Download as pdf or txt
Download as pdf or txt
You are on page 1of 16

-

J,
Bihar State Power Transmission Company Ltd., Patna
A subsidiary company of Bihar State Power (Holding) Company Ltd., Patna
CIN-U40102BR2012SGC018889
[SAVE ENERGY FOR BENE.FIT OF SELF AND NATION]
Head Office, Vidyut Bhawan, Bailey Road, Patna -800021 .
Office Order No. 57 / BSPTCL, Patna Dated <!:J B - 0 3 -/ l g
The Committee of following officers is hereby constituted to prepare and finalise the technical specifications
for turn key projects of 400/132 KV, 400/220/132/33 Kv, 220/33 Kv, 220/132/33 Kv & 132/33 Kv Grid
Sub-stations as well as transmission lines of 400 Kv, 220 Kv & 132Kv with OPGW cables and earth wires
and 220Kv, 132 Kv & 33Kv Cables.

Sr. No Committee No.-1 Details of Works


1 Sri Kumar Prashant 400/132 Kv,
ESE, P-II 400/200/132 KV,
2 Sri A.K.Mislu·a 220/33KV,
EEE, P-I, (Nodal Officer) 220/132/33 KV,
3 Sri Ashwini Kumar GTS & ATS Grid Sub-stations,
EEE, P-II 400KV, 220Kv & 132 Kv GTS & ATS Bays.
4 Sri Rakesh Kumar '
EEE, P-I
5 Sri Abhinav Basu
AEE, P-II
6 Ms. Khistija Ranjan
AEE, P-I

Sr. No Committee No.-2 Details of Works


I Sri R.K.Ambastha Line & Pile foundations 400 KV,
ESE P-I 220KV, 132KV trans lines with OPGW Cables and earth
2 Sri Varun Vineet wire,
EEE, P-II Issues related to river crossing, railway crossing,
3 Sri D.K. Jha Pile Foundations, transmission line towers,
EEE, P-I (Nodal Officer)
use of latest technologies in survey of lines,
4 Sri Ajay 'Kumar
optimisation techniques for transmission lines,
AEE, P-I
5 Sri Prateek Kumar use of narrow base towers, monopoles and other new
AEE, P-ll technologies.
6 Sri Vineet Bageria Any other issues related to tenders of Transmission lines.
AE,Civil
7 Ms. Sarita Kumari
AEE, Planning

Sr. No Committee No.-3 Details of Works


I Sri S. Katiyar 220 KV, 132 KV & 33 KV Power Cables,
ESE, P-II termination equipments,
2 Sri Upendra Kumar Straight through Joints,
EE,Civil Cable laying Procedures,
'"I
J Sri Ravishankar Control Cables with glands,
TS/ EEE P-II (Nodal Officer) cable tranches, insulators,
Mrs. Madhu Priya all type of conductors including HTLS & other new
4
AEE, P-11 generation conductors,
Hardware fittings,
5 Sri Manish Sharma
P-11
Fire fighting equipments portable type as well as HVWS I
Sri Brij Mohan & Hydrant system,
6
AEE, P-I LED lighting.
Any other issues.
7 Ms. Nidhi Vipul
AEE, P&E

E:Dircctor(P)/07.03.18/Committee constituted for technical specification


Page 1
Sr. No Committee No.-4 Details of Works
1 Sri Perwez Alam All communication and PLCC equipments,
ESE, ULDC & Telecom Reliable communic~tion System for present & 13th Plan,
2 Sri Ravi Shankar integration of OPGW equipments with PLCC equipments,
TS/EEE, P-II Communication protocols,
3 Sri A.K.Mishra
RTU with LDMS supply installation &commissioning and
EEE, P- I
integration with SLDC.
4 Sri Khistija Ranjan
AEE, P-1 Auxiliary power supply system DCPS analog / digital
5 Sri Pushkar protection scheme.
AEE, ULDC (Node! Officer)
6 Sri Himanshu Kumar Any other issues related to Communication.
AEE, Telecom
7 Sri Rishi Raj
AEE,P&E
8 Ms. Medha
AEE, Telecom

Sr. No Committee No.-5 Details of Works


1 Sri R.P Srivastava All Civil works related to turnkey projects of G/S/Stn &
Chief Engineer, Civil lines,
2 Sri Upendra Kumar standardisation & formation of Specification to be
EE, Civil (Nodal Officer) adopted for all Civil works of BSPTCL for both G/S/Stn
3 Sri Ravi Shankar
and lines,
TS/EE, P-ll
Pile foundations, different type of foundations of lines,
4 Sri D.K. Jha
EEE, P-1 1-IFL issues,
5 Ms. Archana FGL to be adopted,
AEE,P&E PCC/ gravel filling in switchyard etc.
6 Sri Vineet Bageria
Any other Civil works.
AE,Civil

Sr. No Committee No.-6 Details of Works


I Sri K.N.Sahay Review, modification & formulation of QAP, MQP,
CE (PE & QC) FQP & other works related to qua! ity of works/
2 Sri. R.K.Ambastha equipments.
ESE, P-1
3 Sri S. Katiyar All issues related to quantity of supply of
ESE, P - fl equipments & works being executed.
4 Sri Ram Babu Singh
EEE, CRITL
5 Sri Arvind Kumar
TE, PE & QC (Nodal Officer)
6 Ms. Bharti Kumari
AEE, PE& QC
7 Sri Praveen Kumar
AEE, P-II
8 Ms. Shweta Nirmata
AEE, P&E
9 Rajeev Kumar
JEE, P-1

E:Dircctor(P)/07.03.18/Committee constituted for technical specification Page 2


· 2. All the above committees shall study the technical specifications and practices adopted by
other power utilities across the country and recommend the specifications to be adopted by
BSPTCL accordingly.
3. All the committees shall study the existing specifications of the BSPTCL, all such issues
shall be 'taken care of to remove any ambiguities/ confusions.
4. The committees shall prepare BOQ and proposed schedule for the relevant scope of works.
5. Lump Sum items should be avoided and attempts shall be made to quantify each and every
items.
6. The committee no. 1,2,3 ,4 & 5 shall furnish their report in 2 phase as detailed below:

a) Technical specificatioµs for Bays, G/S/Stn - Within one week of issue of the
-,

lines & Civil Works up to 220KV level order.

- Within two weeks of issue of the


b) Technical specifications for G/S/Stn, lines,
bays & Civil Works upto 400Kv G/S/Stn order.
GIS/AIS
Within three weeks of issue of
-
c) Hybrid G/S/Stn
the order.
The status of preparation of the Technical Specifications with price schedule shall be
reviewed during weekly meeting.
. ti
7. The works covered under the 13 1 plans for BSPTCL have already been approved. The work
of constructions of three nos. of 400 KV G/S/Stn under TBCB has also been started by
PGCIL & BSPTCL has to create the transmission infrastructure for down linking.

As such, it is desirable that the technical specifications with BOQ & price schedule
etc. are to be prepared in mission mode within the targeted schedule.

The details of work covered under 13th plan and also additional works proposed to
the state Government is enclosed for reference.

Encl: As above
Sd/-
(H.R.Panday)
Director (Projects)
BSPTCL
Memo No. /BSPTCL, Patna Dated /
Copy forwarded to OSD to the MD, BSPTCL for kind perusal and approval.

Sd/-
(H.R.Panday)
Director (Projects)
BSPTCL
~ e,__3 Patna Dated <1 g . -e:J 3 -t8 /
Memo No. /BSPTCL,
Copy forwarded to:
1) CE, Project- I, BSPTCL, Patna
2) CE, Project - II, BSPTCL, Patna
3) CE, Trans (0 &M), BSPTCL, Patna
4) CE, (PE &QC), BSPTCL, Patna I .. »:
5) CE, (System Operation), BSPTCL, Patna y~-
6) CE, (P & E), BSPTCL, Patna eg{ti~
(H.R.Pa;nday)
Director (Projects)
BSPTCL

Page 3
E:Director[P)/07.03.18/Committee constituted for technical specification
modi, of finance for 21-222.jpg
/2018
- - ---··----
, .

~ g I'-! ~ -qm ~ 1.-fi f?p~ 1;:, q5.s-q ~'1 ftf o. q c:--11


~m~(~)~~o~~~
ClN - U40J 02BR2012SGC018889
l ~wix1~f%a·~~~ I
~ cf>11.1~&11.1, fctM
'+{qr[, ~ m! ~-aooo21

-~- ~ ?.~.~~ . .? : .

m:TR~,
~ fcri:rrT.
~ "ffWR.. "CfC'TI I

~-. ~ ~ 'WR ~l"'{-1~~1'1 ~ fRo cf> ~ ~ ·cm ~ (2021~~~} cl>


1q,q,y .-
· 3Rr"Wl? ~ ·cfi;·.<W,f·~ l;Jf:lJ.cf>T'!ffi; ~-~ ~ -~ -~ ·~ 400
io~ci ~ cfA mi·~- w+rn:- €i-~:i~-~' ~:,~·~ ~ ~
· :Qownlinking ~ ~-:ifi ~ ~- 1,40~.36. ~. ~· ~: ~- ~
~ ~ ~ ~ ~ xTftf $ 10% ~-~ 28~;.87.~'~·\ul),1Q'\
-~ * -~ R ~- ~ ~ ~ ab% GT~ 11-27.,rn ~ ~d -~-
. ~ ~ ~ <R. ~ ~ ~~'$UT
:, • • , •
mc<r ~cm~ C.

~-~cfi~~I

~
- . ·,
, -3qgc1fl ~ cfi ~ ~ ~ c/'iX'i1 ~ fcp 19cTI q]cR ~ cfi 3l]fITT ~
~ <B):'~ ·fclw1 -i:ni1 6576 TfTITTTc ~ t; I ~ 1'.!T1T cl?1 ~ m ~ ~ixi~~l-i ~
~ 4j.q:{L£l;s. ~ ~ ™· ii
fcRW, ~ ~ cfi ~'Wi.H\4xia 400 cfiO~O ~ 220
· cf>O'BTO ffix' 1lx ~ 2021-22 cf> 3Rl QC() ~ ~ -qM cfi ~ ~ ~ fcRW, ~
~ mvAT 6ffmf Tf<1T % ~ ~ mT ~ ~ 1'.!T1T cf>T ~ cITT ~ I
~ ~ ci; cIBc'l. fu?) -rn) q)]1TI <R ~ ~ mfwRrrr cffl a ch ,11 J;)
~ ID'Cf t1
~ ~ ci; -~ ch 11.1\f.i'\a iA cfTill cITTm <ITT ~ fcrcRufr ~ ~ t:

;,>~ >!"ITT cfi 3RfT@ Tariff Baseu Competitive Bidding (T.BCB) J, r.nu:f1i ii
~cfufr °ti~~ 400/220/132 "$01-110 cfi ffi
chli..llf.i'\a xflcil'iCf>'\ fffixfl1 ~
'34cf>-i:l (.lSTS) "fl~ 220/132/33 -Jiomo ffi ~ ~ ~ 220
' "' CfJ
cl101-il0 ->-- 930 .......AL.
-<-1\CflC
""' '~
1cr>~'11'11CX -c,rcf' 132 ...;,.. -~
Cfl01i10
...;,..
Cfl 407 -AL. fcp ' ~
x;1cnc cvi l id

(~) "ffi1xUJ ~"4 cf,1 f.RroT I


~ -Ji chll~\.:q1.H t,c,"~ ~
~ \.llcfdif2.lci 7<ITTT 1409.36 ~. 3r.:mrf;m-
~" -g ~
I SXi
~ -J, ~
ch~
1u+- 11.1~-1 q\- -me; x\mUT -q-lJTRll 400 -Jio·i.j)o ~ 220 cfio1fro «R crx cft'1 2021-22 cB
\-<~
3Rl ~ ~ ~ 1'!Tff cITT CJYT t!"i"x?. -P ~-Te1"! -g1- \Jllirrfl i ~ TlTvAI cITT 2021-22 cicn 1,
~ cl1[ c,"e=l:1 xNf Tfm f: I

1 /1
·, ·· - - -• - --~,~~;11, ,1n/flinhnx/162005ce5e12bf5e?projector=1 &messagePertid=0.5
· mode of finance for 21-223.jpg
7/2018

f
.f

:311::1: -38-Wt
..J '% re)) ~.;R cf. ~
_-st rcl"Ern
.:;, i:i'M cir q~r
~ cil';--:=i ~~ .. c.r,-<;;'lll i-1~ <f)
~~~ 400 <Bo~.fio ci'; ~ ftrG· ~-;;:: wr.rn: &-~. z-i-~~m -crcj t1--~Mr 'fl zi'Rlf?.t@
Oov,rnlittking ~11:1fOT J:rU[T'fTT ~ i~ ~CJ. 1409 . 36 ~ cl~ ~ "<:llvFTI c:#1 W1c:i;tf?i t(o '3cffi
t~ '!:;fl ·w~T q)T 20% (H~ 28'Ul7 cb·-ll"<5 \'i'il!'~I 'efc)ut! ~-(n~.4 t;cT
Tf)f:r@' ITT-~·: c7i 'vr -;:;

~\ct 30% Z!2.Tf<"t 1121.49 Q'lx'1,s ;_i;:;o ~v 'fRq)lx elf! T!1--<ac:'r ~ ~ fmfr:i m-0..ITTt 'fl '5ft.1JT
m~ ~ clfl x~~ ~- cm7-t ~ m_:lTh1' ~ ·1:.r'j'vR1 <B <NUJ·-:11.H ~ wJ'nl cf1'\ ·2011-18
If 50.00 ¢-<'i-s 'fi1T[l ~T CP'.'B cb'l q1-qT ml' 'CrlTll I
' <

-mvRT3TI ct Wlq~a me~ c!;'t \Tfu ~ 1xrRrcir, ~ ~ x#.'l~ q)'[ ~


~ Lf?l' cfi x-IT~ ~ tI

°50/-
( ~ 'cgtITT 3ITT'O ~~c/'le'ii'h~J:'\ )
1J6iu f.J-~
.
~-~. 29-~'.2:, ._j_ ~ ~- 30\,0.l~D\t__L_

~ ::>A'afef-W-WltT ~. ~ ~ 'QTcR (~) ~ ~o. ~

( #~., '.f'\'""'"'""1)
. ·w;u~

1/1
·, -- - _·_,_ --~1~.,n1, ,/n/ifinhnx/162005ce5e12bf5e?projector=1 &messagePartid=0.6
L6-"
. ""
SI. No.
Description ..
io4"tl .¢<;>s.t (R~. ~r)
'" .. ""'1· ,225.53
A Total Cost of the Complete Project
- -
36.Y7 '
B Contingency (@3% on A)
122.55
C !DC(@ 10% on A)
24.51
D Consultancy (@2% an A)
1,409.36
i!Jcluding
E Total Cost of the Project
Contingency, IDC & Consultancy Charges
(=A+B+C+D)
108 1,04,09,31, 110.23

34 17.28,71,94551
Construction of Sitam arhi (New) - Runnisaidpur (in place
2 of Sitam arhi) 132KV 0/C Trans. line (Single M oose).

~onstruction of 132 KV D/C by m aking LILO arrangem ent 31,54,50,051.87


62
of 132 KV DCSS Benipatti - Pupri Transm ission Line at
3
Sitam arhi New GSS 7,91,35,822.63
Construction of 2 nos. 220 KV Line bays at M otipur GSS
4
5,63,33,537.38
Construction of 2 nos. 132 KV Line bays at Runnisaidpur
5
GSS

1,67,20,71,945.53
200

160 1, 14,82,87,296.04

Construction of 132 KV D/C by m aking LI LO arrangem ent 17,38,91,702.09


20
of 132 KV DCSS Saharsa(OLD)-Banmankhi Transmission
3
Down liking Line at Saharsa (New) GSS
A Lines for
400KV S/S Construction of 132 KV 0/C by making LILO arrangement 12, 19,74,455.08
15
of 132 KV DCSS Saharsa(OLD)-Udakishanganj
4
Transmission Line at Saharsa (New) GSS
7,91,35,822.63
Construction of 2 nos. 220. KV Line bays at Begusarai
5 r
GSS 8,34,57,210.99
Construction of 2 nos. 220 KV Line bays at Khagaria
New GSS
70 27,27,22,747.06

62 31,23,60, 159.17

156.42 79,94,56,702.08
2

30 45,60,32,700.26
4

1, 15,46,28,804.77

220KV New- 2, 15,61,98,513.21


240
Sub-Stations
2 0/c Trans. line Twin Moose .
B with 160 1,50,09.14,037 .19
Construction of Raxaul (New) - Gopalaganj 220KV 0/c
associated 3 Trans. line Twin Moose . 22,25,52,069.61
lines Construction of LILO of both Ckt of Bettiah-Raxaul 132KV 20
4
43,69, 10,452.41
5

•. 1,225.53
; ~ '
3/1/2018 - - .,-,--- ~ - - - - - -

,
•..

'.'

'(fl!fr~~.. ~ fcr;rJ cf> m ii ~ · c1011 t rcn 19~ . -q:j'cR ~ ~ ~ifITT ~


~Ir~:,~, -~fytf~ ~ 6576 ~ ~~ ~ I ~ -tj'jTr q11 ~ ~ ~ ~~ ~-
~ . ,i:u4~11i~ 'cf> -~ Y<-Tm Tl ~ ~ ~ cf> 31u1<H1qxi<1 400 cflo'lfro ~ 220
Gfi0'lfro· :fITT tix cT1l 2021-22 cf>~ cfcf ~ -~ 111l'T cf>~~~~~
~~ ~-rm) \J11 ~c#r ~~~cm·~ cR ~I
t
~ ~ 'cfi ~ ft;ri'.r -rr:r ~ tix ~ ~ ~ c#r ,lcfi-11~

~-~ti
~ ~ cf> 0RPm cfillllR<i ~ cJm1 q)TU! cITT n~ fumun ~i i;rcfiH t:
~ ~ rJil 220 / 132/ 33 <f>Q1-]1Q ~ '3-Y-~ cplFff'ffi ~ C;cfi 132 / 33 cf>O'lf!O
m~~ cITT 220/132 cf>o'lfro ~ tix fuwr~ qft[ITvFnzm Tl
~ 220 cto'lfTo ct 120 fffctc ~~cf \TU 132 cto·.fro ~ 147 nfk
~c,i'ltncx (~f.ic1}:t·c1\'.Lir ~ cflT ~ 1
r x~ cf1 13 -3~ g-~ n2 cto'lfto ct 473.42 x:r%c .,=);c;!11Z1c.~ fi~;~ui ~-{;~ cf.'1
HTLS Conclucl()r (capncit- - 2=-tO V\V •\. 1050 :\) !;,1-:l Rccc;nduuorin:_! c.Fr-11

r ,lv'li 7.fi 09 ;;,rc.;-<'; 220 / 132 c.so·iflo (ti rh m-R~l"i't ~ s;@epfT-\-{i ,:r,[ ~Ff:'fl

1c1«rr~ 1

... r:n:nr::,,~ r·c ,,'/;c: ;,:. ~··:;,.'"':, .. ,. ,,,_r . :.q .;·s--· ,_;,- '.!;.;;·
.,

11
https://mail.google .com/mail/u/Ol#inbox/162005ce5e12bf5e?projector= 1 &messagePartld=O. 7
! I,.., ..... ..., "'! 1 11 l ":" f ,.., .., I V' O ._ I -. ........ ,,.,:;:,

,
-go/-
.

( ~ ~. ~P- -~~clic,tcfie/1 )
. ' '~~ , .. .'···'

trcaT--~ 3'.tt l~2q\~L

•·

1 /1
hllps ://mail .google. com/maii/u/O/#inbox/16200 5ce5e 12bf5e? projector= 1 &message Pa rtld=O. 8
.. '
total Cost (Rs. Cr)
,p1:No. . Description 954.10
A Total·Cost of the Complete Proj~ct
28.62
B Contingency (@3% on A)
95.41
C .ioC·(@ 16% on A)
. ' . 19·.08
D ConsL.Jltaricy .(@2% on A)
including 1,097.21
E Total ·cost- of the Project
· ·Coi:-itingency, IDC & Consultancy Charges
(=A+.B+C+_D) . -
. 8,33,94,483.61

220Kv'.New:. ·
·s.ub~S:tati;n~.
A

54,62,93,240.23

14,14,10,531.33

Barauni TPS-Be usarai 132 'r0./ 0/C Trans. line


19.4 13,79,64,235.62
4 Kishanganj (New)- Kishanganj 132 'r0./ 0/C Trans. Line.
Both Circuits i.e (Ckt 1 & Ckt 2) of 132'10./ Biharsharif-
14 8,83,20,658.99
5 Baripahari D1C Transmission Line(RL-7 Km) with HTLS
Conductor RKM
Re- Both Circuits i.e (Ckt 1 & Ckt 2) of 132KV DIC Lakhisarai
32 24,41,27 ,524.82
Conductoring 6 (PGCIL)-Lakhisarai Transmission Line (RL-16 Km) with
of HT°LS Conductor RKM
B Reconductoring of 132'10./ DIC Dehri-Banjari Transmission
Transmission I
25, 16,44,245.26
Line with HTLS Conductor (line length (RKM) 80
Lines with 7
HTLS
Reconductoring of 132'10./ S/C Sipara-Mithapur- 7 6, 13,76,653.34
8 Karbi ahi a Tr Line with HTLS Conductor
Re-Conductoring of 132'10./ 0/C Chandauti-Tekari 98 50,50,21,052.13
9 Transmission Line with HTLS conductor
Reconductoring of 132'10./ SIC Kahalgaon (BSPTCL)- 7 4,58,27,441.25
10 Kahal aon NTPC Trans Line with HTLS Conductor
Reconductoring of 132'10./ S/C Kahalgaon -Sabour Trans 27 14,85, 18,035.05
11 Line with HTLS Conductor
Reconductoring of 132'10./ D/C Dehri-Sonenagar
38 21,55,50,904.51
12 Transmission Line with HTLS Conductor (line length -
19.00 RKM
D Scheme Modification
Reconductoring of Motihari (ISTS) - Motihari (BSPTCL)
132 'r0./ 0/C with HTLS conductor (Capacity - 240 MVA, 77.52 38,90,39,248.49
Scheme
C 1050A.
Modification
Construction of 132KV D/C Transmission Line from 80 53,85, 16,465.60
2 Banka(PG) to Banka(New) GSS with HTLS Conductor
53,63,71,043.09

2 25,00;91,77 5.79

Up-Gradation '
25;3. 0,49,730.43
,. ..
D 'of ~ul>- :_.'

Station-
16,77;1~,835.41"
•. .A

39,63,45,903.23

25,82,84,900.88

Muzzafarpur (PG) - 'Chtiapra ·(New), Arnrrout 22d KV D/C


130 58,00, 75,1f14.4 7
Trans. line.
Vaisbali - Chhapra (Nl3w); Arnnour (in place of Hajipur
2 8,0 27,35,41,826.92
220 KV GSS KV 132 'kv DIC Trans. line. .
Lauka.hi- Phulparas-132 KV D/C Trans. line with HTLS
3 50 42,99,30,506.76
E Conductor,
New Lines
Construction of"2 Nos. 132KV line bays at Muzaffarpur
4 5,60,96,892.44
GSS
5 Construction of 2 Nos. 132KV line bays at Vashali GSS 3,70,59,593.63

6
-
Construction of 2 Nos. 132KV line bays at Laukahi GSS 4,40,05,7 40.41

7 Construction otzNos, 132.!<V line bays at Phulparas GSS 4,70,04,012.91


_ Tb'QI~ & P amfs.·f~r 1f:aps1Jllss\9_n Uhe '


· Portable lnflata~I~ b.igntl_ng Tow~r . Sel\ - 10 34,79/93.30
Make AS!<A' Model-Air
. ~-- ~ 45C>O, Geheral
. or~ E' uivalent.
~00 Ml; portabl~ Hy_dri~~l_ic eomprs·sor machine·with die sets suitable
for the foll0Wir.lg Ctind,!'icfcr: . I •

(a) For Moose Coridi.JctGr. · 1 Set 10 52,61_,862.90


2 '. . t,a • !
I
· (b) for Zebra.Conductor.
(c) For Panther concuctor.
( d) For Eartti-Wir~-:Coriductor.
T.hermo~Visior) Camera {High End), Set 10 2,09,29,708.44
3
(Minimum - 64.dx480 Pixels
Rechargeable Lon!:J Range Search Liqht Set 10 9,84,771.73
4 Make ASKA (Mbdel-AEL-5W-LED Mode, General) or .Equivalent.
' !~ ' '. : .

Set 10 32,56,099.21
5 Tower Footing Resistance and Impedance Meter (Complete Kit),
/ ..
Puncture insulator Detector Tester with sled and adjustable skid
suitable for Testing of Porcelain Insulator with Laptop, Conductive Set 10 1,21,87,328.56
6 Gloves, Conductive Socks & Conductive Safety Shoes/Boot etc.
Com lete in all res ect
Puncture insulator Detector Tester with sled and adjustable skid
suitable for Testing of Composite Insulator/ Long Rod Polymer Set 10 1,21,87,328.56
7 Insulator with Laptop, Conductive Gloves, Conductive Socks &
Conductive Safety Shoes/Boot etc. (Complete in all respect)

(B) Test Equipments for OPGW


(i) Main Equipments
~1:
·}
Digital Protection Coupler suitable for integration and operation Set 10 27,80,545.82
1 through OPGW System with required Cables, complete in all respect.

(ii) Test Equipments for Terminal Equipments 1

SDH Anal zer u to STM-16 with Jitter and wander option No. 10 1,48,52,3 03.22
1
No. 10 37,87,626.86
2 Handheld 2 Mb s BER Tester
No. 10 3, 13,504.05
3
(iii) Test Equipment for Fibre Optic Cable System
OTDR (Optical Time Domain Reflectometer) for 1310/1550 nm with No. 10 77,58,342.32
laser siource. Equivalent to Amritsu MW9076B1 or better.
Optical Attenuators (Vaiable 1310/1550 nm). Equivalent to JDSU No. 10 23,22,591.22
2
MTS6000 or better
Optical Power Meter (131011550nm) with Laser Source, Equivalent to No. 10 15,45,886.16
3
JDSU OLP55 or better
Optical Talk Set, E uivalent to JDSU OTS55 or better No. 10 20,88,078.12
4
Optical Fiber Fusion Splicer including Fiber Cleaver Equivalent to No. 10 55,63,138.75
5
Sumitomo T-39-SE or better.
No. 10 1,44,375.52
6 Calibrated Fibre.
Connectorization Kit (FIS-Fl-0053-FC-INST or equivalent) No. 10 14,57,608.14
7
Splice Kit (FIS-Fl-0053-FF ore uivalent) No. 10 8,24,013.89
8
Optical test accessory kit including all necessary connectors,
adaptors, cables, terminations and other items required for testing Set 10 7,81,769.27
9
(FIS-Fl-0053-TS-ST or equivalent)
SUB-TOTAL (B) 4,42, 19,783.34
TOTAL(= A+B) 10,25,06,676.05

Page 1 of 1
3/7/2018 mode of finance for 21-22.jpg

•·.
,.
-~
filg1'< ~ trTcR ~1·-·Hf?p~l--1 q5s:q~~ tBo, qc:--1r
1mm m ~ (~) ~ fso c5T ~ c5RRf
C(N - U40l02l3R20JiSGC:0.18889
I ~ ~ x1~f%a l{ ~ ~ J
>f'qR cf>ill\C'lll, ~ tfcf,f, ~ m, '1C"IT-B00021
~~ ?.:-.?.::.~.~ ······
-~ .

'fffucr,
ml"R
~ fcrrrrr,
~ ~. tfC'=f1 I
\~,:.. '•
. '
~ ~ tITTR s;1'i"lf?i~11 ~ ~o
cf5)- 12cff· 4ilgtfiii 'f ~ ~
~~-~om. (201&-=17) ~ -~-~ ~ +TI1T''$1' ~'~ mt~
~ ~: Fclttii,~g;~u1; ~ ~ ·.'(.fi~"/¢{01 ~ ~-- ~- .~,__IV
(mn-~ I 2) ~ ~ 400 cfi"O'lfto -qfr0~9~0 ~- ~~ -~
~ -
~ -,,..
Ji= ,~~!!~
-'< w
~ -~~-.%TI ~- xiiO ~64.76··~ $f:·~'·'§l .. ~ 'c(cr .
. ~ %)-~~-~ -~;~, coT 20% ~ 3{mN 1·3~_9i cfj~\,~;-~~~--i~~;,~~~~,-~.
w:r ·it ~ ~ ~- ~ so·% ~¢tr 531.Bt ~ 'xile· ~ -~ ~ ..
~ ~- ·~~~~-TI ~ m ctr~- WcIT.-J' ffl r$
+i.4l;f '# ·1

~-it ii 'f[fm'r cITT"1T t;· fcr> 12cff 4 -rjq ~ ll 7.TivRT cf)" ¥c1 ii
~ ~ cf;"
~x ~ cBT ~ ~ .:/'fTr cB'r ~ ~- ~ ~iflf?i::tH ~ ~ q1<Jxf?l-s cf;" ~-~,.rm
~ ~ ~ ~ 'cf>T 3{'U1 lj ,fj 4 X id ~ i:rrnm *
fcl '<-d J{) cJ'i '(Of, ~lfUT '(;ci ~~
~ ~ ~ 'rrJl' ~I~ cf)" ~-IV ('lWT-2/2) ii~ 'cf>Tm cf)"~ 400_ cfio'lfro
~o3IT{o~o w.r ~- ~ ~ ~ ~ ~ 'cf>T f.'rnuT ~ tI
'
~ ~ ~ ~ fun ,ro cnn:rr ~ ~ ~ ~ r-tr· cf~
~~t,
~ ~ cfi 3Rf1m ~ ·-;,ii 400 / 220 / 132 cfio'lfro cfi m ~-
fua ii1 x gx ii ~ vfR -g TIW ~ ~ 400 cf;"O-.frO cf;" 10 ~ ~\lex. 220 cfiO'lfrO
i<.l

cf;" 1.31 ~ ~ ~ 132 cfio.fro cfi 53 ~ Rr,C"l11-J1c:~ mRDT ~ (3r:rrrf.m) C{1f ITT'for
~ t,
~ cf)' cl'illlT-cJ[j.--j tg" ~ ~lcfc.f,R;Ja xrfvr xiiO 664.76 q-,x'l'5 3fj1,rf.m 'g I ~
u'r\Jl.-n cB1 2'020-21 c'fcn ~ W 'cf>T ~~ x'm Tf'lIT $I
3Tff 31...fxlS/
..j''
'3'
::r'i'.rmrn:l ZT~ cfi ,3Vi1 c'fcn (2016-17\ fcmx cf, cf>C'T
er, 12a· I V

fci-qc'T 1TITf cB'r ~ ~ ~TI r-f'muT vurrcfl c.'> Pffi'Jrtq>~o,_ ·,-r:~01 t,rci ~~cf10xu1 ~ 'lf/v!';:ff q';
.:tvJ-[V (1-TPT-2 / 2) <fi 3R'J'l'@ 400 <fio1.\To \il'fO~Ot,rflO -:.T: oi ~FT, ~if&P-11'·?~'1' (;d' ~ef;~.@
1

h tips :{/mail .goog le. com/mail/u/0/#i n box/ 162005ce5e 12bf5e?projector= 1 &messagePartld =O .3 . 1/1
mode of finance fo~r-;2~
1-;
22~1~
.jP~Q~-----------------
3/7/2018

~ BWf tg cg'C'I =o 664.76 cnx~ ct,") ~ ~ ~ ~ ~ T-c~.qzci ~ ~:rm cfiT

20% cP1 31'2llil 132.95 ~ ~- ~ f;rcM· cfi ~ "ti ~ ~o,Cf 'C;c1 1'M' 80% 312ffi'i
531.s1 ~ x'io ~ ~ ct'r T>JT~ 4X fcrr'0=r ~ m~ 'fl ";f[1Jf ~'(l m *1
~ ~ q'iB ~ W,,@ 1{cT $11 cf> cW-l1-<1lFf ~~ fcra'r<1 ql'.f 2017-18 it 25.00. ~

~ ~&:r ~ cP1 ~ cb'T ~ I .


qRa'10HIW cf> T~ P.lcM,drl cm- i;rfu 'C[c.i mft~ 'flfq@ ~ -:r-iit-a- cl'i1 Q1·w-l

~~cf>m~~t1

io/-
( ~ ~ 3ITTO ~?icf5§1cB~ei )
~tT~
~ f¥:liq) ,.,.~ o /. l t» L '.).(') < '7
'2 2.~2-. __L

~~ .
( ~ ~ 3ITTO ~~¢<'-!¢~~ )
~'q f;t-~

1/1
htt ns · //mail .oooale .com/mail/u/O/#inboi</162005ce5e 12bf5e?projector= 1 &messagePartld =O .4
"
,.. Bakhtiyaq~ur 40012201132 KV GSS (GIS} and associated Works
Estimated
SI. SCOPE OF WORK , Cost
No. (In Rs.)
A NEW SUBSTATION WORK
283.01
1 2x500 MVA + 2xl60 MVA, 40012201132 KV GIS Sub
Station at Bakhtiyarpur
B LINE BAY EXTENSION WORK
15.60
1 Sheikhpura GIS, BGCL, 220 I~V Ext.
(2 Nos. Line Bay)
15.76
2 Hathidah GIS, BGCL, 220 KV Ext.
(2 Nos. Line Bay) 41.38
,.., Fatuha GIS, BSPTCL, 220 KV Ext.
.)

(2 Nos. Line Bay)


3.38
4 Harnaut AIS, BSPTCL, 132 KV Ext.
(2 Nos. Line Bay)
25.63
5 Baripahari AJS, BSPTCL, 132 KV Ext.
(2 Nos. Line Bay)
C TRANSMISSION LINE WORK
36.71
1 LILO of Barh-Patna 400 KV DIC (Quad) Transmission
Line at Bakhtiyarpur (New)
45.05
2 Bakhtiyarpur (New) to Sheikhpura (New) 220 KV
DIC Transmission Line
45.66
3 Bakhtiyarpur (New) to Hathidah (New) 220 KV DIC
Transmission Line ,
26.26
4 Bakhtiyarpur (New) to Fatuha (8SPTCL) 220 KV
DIC Transmission Line
12.56
5 Bakhtiyarpur (New) to Harnaut (BSPTCL) 132KV
DIC Transmission line
27.06
6 Bakhtiyarpur (New) to Baripahari (BSPTCL) 132KV
DIC Transmission line
578.05
D Transmission System Total (=A+B+C)
17.34
E Contingencies
(@3°/o ofD)
57.80
F IDC (D:E=80:20)
(@10°/o of D)
11.56
G Consultancy
(@2°/o of D)
664.76
H GRAND TOTAL

Page 1 of 1