000%

E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%

F. Install Plastic Sheet


a. Install Plastic Sheet for Capping Beam m2 152.16 0.006% 0 0.000% 0 0.000% 0 0.000% 152.16 0.006% 0.000%
b. Install Plastic Sheet for Pile Cap and Deadment m2 80.86 0.003% 0 0.000% 0 0.000% 0 0.000% 80.86 0.003% 0.000%
c. Install Plastic Sheet for Rubber Fender m2 37.12 0.002% 0 0.000% 0 0.000% 0 0.000% 37.12 0.002% 0.000%
c. Install Plastic Sheet for Mooring Bollards m2 35.20 0.001% 0 0.000% 0 0.000% 0 0.000% 35.2 0.001% 0.000%

G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%

H. Pouring Concrete K-300


a. Pouring Concrete Deadment 400/400 m3 5.32 0.061% 0 0.000% 0 0.000% 0 0.000% 5.32 0.061% 0.000%
b. Pouring Concrete Pile Cap 800/800 m3 6.14 0.070% 0 0.000% 0 0.000% 0 0.000% 6.144 0.070% 0.000%
c. Pouring Concrete Capping Beam 750/400 m3 20.16 0.231% 0 0.000% 0 0.000% 0 0.000% 20.16 0.231% 0.000%
d. Pouring Concrete Rubber Fender 800/2500 m3 12.80 0.147% 0 0.000% 0 0.000% 0 0.000% 12.8 0.147% 0.000%
e. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (rubber fender) m3 10.18 0.117% 0 0.000% 0 0.000% 0 0.000% 10.18 0.117% 0.000%
f. Pouring Concrete in to Steel Pipe Dia 12" Length 5 M (deadment) m3 22.63 0.259% 0 0.000% 0 0.000% 0 0.000% 22.63 0.259% 0.000%
g. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (mooring bollards) m3 20.37 0.233% 0 0.000% 0 0.000% 0 0.000% 20.37 0.233% 0.000%
h. Pouring Concrete in to Steel Pipe Dia 18" Length 1.6 M (mooring bollards) m3 4.20 0.048% 0 0.000% 0 0.000% 0 0.000% 4.20 0.048% 0.000%
i. Pouring Concrete Pile Cap 2000/2000 (mooring bollards) m3 9.60 0.110% 0 0.000% 0 0.000% 0 0.000% 9.6 0.110% 0.000%

8 FINISHING WORK 2.135%


a. Plestering (1 : 3) for Capping Beam 750/400 m2 110.40 0.047% 0 0.000% 0 0.000% 0 0.000% 110.4 0.047% 0.000%
b. Supply & Install Rubber Fender 400 x 2300 ea 8.00 0.625% 0 0.000% 0 0.000% 0 0.000% 8 0.625% 0.000%
c. Install Ancor Bolt dia 19mm for Rubber Fender (@550 Length) ea 128.00 0.267% 0 0.000% 0 0.000% 0 0.000% 128 0.267% 0.000%
d. Supply Soil Fill Up m3 679.05 1.196% 0 0.000% 0 0.000% 0 0.000% 679.05 1.196% 0.000%

TOTAL 100.000% 100.000% 1.518% 7.248% 8.766% 91.234%

Prepared by, Checked & Reviewed by,


PT. Ade Konstruksi Abadi PetroChina International Jabung Ltd Approved by,
PetroChina International Jabung Ltd

M.Siwa Kumar Isrokdin / Dwi Utama / M. Ihsan A


Project Manager HEO Planner & Estimator Chawarie / Jacoob ET
HEO & Facilities Supv.
WEEKLY PROGRESS REPORT

ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA

Status Week : 12 Period : 21-Nov-19


Rest Week : 19 Up to : 27-Nov-19

Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)

INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

1 TECHNICAL PLANNING DESIGN CONSULTANT FOR CONSTRUCTION 4.148%


a Soil investigation Ls 1.00 0.830% 1 0.830% 0 0.000% 1 0.830% 0 0.000% 100.000%
b Design and Calculation
1. Issued for Review ea 3.00 0.277% 1 0.092% 2 0.184% 3 0.277% 0 0.000% 100.000%
2. Issued for Approval ea 3.00 0.277% 1 0.092% 0 0.000% 1 0.092% 2 0.184% 33.333%
3. Approved for Construction ea 3.00 0.277% 0 0.000% 1 0.092% 1 0.092% 2 0.184% 33.333%
c Design drawing
1. Issued for Review ea 7.00 0.277% 7 0.277% 0 0.000% 7 0.277% 0 0.000% 100.000%
2. Issued for Approval ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
3. Approved for Construction ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
d Construction Engineering
1. Issued for Review ea 33.00 0.277% 15 0.126% 3 0.025% 18 0.151% 15 0.126% 54.545%
2. Issued for Approval ea 33.00 0.277% 7 0.059% 0 0.000% 7 0.059% 26 0.218% 21.212%
3. Approved for Construction ea 33.00 0.277% 0 0.000% 0 0.000% 0 0.000% 33 0.277% 0.000%
e Final document Ls 1.00 0.830% 0 0.000% 0 0.000% 0 0.000% 1 0.830% 0.000%

2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0 0.000% 0 0.000% 1 1.513% 0.000%

3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%

4 PREPARATION WORK 0.128%


a. Clean up Area m2 1,237.50 0.052% 0 0.000% 0 0.000% 0 0.000% 1237.5 0.052% 0.000%
b. Stake Out Survey Ls 1.00 0.076% 1 0.076% 0 0.000% 1 0.076% 0 0.000% 100.000%

5 EXCAVATION AND BACKFILL WORK 0.328%


a. Excavation Deadment 400/600 m3 2.23 0.001% 0 0.000% 0 0.000% 0 0.000% 2.2304 0.001% 0.000%
b. Excavation Pile Cap 800/800 m3 6.14 0.002% 0 0.000% 0 0.000% 0 0.000% 6.144 0.002% 0.000%
c. Excavation for Line Tie Rod m3 95.33 0.027% 0 0.000% 0 0.000% 0 0.000% 95.33 0.027% 0.000%
d. Backfill for Excavation m3 34.57 0.011% 0 0.000% 0 0.000% 0 0.000% 34.57 0.011% 0.000%
e. Backfill Area (Compacted) m3 679.05 0.288% 0 0.000% 0 0.000% 0 0.000% 679.05 0.288% 0.000%

6 STRUCTURE WORK 58.288%


PROCUREMENT
a. Supply Sheet Pile W-500 A-1000
1. Purchased Order jt 67.00 7.215% 67 7.215% 0 0.000% 67 7.215% 0 0.000% 100.000%
2. Manufacturing jt 67.00 9.620% 0 0.000% 0 0.000% 0 0.000% 67 9.620% 0.000%
3. Delivery jt 67.00 7.215% 0 0.000% 0 0.000% 0 0.000% 67 7.215% 0.000%
b. Supply Piling Steel Pipe Dia. 12" THK (anchor pilling)
1. Purchased Order jt 30.00 2.438% 0 0.000% 30 2.438% 30 2.438% 0 0.000% 100.000%
2. Manufacturing jt 30.00 3.250% 0 0.000% 0 0.000% 0 0.000% 30 3.250% 0.000%
3. Delivery jt 30.00 2.438% 0 0.000% 0 0.000% 0 0.000% 30 2.438% 0.000%
c. Supply Piling Steel Pipe Dia. 12" THK (mooring bollards pilling)
1. Purchased Order jt 36.00 2.925% 0 0.000% 36 2.925% 36 2.925% 0 0.000% 100.000%
2. Manufacturing jt 36.00 3.900% 0 0.000% 0 0.000% 0 0.000% 36 3.900% 0.000%
3. Delivery jt 36.00 2.925% 0 0.000% 0 0.000% 0 0.000% 36 2.925% 0.000%
d. Supply Piling Steel Pipe Dia. 12" THK (fender pilling)
1. Purchased Order jt 18.00 1.463% 0 0.000% 18 1.463% 18 1.463% 0 0.000% 100.000%
2. Manufacturing jt 18.00 1.950% 0 0.000% 0 0.000% 0 0.000% 18 1.950% 0.000%
3. Delivery jt 18.00 1.463% 0 0.000% 0 0.000% 0 0.000% 18 1.463% 0.000%
e. Steel Pile ø 18" ASTM A 252
1. Purchased Order jt 1.00 0.147% 0 0.000% 0 0.000% 0 0.000% 1 0.147% 0.000%
2. Delivery jt 1.00 0.147% 0 0.000% 0 0.000% 0 0.000% 1 0.147% 0.000%
f. Rebar Concrete
1. Purchased Order kg 12,322.58 1.509% 0 0.000% 0 0.000% 0 0.000% 12322.58 1.509% 0.000%
2. Delivery kg 12,322.58 3.520% 0 0.000% 0 0.000% 0 0.000% 12322.58 3.520% 0.000%
g. Galvanized Sling ø 1 3/4"
1. Purcahsed Order m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
2. Manufacturing m' 311.65 0.187% 0 0.000% 0 0.000% 0 0.000% 311.65 0.187% 0.000%
3. Delivery m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
h. Galvanized Clamp ø 1 3/4" crossby clips G-450
1. Purchased Order ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
2. Manufacturing ea 365.00 0.062% 0 0.000% 0 0.000% 0 0.000% 365 0.062% 0.000%
3. Delivery ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
i. Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145
1. Purchased Order ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
2. Manufacturing ea 45.00 0.140% 0 0.000% 0 0.000% 0 0.000% 45 0.140% 0.000%
3. Delivery ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
j. Concrete
1. Purchased Order m3 111.41 2.298% 0 0.000% 0 0.000% 0 0.000% 111.41 2.298% 0.000%
k. Sand
1. Purchased Order m3 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
l. Fender Rubber
1. Purchased Order ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
2. Manufacturing ea 8.00 0.587% 0 0.000% 0 0.000% 0 0.000% 8 0.587% 0.000%
3. Delivery ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
m. Soil for fill up
1. Purchased Order m3 679.05 0.639% 0 0.000% 0 0.000% 0 0.000% 679.05 0.639% 0.000%

7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%

A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%

C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%

D. Fabricating & Installing Rebar


a. Rebar for Deadment D16 (400/400) kg 647.81 0.113% 0 0.000% 0 0.000% 0 0.000% 647.81 0.113% 0.000%
b. Rebar for Deadment Ø8 (400/400) kg 175.28 0.031% 0 0.000% 0 0.000% 0 0.000% 175.28 0.031% 0.000%
c. Rebar for Pile Cap D16 (800/800) kg 1,527.34 0.267% 0 0.000% 0 0.000% 0 0.000% 1527.34 0.267% 0.000%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.093% 0 0.000% 0 0.000% 0 0.000% 533.00 0.093% 0.000%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.012% 0 0.000% 0 0.000% 0 0.000% 67.54 0.012% 0.000%
f. Rebar for Capping Beam D16 (750/400) kg 3,423.98 0.599% 0 0.000% 0 0.000% 0 0.000% 3423.98 0.599% 0.000%
g. Rebar for Capping Beam Ø8 (750/400) kg 692.01 0.121% 0 0.000% 0 0.000% 0 0.000% 692.01 0.121% 0.000%
h. Rebar for Rubber Fender Beam D16 (800/2500) kg 1,260.11 0.220% 0 0.000% 0 0.000% 0 0.000% 1260.11 0.220% 0.000%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.091% 0 0.000% 0 0.000% 0 0.000% 518.40 0.091% 0.000%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012% 0 0.000% 0 0.000% 0 0.000% 69.23 0.012% 0.000%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.025% 0 0.000% 0 0.000% 0 0.000% 140.15 0.025% 0.000%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.003% 0 0.000% 0 0.000% 0 0.000% 14.34 0.003% 0.000%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.234% 0 0.000% 0 0.000% 0 0.000% 1339.34 0.234% 0.000%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.181% 0 0.000% 0 0.000% 0 0.000% 1036.81 0.181% 0.000%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.024% 0 0.000% 0 0.000% 0 0.000% 138.46 0.024% 0.000%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.129% 0 0.000% 0 0.000% 0 0.000% 738.77 0.129% 0.000%

E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%

F. Install Plastic Sheet


a. Install Plastic Sheet for Capping Beam m2 152.16 0.006% 0 0.000% 0 0.000% 0 0.000% 152.16 0.006% 0.000%
b. Install Plastic Sheet for Pile Cap and Deadment m2 80.86 0.003% 0 0.000% 0 0.000% 0 0.000% 80.86 0.003% 0.000%
c. Install Plastic Sheet for Rubber Fender m2 37.12 0.002% 0 0.000% 0 0.000% 0 0.000% 37.12 0.002% 0.000%
c. Install Plastic Sheet for Mooring Bollards m2 35.20 0.001% 0 0.000% 0 0.000% 0 0.000% 35.2 0.001% 0.000%

G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%

H. Pouring Concrete K-300


a. Pouring Concrete Deadment 400/400 m3 5.32 0.061% 0 0.000% 0 0.000% 0 0.000% 5.32 0.061% 0.000%
b. Pouring Concrete Pile Cap 800/800 m3 6.14 0.070% 0 0.000% 0 0.000% 0 0.000% 6.144 0.070% 0.000%
c. Pouring Concrete Capping Beam 750/400 m3 20.16 0.231% 0 0.000% 0 0.000% 0 0.000% 20.16 0.231% 0.000%
d. Pouring Concrete Rubber Fender 800/2500 m3 12.80 0.147% 0 0.000% 0 0.000% 0 0.000% 12.8 0.147% 0.000%
e. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (rubber fender) m3 10.18 0.117% 0 0.000% 0 0.000% 0 0.000% 10.18 0.117% 0.000%
f. Pouring Concrete in to Steel Pipe Dia 12" Length 5 M (deadment) m3 22.63 0.259% 0 0.000% 0 0.000% 0 0.000% 22.63 0.259% 0.000%
g. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (mooring bollards) m3 20.37 0.233% 0 0.000% 0 0.000% 0 0.000% 20.37 0.233% 0.000%
h. Pouring Concrete in to Steel Pipe Dia 18" Length 1.6 M (mooring bollards) m3 4.20 0.048% 0 0.000% 0 0.000% 0 0.000% 4.20 0.048% 0.000%
i. Pouring Concrete Pile Cap 2000/2000 (mooring bollards) m3 9.60 0.110% 0 0.000% 0 0.000% 0 0.000% 9.6 0.110% 0.000%

8 FINISHING WORK 2.135%


a. Plestering (1 : 3) for Capping Beam 750/400 m2 110.40 0.047% 0 0.000% 0 0.000% 0 0.000% 110.4 0.047% 0.000%
b. Supply & Install Rubber Fender 400 x 2300 ea 8.00 0.625% 0 0.000% 0 0.000% 0 0.000% 8 0.625% 0.000%
c. Install Ancor Bolt dia 19mm for Rubber Fender (@550 Length) ea 128.00 0.267% 0 0.000% 0 0.000% 0 0.000% 128 0.267% 0.000%
d. Supply Soil Fill Up m3 679.05 1.196% 0 0.000% 0 0.000% 0 0.000% 679.05 1.196% 0.000%

TOTAL 100.000% 100.000% 8.766% 7.127% 15.893% 84.107%

Prepared by, Checked & Reviewed by,


PT. Ade Konstruksi Abadi PetroChina International Jabung Ltd Approved by,
PetroChina International Jabung Ltd

M.Siwa Kumar Isrokdin / Dwi Utama / M. Ihsan A


Project Manager HEO Planner & Estimator Chawarie / Jacoob ET
HEO & Facilities Supv.
WEEKLY PROGRESS REPORT

ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA

Status Week : 13 Period : 28-Nov-19


Rest Week : 18 Up to : 4-Dec-19

Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)

INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

1 TECHNICAL PLANNING DESIGN CONSULTANT FOR CONSTRUCTION 4.148%


a Soil investigation Ls 1.00 0.830% 1 0.830% 0 0.000% 1 0.830% 0 0.000% 100.000%
b Design and Calculation
1. Issued for Review ea 3.00 0.277% 3 0.277% 0 0.000% 3 0.277% 0 0.000% 100.000%
2. Issued for Approval ea 3.00 0.277% 1 0.092% 0 0.000% 1 0.092% 2 0.184% 33.333%
3. Approved for Construction ea 3.00 0.277% 1 0.092% 0 0.000% 1 0.092% 2 0.184% 33.333%
c Design drawing
1. Issued for Review ea 7.00 0.277% 7 0.277% 0 0.000% 7 0.277% 0 0.000% 100.000%
2. Issued for Approval ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
3. Approved for Construction ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
d Construction Engineering
1. Issued for Review ea 33.00 0.277% 18 0.151% 2 0.017% 20 0.168% 13 0.109% 60.606%
2. Issued for Approval ea 33.00 0.277% 7 0.059% 0 0.000% 7 0.059% 26 0.218% 21.212%
3. Approved for Construction ea 33.00 0.277% 0 0.000% 0 0.000% 0 0.000% 33 0.277% 0.000%
e Final document Ls 1.00 0.830% 0 0.000% 0 0.000% 0 0.000% 1 0.830% 0.000%

2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0 0.000% 0 0.000% 1 1.513% 0.000%

3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%

4 PREPARATION WORK 0.128%


a. Clean up Area m2 1,237.50 0.052% 0 0.000% 0 0.000% 0 0.000% 1237.5 0.052% 0.000%
b. Stake Out Survey Ls 1.00 0.076% 1 0.076% 0 0.000% 1 0.076% 0 0.000% 100.000%

5 EXCAVATION AND BACKFILL WORK 0.328%


a. Excavation Deadment 400/600 m3 2.23 0.001% 0 0.000% 0 0.000% 0 0.000% 2.2304 0.001% 0.000%
b. Excavation Pile Cap 800/800 m3 6.14 0.002% 0 0.000% 0 0.000% 0 0.000% 6.144 0.002% 0.000%
c. Excavation for Line Tie Rod m3 95.33 0.027% 0 0.000% 0 0.000% 0 0.000% 95.33 0.027% 0.000%
d. Backfill for Excavation m3 34.57 0.011% 0 0.000% 0 0.000% 0 0.000% 34.57 0.011% 0.000%
e. Backfill Area (Compacted) m3 679.05 0.288% 0 0.000% 0 0.000% 0 0.000% 679.05 0.288% 0.000%

6 STRUCTURE WORK 58.288%


PROCUREMENT
a. Supply Sheet Pile W-500 A-1000
1. Purchased Order jt 67.00 7.215% 67 7.215% 0 0.000% 67 7.215% 0 0.000% 100.000%
2. Manufacturing jt 67.00 9.620% 0 0.000% 27 3.877% 27 3.877% 40 5.743% 40.299%
3. Delivery jt 67.00 7.215% 0 0.000% 0 0.000% 0 0.000% 67 7.215% 0.000%
b. Supply Piling Steel Pipe Dia. 12" THK (anchor pilling)
1. Purchased Order jt 30.00 2.438% 30 2.438% 0 0.000% 30 2.438% 0 0.000% 100.000%
2. Manufacturing jt 30.00 3.250% 0 0.000% 0 0.000% 0 0.000% 30 3.250% 0.000%
3. Delivery jt 30.00 2.438% 0 0.000% 0 0.000% 0 0.000% 30 2.438% 0.000%
c. Supply Piling Steel Pipe Dia. 12" THK (mooring bollards pilling)
1. Purchased Order jt 36.00 2.925% 36 2.925% 0 0.000% 36 2.925% 0 0.000% 100.000%
2. Manufacturing jt 36.00 3.900% 0 0.000% 0 0.000% 0 0.000% 36 3.900% 0.000%
3. Delivery jt 36.00 2.925% 0 0.000% 0 0.000% 0 0.000% 36 2.925% 0.000%
d. Supply Piling Steel Pipe Dia. 12" THK (fender pilling)
1. Purchased Order jt 18.00 1.463% 18 1.463% 0 0.000% 18 1.463% 0 0.000% 100.000%
2. Manufacturing jt 18.00 1.950% 0 0.000% 0 0.000% 0 0.000% 18 1.950% 0.000%
3. Delivery jt 18.00 1.463% 0 0.000% 0 0.000% 0 0.000% 18 1.463% 0.000%
e. Steel Pile ø 18" ASTM A 252
1. Purchased Order jt 1.00 0.147% 0 0.000% 1 0.147% 1 0.147% 0 0.000% 100.000%
2. Delivery jt 1.00 0.147% 0 0.000% 0 0.000% 0 0.000% 1 0.147% 0.000%
f. Rebar Concrete
1. Purchased Order kg 12,322.58 1.509% 0 0.000% 0 0.000% 0 0.000% 12322.58 1.509% 0.000%
2. Delivery kg 12,322.58 3.520% 0 0.000% 0 0.000% 0 0.000% 12322.58 3.520% 0.000%
g. Galvanized Sling ø 1 3/4"
1. Purcahsed Order m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
2. Manufacturing m' 311.65 0.187% 0 0.000% 0 0.000% 0 0.000% 311.65 0.187% 0.000%
3. Delivery m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
h. Galvanized Clamp ø 1 3/4" crossby clips G-450
1. Purchased Order ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
2. Manufacturing ea 365.00 0.062% 0 0.000% 0 0.000% 0 0.000% 365 0.062% 0.000%
3. Delivery ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
i. Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145 0 0.000%
1. Purchased Order ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
2. Manufacturing ea 45.00 0.140% 0 0.000% 0 0.000% 0 0.000% 45 0.140% 0.000%
3. Delivery ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
j. Concrete
1. Purchased Order m3 111.41 2.298% 0 0.000% 0 0.000% 0 0.000% 111.41 2.298% 0.000%
k. Sand
1. Purchased Order m3 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
l. Fender Rubber
1. Purchased Order ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
2. Manufacturing ea 8.00 0.587% 0 0.000% 0 0.000% 0 0.000% 8 0.587% 0.000%
3. Delivery ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
m. Soil for fill up
1. Purchased Order m3 679.05 0.639% 0 0.000% 0 0.000% 0 0.000% 679.05 0.639% 0.000%

7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%

A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%

C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%

D. Fabricating & Installing Rebar


a. Rebar for Deadment D16 (400/400) kg 647.81 0.113% 0 0.000% 0 0.000% 0 0.000% 647.81 0.113% 0.000%
b. Rebar for Deadment Ø8 (400/400) kg 175.28 0.031% 0 0.000% 0 0.000% 0 0.000% 175.28 0.031% 0.000%
c. Rebar for Pile Cap D16 (800/800) kg 1,527.34 0.267% 0 0.000% 0 0.000% 0 0.000% 1527.34 0.267% 0.000%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.093% 0 0.000% 0 0.000% 0 0.000% 533.00 0.093% 0.000%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.012% 0 0.000% 0 0.000% 0 0.000% 67.54 0.012% 0.000%
f. Rebar for Capping Beam D16 (750/400) kg 3,423.98 0.599% 0 0.000% 0 0.000% 0 0.000% 3423.98 0.599% 0.000%
g. Rebar for Capping Beam Ø8 (750/400) kg 692.01 0.121% 0 0.000% 0 0.000% 0 0.000% 692.01 0.121% 0.000%
h. Rebar for Rubber Fender Beam D16 (800/2500) kg 1,260.11 0.220% 0 0.000% 0 0.000% 0 0.000% 1260.11 0.220% 0.000%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.091% 0 0.000% 0 0.000% 0 0.000% 518.40 0.091% 0.000%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012% 0 0.000% 0 0.000% 0 0.000% 69.23 0.012% 0.000%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.025% 0 0.000% 0 0.000% 0 0.000% 140.15 0.025% 0.000%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.003% 0 0.000% 0 0.000% 0 0.000% 14.34 0.003% 0.000%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.234% 0 0.000% 0 0.000% 0 0.000% 1339.34 0.234% 0.000%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.181% 0 0.000% 0 0.000% 0 0.000% 1036.81 0.181% 0.000%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.024% 0 0.000% 0 0.000% 0 0.000% 138.46 0.024% 0.000%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.129% 0 0.000% 0 0.000% 0 0.000% 738.77 0.129% 0.000%

E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%

F. Install Plastic Sheet


a. Install Plastic Sheet for Capping Beam m2 152.16 0.006% 0 0.000% 0 0.000% 0 0.000% 152.16 0.006% 0.000%
b. Install Plastic Sheet for Pile Cap and Deadment m2 80.86 0.003% 0 0.000% 0 0.000% 0 0.000% 80.86 0.003% 0.000%
c. Install Plastic Sheet for Rubber Fender m2 37.12 0.002% 0 0.000% 0 0.000% 0 0.000% 37.12 0.002% 0.000%
c. Install Plastic Sheet for Mooring Bollards m2 35.20 0.001% 0 0.000% 0 0.000% 0 0.000% 35.2 0.001% 0.000%

G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%

H. Pouring Concrete K-300


a. Pouring Concrete Deadment 400/400 m3 5.32 0.061% 0 0.000% 0 0.000% 0 0.000% 5.32 0.061% 0.000%
b. Pouring Concrete Pile Cap 800/800 m3 6.14 0.070% 0 0.000% 0 0.000% 0 0.000% 6.144 0.070% 0.000%
c. Pouring Concrete Capping Beam 750/400 m3 20.16 0.231% 0 0.000% 0 0.000% 0 0.000% 20.16 0.231% 0.000%
d. Pouring Concrete Rubber Fender 800/2500 m3 12.80 0.147% 0 0.000% 0 0.000% 0 0.000% 12.8 0.147% 0.000%
e. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (rubber fender) m3 10.18 0.117% 0 0.000% 0 0.000% 0 0.000% 10.18 0.117% 0.000%
f. Pouring Concrete in to Steel Pipe Dia 12" Length 5 M (deadment) m3 22.63 0.259% 0 0.000% 0 0.000% 0 0.000% 22.63 0.259% 0.000%
g. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (mooring bollards) m3 20.37 0.233% 0 0.000% 0 0.000% 0 0.000% 20.37 0.233% 0.000%
h. Pouring Concrete in to Steel Pipe Dia 18" Length 1.6 M (mooring bollards) m3 4.20 0.048% 0 0.000% 0 0.000% 0 0.000% 4.20 0.048% 0.000%
i. Pouring Concrete Pile Cap 2000/2000 (mooring bollards) m3 9.60 0.110% 0 0.000% 0 0.000% 0 0.000% 9.6 0.110% 0.000%

8 FINISHING WORK 2.135%


a. Plestering (1 : 3) for Capping Beam 750/400 m2 110.40 0.047% 0 0.000% 0 0.000% 0 0.000% 110.4 0.047% 0.000%
b. Supply & Install Rubber Fender 400 x 2300 ea 8.00 0.625% 0 0.000% 0 0.000% 0 0.000% 8 0.625% 0.000%
c. Install Ancor Bolt dia 19mm for Rubber Fender (@550 Length) ea 128.00 0.267% 0 0.000% 0 0.000% 0 0.000% 128 0.267% 0.000%
d. Supply Soil Fill Up m3 679.05 1.196% 0 0.000% 0 0.000% 0 0.000% 679.05 1.196% 0.000%

TOTAL 100.000% 100.000% 15.893% 4.041% 19.934% 80.066%

Prepared by, Checked & Reviewed by,


PT. Ade Konstruksi Abadi PetroChina International Jabung Ltd Approved by,
PetroChina International Jabung Ltd

M.Siwa Kumar Isrokdin / Dwi Utama / M. Ihsan A


Project Manager HEO Planner & Estimator Chawarie / Jacoob ET
HEO & Facilities Supv.
WEEKLY PROGRESS REPORT

ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA

Status Week : 14 Period : 5-Dec-19


Rest Week : 17 Up to : 11-Dec-19

Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)

INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

1 TECHNICAL PLANNING DESIGN CONSULTANT FOR CONSTRUCTION 4.148%


a Soil investigation Ls 1.00 0.830% 1 0.830% 0 0.000% 1 0.830% 0 0.000% 100.000%
b Design and Calculation
1. Issued for Review ea 3.00 0.277% 3 0.277% 0 0.000% 3 0.277% 0 0.000% 100.000%
2. Issued for Approval ea 3.00 0.277% 1 0.092% 2 0.184% 3 0.277% 0 0.000% 100.000%
3. Approved for Construction ea 3.00 0.277% 1 0.092% 0 0.000% 1 0.092% 2 0.184% 33.333%
c Design drawing
1. Issued for Review ea 7.00 0.277% 7 0.277% 0 0.000% 7 0.277% 0 0.000% 100.000%
2. Issued for Approval ea 7.00 0.277% 0 0.000% 2 0.079% 2 0.079% 5 0.198% 28.571%
3. Approved for Construction ea 7.00 0.277% 0 0.000% 0 0.000% 0 0.000% 7 0.277% 0.000%
d Construction Engineering
1. Issued for Review ea 33.00 0.277% 20 0.168% 0 0.000% 20 0.168% 13 0.109% 60.606%
2. Issued for Approval ea 33.00 0.277% 7 0.059% 7 0.059% 14 0.117% 19 0.159% 42.424%
3. Approved for Construction ea 33.00 0.277% 0 0.000% 8 0.067% 8 0.067% 25 0.209% 24.242%
e Final document Ls 1.00 0.830% 0 0.000% 0 0.000% 0 0.000% 1 0.830% 0.000%

2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0 0.000% 0 0.000% 1 1.513% 0.000%
0 0.000%
3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%

4 PREPARATION WORK 0.128% 0 0.000%


a. Clean up Area m2 1,237.50 0.052% 0 0.000% 0 0.000% 0 0.000% 1237.5 0.052% 0.000%
b. Stake Out Survey Ls 1.00 0.076% 1 0.076% 0 0.000% 1 0.076% 0 0.000% 100.000%

5 EXCAVATION AND BACKFILL WORK 0.328%


a. Excavation Deadment 400/600 m3 2.23 0.001% 0 0.000% 0 0.000% 0 0.000% 2.2304 0.001% 0.000%
b. Excavation Pile Cap 800/800 m3 6.14 0.002% 0 0.000% 0 0.000% 0 0.000% 6.144 0.002% 0.000%
c. Excavation for Line Tie Rod m3 95.33 0.027% 0 0.000% 0 0.000% 0 0.000% 95.33 0.027% 0.000%
d. Backfill for Excavation m3 34.57 0.011% 0 0.000% 0 0.000% 0 0.000% 34.57 0.011% 0.000%
e. Backfill Area (Compacted) m3 679.05 0.288% 0 0.000% 0 0.000% 0 0.000% 679.05 0.288% 0.000%

6 STRUCTURE WORK 58.288%


PROCUREMENT
a. Supply Sheet Pile W-500 A-1000
1. Purchased Order jt 67.00 7.215% 67 7.215% 0 0.000% 67 7.215% 0 0.000% 100.000%
2. Manufacturing jt 67.00 9.620% 27 3.877% 9 1.292% 36 5.169% 31 4.451% 53.731%
3. Delivery jt 67.00 7.215% 0 0.000% 0 0.000% 0 0.000% 67 7.215% 0.000%
b. Supply Piling Steel Pipe Dia. 12" THK (anchor pilling)
1. Purchased Order jt 30.00 2.438% 30 2.438% 0 0.000% 30 2.438% 0 0.000% 100.000%
2. Manufacturing jt 30.00 3.250% 0 0.000% 15 1.625% 15 1.625% 15 1.625% 50.000%
3. Delivery jt 30.00 2.438% 0 0.000% 0 0.000% 0 0.000% 30 2.438% 0.000%
c. Supply Piling Steel Pipe Dia. 12" THK (mooring bollards pilling)
1. Purchased Order jt 36.00 2.925% 36 2.925% 0 0.000% 36 2.925% 0 0.000% 100.000%
2. Manufacturing jt 36.00 3.900% 0 0.000% 18 1.950% 18 1.950% 18 1.950% 50.000%
3. Delivery jt 36.00 2.925% 0 0.000% 0 0.000% 0 0.000% 36 2.925% 0.000%
d. Supply Piling Steel Pipe Dia. 12" THK (fender pilling)
1. Purchased Order jt 18.00 1.463% 18 1.463% 0 0.000% 18 1.463% 0 0.000% 100.000%
2. Manufacturing jt 18.00 1.950% 0 0.000% 9 0.975% 9 0.975% 9 0.975% 50.000%
3. Delivery jt 18.00 1.463% 0 0.000% 0 0.000% 0 0.000% 18 1.463% 0.000%
e. Steel Pile ø 18" ASTM A 252
1. Purchased Order jt 1.00 0.147% 1 0.147% 0 0.000% 1 0.147% 0 0.000% 100.000%
2. Delivery jt 1.00 0.147% 0 0.000% 0 0.000% 0 0.000% 1 0.147% 0.000%
f. Rebar Concrete
1. Purchased Order kg 12,322.58 1.509% 0 0.000% 0 0.000% 0 0.000% 12322.58 1.509% 0.000%
2. Delivery kg 12,322.58 3.520% 0 0.000% 0 0.000% 0 0.000% 12322.58 3.520% 0.000%
g. Galvanized Sling ø 1 3/4"
1. Purcahsed Order m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
2. Manufacturing m' 311.65 0.187% 0 0.000% 0 0.000% 0 0.000% 311.65 0.187% 0.000%
3. Delivery m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
h. Galvanized Clamp ø 1 3/4" crossby clips G-450
1. Purchased Order ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
2. Manufacturing ea 365.00 0.062% 0 0.000% 0 0.000% 0 0.000% 365 0.062% 0.000%
3. Delivery ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
i. Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145
1. Purchased Order ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
2. Manufacturing ea 45.00 0.140% 0 0.000% 0 0.000% 0 0.000% 45 0.140% 0.000%
3. Delivery ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
j. Concrete
1. Purchased Order m3 111.41 2.298% 0 0.000% 0 0.000% 0 0.000% 111.41 2.298% 0.000%
k. Sand
1. Purchased Order m3 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
l. Fender Rubber
1. Purchased Order ea 8.00 0.440% 0 0.000% 8 0.440% 8 0.440% 0 0.000% 100.000%
2. Manufacturing ea 8.00 0.587% 0 0.000% 0 0.000% 0 0.000% 8 0.587% 0.000%
3. Delivery ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
m. Soil for fill up
1. Purchased Order m3 679.05 0.639% 0 0.000% 0 0.000% 0 0.000% 679.05 0.639% 0.000%

7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%

A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%

C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%

D. Fabricating & Installing Rebar


a. Rebar for Deadment D16 (400/400) kg 647.81 0.113% 0 0.000% 0 0.000% 0 0.000% 647.81 0.113% 0.000%
b. Rebar for Deadment Ø8 (400/400) kg 175.28 0.031% 0 0.000% 0 0.000% 0 0.000% 175.28 0.031% 0.000%
c. Rebar for Pile Cap D16 (800/800) kg 1,527.34 0.267% 0 0.000% 0 0.000% 0 0.000% 1527.34 0.267% 0.000%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.093% 0 0.000% 0 0.000% 0 0.000% 533.00 0.093% 0.000%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.012% 0 0.000% 0 0.000% 0 0.000% 67.54 0.012% 0.000%
f. Rebar for Capping Beam D16 (750/400) kg 3,423.98 0.599% 0 0.000% 0 0.000% 0 0.000% 3423.98 0.599% 0.000%
g. Rebar for Capping Beam Ø8 (750/400) kg 692.01 0.121% 0 0.000% 0 0.000% 0 0.000% 692.01 0.121% 0.000%
h. Rebar for Rubber Fender Beam D16 (800/2500) kg 1,260.11 0.220% 0 0.000% 0 0.000% 0 0.000% 1260.11 0.220% 0.000%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.091% 0 0.000% 0 0.000% 0 0.000% 518.40 0.091% 0.000%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012% 0 0.000% 0 0.000% 0 0.000% 69.23 0.012% 0.000%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.025% 0 0.000% 0 0.000% 0 0.000% 140.15 0.025% 0.000%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.003% 0 0.000% 0 0.000% 0 0.000% 14.34 0.003% 0.000%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.234% 0 0.000% 0 0.000% 0 0.000% 1339.34 0.234% 0.000%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.181% 0 0.000% 0 0.000% 0 0.000% 1036.81 0.181% 0.000%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.024% 0 0.000% 0 0.000% 0 0.000% 138.46 0.024% 0.000%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.129% 0 0.000% 0 0.000% 0 0.000% 738.77 0.129% 0.000%

E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%

F. Install Plastic Sheet


a. Install Plastic Sheet for Capping Beam m2 152.16 0.006% 0 0.000% 0 0.000% 0 0.000% 152.16 0.006% 0.000%
b. Install Plastic Sheet for Pile Cap and Deadment m2 80.86 0.003% 0 0.000% 0 0.000% 0 0.000% 80.86 0.003% 0.000%
c. Install Plastic Sheet for Rubber Fender m2 37.12 0.002% 0 0.000% 0 0.000% 0 0.000% 37.12 0.002% 0.000%
c. Install Plastic Sheet for Mooring Bollards m2 35.20 0.001% 0 0.000% 0 0.000% 0 0.000% 35.2 0.001% 0.000%

G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%

H. Pouring Concrete K-300


a. Pouring Concrete Deadment 400/400 m3 5.32 0.061% 0 0.000% 0 0.000% 0 0.000% 5.32 0.061% 0.000%
b. Pouring Concrete Pile Cap 800/800 m3 6.14 0.070% 0 0.000% 0 0.000% 0 0.000% 6.144 0.070% 0.000%
c. Pouring Concrete Capping Beam 750/400 m3 20.16 0.231% 0 0.000% 0 0.000% 0 0.000% 20.16 0.231% 0.000%
d. Pouring Concrete Rubber Fender 800/2500 m3 12.80 0.147% 0 0.000% 0 0.000% 0 0.000% 12.8 0.147% 0.000%
e. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (rubber fender) m3 10.18 0.117% 0 0.000% 0 0.000% 0 0.000% 10.18 0.117% 0.000%
f. Pouring Concrete in to Steel Pipe Dia 12" Length 5 M (deadment) m3 22.63 0.259% 0 0.000% 0 0.000% 0 0.000% 22.63 0.259% 0.000%
g. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (mooring bollards) m3 20.37 0.233% 0 0.000% 0 0.000% 0 0.000% 20.37 0.233% 0.000%
h. Pouring Concrete in to Steel Pipe Dia 18" Length 1.6 M (mooring bollards) m3 4.20 0.048% 0 0.000% 0 0.000% 0 0.000% 4.20 0.048% 0.000%
i. Pouring Concrete Pile Cap 2000/2000 (mooring bollards) m3 9.60 0.110% 0 0.000% 0 0.000% 0 0.000% 9.6 0.110% 0.000%

8 FINISHING WORK 2.135%


a. Plestering (1 : 3) for Capping Beam 750/400 m2 110.40 0.047% 0 0.000% 0 0.000% 0 0.000% 110.4 0.047% 0.000%
b. Supply & Install Rubber Fender 400 x 2300 ea 8.00 0.625% 0 0.000% 0 0.000% 0 0.000% 8 0.625% 0.000%
c. Install Ancor Bolt dia 19mm for Rubber Fender (@550 Length) ea 128.00 0.267% 0 0.000% 0 0.000% 0 0.000% 128 0.267% 0.000%
d. Supply Soil Fill Up m3 679.05 1.196% 0 0.000% 0 0.000% 0 0.000% 679.05 1.196% 0.000%

TOTAL 100.000% 100.000% 19.934% 6.672% 26.606% 73.394%

Prepared by, Checked & Reviewed by,


PT. Ade Konstruksi Abadi PetroChina International Jabung Ltd Approved by,
PetroChina International Jabung Ltd

M.Siwa Kumar Isrokdin / Dwi Utama / M. Ihsan A


Project Manager HEO Planner & Estimator Chawarie / Jacoob ET
HEO & Facilities Supv.
WEEKLY PROGRESS REPORT

ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA

Status Week : 15 Period : 12-Dec-19


Rest Week : 16 Up to : 18-Dec-19

Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)

INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

1 TECHNICAL PLANNING DESIGN CONSULTANT FOR CONSTRUCTION 4.148%


a Soil investigation Ls 1.00 0.830% 1 0.830% 0 0.000% 1 0.830% 0 0.000% 100.000%
b Design and Calculation
1. Issued for Review ea 3.00 0.277% 3 0.277% 0 0.000% 3 0.277% 0 0.000% 100.000%
2. Issued for Approval ea 3.00 0.277% 3 0.277% 0 0.000% 3 0.277% 0 0.000% 100.000%
3. Approved for Construction ea 3.00 0.277% 1 0.092% 2 0.184% 3 0.277% 0 0.000% 100.000%
c Design drawing
1. Issued for Review ea 7.00 0.277% 7 0.277% 0 0.000% 7 0.277% 0 0.000% 100.000%
2. Issued for Approval ea 7.00 0.277% 2 0.079% 5 0.198% 7 0.277% 0 0.000% 100.000%
3. Approved for Construction ea 7.00 0.277% 0 0.000% 7 0.277% 7 0.277% 0 0.000% 100.000%
d Construction Engineering
1. Issued for Review ea 33.00 0.277% 20 0.168% 2 0.017% 22 0.184% 11 0.092% 66.667%
2. Issued for Approval ea 33.00 0.277% 14 0.117% 7 0.059% 21 0.176% 12 0.101% 63.636%
3. Approved for Construction ea 33.00 0.277% 8 0.067% 12 0.101% 20 0.168% 13 0.109% 60.606%
e Final document Ls 1.00 0.830% 0 0.000% 0 0.000% 0 0.000% 1 0.830% 0.000%

2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0 0.000% 0.3 0.454% 0.3 0.454% 0.7 1.059% 30.000%

3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%

4 PREPARATION WORK 0.128% 0 0.000%


a. Clean up Area m2 1,237.50 0.052% 0 0.000% 0 0.000% 0 0.000% 1237.5 0.052% 0.000%
b. Stake Out Survey Ls 1.00 0.076% 1 0.076% 0 0.000% 1 0.076% 0 0.000% 100.000%

5 EXCAVATION AND BACKFILL WORK 0.328% 0 0.000%


a. Excavation Deadment 400/600 m3 2.23 0.001% 0 0.000% 0 0.000% 0 0.000% 2.2304 0.001% 0.000%
b. Excavation Pile Cap 800/800 m3 6.14 0.002% 0 0.000% 0 0.000% 0 0.000% 6.144 0.002% 0.000%
c. Excavation for Line Tie Rod m3 95.33 0.027% 0 0.000% 0 0.000% 0 0.000% 95.33 0.027% 0.000%
d. Backfill for Excavation m3 34.57 0.011% 0 0.000% 0 0.000% 0 0.000% 34.57 0.011% 0.000%
e. Backfill Area (Compacted) m3 679.05 0.288% 0 0.000% 0 0.000% 0 0.000% 679.05 0.288% 0.000%

6 STRUCTURE WORK 58.288%


PROCUREMENT
a. Supply Sheet Pile W-500 A-1000
1. Purchased Order jt 67.00 7.215% 67 7.215% 0 0.000% 67 7.215% 0 0.000% 100.000%
2. Manufacturing jt 67.00 9.620% 36 5.169% 15 2.154% 51 7.323% 16 2.297% 76.119%
3. Delivery jt 67.00 7.215% 0 0.000% 0 0.000% 0 0.000% 67 7.215% 0.000%
b. Supply Piling Steel Pipe Dia. 12" THK (anchor pilling)
1. Purchased Order jt 30.00 2.438% 30 2.438% 0 0.000% 30 2.438% 0 0.000% 100.000%
2. Manufacturing jt 30.00 3.250% 15 1.625% 15 1.625% 30 3.250% 0 0.000% 100.000%
3. Delivery jt 30.00 2.438% 0 0.000% 0 0.000% 0 0.000% 30 2.438% 0.000%
c. Supply Piling Steel Pipe Dia. 12" THK (mooring bollards pilling)
1. Purchased Order jt 36.00 2.925% 36 2.925% 0 0.000% 36 2.925% 0 0.000% 100.000%
2. Manufacturing jt 36.00 3.900% 18 1.950% 18 1.950% 36 3.900% 0 0.000% 100.000%
3. Delivery jt 36.00 2.925% 0 0.000% 0 0.000% 0 0.000% 36 2.925% 0.000%
d. Supply Piling Steel Pipe Dia. 12" THK (fender pilling)
1. Purchased Order jt 18.00 1.463% 18 1.463% 0 0.000% 18 1.463% 0 0.000% 100.000%
2. Manufacturing jt 18.00 1.950% 9 0.975% 9 0.975% 18 1.950% 0 0.000% 100.000%
3. Delivery jt 18.00 1.463% 0 0.000% 0 0.000% 0 0.000% 18 1.463% 0.000%
e. Steel Pile ø 18" ASTM A 252
1. Purchased Order jt 1.00 0.147% 1 0.147% 0 0.000% 1 0.147% 0 0.000% 100.000%
2. Delivery jt 1.00 0.147% 0 0.000% 0 0.000% 0 0.000% 1 0.147% 0.000%
f. Rebar Concrete
1. Purchased Order kg 12,322.58 1.509% 0 0.000% 12322.58 1.509% 12322.58 1.509% 0.00 0.000% 100.000%
2. Delivery kg 12,322.58 3.520% 0 0.000% 0 0.000% 0 0.000% 12322.58 3.520% 0.000%
g. Galvanized Sling ø 1 3/4"
1. Purcahsed Order m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
2. Manufacturing m' 311.65 0.187% 0 0.000% 0 0.000% 0 0.000% 311.65 0.187% 0.000%
3. Delivery m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
h. Galvanized Clamp ø 1 3/4" crossby clips G-450
1. Purchased Order ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
2. Manufacturing ea 365.00 0.062% 0 0.000% 0 0.000% 0 0.000% 365 0.062% 0.000%
3. Delivery ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
i. Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145
1. Purchased Order ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
2. Manufacturing ea 45.00 0.140% 0 0.000% 0 0.000% 0 0.000% 45 0.140% 0.000%
3. Delivery ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
j. Concrete
1. Purchased Order m3 111.41 2.298% 0 0.000% 0 0.000% 0 0.000% 111.41 2.298% 0.000%
k. Sand
1. Purchased Order m3 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
l. Fender Rubber
1. Purchased Order ea 8.00 0.440% 8 0.440% 0 0.000% 8 0.440% 0 0.000% 100.000%
2. Manufacturing ea 8.00 0.587% 0 0.000% 0 0.000% 0 0.000% 8 0.587% 0.000%
3. Delivery ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
m. Soil for fill up
1. Purchased Order m3 679.05 0.639% 0 0.000% 0 0.000% 0 0.000% 679.05 0.639% 0.000%

7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%

A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%

C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%

D. Fabricating & Installing Rebar


a. Rebar for Deadment D16 (400/400) kg 647.81 0.113% 0 0.000% 0 0.000% 0 0.000% 647.81 0.113% 0.000%
b. Rebar for Deadment Ø8 (400/400) kg 175.28 0.031% 0 0.000% 0 0.000% 0 0.000% 175.28 0.031% 0.000%
c. Rebar for Pile Cap D16 (800/800) kg 1,527.34 0.267% 0 0.000% 0 0.000% 0 0.000% 1527.34 0.267% 0.000%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.093% 0 0.000% 0 0.000% 0 0.000% 533.00 0.093% 0.000%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.012% 0 0.000% 0 0.000% 0 0.000% 67.54 0.012% 0.000%
f. Rebar for Capping Beam D16 (750/400) kg 3,423.98 0.599% 0 0.000% 0 0.000% 0 0.000% 3423.98 0.599% 0.000%
g. Rebar for Capping Beam Ø8 (750/400) kg 692.01 0.121% 0 0.000% 0 0.000% 0 0.000% 692.01 0.121% 0.000%
h. Rebar for Rubber Fender Beam D16 (800/2500) kg 1,260.11 0.220% 0 0.000% 0 0.000% 0 0.000% 1260.11 0.220% 0.000%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.091% 0 0.000% 0 0.000% 0 0.000% 518.40 0.091% 0.000%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012% 0 0.000% 0 0.000% 0 0.000% 69.23 0.012% 0.000%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.025% 0 0.000% 0 0.000% 0 0.000% 140.15 0.025% 0.000%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.003% 0 0.000% 0 0.000% 0 0.000% 14.34 0.003% 0.000%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.234% 0 0.000% 0 0.000% 0 0.000% 1339.34 0.234% 0.000%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.181% 0 0.000% 0 0.000% 0 0.000% 1036.81 0.181% 0.000%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.024% 0 0.000% 0 0.000% 0 0.000% 138.46 0.024% 0.000%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.129% 0 0.000% 0 0.000% 0 0.000% 738.77 0.129% 0.000%

E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%

F. Install Plastic Sheet


a. Install Plastic Sheet for Capping Beam m2 152.16 0.006% 0 0.000% 0 0.000% 0 0.000% 152.16 0.006% 0.000%
b. Install Plastic Sheet for Pile Cap and Deadment m2 80.86 0.003% 0 0.000% 0 0.000% 0 0.000% 80.86 0.003% 0.000%
c. Install Plastic Sheet for Rubber Fender m2 37.12 0.002% 0 0.000% 0 0.000% 0 0.000% 37.12 0.002% 0.000%
c. Install Plastic Sheet for Mooring Bollards m2 35.20 0.001% 0 0.000% 0 0.000% 0 0.000% 35.2 0.001% 0.000%

G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%

H. Pouring Concrete K-300


a. Pouring Concrete Deadment 400/400 m3 5.32 0.061% 0 0.000% 0 0.000% 0 0.000% 5.32 0.061% 0.000%
b. Pouring Concrete Pile Cap 800/800 m3 6.14 0.070% 0 0.000% 0 0.000% 0 0.000% 6.144 0.070% 0.000%
c. Pouring Concrete Capping Beam 750/400 m3 20.16 0.231% 0 0.000% 0 0.000% 0 0.000% 20.16 0.231% 0.000%
d. Pouring Concrete Rubber Fender 800/2500 m3 12.80 0.147% 0 0.000% 0 0.000% 0 0.000% 12.8 0.147% 0.000%
e. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (rubber fender) m3 10.18 0.117% 0 0.000% 0 0.000% 0 0.000% 10.18 0.117% 0.000%
f. Pouring Concrete in to Steel Pipe Dia 12" Length 5 M (deadment) m3 22.63 0.259% 0 0.000% 0 0.000% 0 0.000% 22.63 0.259% 0.000%
g. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (mooring bollards) m3 20.37 0.233% 0 0.000% 0 0.000% 0 0.000% 20.37 0.233% 0.000%
h. Pouring Concrete in to Steel Pipe Dia 18" Length 1.6 M (mooring bollards) m3 4.20 0.048% 0 0.000% 0 0.000% 0 0.000% 4.20 0.048% 0.000%
i. Pouring Concrete Pile Cap 2000/2000 (mooring bollards) m3 9.60 0.110% 0 0.000% 0 0.000% 0 0.000% 9.6 0.110% 0.000%

8 FINISHING WORK 2.135%


a. Plestering (1 : 3) for Capping Beam 750/400 m2 110.40 0.047% 0 0.000% 0 0.000% 0 0.000% 110.4 0.047% 0.000%
b. Supply & Install Rubber Fender 400 x 2300 ea 8.00 0.625% 0 0.000% 0 0.000% 0 0.000% 8 0.625% 0.000%
c. Install Ancor Bolt dia 19mm for Rubber Fender (@550 Length) ea 128.00 0.267% 0 0.000% 0 0.000% 0 0.000% 128 0.267% 0.000%
d. Supply Soil Fill Up m3 679.05 1.196% 0 0.000% 0 0.000% 0 0.000% 679.05 1.196% 0.000%

TOTAL 100.000% 100.000% 26.606% 9.501% 36.107% 63.893%

Prepared by, Checked & Reviewed by,


PT. Ade Konstruksi Abadi PetroChina International Jabung Ltd Approved by,
PetroChina International Jabung Ltd

M.Siwa Kumar Isrokdin / Dwi Utama / M. Ihsan A


Project Manager HEO Planner & Estimator Chawarie / Jacob ET
HEO & Facilities Supv.
WEEKLY PROGRESS REPORT

ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA

Status Week : 16 Period : 19-Dec-19


Rest Week : 15 Up to : 25-Dec-19

Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)

INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

1 TECHNICAL PLANNING DESIGN CONSULTANT FOR CONSTRUCTION 4.148%


a Soil investigation Ls 1.00 0.830% 1 0.830% 0 0.000% 1 0.830% 0 0.000% 100.000%
b Design and Calculation
1. Issued for Review ea 3.00 0.277% 3 0.277% 0 0.000% 3 0.277% 0 0.000% 100.000%
2. Issued for Approval ea 3.00 0.277% 3 0.277% 0 0.000% 3 0.277% 0 0.000% 100.000%
3. Approved for Construction ea 3.00 0.277% 3 0.277% 0 0.000% 3 0.277% 0 0.000% 100.000%
c Design drawing
1. Issued for Review ea 7.00 0.277% 7 0.277% 0 0.000% 7 0.277% 0 0.000% 100.000%
2. Issued for Approval ea 7.00 0.277% 7 0.277% 0 0.000% 7 0.277% 0 0.000% 100.000%
3. Approved for Construction ea 7.00 0.277% 7 0.277% 0 0.000% 7 0.277% 0 0.000% 100.000%
d Construction Engineering
1. Issued for Review ea 33.00 0.277% 22 0.184% 2 0.017% 24 0.201% 9 0.075% 72.727%
2. Issued for Approval ea 33.00 0.277% 21 0.176% 1 0.008% 22 0.184% 11 0.092% 66.667%
3. Approved for Construction ea 33.00 0.277% 20 0.168% 0 0.000% 20 0.168% 13 0.109% 60.606%
e Final document Ls 1.00 0.830% 0 0.000% 0 0.000% 0 0.000% 1 0.830% 0.000%

2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0.3 0.454% 0 0.000% 0.3 0.454% 0.7 1.059% 30.000%

3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%

4 PREPARATION WORK 0.128%


a. Clean up Area m2 1,237.50 0.052% 0 0.000% 0 0.000% 0 0.000% 1237.5 0.052% 0.000%
b. Stake Out Survey Ls 1.00 0.076% 1 0.076% 0 0.000% 1 0.076% 0 0.000% 100.000%

5 EXCAVATION AND BACKFILL WORK 0.328%


a. Excavation Deadment 400/600 m3 2.23 0.001% 0 0.000% 0 0.000% 0 0.000% 2.2304 0.001% 0.000%
b. Excavation Pile Cap 800/800 m3 6.14 0.002% 0 0.000% 0 0.000% 0 0.000% 6.144 0.002% 0.000%
c. Excavation for Line Tie Rod m3 95.33 0.027% 0 0.000% 0 0.000% 0 0.000% 95.33 0.027% 0.000%
d. Backfill for Excavation m3 34.57 0.011% 0 0.000% 0 0.000% 0 0.000% 34.57 0.011% 0.000%
e. Backfill Area (Compacted) m3 679.05 0.288% 0 0.000% 0 0.000% 0 0.000% 679.05 0.288% 0.000%

6 STRUCTURE WORK 58.288%


PROCUREMENT
a. Supply Sheet Pile W-500 A-1000
1. Purchased Order jt 67.00 7.215% 67 7.215% 0 0.000% 67 7.215% 0 0.000% 100.000%
2. Manufacturing jt 67.00 9.620% 51 7.323% 0 0.000% 51 7.323% 16 2.297% 76.119%
3. Delivery jt 67.00 7.215% 0 0.000% 0 0.000% 0 0.000% 67 7.215% 0.000%
b. Supply Piling Steel Pipe Dia. 12" THK (anchor pilling)
1. Purchased Order jt 30.00 2.438% 30 2.438% 0 0.000% 30 2.438% 0 0.000% 100.000%
2. Manufacturing jt 30.00 3.250% 30 3.250% 0 0.000% 30 3.250% 0 0.000% 100.000%
3. Delivery jt 30.00 2.438% 0 0.000% 30 2.438% 30 2.438% 0 0.000% 100.000%
c. Supply Piling Steel Pipe Dia. 12" THK (mooring bollards pilling)
1. Purchased Order jt 36.00 2.925% 36 2.925% 0 0.000% 36 2.925% 0 0.000% 100.000%
2. Manufacturing jt 36.00 3.900% 36 3.900% 0 0.000% 36 3.900% 0 0.000% 100.000%
3. Delivery jt 36.00 2.925% 0 0.000% 36 2.925% 36 2.925% 0 0.000% 100.000%
d. Supply Piling Steel Pipe Dia. 12" THK (fender pilling)
1. Purchased Order jt 18.00 1.463% 18 1.463% 0 0.000% 18 1.463% 0 0.000% 100.000%
2. Manufacturing jt 18.00 1.950% 18 1.950% 0 0.000% 18 1.950% 0 0.000% 100.000%
3. Delivery jt 18.00 1.463% 0 0.000% 18 1.463% 18 1.463% 0 0.000% 100.000%
e. Steel Pile ø 18" ASTM A 252
1. Purchased Order jt 1.00 0.147% 1 0.147% 0 0.000% 1 0.147% 0 0.000% 100.000%
2. Delivery jt 1.00 0.147% 0 0.000% 1 0.147% 1 0.147% 0 0.000% 100.000%
f. Rebar Concrete
1. Purchased Order kg 12,322.58 1.509% 12322.5771165 1.509% 0 0.000% 12322.58 1.509% 0.00 0.000% 100.000%
2. Delivery kg 12,322.58 3.520% 0 0.000% 0 0.000% 0 0.000% 12322.58 3.520% 0.000%
g. Galvanized Sling ø 1 3/4"
1. Purcahsed Order m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
2. Manufacturing m' 311.65 0.187% 0 0.000% 0 0.000% 0 0.000% 311.65 0.187% 0.000%
3. Delivery m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
h. Galvanized Clamp ø 1 3/4" crossby clips G-450
1. Purchased Order ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
2. Manufacturing ea 365.00 0.062% 0 0.000% 0 0.000% 0 0.000% 365 0.062% 0.000%
3. Delivery ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
i. Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145
1. Purchased Order ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
2. Manufacturing ea 45.00 0.140% 0 0.000% 0 0.000% 0 0.000% 45 0.140% 0.000%
3. Delivery ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
j. Concrete
1. Purchased Order m3 111.41 2.298% 0 0.000% 0 0.000% 0 0.000% 111.41 2.298% 0.000%
k. Sand
1. Purchased Order m3 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
l. Fender Rubber
1. Purchased Order ea 8.00 0.440% 8 0.440% 0 0.000% 8 0.440% 0 0.000% 100.000%
2. Manufacturing ea 8.00 0.587% 0 0.000% 0 0.000% 0 0.000% 8 0.587% 0.000%
3. Delivery ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
m. Soil for fill up
1. Purchased Order m3 679.05 0.639% 0 0.000% 0 0.000% 0 0.000% 679.05 0.639% 0.000%

7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%

A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%

C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%

D. Fabricating & Installing Rebar


a. Rebar for Deadment D16 (400/400) kg 647.81 0.113% 0 0.000% 0 0.000% 0 0.000% 647.81 0.113% 0.000%
b. Rebar for Deadment Ø8 (400/400) kg 175.28 0.031% 0 0.000% 0 0.000% 0 0.000% 175.28 0.031% 0.000%
c. Rebar for Pile Cap D16 (800/800) kg 1,527.34 0.267% 0 0.000% 0 0.000% 0 0.000% 1527.34 0.267% 0.000%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.093% 0 0.000% 0 0.000% 0 0.000% 533.00 0.093% 0.000%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.012% 0 0.000% 0 0.000% 0 0.000% 67.54 0.012% 0.000%
f. Rebar for Capping Beam D16 (750/400) kg 3,423.98 0.599% 0 0.000% 0 0.000% 0 0.000% 3423.98 0.599% 0.000%
g. Rebar for Capping Beam Ø8 (750/400) kg 692.01 0.121% 0 0.000% 0 0.000% 0 0.000% 692.01 0.121% 0.000%
h. Rebar for Rubber Fender Beam D16 (800/2500) kg 1,260.11 0.220% 0 0.000% 0 0.000% 0 0.000% 1260.11 0.220% 0.000%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.091% 0 0.000% 0 0.000% 0 0.000% 518.40 0.091% 0.000%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012% 0 0.000% 0 0.000% 0 0.000% 69.23 0.012% 0.000%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.025% 0 0.000% 0 0.000% 0 0.000% 140.15 0.025% 0.000%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.003% 0 0.000% 0 0.000% 0 0.000% 14.34 0.003% 0.000%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.234% 0 0.000% 0 0.000% 0 0.000% 1339.34 0.234% 0.000%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.181% 0 0.000% 0 0.000% 0 0.000% 1036.81 0.181% 0.000%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.024% 0 0.000% 0 0.000% 0 0.000% 138.46 0.024% 0.000%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.129% 0 0.000% 0 0.000% 0 0.000% 738.77 0.129% 0.000%

E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%

F. Install Plastic Sheet


a. Install Plastic Sheet for Capping Beam m2 152.16 0.006% 0 0.000% 0 0.000% 0 0.000% 152.16 0.006% 0.000%
b. Install Plastic Sheet for Pile Cap and Deadment m2 80.86 0.003% 0 0.000% 0 0.000% 0 0.000% 80.86 0.003% 0.000%
c. Install Plastic Sheet for Rubber Fender m2 37.12 0.002% 0 0.000% 0 0.000% 0 0.000% 37.12 0.002% 0.000%
c. Install Plastic Sheet for Mooring Bollards m2 35.20 0.001% 0 0.000% 0 0.000% 0 0.000% 35.2 0.001% 0.000%

G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%

H. Pouring Concrete K-300


a. Pouring Concrete Deadment 400/400 m3 5.32 0.061% 0 0.000% 0 0.000% 0 0.000% 5.32 0.061% 0.000%
b. Pouring Concrete Pile Cap 800/800 m3 6.14 0.070% 0 0.000% 0 0.000% 0 0.000% 6.144 0.070% 0.000%
c. Pouring Concrete Capping Beam 750/400 m3 20.16 0.231% 0 0.000% 0 0.000% 0 0.000% 20.16 0.231% 0.000%
d. Pouring Concrete Rubber Fender 800/2500 m3 12.80 0.147% 0 0.000% 0 0.000% 0 0.000% 12.8 0.147% 0.000%
e. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (rubber fender) m3 10.18 0.117% 0 0.000% 0 0.000% 0 0.000% 10.18 0.117% 0.000%
f. Pouring Concrete in to Steel Pipe Dia 12" Length 5 M (deadment) m3 22.63 0.259% 0 0.000% 0 0.000% 0 0.000% 22.63 0.259% 0.000%
g. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (mooring bollards) m3 20.37 0.233% 0 0.000% 0 0.000% 0 0.000% 20.37 0.233% 0.000%
h. Pouring Concrete in to Steel Pipe Dia 18" Length 1.6 M (mooring bollards) m3 4.20 0.048% 0 0.000% 0 0.000% 0 0.000% 4.20 0.048% 0.000%
i. Pouring Concrete Pile Cap 2000/2000 (mooring bollards) m3 9.60 0.110% 0 0.000% 0 0.000% 0 0.000% 9.6 0.110% 0.000%

8 FINISHING WORK 2.135%


a. Plestering (1 : 3) for Capping Beam 750/400 m2 110.40 0.047% 0 0.000% 0 0.000% 0 0.000% 110.4 0.047% 0.000%
b. Supply & Install Rubber Fender 400 x 2300 ea 8.00 0.625% 0 0.000% 0 0.000% 0 0.000% 8 0.625% 0.000%
c. Install Ancor Bolt dia 19mm for Rubber Fender (@550 Length) ea 128.00 0.267% 0 0.000% 0 0.000% 0 0.000% 128 0.267% 0.000%
d. Supply Soil Fill Up m3 679.05 1.196% 0 0.000% 0 0.000% 0 0.000% 679.05 1.196% 0.000%

TOTAL 100.000% 100.000% 36.107% 6.998% 43.105% 56.895%

Prepared by, Checked & Reviewed by,


PT. Ade Konstruksi Abadi PetroChina International Jabung Ltd Approved by,
PetroChina International Jabung Ltd

M.Siwa Kumar Isrokdin / Dwi Utama / M. Ihsan A


Project Manager HEO Planner & Estimator Chawarie / Jacob ET
HEO & Facilities Supv.
WEEKLY PROGRESS REPORT

ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA

Status Week : 17 Period : 26-Dec-19


Rest Week : 14 Up to : 1-Jan-20

Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)

INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

1 TECHNICAL PLANNING DESIGN CONSULTANT FOR CONSTRUCTION 4.148%


a Soil investigation Ls 1.00 0.830% 1 0.830% 0 0.000% 1 0.830% 0 0.000% 100.000%
b Design and Calculation
1. Issued for Review ea 3.00 0.277% 3 0.277% 0 0.000% 3 0.277% 0 0.000% 100.000%
2. Issued for Approval ea 3.00 0.277% 3 0.277% 0 0.000% 3 0.277% 0 0.000% 100.000%
3. Approved for Construction ea 3.00 0.277% 3 0.277% 0 0.000% 3 0.277% 0 0.000% 100.000%
c Design drawing
1. Issued for Review ea 7.00 0.277% 7 0.277% 0 0.000% 7 0.277% 0 0.000% 100.000%
2. Issued for Approval ea 7.00 0.277% 7 0.277% 0 0.000% 7 0.277% 0 0.000% 100.000%
3. Approved for Construction ea 7.00 0.277% 7 0.277% 0 0.000% 7 0.277% 0 0.000% 100.000%
d Construction Engineering
1. Issued for Review ea 33.00 0.277% 24 0.201% 3 0.025% 27 0.226% 6 0.050% 81.818%
2. Issued for Approval ea 33.00 0.277% 22 0.184% 0 0.000% 22 0.184% 11 0.092% 66.667%
3. Approved for Construction ea 33.00 0.277% 20 0.168% 0 0.000% 20 0.168% 13 0.109% 60.606%
e Final document Ls 1.00 0.830% 0 0.000% 0 0.000% 0 0.000% 1 0.830% 0.000%

2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0.3 0.454% 0 0.000% 0.3 0.454% 0.7 1.059% 30.000%

3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%

4 PREPARATION WORK 0.128%


a. Clean up Area m2 1,237.50 0.052% 0 0.000% 0 0.000% 0 0.000% 1237.5 0.052% 0.000%
b. Stake Out Survey Ls 1.00 0.076% 1 0.076% 0 0.000% 1 0.076% 0 0.000% 100.000%

5 EXCAVATION AND BACKFILL WORK 0.328%


a. Excavation Deadment 400/600 m3 2.23 0.001% 0 0.000% 0 0.000% 0 0.000% 2.2304 0.001% 0.000%
b. Excavation Pile Cap 800/800 m3 6.14 0.002% 0 0.000% 0 0.000% 0 0.000% 6.144 0.002% 0.000%
c. Excavation for Line Tie Rod m3 95.33 0.027% 0 0.000% 0 0.000% 0 0.000% 95.33 0.027% 0.000%
d. Backfill for Excavation m3 34.57 0.011% 0 0.000% 0 0.000% 0 0.000% 34.57 0.011% 0.000%
e. Backfill Area (Compacted) m3 679.05 0.288% 0 0.000% 0 0.000% 0 0.000% 679.05 0.288% 0.000%

6 STRUCTURE WORK 58.288%


PROCUREMENT
a. Supply Sheet Pile W-500 A-1000
1. Purchased Order jt 67.00 7.215% 67 7.215% 0 0.000% 67 7.215% 0 0.000% 100.000%
2. Manufacturing jt 67.00 9.620% 51 7.323% 0 0.000% 51 7.323% 16 2.297% 76.119%
3. Delivery jt 67.00 7.215% 0 0.000% 0 0.000% 0 0.000% 67 7.215% 0.000%
b. Supply Piling Steel Pipe Dia. 12" THK (anchor pilling)
1. Purchased Order jt 30.00 2.438% 30 2.438% 0 0.000% 30 2.438% 0 0.000% 100.000%
2. Manufacturing jt 30.00 3.250% 30 3.250% 0 0.000% 30 3.250% 0 0.000% 100.000%
3. Delivery jt 30.00 2.438% 30 2.438% 0 0.000% 30 2.438% 0 0.000% 100.000%
c. Supply Piling Steel Pipe Dia. 12" THK (mooring bollards pilling)
1. Purchased Order jt 36.00 2.925% 36 2.925% 0 0.000% 36 2.925% 0 0.000% 100.000%
2. Manufacturing jt 36.00 3.900% 36 3.900% 0 0.000% 36 3.900% 0 0.000% 100.000%
3. Delivery jt 36.00 2.925% 36 2.925% 0 0.000% 36 2.925% 0 0.000% 100.000%
d. Supply Piling Steel Pipe Dia. 12" THK (fender pilling)
1. Purchased Order jt 18.00 1.463% 18 1.463% 0 0.000% 18 1.463% 0 0.000% 100.000%
2. Manufacturing jt 18.00 1.950% 18 1.950% 0 0.000% 18 1.950% 0 0.000% 100.000%
3. Delivery jt 18.00 1.463% 18 1.463% 0 0.000% 18 1.463% 0 0.000% 100.000%
e. Steel Pile ø 18" ASTM A 252
1. Purchased Order jt 1.00 0.147% 1 0.147% 0 0.000% 1 0.147% 0 0.000% 100.000%
2. Delivery jt 1.00 0.147% 1 0.147% 0 0.000% 1 0.147% 0 0.000% 100.000%
f. Rebar Concrete
1. Purchased Order kg 12,322.58 1.509% 12322.5771165 1.509% 0 0.000% 12322.58 1.509% 0.00 0.000% 100.000%
2. Delivery kg 12,322.58 3.520% 0 0.000% 0 0.000% 0 0.000% 12322.58 3.520% 0.000%
g. Galvanized Sling ø 1 3/4"
1. Purcahsed Order m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
2. Manufacturing m' 311.65 0.187% 0 0.000% 0 0.000% 0 0.000% 311.65 0.187% 0.000%
3. Delivery m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
h. Galvanized Clamp ø 1 3/4" crossby clips G-450
1. Purchased Order ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
2. Manufacturing ea 365.00 0.062% 0 0.000% 0 0.000% 0 0.000% 365 0.062% 0.000%
3. Delivery ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
i. Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145
1. Purchased Order ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
2. Manufacturing ea 45.00 0.140% 0 0.000% 0 0.000% 0 0.000% 45 0.140% 0.000%
3. Delivery ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
j. Concrete
1. Purchased Order m3 111.41 2.298% 0 0.000% 0 0.000% 0 0.000% 111.41 2.298% 0.000%
k. Sand
1. Purchased Order m3 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
l. Fender Rubber
1. Purchased Order ea 8.00 0.440% 8 0.440% 0 0.000% 8 0.440% 0 0.000% 100.000%
2. Manufacturing ea 8.00 0.587% 0 0.000% 0 0.000% 0 0.000% 8 0.587% 0.000%
3. Delivery ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
m. Soil for fill up
1. Purchased Order m3 679.05 0.639% 0 0.000% 0 0.000% 0 0.000% 679.05 0.639% 0.000%

7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%

A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%

C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%

D. Fabricating & Installing Rebar


a. Rebar for Deadment D16 (400/400) kg 647.81 0.113% 0 0.000% 0 0.000% 0 0.000% 647.81 0.113% 0.000%
b. Rebar for Deadment Ø8 (400/400) kg 175.28 0.031% 0 0.000% 0 0.000% 0 0.000% 175.28 0.031% 0.000%
c. Rebar for Pile Cap D16 (800/800) kg 1,527.34 0.267% 0 0.000% 0 0.000% 0 0.000% 1527.34 0.267% 0.000%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.093% 0 0.000% 0 0.000% 0 0.000% 533.00 0.093% 0.000%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.012% 0 0.000% 0 0.000% 0 0.000% 67.54 0.012% 0.000%
f. Rebar for Capping Beam D16 (750/400) kg 3,423.98 0.599% 0 0.000% 0 0.000% 0 0.000% 3423.98 0.599% 0.000%
g. Rebar for Capping Beam Ø8 (750/400) kg 692.01 0.121% 0 0.000% 0 0.000% 0 0.000% 692.01 0.121% 0.000%
h. Rebar for Rubber Fender Beam D16 (800/2500) kg 1,260.11 0.220% 0 0.000% 0 0.000% 0 0.000% 1260.11 0.220% 0.000%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.091% 0 0.000% 0 0.000% 0 0.000% 518.40 0.091% 0.000%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012% 0 0.000% 0 0.000% 0 0.000% 69.23 0.012% 0.000%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.025% 0 0.000% 0 0.000% 0 0.000% 140.15 0.025% 0.000%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.003% 0 0.000% 0 0.000% 0 0.000% 14.34 0.003% 0.000%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.234% 0 0.000% 0 0.000% 0 0.000% 1339.34 0.234% 0.000%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.181% 0 0.000% 0 0.000% 0 0.000% 1036.81 0.181% 0.000%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.024% 0 0.000% 0 0.000% 0 0.000% 138.46 0.024% 0.000%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.129% 0 0.000% 0 0.000% 0 0.000% 738.77 0.129% 0.000%

E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%

F. Install Plastic Sheet


a. Install Plastic Sheet for Capping Beam m2 152.16 0.006% 0 0.000% 0 0.000% 0 0.000% 152.16 0.006% 0.000%
b. Install Plastic Sheet for Pile Cap and Deadment m2 80.86 0.003% 0 0.000% 0 0.000% 0 0.000% 80.86 0.003% 0.000%
c. Install Plastic Sheet for Rubber Fender m2 37.12 0.002% 0 0.000% 0 0.000% 0 0.000% 37.12 0.002% 0.000%
c. Install Plastic Sheet for Mooring Bollards m2 35.20 0.001% 0 0.000% 0 0.000% 0 0.000% 35.2 0.001% 0.000%

G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%

H. Pouring Concrete K-300


a. Pouring Concrete Deadment 400/400 m3 5.32 0.061% 0 0.000% 0 0.000% 0 0.000% 5.32 0.061% 0.000%
b. Pouring Concrete Pile Cap 800/800 m3 6.14 0.070% 0 0.000% 0 0.000% 0 0.000% 6.144 0.070% 0.000%
c. Pouring Concrete Capping Beam 750/400 m3 20.16 0.231% 0 0.000% 0 0.000% 0 0.000% 20.16 0.231% 0.000%
d. Pouring Concrete Rubber Fender 800/2500 m3 12.80 0.147% 0 0.000% 0 0.000% 0 0.000% 12.8 0.147% 0.000%
e. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (rubber fender) m3 10.18 0.117% 0 0.000% 0 0.000% 0 0.000% 10.18 0.117% 0.000%
f. Pouring Concrete in to Steel Pipe Dia 12" Length 5 M (deadment) m3 22.63 0.259% 0 0.000% 0 0.000% 0 0.000% 22.63 0.259% 0.000%
g. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (mooring bollards) m3 20.37 0.233% 0 0.000% 0 0.000% 0 0.000% 20.37 0.233% 0.000%
h. Pouring Concrete in to Steel Pipe Dia 18" Length 1.6 M (mooring bollards) m3 4.20 0.048% 0 0.000% 0 0.000% 0 0.000% 4.20 0.048% 0.000%
i. Pouring Concrete Pile Cap 2000/2000 (mooring bollards) m3 9.60 0.110% 0 0.000% 0 0.000% 0 0.000% 9.6 0.110% 0.000%

8 FINISHING WORK 2.135%


a. Plestering (1 : 3) for Capping Beam 750/400 m2 110.40 0.047% 0 0.000% 0 0.000% 0 0.000% 110.4 0.047% 0.000%
b. Supply & Install Rubber Fender 400 x 2300 ea 8.00 0.625% 0 0.000% 0 0.000% 0 0.000% 8 0.625% 0.000%
c. Install Ancor Bolt dia 19mm for Rubber Fender (@550 Length) ea 128.00 0.267% 0 0.000% 0 0.000% 0 0.000% 128 0.267% 0.000%
d. Supply Soil Fill Up m3 679.05 1.196% 0 0.000% 0 0.000% 0 0.000% 679.05 1.196% 0.000%

TOTAL 100.000% 100.000% 43.105% 0.025% 43.130% 56.870%

Prepared by, Checked & Reviewed by,


PT. Ade Konstruksi Abadi PetroChina International Jabung Ltd Approved by,
PetroChina International Jabung Ltd

M.Siwa Kumar Isrokdin / Dwi Utama / M. Ihsan A


Project Manager HEO Planner & Estimator Chawarie / Jacob ET
HEO & Facilities Supv.
WEEKLY PROGRESS REPORT

ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA

Status Week : 18 Period : 2-Jan-20


Rest Week : 13 Up to : 8-Jan-20

Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)

INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

1 TECHNICAL PLANNING DESIGN CONSULTANT FOR CONSTRUCTION 4.148%


a Soil investigation Ls 1.00 0.830% 1 0.830% 0 0.000% 1 0.830% 0 0.000% 100.000%
b Design and Calculation
1. Issued for Review ea 3.00 0.277% 3 0.277% 0 0.000% 3 0.277% 0 0.000% 100.000%
2. Issued for Approval ea 3.00 0.277% 3 0.277% 0 0.000% 3 0.277% 0 0.000% 100.000%
3. Approved for Construction ea 3.00 0.277% 3 0.277% 0 0.000% 3 0.277% 0 0.000% 100.000%
c Design drawing
1. Issued for Review ea 7.00 0.277% 7 0.277% 0 0.000% 7 0.277% 0 0.000% 100.000%
2. Issued for Approval ea 7.00 0.277% 7 0.277% 0 0.000% 7 0.277% 0 0.000% 100.000%
3. Approved for Construction ea 7.00 0.277% 7 0.277% 0 0.000% 7 0.277% 0 0.000% 100.000%
d Construction Engineering
1. Issued for Review ea 33.00 0.277% 27 0.226% 2 0.017% 29 0.243% 4 0.034% 87.879%
2. Issued for Approval ea 33.00 0.277% 22 0.184% 1 0.008% 23 0.193% 10 0.084% 69.697%
3. Approved for Construction ea 33.00 0.277% 20 0.168% 1 0.008% 21 0.176% 12 0.101% 63.636%
e Final document Ls 1.00 0.830% 0 0.000% 0 0.000% 0 0.000% 1 0.830% 0.000%

2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0.3 0.454% 0 0.000% 0.3 0.454% 0.7 1.059% 30.000%

3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%

4 PREPARATION WORK 0.128%


a. Clean up Area m2 1,237.50 0.052% 0 0.000% 0 0.000% 0 0.000% 1237.5 0.052% 0.000%
b. Stake Out Survey Ls 1.00 0.076% 1 0.076% 0 0.000% 1 0.076% 0 0.000% 100.000%

5 EXCAVATION AND BACKFILL WORK 0.328%


a. Excavation Deadment 400/600 m3 2.23 0.001% 0 0.000% 0 0.000% 0 0.000% 2.2304 0.001% 0.000%
b. Excavation Pile Cap 800/800 m3 6.14 0.002% 0 0.000% 0 0.000% 0 0.000% 6.144 0.002% 0.000%
c. Excavation for Line Tie Rod m3 95.33 0.027% 0 0.000% 0 0.000% 0 0.000% 95.33 0.027% 0.000%
d. Backfill for Excavation m3 34.57 0.011% 0 0.000% 0 0.000% 0 0.000% 34.57 0.011% 0.000%
e. Backfill Area (Compacted) m3 679.05 0.288% 0 0.000% 0 0.000% 0 0.000% 679.05 0.288% 0.000%

6 STRUCTURE WORK 58.288%


PROCUREMENT
a. Supply Sheet Pile W-500 A-1000
1. Purchased Order jt 67.00 7.215% 67 7.215% 0 0.000% 67 7.215% 0 0.000% 100.000%
2. Manufacturing jt 67.00 9.620% 51 7.323% 16 2.297% 67 9.620% 0 0.000% 100.000%
3. Delivery jt 67.00 7.215% 0 0.000% 0 0.000% 0 0.000% 67 7.215% 0.000%
b. Supply Piling Steel Pipe Dia. 12" THK (anchor pilling)
1. Purchased Order jt 30.00 2.438% 30 2.438% 0 0.000% 30 2.438% 0 0.000% 100.000%
2. Manufacturing jt 30.00 3.250% 30 3.250% 0 0.000% 30 3.250% 0 0.000% 100.000%
3. Delivery jt 30.00 2.438% 30 2.438% 0 0.000% 30 2.438% 0 0.000% 100.000%
c. Supply Piling Steel Pipe Dia. 12" THK (mooring bollards pilling)
1. Purchased Order jt 36.00 2.925% 36 2.925% 0 0.000% 36 2.925% 0 0.000% 100.000%
2. Manufacturing jt 36.00 3.900% 36 3.900% 0 0.000% 36 3.900% 0 0.000% 100.000%
3. Delivery jt 36.00 2.925% 36 2.925% 0 0.000% 36 2.925% 0 0.000% 100.000%
d. Supply Piling Steel Pipe Dia. 12" THK (fender pilling)
1. Purchased Order jt 18.00 1.463% 18 1.463% 0 0.000% 18 1.463% 0 0.000% 100.000%
2. Manufacturing jt 18.00 1.950% 18 1.950% 0 0.000% 18 1.950% 0 0.000% 100.000%
3. Delivery jt 18.00 1.463% 18 1.463% 0 0.000% 18 1.463% 0 0.000% 100.000%
e. Steel Pile ø 18" ASTM A 252
1. Purchased Order jt 1.00 0.147% 1 0.147% 0 0.000% 1 0.147% 0 0.000% 100.000%
2. Delivery jt 1.00 0.147% 1 0.147% 0 0.000% 1 0.147% 0 0.000% 100.000%
f. Rebar Concrete
1. Purchased Order kg 12,322.58 1.509% 12322.5771165 1.509% 0 0.000% 12322.58 1.509% 0.00 0.000% 100.000%
2. Delivery kg 12,322.58 3.520% 0 0.000% 0 0.000% 0 0.000% 12322.58 3.520% 0.000%
g. Galvanized Sling ø 1 3/4"
1. Purcahsed Order m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
2. Manufacturing m' 311.65 0.187% 0 0.000% 0 0.000% 0 0.000% 311.65 0.187% 0.000%
3. Delivery m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
h. Galvanized Clamp ø 1 3/4" crossby clips G-450
1. Purchased Order ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
2. Manufacturing ea 365.00 0.062% 0 0.000% 0 0.000% 0 0.000% 365 0.062% 0.000%
3. Delivery ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
i. Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145
1. Purchased Order ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
2. Manufacturing ea 45.00 0.140% 0 0.000% 0 0.000% 0 0.000% 45 0.140% 0.000%
3. Delivery ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
j. Concrete
1. Purchased Order m3 111.41 2.298% 0 0.000% 0 0.000% 0 0.000% 111.41 2.298% 0.000%
k. Sand
1. Purchased Order m3 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
l. Fender Rubber
1. Purchased Order ea 8.00 0.440% 8 0.440% 0 0.000% 8 0.440% 0 0.000% 100.000%
2. Manufacturing ea 8.00 0.587% 0 0.000% 8 0.587% 8 0.587% 0 0.000% 100.000%
3. Delivery ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
m. Soil for fill up
1. Purchased Order m3 679.05 0.639% 0 0.000% 0 0.000% 0 0.000% 679.05 0.639% 0.000%

7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 0 0.000% 0 0.000% 0 0.000% 28 5.989% 0.000%

A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 0 0.000% 0 0.000% 0 0.000% 148.8 0.283% 0.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%

C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 0 0.000% 0 0.000% 0 0.000% 1 0.064% 0.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 0 0.000% 0 0.000% 0 0.000% 1 0.036% 0.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 0 0.000% 0 0.000% 0 0.000% 2 0.067% 0.000%

D. Fabricating & Installing Rebar


a. Rebar for Deadment D16 (400/400) kg 647.81 0.113% 0 0.000% 0 0.000% 0 0.000% 647.81 0.113% 0.000%
b. Rebar for Deadment Ø8 (400/400) kg 175.28 0.031% 0 0.000% 0 0.000% 0 0.000% 175.28 0.031% 0.000%
c. Rebar for Pile Cap D16 (800/800) kg 1,527.34 0.267% 0 0.000% 0 0.000% 0 0.000% 1527.34 0.267% 0.000%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.093% 0 0.000% 0 0.000% 0 0.000% 533.00 0.093% 0.000%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.012% 0 0.000% 0 0.000% 0 0.000% 67.54 0.012% 0.000%
f. Rebar for Capping Beam D16 (750/400) kg 3,423.98 0.599% 0 0.000% 0 0.000% 0 0.000% 3423.98 0.599% 0.000%
g. Rebar for Capping Beam Ø8 (750/400) kg 692.01 0.121% 0 0.000% 0 0.000% 0 0.000% 692.01 0.121% 0.000%
h. Rebar for Rubber Fender Beam D16 (800/2500) kg 1,260.11 0.220% 0 0.000% 0 0.000% 0 0.000% 1260.11 0.220% 0.000%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.091% 0 0.000% 0 0.000% 0 0.000% 518.40 0.091% 0.000%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012% 0 0.000% 0 0.000% 0 0.000% 69.23 0.012% 0.000%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.025% 0 0.000% 0 0.000% 0 0.000% 140.15 0.025% 0.000%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.003% 0 0.000% 0 0.000% 0 0.000% 14.34 0.003% 0.000%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.234% 0 0.000% 0 0.000% 0 0.000% 1339.34 0.234% 0.000%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.181% 0 0.000% 0 0.000% 0 0.000% 1036.81 0.181% 0.000%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.024% 0 0.000% 0 0.000% 0 0.000% 138.46 0.024% 0.000%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.129% 0 0.000% 0 0.000% 0 0.000% 738.77 0.129% 0.000%

E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%

F. Install Plastic Sheet


a. Install Plastic Sheet for Capping Beam m2 152.16 0.006% 0 0.000% 0 0.000% 0 0.000% 152.16 0.006% 0.000%
b. Install Plastic Sheet for Pile Cap and Deadment m2 80.86 0.003% 0 0.000% 0 0.000% 0 0.000% 80.86 0.003% 0.000%
c. Install Plastic Sheet for Rubber Fender m2 37.12 0.002% 0 0.000% 0 0.000% 0 0.000% 37.12 0.002% 0.000%
c. Install Plastic Sheet for Mooring Bollards m2 35.20 0.001% 0 0.000% 0 0.000% 0 0.000% 35.2 0.001% 0.000%

G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%

H. Pouring Concrete K-300


a. Pouring Concrete Deadment 400/400 m3 5.32 0.061% 0 0.000% 0 0.000% 0 0.000% 5.32 0.061% 0.000%
b. Pouring Concrete Pile Cap 800/800 m3 6.14 0.070% 0 0.000% 0 0.000% 0 0.000% 6.144 0.070% 0.000%
c. Pouring Concrete Capping Beam 750/400 m3 20.16 0.231% 0 0.000% 0 0.000% 0 0.000% 20.16 0.231% 0.000%
d. Pouring Concrete Rubber Fender 800/2500 m3 12.80 0.147% 0 0.000% 0 0.000% 0 0.000% 12.8 0.147% 0.000%
e. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (rubber fender) m3 10.18 0.117% 0 0.000% 0 0.000% 0 0.000% 10.18 0.117% 0.000%
f. Pouring Concrete in to Steel Pipe Dia 12" Length 5 M (deadment) m3 22.63 0.259% 0 0.000% 0 0.000% 0 0.000% 22.63 0.259% 0.000%
g. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (mooring bollards) m3 20.37 0.233% 0 0.000% 0 0.000% 0 0.000% 20.37 0.233% 0.000%
h. Pouring Concrete in to Steel Pipe Dia 18" Length 1.6 M (mooring bollards) m3 4.20 0.048% 0 0.000% 0 0.000% 0 0.000% 4.20 0.048% 0.000%
i. Pouring Concrete Pile Cap 2000/2000 (mooring bollards) m3 9.60 0.110% 0 0.000% 0 0.000% 0 0.000% 9.6 0.110% 0.000%

8 FINISHING WORK 2.135%


a. Plestering (1 : 3) for Capping Beam 750/400 m2 110.40 0.047% 0 0.000% 0 0.000% 0 0.000% 110.4 0.047% 0.000%
b. Supply & Install Rubber Fender 400 x 2300 ea 8.00 0.625% 0 0.000% 0 0.000% 0 0.000% 8 0.625% 0.000%
c. Install Ancor Bolt dia 19mm for Rubber Fender (@550 Length) ea 128.00 0.267% 0 0.000% 0 0.000% 0 0.000% 128 0.267% 0.000%
d. Supply Soil Fill Up m3 679.05 1.196% 0 0.000% 0 0.000% 0 0.000% 679.05 1.196% 0.000%

TOTAL 100.000% 100.000% 43.130% 2.917% 46.047% 53.953%

Prepared by, Checked & Reviewed by,


PT. Ade Konstruksi Abadi PetroChina International Jabung Ltd Approved by,
PetroChina International Jabung Ltd

M.Siwa Kumar Isrokdin / Dwi Utama / M. Ihsan A


Project Manager HEO Planner & Estimator Chawarie / Jacob ET
HEO & Facilities Supv.
WEEKLY PROGRESS REPORT

ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER
PCJ-3060-CA

Status Week : 18 Period : 2-Jan-20


Rest Week : 13 Up to : 8-Jan-20

Progress
Weight
No. Description Unit Qty Factor
Last Week This Week Cummulative Remaining Progress Total Cummulative (%)
(%)
Qty Weight (%) Qty Weight (%) Qty Weight (%) Qty Weight (%)

INSTALL SHEET PILES AROUND JETTY AT LAGAN STAGING RIVER

1 TECHNICAL PLANNING DESIGN CONSULTANT FOR CONSTRUCTION 4.148%


a Soil investigation Ls 1.00 0.830% 1 0.830% 0 0.000% 1 0.830% 0 0.000% 100.000%
b Design and Calculation
1. Issued for Review ea 3.00 0.277% 3 0.277% 0 0.000% 3 0.277% 0 0.000% 100.000%
2. Issued for Approval ea 3.00 0.277% 3 0.277% 0 0.000% 3 0.277% 0 0.000% 100.000%
3. Approved for Construction ea 3.00 0.277% 3 0.277% 0 0.000% 3 0.277% 0 0.000% 100.000%
c Design drawing
1. Issued for Review ea 7.00 0.277% 7 0.277% 0 0.000% 7 0.277% 0 0.000% 100.000%
2. Issued for Approval ea 7.00 0.277% 7 0.277% 0 0.000% 7 0.277% 0 0.000% 100.000%
3. Approved for Construction ea 7.00 0.277% 7 0.277% 0 0.000% 7 0.277% 0 0.000% 100.000%
d Construction Engineering
1. Issued for Review ea 33.00 0.277% 32 0.226% 0 0.000% 32 0.226% 1 0.050% 81.818%
2. Issued for Approval ea 33.00 0.277% 29 0.184% 0 0.000% 29 0.184% 4 0.092% 66.667%
3. Approved for Construction ea 33.00 0.277% 29 0.168% 0 0.000% 29 0.168% 4 0.109% 60.606%
e Final document Ls 1.00 0.830% 0 0.000% 0 0.000% 0 0.000% 1 0.830% 0.000%

2 MOBILIZATION & DEMOBILIZATION Ls 1.00 1.513% 1.513% 0.3 0.454% 0 0.000% 0.3 0.454% 0.7 1.059% 30.000%

3 PERMIT FOR CONCRETE SHEET PILE MOBILIZATION Ls 1.00 0.458% 0.458% 0 0.000% 0 0.000% 0 0.000% 1 0.458% 0.000%

4 PREPARATION WORK 0.128%


a. Clean up Area m2 1,237.50 0.052% 0 0.000% 0 0.000% 0 0.000% 1237.5 0.052% 0.000%
b. Stake Out Survey Ls 1.00 0.076% 1 0.076% 0 0.000% 1 0.076% 0 0.000% 100.000%

5 EXCAVATION AND BACKFILL WORK 0.328%


a. Excavation Deadment 400/600 m3 2.23 0.001% 0 0.000% 0 0.000% 0 0.000% 2.2304 0.001% 0.000%
b. Excavation Pile Cap 800/800 m3 6.14 0.002% 0 0.000% 0 0.000% 0 0.000% 6.144 0.002% 0.000%
c. Excavation for Line Tie Rod m3 95.33 0.027% 0 0.000% 0 0.000% 0 0.000% 95.33 0.027% 0.000%
d. Backfill for Excavation m3 34.57 0.011% 0 0.000% 0 0.000% 0 0.000% 34.57 0.011% 0.000%
e. Backfill Area (Compacted) m3 679.05 0.288% 0 0.000% 0 0.000% 0 0.000% 679.05 0.288% 0.000%

6 STRUCTURE WORK 58.288%


PROCUREMENT
a. Supply Sheet Pile W-500 A-1000
1. Purchased Order jt 67.00 7.215% 67 7.215% 0 0.000% 67 7.215% 0 0.000% 100.000%
2. Manufacturing jt 67.00 9.620% 67 7.323% 0 0.000% 67 7.323% 0 2.297% 76.119%
3. Delivery jt 67.00 7.215% 52 5.600% 0 0.000% 52 5.600% 15 1.615% 77.612%
b. Supply Piling Steel Pipe Dia. 12" THK (anchor pilling)
1. Purchased Order jt 30.00 2.438% 30 2.438% 0 0.000% 30 2.438% 0 0.000% 100.000%
2. Manufacturing jt 30.00 3.250% 30 3.250% 0 0.000% 30 3.250% 0 0.000% 100.000%
3. Delivery jt 30.00 2.438% 30 2.438% 0 0.000% 30 2.438% 0 0.000% 100.000%
c. Supply Piling Steel Pipe Dia. 12" THK (mooring bollards pilling)
1. Purchased Order jt 36.00 2.925% 36 2.925% 0 0.000% 36 2.925% 0 0.000% 100.000%
2. Manufacturing jt 36.00 3.900% 36 3.900% 0 0.000% 36 3.900% 0 0.000% 100.000%
3. Delivery jt 36.00 2.925% 36 2.925% 0 0.000% 36 2.925% 0 0.000% 100.000%
d. Supply Piling Steel Pipe Dia. 12" THK (fender pilling)
1. Purchased Order jt 18.00 1.463% 18 1.463% 0 0.000% 18 1.463% 0 0.000% 100.000%
2. Manufacturing jt 18.00 1.950% 18 1.950% 0 0.000% 18 1.950% 0 0.000% 100.000%
3. Delivery jt 18.00 1.463% 18 1.463% 0 0.000% 18 1.463% 0 0.000% 100.000%
e. Steel Pile ø 18" ASTM A 252
1. Purchased Order jt 1.00 0.147% 1 0.147% 0 0.000% 1 0.147% 0 0.000% 100.000%
2. Delivery jt 1.00 0.147% 1 0.147% 0 0.000% 1 0.147% 0 0.000% 100.000%
f. Rebar Concrete
1. Purchased Order kg 12,322.58 1.509% 12322.5771165 1.509% 0 0.000% 12322.58 1.509% 0.00 0.000% 100.000%
2. Delivery kg 12,322.58 3.520% 12322.5771165 3.520% 0 0.000% 12322.5771165 3.520% 0.00 0.000% 100.000%
g. Galvanized Sling ø 1 3/4"
1. Purcahsed Order m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
2. Manufacturing m' 311.65 0.187% 0 0.000% 0 0.000% 0 0.000% 311.65 0.187% 0.000%
3. Delivery m' 311.65 0.140% 0 0.000% 0 0.000% 0 0.000% 311.65 0.140% 0.000%
h. Galvanized Clamp ø 1 3/4" crossby clips G-450
1. Purchased Order ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
2. Manufacturing ea 365.00 0.062% 0 0.000% 0 0.000% 0 0.000% 365 0.062% 0.000%
3. Delivery ea 365.00 0.046% 0 0.000% 0 0.000% 0 0.000% 365 0.046% 0.000%
i. Galvanized Turn Buckle Eye-Eye crossby HG 226, ASTM F1145
1. Purchased Order ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
2. Manufacturing ea 45.00 0.140% 0 0.000% 0 0.000% 0 0.000% 45 0.140% 0.000%
3. Delivery ea 45.00 0.105% 0 0.000% 0 0.000% 0 0.000% 45 0.105% 0.000%
j. Concrete
1. Purchased Order m3 111.41 2.298% 0 0.000% 0 0.000% 0 0.000% 111.41 2.298% 0.000%
k. Sand
1. Purchased Order m3 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%
l. Fender Rubber
1. Purchased Order ea 8.00 0.440% 8 0.440% 0 0.000% 8 0.440% 0 0.000% 100.000%
2. Manufacturing ea 8.00 0.587% 0 0.000% 8 0.587% 8 0.587% 0 0.000% 100.000%
3. Delivery ea 8.00 0.440% 0 0.000% 0 0.000% 0 0.000% 8 0.440% 0.000%
m. Soil for fill up
1. Purchased Order m3 679.05 0.639% 0 0.000% 0 0.000% 0 0.000% 679.05 0.639% 0.000%

7 CONSTRUCTION 33.001%
A. PILING SHEET PILE AND STEEL PILE
a. Install Sheet Pile (W-500 A -1000) jt 67.00 20.717% 0 0.000% 0 0.000% 0 0.000% 67 20.717% 0.000%
b. Install Piling Steel Pipe Dia. 12" THK point 28.00 5.989% 5 1.069% 0 0.000% 5 1.069% 23 4.920% 17.857%

A. Formwork
a. Install Formwork for Concrete Pile Cap 800/800 m2 35.84 0.068% 0 0.000% 0 0.000% 0 0.000% 35.84 0.068% 0.000%
b. Install Formwork for Concrete Deadmant 400/400 m2 22.30 0.042% 0 0.000% 0 0.000% 0 0.000% 22.304 0.042% 0.000%
c. Install Formwork for Concrete Capping Beam 750/400 m2 148.80 0.283% 111.6 0.212% 0 0.000% 111.6 0.212% 37.2 0.071% 75.000%
d. Install Formwork for Concrete Fender 800/2000/2500 m2 45.12 0.086% 0 0.000% 0 0.000% 0 0.000% 45.12 0.086% 0.000%
e. Install Formwork for Mooring Bollard m2 14.40 0.027% 0 0.000% 0 0.000% 0 0.000% 14.4 0.027% 0.000%

C. Install Steel Pipe 4", 12" & 18" ASTM A 252 & Steel Plate 12 mm thk
a. Supply & Install Steel Pipe Dia. 4" (mooring bollards) jt 1.00 0.064% 1 0.064% 0 0.000% 1 0.064% 0 0.000% 100.000%
d. Install Steel Pipe Dia. 18" THK jt 1.00 0.036% 1 0.036% 0 0.000% 1 0.036% 0 0.000% 100.000%
e. Supply & Install Steel Plate 12 MM THK sheet 2.00 0.067% 2 0.067% 0 0.000% 2 0.067% 0 0.000% 100.000%

D. Fabricating & Installing Rebar


a. Rebar for Deadment D16 (400/400) kg 647.81 0.113% 647.80632 0.113% 0 0.000% 647.80632 0.113% 0.00 0.000% 100.000%
b. Rebar for Deadment Ø8 (400/400) kg 175.28 0.031% 175.277214 0.031% 0 0.000% 175.277214 0.031% 0.00 0.000% 100.000%
c. Rebar for Pile Cap D16 (800/800) kg 1,527.34 0.267% 1527.34176 0.267% 0 0.000% 1527.34176 0.267% 0.00 0.000% 100.000%
d. Rebar for Anchor D16 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 533.00 0.093% 533.00352 0.093% 0 0.000% 533.00352 0.093% 0.00 0.000% 100.000%
e. Rebar for Anchor Ø8 at Pile Cap & Deadment Beam (steel pipe Ø12" ) kg 67.54 0.012% 67.542552 0.012% 0 0.000% 67.542552 0.012% 0.00 0.000% 100.000%
f. Rebar for Capping Beam D16 (750/400) kg 3,423.98 0.599% 3423.97692 0.599% 0 0.000% 3423.97692 0.599% 0.00 0.000% 100.000%
g. Rebar for Capping Beam Ø8 (750/400) kg 692.01 0.121% 692.01405 0.121% 0 0.000% 692.01405 0.121% 0.00 0.000% 100.000%
h. Rebar for Rubber Fender Beam D16 (800/2500) kg 1,260.11 0.220% 1260.11004 0.220% 0 0.000% 1260.11004 0.220% 0.00 0.000% 100.000%
i. Rebar for Anchor D16 at Rubber Fender (steel pipe Ø12") kg 518.40 0.091% 518.40432 0.091% 0 0.000% 518.40432 0.091% 0.00 0.000% 100.000%
j. Rebar for Anchor Ø8 at Rubber Fender (steel pipe Ø12") kg 69.23 0.012% 69.2302905 0.012% 0 0.000% 69.2302905 0.012% 0.00 0.000% 100.000%
k. Rebar for Mooring Bollards D16 (steel pipe Ø18") kg 140.15 0.025% 140.15232 0.025% 0 0.000% 140.15232 0.025% 0.00 0.000% 100.000%
l. Rebar for Mooring Bollards Ø8 (steel pipe Ø18") kg 14.34 0.003% 14.343714 0.003% 0 0.000% 14.343714 0.003% 0.00 0.000% 100.000%
m. Rebar for Mooring Bollards Pile Cap D19 kg 1,339.34 0.234% 1339.338 0.234% 0 0.000% 1339.338 0.234% 0.00 0.000% 100.000%
n. Rebar for Anchor D16 at Mooring Bollards (steel pipe Ø12") kg 1,036.81 0.181% 1036.80864 0.181% 0 0.000% 1036.80864 0.181% 0.00 0.000% 100.000%
o. Rebar for Anchor Ø8 at Mooring Bollards (steel pipe Ø12") kg 138.46 0.024% 138.460581 0.024% 0 0.000% 138.460581 0.024% 0.00 0.000% 100.000%
p. Anchor Bar Ø1" (capping beam and pile cap deadment) kg 738.77 0.129% 738.766875 0.129% 0 0.000% 738.766875 0.129% 0.00 0.000% 100.000%

E. Install Tie Rod (Galv. Sling, Galv. Clamp & Galv. Turnbuckle)
a. Galvanized Sling Ø1--1/4" m' 311.65 0.668% 0 0.000% 0 0.000% 0 0.000% 311.65 0.668% 0.000%
b. Galvanized Clamp Ø1--1/4" ea 552.00 0.220% 0 0.000% 0 0.000% 0 0.000% 552 0.220% 0.000%
c. Galvanized Turnbuckle Eye & Eye ea 45.00 0.499% 0 0.000% 0 0.000% 0 0.000% 45 0.499% 0.000%

F. Install Plastic Sheet


a. Install Plastic Sheet for Capping Beam m2 152.16 0.006% 0 0.000% 0 0.000% 0 0.000% 152.16 0.006% 0.000%
b. Install Plastic Sheet for Pile Cap and Deadment m2 80.86 0.003% 0 0.000% 0 0.000% 0 0.000% 80.86 0.003% 0.000%
c. Install Plastic Sheet for Rubber Fender m2 37.12 0.002% 0 0.000% 0 0.000% 0 0.000% 37.12 0.002% 0.000%
c. Install Plastic Sheet for Mooring Bollards m2 35.20 0.001% 0 0.000% 0 0.000% 0 0.000% 35.2 0.001% 0.000%

G. Sand Fill in to the stell pipe 12" 293.04 0.790% 0 0.000% 0 0.000% 0 0.000% 293.04 0.790% 0.000%

H. Pouring Concrete K-300


a. Pouring Concrete Deadment 400/400 m3 5.32 0.061% 0 0.000% 0 0.000% 0 0.000% 5.32 0.061% 0.000%
b. Pouring Concrete Pile Cap 800/800 m3 6.14 0.070% 0 0.000% 0 0.000% 0 0.000% 6.144 0.070% 0.000%
c. Pouring Concrete Capping Beam 750/400 m3 20.16 0.231% 0 0.000% 0 0.000% 0 0.000% 20.16 0.231% 0.000%
d. Pouring Concrete Rubber Fender 800/2500 m3 12.80 0.147% 0 0.000% 0 0.000% 0 0.000% 12.8 0.147% 0.000%
e. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (rubber fender) m3 10.18 0.117% 0 0.000% 0 0.000% 0 0.000% 10.18 0.117% 0.000%
f. Pouring Concrete in to Steel Pipe Dia 12" Length 5 M (deadment) m3 22.63 0.259% 0 0.000% 0 0.000% 0 0.000% 22.63 0.259% 0.000%
g. Pouring Concrete in to Steel Pipe Dia 12" Length 6 M (mooring bollards) m3 20.37 0.233% 0 0.000% 0 0.000% 0 0.000% 20.37 0.233% 0.000%
h. Pouring Concrete in to Steel Pipe Dia 18" Length 1.6 M (mooring bollards) m3 4.20 0.048% 0 0.000% 0 0.000% 0 0.000% 4.20 0.048% 0.000%
i. Pouring Concrete Pile Cap 2000/2000 (mooring bollards) m3 9.60 0.110% 0 0.000% 0 0.000% 0 0.000% 9.6 0.110% 0.000%

8 FINISHING WORK 2.135%


a. Plestering (1 : 3) for Capping Beam 750/400 m2 110.40 0.047% 0 0.000% 0 0.000% 0 0.000% 110.4 0.047% 0.000%
b. Supply & Install Rubber Fender 400 x 2300 ea 8.00 0.625% 0 0.000% 0 0.000% 0 0.000% 8 0.625% 0.000%
c. Install Ancor Bolt dia 19mm for Rubber Fender (@550 Length) ea 128.00 0.267% 0 0.000% 0 0.000% 0 0.000% 128 0.267% 0.000%
d. Supply Soil Fill Up m3 679.05 1.196% 0 0.000% 0 0.000% 0 0.000% 679.05 1.196% 0.000%

TOTAL 100.000% 100.000% 55.853% 0.587% 56.440% 43.560%

Prepared by, Checked & Reviewed by,


PT. Ade Konstruksi Abadi PetroChina International Jabung Ltd Approved by,
PetroChina International Jabung Ltd

M.Siwa Kumar Isrokdin / Dwi Utama / M. Ihsan A


Project Manager HEO Planner & Estimator Chawarie / Jacob ET
HEO & Facilities Supv.
1 2 3 4
### ### ### ###
### ### ### ###
5 6 7 8
### ### ### ###
### ### ### ###
9 10 11 12
### ### ### ###
### ### ### ###
13 14 15 16
### ### ### ###
### ### ### ###
17 18 19 20
### ### ### ###
### ### ### ###
21 22 23 24
### ### ### ###
### ### ### ###
24 26 27 28
### ### ### ###
### ### ### ###