SECTION 03310

STRUCTURAL CONCRETE

TABLE 1A: LISTING AND FREQUENCY OF REPORTS

No. Title Submittal Frequency


1. Sources of material a) 31 days prior to delivery a) One time
of concrete
b) Un-apparent change b) as required
2. Supplier Quality Inspection a) 31 days prior to delivery a) One time
Plan of concrete
3. Mix design for all classes of a) 31 days prior to delivery a) One time
concrete of concrete
b) When mix is re-designed b) As required
for any purpose

4. Name, location, equipment a) 31 days prior to delivery of a) One time


& personnel of test concrete
laboratory to be used by b) If changed b) As required
supplier (including own
laboratory)
5. Programs, methods and a) 31 days prior to delivery of a) One time
details of batching plant concrete
equipment

6. Proposed methods of a) 31 days prior to delivery of a) One time


complying with hot weather concrete
mixing and delivery

7. Certificates for cement and a) 31 days prior to delivery of a) One time


mineral admixtures from concrete
manufacturers and/or b) For each new delivery b) As required
suppliers from manufacturer

8. Certificate for admixture a) 31 days prior to delivery of a) One time


from manufacturer concrete
b) If any change occurs b) As required
9. Report of plant trial mixes a) 31 days prior to delivery of a) One time
with 7-day and 28-day test concrete
results for all classes of b) If any change b) As required
concrete required for the
work

Rev 1 9 of 45 Contract No: