Professional Documents
Culture Documents
Mbale General Drawing March 22 2013 PDF
Mbale General Drawing March 22 2013 PDF
48,00 3,63
7,0
18,0 11,0
shelter
2
Dust room
3,0
2,0
(17,5 SM)
2
Precleaner
Old Vertical
Drier
Wet silo
(20 TN)
1,38
6,0 3,50
Destoner
11,5
(166,8 SM)
3,0
Wet silo
(20 TN)
6,00
2,50
14,5
Drum drier
Drum drier
5,0
14,5
13,0
Dry Silo
5,50
Dry Silo (50 ton)
1,81
(50 ton)
(143 SM)
W.C Ladies
Visitors Toilets
W.C Ladies
48,80
Bagging Off
W.C Gents
6,0
W.C Gents
11,0
Ashes room Urinal
3,0
(21 SM)
7,0 Urinal
7,25
1,00
1,00
Workshop and
4,5
Weighbridge
(49,5 SM)
3
4,0
11,0
2,5
Basin
Shower
Shower
Urinal
Dresser
Toilet
Casuals Toilet
Garden
Lockers
5,0
Production Offices
(66 sm)
2,81
Lab Kitchen
4,0
Admon. Offices
(203,5 sm)
Office lab
Samples
24,50
Cash office
Reception
82,50
18,50
Account
36,00 3,00
Toilets
3,00
33,0
Meeting room
1,25
Assistant Manager
Office
25%
0,75
1,50
4,06
3,0
38,00
2,00
32,5
46,75
2,00
1,00
84,00