FEASIBILITY STUDY

I. PROJECT PROFILE

A. PROJECT TITLE : Concreting of Pinagwarasan to Lanot Road

B. PROJECT LOCATION :Pinagwarasan, Taisan, Angas,


Mangcamagong, Basud, Matoog-toog, Hinipaan,
Masalongsalong, Pambuhan, Tarum, Colasi, Hamoraon,
Lalawigan and Lanot, Mercedes Road Sections

C. PROJECT BENEFICIARIES: Coconut farmers, fish


farmers, housewives, students and general public

D. TOTAL PROJECT COST: P 281,520,000.00

E. PHYSICAL TARGET : 23.46 km

F. PROJECT DURATION : 360 calendar days

G. PROJECT PROPONENT

1. Name : Provincial Government of Camarines Norte


2. Address : Capitol Building, Daet, Camarines Norte
3. Name of Contact Person : EDGARDO A. TALLADO
Position/Designation : Provincial Governor
Telephone Number : (054) 571- 2998
E-mail Address : govegaytallado@yahoo.com
Mobile Phone Number : 09088967963

H. PROJECT PARTNER/S : Department of Agriculture

II. PROJECT DESCRIPTION

1. BACKGROUND/RATIONALE:

It is estimated that a combined population of the influenced barangays is 16,922 consisting of


3,476 households. These households, specifically the farmers need better road access to transport
their produced from the production areas to the market and processing centers.

2. PROJECT OBJECTIVES

General Objective:

To improve and alleviate the quality of life of the people of the covered area
through better access of farm produced to the market and processing centers, fast
delivery of basic socio-economic services and increase adaptive capacity and reduce
vulnerability to disasters.
FEASIBILITY STUDY

A. Project Title : Concreting of Pinagwarasan to Lanot Road


B. Project Location : Municipalities of Basud and Mercedes
C. Project Type : Access Road
D. Project Scale/Dimension : 23.46 kms with ____ box culvert
E. Project Proponent : Provincial Local Government Unit of Camarines Norte (PLGU-Cam.
Norte)
F. Implementing Unit : Provincial Engineer’s Office, Cam. Norte
G. Total No. of Barangays of : Basud – 4 barangays
the Municipality Mercedes – 9 barangays
H. Mode of Implementation : By Contract

I. Direct Road Influence Area : ________________________ Hectares

Name of Barangay No. of Hectares Type of Crop/s


Basud
Pinagwarasan
Mangcamagong
Mercedes
Matoogtoog
Hinipaan
Masalongsalong
Pambuhan
Tarum
Colasi
Hamoraon
Lalawigan
Lanot
Total
J. Project Beneficiaries
: 16,922 Population: _________ Male, _________ Female
3,476 Households
K. Total Project Cost : Php. 281,520,000.00
Cost Sharing : WB Loan Proceeds: Php. ___________________
: GoP : Php. __________________
: LGU Equity : Php. __________________
L. Conclusion/Recommendation

I. Project Profile

Municipal Profile

Name of Municipality : Mercedes


: Basud
No. of Barangays Covered : Mercedes : 9
Basud :4
Province : Camarines Norte
Geographical Boundaries
______________________________________________________________________________________
______________________________________________________________________
Relative distance to growth and commercial center/s :
a) Distance to Daet : ______________ Kms.
b) Distance to Naga City : ___________ Kms.
Existing road transport network and physical condition (accessibility via national, provincial and
other major thoroughfares)
Availability of public transport (land, water)
Total land Area __________________________________________
General Land Use Classification (residential, agricultural, forest, etc.)
Agricultural Land Use classification (by crop)
Land Area relative to Province : _________________
Topography : ___________________________________________________________
Soils and Suitability : ___________________________________________________
Water Sources : ________________________________________________________
Municipal Population (as of latest dated report)
Total Population (Male/Female)
No. of Households ____________________
Average Household Size: ____________
Average growth rate : _________________

1.1 Economic Activities and Sources of Income


1.1.1 On -farm (crops, livestock produced, forestry, fishing)
1.1.2 Off-farm
1.1.3 Non-farm
1.1.4 Analysis of average yield/production and income sources
II. Project Background and Rationale
2.1 Statement of the problem and opportunities

The proportion of poor families in the province have decreased from 31.9% in
2009 to 21.7% in 2012, respectively, but it is still higher from the national figure of 20.5
in 2009. A total of 26,563 families are still below the poverty threshold, with only9,864
families graduating out of poverty from 2009 to 2012.

Each individual needs at least Php 18,390 a year so as not to be considered


poor based on the poverty threshold estimate for the province. A family of 5 in the
province needs at least Php 91,950 a year or Php 251,.92 a day to meet its basic needs.

Among the municipalities of Camarines Norte and as per municipal level small
area poverty estimates ranked 3rd in 2009 at 43.4% while Basud ranked 6th at 38.3%
poverty incidence among the twelve (12) municipalities of the province.

According to the Regional Development Plan, an economy that is driven


primarily by consumer spending which is always coupled with decreasing ration of
investment, was proven to be unsustainable in the long run. In this case, the present
administration had aggressively implement priority infrastructure projects such as access
road from point of production to the market, post-harvest facilities, water system,
irrigation system and others. These type of projects promote and generate more
investments towards a sustainable economic development and was proven to be the one
of the contributors to the remarkable economic accomplishment of the province. This
feasibility study is undertaken to the viability of the project in terms of improving the life
of the populace thereby transforming Camarines Norte into a net exporting economy and
in the process, maximize opportunity for employment generation of its people for
sustained economic growth and development.

2.2 Project Objectives

General Objective:

Consistent with the national thrusts and priorities, this project is aimed at
reducing poverty through provision of access infrastructure support facilities to
production, thus, increasing volume of investment from the private sector resulting to
sustainable economic development in the municipalities of Basud and Mercedes in
particular and in the province of Camarines Norte in general.

Specific Objectives

Specifically, the project aimed to :

1. Reduce average hauling and transport cost of produce brought to the


market by 20%;
2. Reduce post-harvest losses from 8% to 3%
3. Reduce commuters’ travel time by 50% from Lanot to Daet
4. Increase agricultural production by 20%;
5. Increase feasibility of agribusiness/processing enterprises in the
influenced area;
6. Reduce vehicle operating cost (VOC) by 70%;
7. Increase access of populace to amenities such as schools, health centers,
church, market, hospitals, civic centers and others;
8. Tourism industry development
9. Economic activities increased
- No. of regular business establishment catering to different services increased
- Unemployment rate decreased
10. Local revenue increased

2.3 Brief presentation of socio-economic indicators (population, livelihood, and relation


of the project to the development plan of the project influence area)

III. Project Description and Analysis

A. Market/Demand-Supply Situation

3.1 Existing Roads, Bridges and Transport System in the Area


c/o Engr. Sam

Road Type Road Classification (Kms) Total


Gravel Earth Asphalt /Concrete
Passable Not Passable Not Asphalt Concrete Passable Not
Passable Passable Passable Passable Passable
(Km) (Km)
Bgy/FMR
18.90
Municipal 13.1697 5.4153
Provincial 5.8000
National

3.2 Analysis of Road and Transport System (without and with road improvement)

The road condition from Bgy. Pinagwarasan (….….Basud) to Mangcamagong


(Basud) connecting the Mercedes’ barangays of Matoogtoog, Hinipaan,
Masalongsalong, Pambuhan, Tarum, Colasi, Hamoraon, Lalawigan and Lanot hinder
the development of these barangays. The aforementioned road segments/network are
very rugged, eroded and slippery during rainy days. It is accessible to any form of
vehicle but the daily operating maintenance cost is comparatively high due to poor
condition of road segment. These expenses are added cost to the farmers/fishermen in
terms of high transport cost of different commodities. Aside from the higher transport
cost of produce, heavy quality decline of crops was reported due to bumpy trips
coupled with long travel of 3 hours from Bgy. Lanot to Daet (central commercial center
in Camarines Norte). The lone exposure of perishable crops and coarse/uneven travel
have resulted to quality decline/deterioration resulting to lower prices/decrease
volume sold. Heavy expenses on hauling and transport in bringing their products to the
market are incurred by farmers and fishermen which redound to a decrease in farm
income and fishing income of both farmers and fishermen respectively.

Moreover, with the very poor road condition, the products could not be brought
immediately to the market. This result to at least _____ spoilage of produce per report
from farmers due to exposure to harsh environment and handling damage during
hauling. At normal condition, spoilage on coconut/copra and pineapple is estimated at
_______ %.

The following cost items are incurred by farmers in bringing produce to the
market in Daet.

Source: Actual interview of drivers and conductors of Utility Jeeps plying Daet to
Lanot and Back.

Source: Actual interview of drivers and conductors of Utility Jeeps plying Daet to Lanot
and Back.

Without the Project With the Project Difference


Lanot - Daet:
Fare crop P 150.00 P 65.00 P 85.00
Distance in KM 53 Km 53 Km
Time of travel by Jeep 3 hrs. 1.5 hrs. 1.3 hrs.
(including waiting time)

Sample :
Tulay na Lupa to Daet
Fare of crop and commuters : 32 pesos
Distance : 25 Km
Time of Travel : 45 Minutes

Hauling/handling of Products:

During rainy days when Colasi river overflows, the road from Bgy. Colasi to Lanot is not
passable. Farmers usually hauled their crops by carabao drawn cart from their farm to pick-up point in
Colasi bgy. proper for pick-up by Public utility jeeps/trucks. Their hauling costs them 1 -2 pesos per kilo
e.g. for a sack of copra, the charge is 120 pesos since 1 sack of copra is 60 kilos. Rice on the other hand
with 50 kilos weight per sack is charged 100 pesos for hauling. Aside from hauling to the pick-up points
for land transport of crops, these are also hauled in various pick-up points for sea transport. They are
charged 1-2 pesos per sack/”kaing”. Farmers preferred land compared to sea transport due to its
cheaper charge and less handling. By sea transport, crops are transported to mangcamagong where they
are picked up by jeeps/trucks. In mangcamagong, they are again hauled to the pick-up point in
Camagong bgy. proper for pick-up by jeepneys or trucks. The hauling service fee is 10 to 20 pesos per
sack.

PRESENT:

For Copra (per sack):

Hauling charge from farm gate - pick-up point : ______ pesos/sack copra

Transport charge from pick-up point to Daet market : _____ pesos/sack

Total Cost : ______pesos /sack

For ____________

Hauling Cost per _____ - Pick-up point : __________

Transport cost from pick-up point to Daet Market : _______

Total hauling and transport Cost: ______________

WITH THE PROJECT:

For Copra (per sack):

Hauling charge from farm gate - pick-up point : ______ pesos/sack copra

Transport charge from pick-up point to Daet market : ________ pesos/sack

Total Cost : ________ pesos /sack

For ________________

Hauling Cost per fruit from farmgate - Pick-up point : ______________


Transport cost from pick-up point to Daet Market : ___________

Total hauling and transport Cost: _____________

Savings with the project:

Copra : ________ pesos/sack

Rice : ________ pesos/sack

Pineapple : ________ peso/fruit

Hauling of agricultural products is usually through carabao-drawn cart to the pick-up point, then
transported to Daet market by means of public utility jeepney/truck. Transport fare per sack of copra is
Php _______. With the project, the farmers will be able to save at least Php. ____ per sack (the amount
corresponding to the hauling cost) of copra brought to the Daet Market.

The residents travel by foot from the interior sitios to the Barangay Proper to be able to access
basic social services and other amenities they need. With the realization of the proposed road sub-project,
public utility jeepneys can already route near the farms/production area from _____ proper. Commuters
will have a fast travel to commercial centers, schools, hospitals, government offices or churches at ______.
Access of residents of _______to various amenities in Daet will also improve particularly _______
women, ______ High School students, _____ elementary school pupils and ___ day care children.

Actual traffic count of vehicles plying the road was recorded as:

Type of vehicle plying Number Number of trips per Number of days per
the proposed sub- day week plying the
project proposed sub-project
Public utility jeep 13 3 7
Truck 4 2 6
Motorcycle 60 2 5
Tricycle 25 4 8
Private Vehicle 37 2 5
Actual traffic count conducted on March 23-29, 2014

3.2.1 Present road network condition in the project area vis-à-vis accessibility
of the road to market centers/trading points (specify also major market
for products)
a) Concreted : 8.0
b) Aspahlted : 5.1
c) Graveled: 18.9
Total : 32.0 Km
Road Segment Length of Length of Length of Length of
Road concrete asphalted graveled road in
Segment in road in Km road in Km Km
KM.
Lanot-Lalawigan 5 5.0
Lalawigan - 3 3.0
Hamoraon
Hamoraon - Colasi 3 3.0
Colasi - Tarum 3 0.800 2.2
Tarum - Pambuhan 3 2.0 1.0
Pambuhan - 4 4.0
Masalongsalong
Masalongsalong - 8 2.0 1.5 4.5
Hinipaan
Hinipaan - 3 1.2 1.600 0.20
Matoogtoog
Matoogtoog - 1.5 1.15 0.35
Mangcamagong
Mangcamagong- 3.5 1.4 2.1
Pinagwarasan
Pinagwarasan-Daet 6.5 6.5
Total 43.50 17.05 7.55 18.90

Total length for concreting: 26.45 Kms.

3.2.2 Availability of public transport vehicles in the project area (origin to


destination)

Type of vehicle plying Number Number of trips per Number of days per
the proposed sub- day week plying the
project proposed sub-project
Public utility jeep 13 3 7
Motorcycle 115 2 5
Tricycle 25 4 7
‘Actual traffic count conducted on march 23-29, 2014

3.2.3 Seasonal Impassability of road site

a) No. of Concrete Bridge :


a.1. Matoogtoog bridge
a.2 Hinipaan bridge
a.3 Masalongsalong bridge 1
a.4 Masalongsalong bridge 2
b) Reinforced Concrete Pipe Culvert (RCPC)
b.1) Matoogtoog RCPC 1
b.2) Matoogtoog RCPC 2
a.5 Masalongsalong brideg 1
a.6 Masalongsalong bridge 2
c) Reinforced Concrete Box Culvert (RCBC)
c.1 ________________ RCBC
c.2 _________________ RCBC
c.3 _________________ RCBC
d) River
d.1 Colasi River (140 meter spillway needed)
e) Creek
e.1) Hamoraon Creek

The alternate route during rainy days when Colasi River overflow making the subject
road is impassable is Bgy. San Vicente Road, Sipocot, Camarines Sur. This is ______ kilometers to
Sipocot Town proper. Affected areas are Colasi, Hamoraon, Lalawigan and Lanot, Mercedes.
Crops from these areas are hauled from the farm to the bgy. proper and then transported to the
market passing San Vicente, Sipocot, Camarines Sur.

3.2.4 Availability of other modes of transport which tend to compete with the
road under construction

Alternative mode of transportation are motorboats from the barangays: Colasi,


Hamoraon, Lalawigan and Lanot to Mangcamagong, Basud and from there, crops are
transported to Daet Market through trucks or public Utility Jeepney.

The cost of hauling of crops from the pick-up point to the motor
boat is : _________ per sack/kaing

The transport cost from Mangcamagong to Daet is _______


sack/kaing.

3.2.5 Existing modes of transport and hauling passenger and cargo

The existing medium of transport in the influenced areas are motorcycle, tricycle, private cars
and trucks. But during rainy days when Colasi to Lanut access is not passable due to river overflow of
Colasi River, crops are transported by motorboats to pick-up points in bgy. Mangcamagong, Basud. It
took at least ____ days to let down the river overflow.

3.2.6 Current trip volumes, destinations, travel times, volume/capacity ratios

Trucks: 200 sacks/kaing per trip (10 - 12 MT)


PU Jeep: 50 sacks/kaing per trip (2.5 - 3.00 MT)
Motorboat: 30 sacks/kaings per trip (1.5 - 1.8 MT)

Destinations:
Copra/coconut :
a) Lanot - Daet : 3 Hrs
b) Lalawigan - Daet : 2.5 Hrs
c) Hamoraon - Daet : 2.3 Hrs
d) Colasi /Tarum - Daet : 2.0 hrs
e) Tarum/Pambuhan - Daet : 1.5 hrs
f) Masalongsalong/Hinipaan - Daet 1.0 hr.
g) Matoogtoog/Mangcamagong/Pinagwarasan - Daet : 45 minutes

Daet Market - 45 min - 3 hrs. depending on the bgy. of origin


Rootcrops/vegetables destination : Daet Market- 45 min - 3 hrs.
Fish and Fish products:
a) Truck/jeep to Mercedes Fishport : 45 min - 3 hrs.
b) Motorboat to Mercedes Fishport : 1-3 hrs.

3.2.7 Analysis of how the proposed road facility will close in the gap in
infrastructure development within the area in terms of generated,
induced and diverted traffic.

Present Condition (Without the Project)

The poor condition of “Pinagwarasan to Lanot road segment has hindered the
development of 11 barangays: two barangays of Basud and nine (9) barangays of Mercedes,
Camarines Norte. Said road segment is very rugged, eroded, smooth (soily) with deep
potholes. Some segment of said road is flooded and very slippery during rainy days. Thus,
only a few public utility jeepneys (PUJ) are routing the place because of high vehicle
operating cost (VOC). This resulted to low frequency of trips, thus waiting time of
commuters is significantly high (1-1.5 Hrs). Moreover, because of the high demand for
service vehicles, high commuters fare and transport charges for crops are dictated by PUJ
operators. As such, farmers incurred higher transport cost of their crops brought to the
market. Long travel to commercial centers is experienced by commuters at 1-3 hours. The low
frequency of vehicles also increased waiting time of commuters who are going to Daet.
Vegetables and rootcrops quality declined when they are transported to the market due to
long trips and bumby roads, thus, can be sold for lower price (_____).
.
Moreover, with the very poor road condition, the produce could not be brought immediately
to the market. This result to at least 8 % spoilage of produce particularly pineapple per
report from farmers due to exposure to harsh environment and handling damage during
hauling. At normal condition, spoilage on coconut/copra and pineapple during transport is
estimated at 3 %.

WITH THE PROJECT:

The realization of the project will brought more benefit to the farmers of the eleven (11)
influenced barangays in terms of reduced transport cost of crops to the market from 75 %
reduction in hauling and handling cost, 5 % reduction in transport losses due to
deterioration and quality decline of crops because of the bumpy and long travel from the
production area to market. Consequently, commuters waiting time will also reduce from 1.5
hour to 15 minutes, since, the frequency of PUJ routing the area will also increase.

A. Reduction in Transport and hauling/handling Cost of Crops/Fishery Products

Road Section Distanc Before Project With the Project


e in Hauling Transpo Commute Hauling Transpo Commute
Kilomet charge rt rs Fare charge rt rs Fare
er per sack/” Charge per sack/” Charge
kaing”/”bane kaing”/”bane
ra’ ra’
Lanot-Daet 53 150 150 60 60
Lalawigan - 48 70 70 55 55
Daet
Hamoraon - 45 70 70 50 50
Daet
Colasi - Daet 42 50 50 40 40
Tarum - Daet 39 40 40 40 40
Pambuhan - 36 35 35 30 30
Daet
Masalongsalo 32 30 30 25 25
ng - Daet
Hinipaan- 24 25 25 20 20
Daet
Matoogtoog - 20 20 20 15 15
Daet
Mangcamago 18.5 20 20 15 15
ng-Daet
Pinagwarasan 15 15 15 13 13
-Daet
Note: Transport charge for crops in terms of sacks/kaing is similar to fare charge to commuters.

Commuters from one barangay to another will also benefit with the project In terms of lower fare
per distance traveled with PUJ. The basis for said projection is in areas in Camarines Norte with
well-paved road.

Road Section Distanc Before Project With the Project


e in Hauling Transpo Commute Hauling Transpo Commute
Kilomet charge rt rs Fare charge rt rs Fare
er per sack/” Charge per sack/” Charge
kaing”/”bane kaing”/”bane
ra’ ra’
Lanot- 5 25 25 10 10
Lalawigan
Lalawigan - 3 10 10 8 8
Hamoraon
Hamoraon - 3 8 8 7 7
Colasi
Colasi - 3 8 8 7 7
Tarum
Tarum - 3 15 15 10 10
Pambuhan
Pambuhan - 4 8 8 7 7
Masalongsalo
ng
Masalongsalo 8 8 8 7 7
ng - Hinipaan
Hinipaan - 3 10 10 8 8
Matoogtoog
Matoogtoog - 1.5 8 8 7 7
Mangcamago
ng
Mangcamago 3.5 8 8 7 7
ng-
Pinagwarasan
Pinagwarasan 15 15 15 13 13
-Daet

B. Reduction in Waiting Time with the Project

Name of Total Proportio Total # of # of trips Saved # of Total #


project Populatio n of Affected Affected to Waitin Weeks of
influenced n project Populatio Househol market/ g time / saved
Barangays as of affected n d Week/H per Year waiting
2010 Populatio H trip to Hrs. by
n (%) market HHs/Y
(Hr.) r with
the
project
1. 1,054 50 1 1.0 52
Pinagwarasan 527 105 5,460
2. 1,400 100 1,400 1 1.0 52
Mangcamago
ng 280 14,560
3. Matoogtoog 1,409 100 1,409 282 1 1.0 52 14,664
4. Hinipaan 1,810 100 1,810 362 1 1.0 52 18,824
5. 1,029 100 1,029 1 1.0 52
Masalongsalo
ng 206 10,712
6. Pambuhan 2,834 100 2,834 567 1 1.0 52 29,484
7. Tarum 1,440 100 1,440 288 1 1.0 52 14,976
8. Colasi 1,643 100 1,643 329 1 1.0 52 17,108
9. Hamoraon 1,466 100 1,466 293 1 1.0 52 15,236
10. Lalawigan 1,630 80 1304 261 1 1.0 52 13,572
11. Lanot 1,208 70 846 169 1 1.0 52 8,788
Total 16,923 15,708 3,142 163,384
Equivalent number of Days 20,423
Equivalent peso value if the saved waiting time at 200 pesos/day with the project 4,084,60
0

C. Reduction in Transport losses due to ease in transport time and less exposure to harsh
environment with the project

Coconut/Copra Rice
Without the With the Project Without the Project With the Project
Name of Bgys Project
Copra 8 % 3 % Reduct’ 70 % of 5 % 3 % Reduct’
Annua Losses losses n Annual prod’n Losses losses n
l due to with In of rice. due to with In losses
Prodn. Transpor the losses being brought Transp the (MT)
(MT) t delays Project (MT) to market for ort Project
(MT) sale, the 30 % delays (MT)
are left for
consumption.
1. 8.568 3.213 5.355 15.666 9.3996 6.2664
Pinagwarasan 107.1 313.32
2. 18.816 7.056 11.76 7.4413 4.46481 2.97654
Mangcamagon 5
g 235.2 148.827
3. Matoogtoog 62.244 23.3415 38.9025 4.8629 2.91779 1.945195
778.05 97.25975 88 3
4. Hinipaan 39.816 14.931 24.885 5.1567 3.09403 2.06269
497.7 103.1345 25 5
5. 28.98 10.8675 18.1125 0.9464 0.56789 0.378595
Masalongsalon 88 3
g 362.25 18.92975
6. Pambuhan 1054.2 84.336 31.626 52.71 167.104 8.3552 5.01312 3.34208
7. Tarum 30.492 11.4345 19.0575 0.3916 0.23499 0.15666
381.15 7.833 5
8. Colasi 57.96 21.735 36.225 6.9844 4.19065 2.79377
724.5 139.6885 25 5
9. Hamoraon 864.15 69.132 25.9245 43.2075
10. Lalawigan 597.45 47.796 17.9235 29.8725 5.222 0.2611 0.15666 0.10444
11. Lanot 384.3 30.744 11.529 19.215
Total 5986.0 478.884 179.581 299.302 50.065 30.0395 20.02637
5 5 5 1001.3185 93 6
Value in pesos of the reduced losses with the 8,979,07 Value in pesos of the reduced 429,136.
project 5 losses with the project 5
Reduction in transport losses with the project
Copra/Coconut : 299.3 MT (Php. 8,979,075.00) at 30 pesos average selling price per kilo.
Rice ; 20.03 MT (Php. 300,390) at 15 pesos average selling price per kilo.
Pineapple :

D. Reduction in Hauling and handling Cost Incurred by Farmers During Rainy Days

Hauling of agricultural products particularly during rainy days is usually through carabao-
drawn cart to the pick-up point, then transported to Daet market by means of public utility
jeepney/truck. The hauling service fee is Php. 1.00 per kilo. Consequently, transport fare per
sack of copra from Bgy. Colasi to Daet is Php. 50.00.

With the project, the farmers will be able to save at least Php. 60.00 per sack (the amount
corresponding to the hauling cost) of copra brought to the Market. A sack of rice is charged
at 50 pesos hauling fee. Other crops are charge the same hauling fee per kilo.

When the medium used for transport is sea vessels, particularly motorboats, the farmers also
pay for loading and unloading their products at the rate of 5-10 pesos per sack.

Inaccessible Copra Hauling Hauling Saved Rice Hauling Hauling Total


Bgys. During Annual by rate per hauling Annual by rate per hauling
Rainy Days Prodn. Carabao kilo cost Prodn. Carabao kilo cost with
(MT) to Pick- In Php with the (MT) to Pick- In Php the project
up project up Points
Points in in kilos
kilos
1. Colasi 724.5 724,500 1.00 724,500 139.6885 139,688.50 1.0 139,688.50
2. Hamoraon 864.15 864,150 1.00 864,150
3. Lalawigan 597.45 597450 1.00 597450 5.222 5,222 1.0 5,222.00
4. Lanot 384.3 384,300 1.00 384,300
Total 2,570.40 2,570,400 1.00 2,570,400 144.900 144,900 144,900

Saved Hauling Cost during rainy days/month :


For Copra/coconut :2,570,400.00
Rice : 144,900.00

E. Reduced Vehicle Operating Cost (VOC)

With the realization of the project, the cost of vehicle operation (based on 2013 standard
VOCs) per kilometer course by the vehicle in the project decreased as follows:

a) PUJ : from Php43.47 to 22.95 or a reduction of Php. 20.52 VOC


b) Motorcycles : Php 10.89 to 4.51 or a reduction of php. 6.38 VOC
c) Tricycles ; php. 13.71 to 7.10 a reduction of Php 6.61
d) Private vehicles ; php. 45.89 to 22.96 a reduction of php. 22.93
e) Truck/s : php. 52.97 to 28.09 a reduction of 24.88

Type of vehicle plying Number Number of trips per Number of days per
the proposed sub- day week plying the
project proposed sub-project
Public utility jeep 13 3 7
Truck 4 2 6
Motorcycle 60 2 5
Tricycle 25 4 7
Private Vehicle 37 2 5

F. Easy and fast commuters’ travel to the commercial centers

The residents travel by foot from the interior sitios to the Barangay Proper to be able to access
basic social services and other amenities they need. With the realization of the proposed road sub-project,
the frequency of public utility jeepneys routing the area increases, thus, decreasing the waiting time spent
by commuters from 1 hours and 30 minutes to just 30 minutes. Commuters will have a fast travel to
commercial centers, schools, hospitals, government offices or churches at Basud or Daet proper. Access
of residents of the 11 influenced barangays to various amenities in Basud and Daet proper will also
improve, particularly 7,697 women, 319 High School students and at least 100 crops/fish traders in the
area.

Actual population needing better access road to the amenities in the Poblacion and
commercial centers

Name influenced Total Population Proportion of Total Affected


Barangays as of 2010 affected Population Population
(%)
1. Pinagwarasan 1,054 50 527
2. Mangcamagong 1,400 100 1,400
3. Matoogtoog 1,409 100 1,409
4. Hinipaan 1,810 100 1,810
5. Masalongsalong 1,029 100 1,029
6. Pambuhan 2,834 100 2,834
7. Tarum 1,440 100 1,440
8. Colasi 1,643 100 1,643
9. Hamoraon 1,466 100 1,466
10. Lalawigan 1,630 80 1304
11. Lanot 1,208 70 846
Total 16,923 15,708
Number of HH 3,385 3,142
Population of 47,674
Mercedes
Number of 9,959
Households
Population of 542,915
Camarines Norte
Number of 116,728
Households
Source: Based on Municipal Profile/ Interview of Barangay officials

3.3 Technical Analysis

3.3.1 Existing road alignment describing the route, start and terminal points,
surface condition, length, major population centers traversed, road
influence area (RIA) and terrain

3.3.2 Description and location/site of existing structures and their current


physical condition

3.3.3 Design analysis of proposed works

3.3.3.1 Description of proposed road alignment, terminal points, length, maximum


grade, minimum and maximum side slopes for cuts and fills, height of
embankment, population centers traversed, right of way, direct and indirect RIA,
location of critical structures, and major roads to which the proposed road will
connect (Pls. cite if proposed road will follow existing road alignment and canal
routes)

3.3.3.2 Design analysis of major and minor structures including drainage crossing of
bridge for waterways traversed by road

The proposed project will involve concreting of the ______km. graveled/earth portion of the
Pinagwarasan - Lanot Road with a carriageway of 5.00 meters, provision of 1.5 meter shoulder on both
sides and ditching on flood critical portion of the road. It will follow the existing road alignment.

A _____ m. thick concrete surfacing will be provided on road sections. While _____ m thick
aggregate sub-base and base course materials will be provided. It will adopt the DPWH standard design
for rural roads.

The road is traversing a relatively flat to rolling terrain. Right of way is not a problem since the
road is existing.
3.3.4 Proposed Sources and Location of Quarries, Borrow Pits and Construction
Materials

3.3.4.1 Relative distance of quarry and construction materials to project site

3.3.4.2 Handling materials

3.3.4.3 Dependability and availability of required quantities

3.4 Operational Aspects

3.4.1 Organization to implement the project

Implementation of the road project will be by contract under the supervision of the Provincial
Government Unit of Camarines Norte through a Local Project Office (LPO) which will be created
through Executive Order ________. During construction, the LPO will be responsible for the
implementation, monitoring and supervision of the sub-project. It will also be responsible in managing
the financial concerns of the project. It will be responsible for the proper disbursement and sees to it that
proper documents and reports will be submitted on time or on schedule.

To better equip the LPO in the implementation of the subproject, its members will undergo
several appropriate trainings and other training that will be sponsored by PRDP. The provincial
Government through the Provincial Engineer’s office, Provincial Planning and development Office
(PPDO), Provincial Environment office and Office of the Provincial Agriculturist (OPAG) have already
attended the SES training to familiarize them with the Social and Environmental aspect of the project.

The Provincial Engineers Office (PEO) having mastered on the design of the project will be task
by the PPO to monitor the implementation of the project. Organizational structure of the PEO is shown
in the ANNEX ______.

3.4.2 Plan for management and during construction, key roles and
responsibilities and implementation arrangements

3.4.3 Collection of Road user fees and other operational policies

3.4.4 Implementation schedule of the project (project duration, estimated start


and end of construction)

The abovecited road project is expected to start in _______ 2014 and be completed in
________ 2015 for a duration of ______ calendar days. See Annex ______ for the detailed
implementation schedule of civil works and other component of the project.
3.4.5 Project monitoring and supervision

3.4.6 Operation and maintenance scheme

3.5 Social Assessment

3.5.1 Project Beneficiaries

Name influenced Total Population Proportion of Total Affected


Barangays as of 2010 affected Population Population
(%)
1. Pinagwarasan 1,054 50 527
2. Mangcamagong 1,400 100 1,400
3. Matoogtoog 1,409 100 1,409
4. Hinipaan 1,810 100 1,810
5. Masalongsalong 1,029 100 1,029
6. Pambuhan 2,834 100 2,834
7. Tarum 1,440 100 1,440
8. Colasi 1,643 100 1,643
9. Hamoraon 1,466 100 1,466
10. Lalawigan 1,630 80 1304
11.Lanot 1,208 70 845.6
Total 16,923 50 15,708
Population of 47,674
Mercedes
Number of 9,959
Households
Population of 542,915
Camarines Norte
Number of 116,728
Households

Male : _______ female __________

3.5.2 Indigenous Cultural Community/Indigenous Peoples (ICC/IP)

3.5.3 Site and Right of Way acquisition

3.5.4 Damage to standing crops, houses and /or properties


3.5.5 Physical displacement of persons

3.5.6 Economic displacement of persons


3.6 Environmental Assessment
3.6.1 Natural habitat
3.6.2 Physical Cultural Resources
3.6.3 Terrain, Soil Types and Rainfall
3.6.4 Drainage, Situations and Flooding Potential
3.6.5 Impacts during Construction

3.7 Financial Aspect

3.7.1 Total project cost by financing source and cost sharing

The total project cost is ________________ broken down into the following
item cost and their corresponding financing sources.

Cost items Total Item LP GOP PLGU


Cost

3.7.2 (WB,LP,LGU,Banaficiaries)

3.7.2.1 Show table of project cost sharing

3.7.2.2 Provide a short write up/narrative explanation

3.7.3 Total Project Cost Breakdown (See POW)

3.7.3.1 Direct
3.7.3.2 Indirect

Provide a short write-up/narrative explanation

3.7.4 Status of LGU Equity availability and LFC certification


Provide a short write-up/narrative/explaination

A Sangguniang Panlalawigan Resolution No. ______ was approved by the PLGU Camarines Norte
expressing its commitment to support in the implementation of the proposed project.

On ____________2014, the Local Finance Committee of Camarines Norte has certified that Php
_________ equivalent to 10 % of the total project cost was appropriated in its Year 2014 budget as equity
for the proposed projects.
3.8 Economic Aspect

3.8.1 Economic Benefits

Enumerate the project benefits valuated for the analysis. Explain briefly each
benefit and how it is calculated

3.8.1.1 The project Influence Area

4. Table _____ No. ___ Agricultural, Fishery and Forest Production Areas to be served
by the (Title of the Road Sub-Project) (within and outside ARC ), YYYY

Coconut/Copra Rice
Barangay Hectares Annual Total Hectares Annual Total
Planted Prod’n Prod’n Planted Prod’n Prod’n
(Ha.) (MT) (MT) (Ha.) (MT) (MT)
1.Pinagwarasan 102 1.050 107.1 120.00 3.73 447.6
2. 224 1.050 57.00 3.73
Mangcamagong 235.2 212.61
3. Matoogtoog 741 1.050 778.05 37.25 3.73 138.9425
4. Hinipaan 474 1.050 497.7 39.50 3.73 147.335
5. 345 1.050 7.25 3.73
Masalongsalong 362.25 27.0425
6. Pambuhan 1,004 1.050 1054.2 64.00 3.73 238.72
7. Tarum 363 1.050 381.15 3.00 3.73 11.19
8. Colasi 690 1.050 724.5 53.50 3.73 199.555
9. Hamoraon 823 1.050 864.15 3.73 0
10. Lalawigan 569 1.050 597.45 2.00 3.73 7.46
11 . Lanot 366 1.050 384.3 3.73 0
Total 5,701 5,986.05 383.50 1,430.455

Provide a brief description of the project influence area

Vegetables Pineapple
Barangay Hectares Annual Total Hectares Annual Total
Planted Prod’n Prod’n Planted Prod’n Prod’n
(Ha.) (MT) (MT) (Ha.) (#of (MT)
Fruits)
1.Pinagwarasan 12.00 5.0 60 5.0 25,000 125,000
2. 10.00 5.0 4.0 25,000
Mangcamagong 50 100,000
3. Matoogtoog 7.5 5.0 37.5 2.5 25,000 62,500
4. Hinipaan 9.16 5.0 45.8 3.0 25,000 75,000
5. 3.00 5.0 8.00 25,000
Masalongsalong 15 200,000
6. Pambuhan 12.00 5.0 60 3.00 25,000 75,000
7. Tarum 8.5 5.0 42.5
8. Colasi 7.00 5.0 35
9. Hamoraon 10.73 5.0 53.65
10. Lalawigan 2.5 5.0 12.5
11 . Lanot 2.0 5.0 10
Total 84.39 421.95 25.50 637,500

Baran Crop/Fish/ Ar Average No. of Mineral Seed Annua % of


gay Forest ea Yield/ha turn- Fertilizer Requirement l produc
(H over/cro Requirement /ha/yr produc tion
a) pping /ha/yr tion sold
seasons/
yr
1. Bgy Palay 50 100 2x 50 cavans/ha 25 cav/ha 10,000 80 %
X cav/ha/cr cav
opping
2. Bgy Cocnut 20 250 4x 250 kgs/ha 200 Kgs/ha 20,000 100 %
Y kgs/ha/ha kgs
rvest
Source : ________________________________
Provide a short write-up/narrative/explanation for the table

4.1.1.1 Post-Harvest Losses in Agricultural Production

Coconut/Copra Rice
Without the Project With the Project Without the Project With the Project
Name of Bgys Copra 8 % 3 % Reduct’n 70 % of 5 % 3 % Reduct’n
Annual Losses losses In losses Annual Losses losses In losses
Prodn. due to with the (MT) prod’n of due to with the (MT)
(MT) Transport Project rice. Transport Project
delays (MT) being delays (MT)
brought to
market for
sale, the 30 %
are left for
consumption.
1. 8.568 3.213 5.355 15.666 9.3996 6.2664
Pinagwarasan 107.1 313.32
2. 18.816 7.056 11.76 7.44135 4.46481 2.97654
Mangcamagong 235.2 148.827
3. Matoogtoog 778.05 62.244 23.3415 38.9025 97.25975 4.862988 2.917793 1.945195
4. Hinipaan 497.7 39.816 14.931 24.885 103.1345 5.156725 3.094035 2.06269
5. 28.98 10.8675 18.1125 0.946488 0.567893 0.378595
Masalongsalong 362.25 18.92975
6. Pambuhan 1054.2 84.336 31.626 52.71 167.104 8.3552 5.01312 3.34208
7. Tarum 381.15 30.492 11.4345 19.0575 7.833 0.39165 0.23499 0.15666
8. Colasi 724.5 57.96 21.735 36.225 139.6885 6.984425 4.190655 2.79377
9. Hamoraon 864.15 69.132 25.9245 43.2075
10. Lalawigan 597.45 47.796 17.9235 29.8725 5.222 0.2611 0.15666 0.10444
11. Lanot 384.3 30.744 11.529 19.215
Total 5986.05 478.884 179.5815 299.3025 1001.3185 50.06593 30.03956 20.02637
Value in pesos of the reduced losses with the 8,979,075 Value in pesos of the reduced losses
project with the project 429,136.5

Table __________ (No.) Reduction in Post-Harvest Losses per crop in Barangay _________,YYYY

Barangay Crop/Fish/Forest Market Price Post-harvest Estimated


(Per Kilogram) Losses (W/O reduction in Post-
Project) (in %) Harvest Losses
With Project (in %)
1. Bgy. X Mango Php. 35.00 15 % 5%
2. Bgy. Y Vegetables Php. 10.00 20 % 5%

Source: ______________________
Provide a short write-up/narrative/explanation for the table
4.1.1.2 Table _____ No. ______ Population within the direct road influence area and
other areas to benefit from the road facility

Name influenced Total Population Proportion of Total Affected


Barangays as of 2010 affected Population Population
(%)
1. Pinagwarasan 1,054 50 527
2. Mangcamagong 1,400 100 1,400
3. Matoogtoog 1,409 100 1,409
4. Hinipaan 1,810 100 1,810
5. Masalongsalong 1,029 100 1,029
6. Pambuhan 2,834 100 2,834
7. Tarum 1,440 100 1,440
8. Colasi 1,643 100 1,643
9. Hamoraon 1,466 100 1,466
10. Lalawigan 1,630 80 1304
11. Lanot 1,208 70 846
Total 16,923 15,708
Number of HH 3,385 3,142
Population of 47,674
Mercedes
Number of 9,959
Households
Population of 542,915
Camarines Norte
Number of 116,728
Households
Barangay Population HH Ave. Annual Ave. Annual Real
Population growth Income Growth
rate (in %) Rate per capita (In
%)
w/in Direct RIA
Bgy X 2,000 400 2.3 % 2%
Bgy Y

Source: ______________________
Provide a short write-up/narrative/explanation for the table
4.1.1.3 Existing vehicular traffic based on Traffic survey results2 and indicating
representative vehicles, passenger occupancy/average load by vehicle type,
average daily trips, and travelled distance.

Type of vehicle plying Number Number of trips per Number of days per
the proposed sub- day week plying the
project proposed sub-project
Public utility jeep 13 3 7
Truck 4 2 6
Motorcycle 60 2 5
Tricycle 25 4 7
Private Vehicle 37 2 5

Table_______ No. _____ Annual Average Daily Traffic in Barangay _______. YYYY

Bgy Existing No. of Average Average Average Observed Average Original


mode of vehicle operating loading no. of transport fares traveled destination
transport units3 days per capacity daily for distance
in the area year trips passenger/cargo
Bgy Motorcycle 10 300 4 6 10/Passenger 5 km Poblacion
X Jeep 2 200 8 2 with cargo 5km to Bgy
P 8/pass Proper

Source: __________________________
Provide short write-up/narrative/explanation for the table
____2 if traffic survey is done along the proposed road site or adjacent existing road. This may be done
thru CLASSIFIED manual count and roadside origin-destination.
____3 Indicate if these vehicles units are based in the area.

4.1.1.4 Transport Prices by Animal/Human Haulers


Table ______ No. Transport Prices by animal/human haulers in bgy. _______, yyyy

Bgy Type of Origin to Transport Transport Price Ave. Loading


Animal Destination Distance4 Capacity
Bgy. X Carabao From Farm to 0.500 Km P 20/sack 3 sacks
nearest bgy
road

Source:_______________________________
__4 Either from barangay center or production area to market along major/passable road
Provide a short write-up narrative/explanation for table

4.1.1.5 Commuter Time Savings

Table ______ No. Average Travel Time of Communters in Bgy ________,YYYY

Bgy Travel time Travel time No. of trips No. of %Share of Average
Without With Project per person Working saved time Daily Wage
project (from per day days for work Rate
(from destination
destination and back, in
and back, in minutes)
minutes)
Bgy. X 30 15 2 260 50 % P 200.00

Source: _____________________________
Provide a short write-up narrative/explanation for table

4.1.1.5.1 Savings in Reduction in the Frequency and Severity of Accidents

Table _______ No. Frequency and Severity of accidents in Bgy., YYYY

Bgy. No. of Cost of Share of people Number of Cost of Medical


Reported Physical injured days injured Treatment
Vehicular Damages person id
Accidents per hospitalized
year
Bgy X 55 Php 5,000 1.5 % 6 Days Ph. 2,000
Source: _____________________________
Provide a short write-up narrative/explanation for table

4.1.2 Economic Cost


4.1.2.1 Capital Cost and O & M Cost Breakdown
4.1.2.1.1 Show O and M Cost Breakdown
4.1.2.1.2 Provide a short write-up/narrative/explanantion
4.2 Direct Jobs from Construction5
4.2.1 Number of unskilled labor to be hired
4.2.2 Number of Skilled labor to be hired
_____5 Based on Detailed Estimates in the program of Works
Provide a short write-up narrative/explanation for table

4.2.3 Adjustment of Financial Values to Economic Terms


Provide a short write-up narrative/explanation for table (See Table____)

The economic value of materials and equipment are computed by adding the base cost (POW
shown Cost) and OCM. Here the tax and contractors profit are excluded since tax goes back to
society in the form of basic services while contractors profit returned to society in the form of
employment, thus, already benefited society. Considering them in the computation for economic cost will
be a double counting of benefit to society.

On the other hand, the economic value of unskilled labor is computed by using shadow wage
factor of 0.6. This is so, since the demand for unskilled labor is low compared to supply. There is a great
supply of unskilled labor compared to the demand for it, thus, a shadow wage factor less than 1.0.
Moreover, the shadow wage factor for skilled labor is 1.0, with great demand by the society. Foreign
exchange conversion to economic cost uses a conversion factor of 1.20. The value of imported goods
to society is greater than 1.0.

Foreign exchange conversion factor : 1.2


Skilled Labor shadow wage factor : 1.0
Unskilled labor shadow wage factor : 0.6

4.2.4 Result of Economic Analysis


Present and discuss EIRR, NPV and BCR results

4.2.5 Economic Sensitivity Results

4.2.5.1 Present and discuss results of sensitivity analysis


4.2.5.2 Describe if project is robust.