Professional Documents
Culture Documents
Table of Content-Model
Table of Content-Model
Table of Content-Model
GENERAL NOTES
2 TYPICAL DIMENSION DRAWING OF SINGLE CELL PIPE CULVERTS FOR NEW CONSTRUCTION OR RECONSTRUCTION (NORMAL INLET AND NORMAL OUTLET) 80053\LASA\STR\KBK\PD\PIPE\TYPE-01 03
3 TYPICAL DIMENSION DRAWING OF SINGLE CELL PIPE CULVERTS FOR NEW OR RECONSTRUCTION (DROPPED INLET AND NORMAL OUTLET) 80053\LASA\STR\KBK\PD\PIPE\TYPE-02 03
4 TYPICAL DIMENSION DRAWING OF SINGLE CELL PIPE CULVERTS FOR NEW OR RECONSTRUCTION (DROP INLET AND STEPPED OUTLET) 80053\LASA\STR\KBK\PD\PIPE\TYPE-03 03
5 TYPICAL DIMENSION DRAWING OF DOUBLE CELL PIPE CULVERTS FOR RECONSTRUCTION/ NEW CONSTRUCTION (NORMAL INLET AND NORMAL OUTLET) 80053\LASA\STR\KBK\PD\PIPE\TYPE-04 03
6 TYPICAL DIMENSION DRAWING OF TRIPLE CELL PIPE CULVERTS FOR RECONSTRUCTION/ NEW CONSTRUCTION (NORMAL INLET AND NORMAL OUTLET) 80053\LASA\STR\KBK\PD\PIPE\TYPE-05 03
7 TYPICAL DIMENSION DRAWING OF SINGLE CELL PIPE CULVERTS FOR WIDENING (NORMAL INLET AND NORMAL OUTLET) 80053\LASA\STR\KBK\PD\PIPE\TYPE-06 03
11 TYPICAL DIMENSION AND REINFORCEMENT DRAWING OF DROP INLET FOR SINGLE CELL PIPE CULVERTS 80053\LASA\STR\KBK\PD\DI\REINF-01 01
12 TYPICAL DIMENSION DRAWING OF SINGLE CELL BOX CULVERTS FOR NEW OR RECONSTRUCTION 80053\LASA\STR\KBK\PD\BOX\TYPE-01 02
13 TYPICAL DIMENSION DRAWING OF DOUBLE CELL BOX CULVERTS FOR NEW OR RECONSTRUCTION 80053\LASA\STR\KBK\PD\BOX\TYPE-02 02
14 TYPICAL DIMENSION DRAWING OF TRIPLE CELL BOX CULVERTS FOR NEW OR RECONSTRUCTION 80053\LASA\STR\KBK\PD\BOX\TYPE-03 02
15 REINFORCEMENT DETAILS OF SINGLE CELL BOX CULVERTS FOR RECONSTRUCTION / NEW CONSTRUCTION 80053\LASA\STR\KBK\PD\BC\REINF-01 02
16 REINFORCEMENT DETAILS OF DOUBLE CELL BOX CULVERTS FOR RECONSTRUCTION / NEW CONSTRUCTION 80053\LASA\STR\KBK\PD\BC\REINF-02 02
17 REINFORCEMENT DETAILS OF TRIPLE CELL BOX CULVERTS FOR RECONSTRUCTION / NEW CONSTRUCTION 80053\LASA\STR\KBK\PD\BC\REINF-03 04
DESIGN SUB CONSULTANT: CLIENT : PROJECT : DRAWING TITLE : DRAWING NUMBER : DATE:
DRAWN: MOHAN APPROVED BY
DECEMBER 2020
REV. R0
DESIGNED: AJAY
CONSULTANCY SERVICES FOR FEASIBILITY STUDY AND 80053\LASA\STR\KBK\PD\TOC
TABLE OF CONTENTS SCALE:
LEA INTERNATIONAL LTD., Canada DETAILED ENGINEERING DESIGN FOR UPGRADING OF (SHEET 1 OF 1)
CHECKED: RUNAL In Joint Venture with
KAZO - BUREMBA-KABAGOLE- KYEGEGWA ROAD (82 KM) PRELIMINARY DESIGN PD FINAL DESIGN FD
LEA Associates South Asia Pvt. Ltd., India GOVERNMENT OF REPUBLIC OF UGANDA
No. DATE DESCRIPTIONS BY in association with RELEASED FOR CONSTRUCTION RFC AS BUILT AB
APPROVED: S.K. ROY UGANDA NATIONAL ROADS AUTHORITY
R E V I S I O N KOM Consulting Ltd., Uganda COPYRIGHT RESERVED SHEET SIZE A3