Philippine Society of United Master Plumber (PSUMP)

LECTURE ON:

ARCHT. FLYNN B. ARANA, UAP, RMP


2nd Placer, Feb. 1993 Master Plumber Exam
PSUMP – Vice President for Training
SUMMARY RESUME OF ARCHT. FLYNN B. ARANA, UAP, RMP, ASPE, MEFP
Registered and Licensed Architect – PRC No. 10569, UAP No. 5969
• Passed Board of Architecture – January 1991
• President – UAP MANILA LA SOLIDARIDAD CHAPTER 2013-2014
Registered Master Plumber – PRC No. 2104, NAMPAP No. QC-R12-23
• Passed the Board of Master Plumbers – February 1993 – 2nd Placer
• Past President – Pro-Change NAMPAP Quezon City Chapter 2013
• Interim President – PSUMP Metro Manila North
Certified Fire Safety Practitioner – by Bureau of Fire and UAP
Master Plumber Board Review - JPT, CTP, Bauhaus and MEPF Review Center Lecturer
Mapua Institute of Technology – School of Architecture Graduate March 1989
MITROTCU – Corps Commander Class 1987
MCMTC 4TH CMTG – Gold Medal for Leadership Award 1987-GEN FIDEL V RAMOS AFP
CMT 43 (P2LT) – AFPGCT Top Notcher – Probationary 2nd Lieutenant, PA, Batch 1987
AFP Commissioned Officer - CAPTAIN AFPSN O-128476 PA (RES)

Affiliations and Organizations:


ASPE (American Society of Plumbing Engineers) Member – March 2014
• MITSCAAI (MIT Sword & Castle Alumni Asso. Inc. ) – Vice President 2013-2015
PSUMP (Phil. Society of United Master Plumber) National Board of Director -2013
• NAMA (National Association of Mapua Alumni) – MITSCAAI – Past Affiliate Director
• AHMA (Aguinaldo High Manila Alumni ) Association Worldwide, Inc. –PP Interim
• Rotary Club of Kalakhang Katipunan, District 3780– Past Centennial President –2004
• ARESCOM (Army Reserve Command), PA, AFP, Taguig 131st Company Commander
 Plumbing General Notes and Specification
 Plumbing Symbols and Abbreviations
 Plumbing Fixtures Schedules
 Septic Tank, Cistern and Catch Basic Plans & Sections
 Soil, Waste, Vents and Drainage System Layout Plans
 Cold Water Line Layout Plans
 Isometric Drawings of DWV & CWL System
 Bill of Material Quantities w/ Labor
 Plumbing Materials Specifications
 Plumbing Permit Application Forms
 All documents must be signed and sealed by a
licensed and Registered Master Plumber.
 Soon to be implemented: Plumbing design
computations.
OTHER DETAILS:
OTHER DETAILS:
OTHER DETAILS:
OTHER DETAILS:
1. Sizing of Service Pipe Connection and Supply Pipe
2. Sizing of Overhead Tank
3. Sizing of Cistern Tank
4. Sizing of Hot Water Storage Tank
5. Pump Horse Power computation and Riser Pipe
Diameter
6. Sizing of Septic Tank
7. Sizing of Branch Pipe and Soil Stack pipe
8. Sizing of Sanitary House Sewer Drain Pipe
9. Sizing Branch Vent and Vent Stack for Residential
10. Sizing of Gutter, Roof Leaders (Int.) or Downspouts
(Ext.)
11. Sizing of Storm Drain Pipe
Service Pipe connection:
Table 1: Fixture Unit Values:
Table 2: PROBABLE DEMAND OF WATER:
1. Computation of Fixture Units of a Household:

Determine the maximum and the probable demand of water for the
following fixtures installed:

Water closet – 7, Lavatory- 7, Shower / Bathtub – 7, Kitchen sink-1,


Bar Sink – 1, Laundry sink –1. What size of the service pipe is
required to serve the above fixtures?

SOLUTION:

Solving for the fixture units as base on the given above using
the table:

Water closet 7 sets x 6 F.U. = 46


Lavatory 7 sets x 2 F.U. = 14
Shower 7 sets x 2 F.U. = 14
Kitchen sink 1 set x 2 F.U. = 2
Bar sink 1 set x 2 F.U. = 2
Laundry sink 1 set x 2 F.U. = 2

Total = 80 Fixture Units


Compute for the Maximum Demand:

80 F.U. X 8 Gals. = 640 Gals

Referring to the Table of Probable Use:

80 F.U. is above 50 Fixture Units or More & between 10% to 25%

Assume that 10% is safe for 80 Fixture Units, Therefore;

640 Gals x 10% = 64 Gals per Minute.

Refer to Table below:

for a 25 mm ( 1” ) inside diameter of pipe in 6.00 meter


length with 133 Newton pressure the size of 25 mm
( 1” ) diameter could supply water of 70 Gals.
Per minute (GPM).
Table 3: Pipe Sizing
Continuation:
Continuation:
TABLE 4: CONSUMPTION AND PEAK DEMAND OF EVERY OCCUPANT:

Consumption per Peak demand Storage per


occupant per occupant occupant
Type of building
liter/day gal/day liter/hr gal/hr liter gal

Factories (no
22 - 45 5 - 10 9 2 5 1
process)
Hospitals, general 160 35 30 7 27 6
Hospitals, mental 110 25 22 5 27 6
Hostels 90 20 45 10 30 7
90 -
Hotels 20 - 35 45 10 30 7
160
90 -
Houses and flats 20 - 35 45 10 30 7
160
Offices 22 5 9 2 5 1
Schools, boarding 115 25 20 4 25 5
Schools, day 15 3 9 2 5 1
TABLE 5: Building Type and Gallons per Occupant:

Storage per occupant


Type of building
liters gal
Factories (no process) 10 2
Hospitals, per bed 135 30
Hospitals, per staff on duty 45 10
Hostels 90 20
Hotels 135 30
Houses and flats 135 30
Offices with canteens 45 10
Offices without canteen 35 8
Restaurant per meal 7 1.5
Schools, boarding 90 20
Schools, day 30 7
2. OVERHEAD TANK SIZING COMPUTATION:
DETERMINE THE QUANTITY OF THE PERSONS LIVING IN THE
HOUSE:

DESIGN CRITETIA:
SAY; 10 PERSONS MULTIPIED BY 30 GALS / PERSON
= 300 GALS.
ADD: 1/3 FOR RESERVE, SO;
= 300 GALS + 100 GALS = 400 GALS.

AS PER TABLE BELOW UNDER CYLINDRICAL TANK CAPACITY,


THE SIZE OF THE CYLINDER TANK UNDER 396 GALS CAP.
IS;
LENGTH=1.65 MTRS X DIAMETER = 1.05 MTR.

3. TO COMPUTE FOR THE CISTERN;

JUST MULTIPLY THIS BY 2 OR MORE OR ASK YOUR CLIENT.


THEREFORE; 400 GALS. X 2 = 800 GALS.
THE SIZE OF THE RECTANGLE CISTERN SHALL BE;
WIDTH = 9 FT X LENGTH =10 FT & 6 INCHES X 1 FT.
OF HEIGHT.
TABLE 6: FOR SIZING OF OVERHEAD TANK:
TABLE 7: FOR SIZING OF CISTERN TANK:
PUMP AND PRESSURE TANK CONNECTION:
PUMPS FOR HIGH RISE BUILDINGS:
TABLE 8: FOR SIZING OF PRESSURIZE TANK:
TABLE 9: FOR SIZING CYLINDRICAL HOT WATER STORAGE IN INCHES:
Hot-Water Storage Capacity (Gallons)
Tank Length (ft)
Tank
Diamet
er
(inches 1 2 3 4 5 6 7 8 9 10
)

20 16 32 48 66 82 98 114 131 147 163


22 20 40 60 80 100 120 140 160 180 200
24 24 48 72 96 120 144 168 192 216 240
30 37 74 110 147 184 220 257 294 330 367
36 53 106 159 212 265 317 370 423 476 529
42 72 144 216 288 360 432 504 576 648 720

4. In sizing Cylindrical Hot Water Storage Tank. In order to serve a total of


10 persons, therefore;
10 persons x 10 Gals. Of water = 100 Gals. Multiply by 35% = 100 Gals x
0.35 = 35 Gals. Refer to table above, it is under 37 Gals.
Therefore use 2 Ft. x 30 inches Tank. Air space is not included.
TABLE FOR BOILER TANK PER PERSON CONSUMPTION:
FORMULA:
5. FORMULA ON HOW TO COMPUTE HORSE POWER OF THE PUMP:

Therefore; Use 0.50 hp booster pump and 25 mm dia. Riser pipe.


DWV LAYOUT
FORMULA IN SIZING DIGESTIVE CHAMBER:
TABLE 10: FOR SIZING SEPTIC TANK DIGESTION CHAMBER:

6. SIZING OF SEPTIC TANK FOR RESIDENTIAL:


For Residential places such as Condos; volume per person shall be 0.14 to 0.17 cu.m.
of liquid per person, however, Single Dwelling that has 10 person serve, refer to table above,
the size of the digestive tank is D = 1.20 x W = 0.90 x L = 1.80 meters.
TABLE 11: SIZING THE BRANCH PIPE AND SOIL STACK PIPE:
7. SIZING OF BRANCH PIPE AND SOIL STACK PIPE:

TAKE NOTE:
75 MM DIAMETER ( 3”) BRANCH PIPE CAN CARRY DISCHARGE
FROM A MAXIMUM OF THREE ( 3 ) WATER CLOSETS AND ABOUT 3
BRANCHES OF SOIL AND WASTE PIPE CAN
CONNECT TO SOIL STACK IN SAME DIAMETER.

IN THE DESIGN GIVEN, ONLY TWO WATER CLOSETS ARE


CONNECTED TO SOIL-WASTE BRANCH PIPE.

COMPUTE FOR THE TOTAL FIXTURE UNITS IN ONE OF THE BRANCH


PIPE SHOWN:

2 WATERCLOSETS X 6 F.U. = 12 F.U. OR 3 WCLOSET X 6 F.U. = 18 F.U.


2 LAVATORIES X 2 F.U. = 4 F.U.
2 SHOWERS X F.U. = 4 F.U.
20 F.U. ONLY

REFERRING TO TABLE ABOVE:


20 FIXTURE UNITS IS UNDER 75 MM ( 3”) DIA.
THEREFORE SPECIFY 75 MM DIA. SOIL-WASTE BRANCH PIPE
TABLE 12: FOR SIZING THE SANITARY OR HOUSE SEWER DRAIN:
SANITARY DRAIN DEFINITION:
8. SIZING OF SANITARY OR HOUSE SEWER DRAIN PIPE:

COMPUTE FOR THE SANITARY HOUSE DRAIN PIPE:


AS SHOWN IN THE PLANS:

Water Closet - 7 sets x 6 f.u. = 42 f.u.


Lavatory - 7 sets x 2 f.u. = 14 f.u.
Shower - 7 sets x 2 f.u. = 14 f.u.
Kitchen Sink - 1 set x 2 f.u. = 2 f.u.
Bar Sink - 1 set x 2 f.u. = 2 f.u.
Laundry Sink - 1 set x 2 f.u. = 2 f.u.
Total Fixture Units = 76 f.u.

THEREFORE:

Referring to Table to determine the Size of Sanitary Drain


Under 2% Slope…for 96 f.u. the approve pipe size is 100 mm (4”)
Diameter.
TABLE 12: FOR SIZING VENT STACK AND BRANCH VENT PIPE:

9. IN SIZING BRANCH VENT AND VENT STACK PIPES FOR RESIDENTIAL, JUST
DIVIDE THE SIZE OF DRAINAGE PIPE TO BE VENTED. BUT SINCE 1-1/2 “ DIA. PIPE
IS NOT AVAILABLE IN PVC, THEREFORE USE 2” DIA. PIPE FOR VENTS.
TABLE 13: ROOF LEADER AND GUTTER SIZING:
ROOF LEADERS OR DOWNSPOUT:
10. SIZING ROOF LEADERS OR DOWNSPOUT:

DETERMINE THE SIZE OF THE ROOF:

FIRST IDENTIFY THE TYPE OF THE ROOF WHETHER IT IS FLAT ROOF,


GABLE ROOF OR HIP ROOF.

IN THE ROOF DESIGNED FOR THIS PROJECT, THE TYPE IS HIP ROOF.
THIS TYPE OF ROOF HAS FOUR SLOPES DOWN TO EACH SIDE.

IF THE TOTAL ROOF TRIBUTARY AREA IS 280 S.M. FOR EASY


COMPUTATION THEREFORE:
HAVING DIMENSIONS OF (14 M. X 20 M.) THE LONGEST DIMENSION IS
(20.00 +6.00) / 2 X 7.00 = 91 S.M. LONGEST SIDE, WITH 49 S.M. ON
EACH SHORTER SIDE.

REFERRING UNDER THE GIVEN TABLE ABOVE “ROOF LEADER”


95 S.M. IS BETWEEN 76 TO 165 S.M. , AND HAS 125 MM WIDTH
GUTTER OPENNING AND 90 MM DIA. DOWNSPOUT PIPE.

SO PUTTING 2 OR MORE DOWN SPOUTS OF 75 MM DIA. IN ONE SIDE


IS SAFE FOR BACKFLOW.
TABLE 13: FOR SIZING OF STORM DRAIN PIPE:
11. SIZING OF STORM DRAIN PIPE:

TO DETERMINE THE SIZE OF THE STORM DRAIN, COMPUTE FOR THE


TOTAL FLOOR AREA OF WHERE THE DRAIN HAS TO BE PUT ON.

IN THE DESIGN PRESENTED, THE LOT IS CUT TO TWO, IT HAS UPPER


GROUND AND LOWER GROUND.

THAT MEANS IF THE LOT IS 390 S.M. JUST DIVIDE IT BY TWO,


AND YOU HAVE NOW A REFERENCE OF 195 S.M. PER AREA.

REFERRING TO STORM DRAIN TABLE ABOVE:

195 S.M. IS BELOW 242 S.M. UNDER 2% SLOPE,


THEREFORE; USING 4” (100 MM) DIA. PIPE IS SAFE FOR STORM DRAIN.

Note: All what is indicated on the table are in Minimum, that means,
we can always use the next higher diameter of pipe.
COLD WATER LINE PIPES AND FITTINGS:
(GALVANIZED IRON PIPE)
COLD WATER LINE FITTINGS:
SOIL, WASTE, VENTS, DRAINAGE PIPES AND FITTINGS:
(CAST IRON PIPES)
PVC PIPES AND FITTINGS
BILL OF MATERIALS AND LABOR:
PROJECT: PROPOSED TWO STOREY W/ ATTIC & BSMT

Location: 3 Miguel St. Mt. Carmel II Subd., Project 6, Quezon City

Owner: Cherry Mae L. Paez

Date: June 4, 2011

RE: PLUMBING BILL OF MATERIALS & LABOR

Item No. Description Unit Qty Unit Cost Amount

I PLUMBING WORKS: PHP 724,388.35

1.00 Sanitary lines, Crown pipes, Series 1000 315,597.12

PVC cleanout, 4 dia pcs 10 207.90 2,079.00

PVC cleanout, 2 dia pcs 4 160.65 642.60

PVC wye, 4 x 3 dia. pcs 4 185.22 740.88

PVC wye, 4 x 4 dia. pcs 16 198.45 3,175.20

PVC wye, 2 x 2 dia. pcs 6 139.86 839.16

PVC P-trap, 2 dia. pcs 12 132.30 1,587.60

PVC wye, 4 x 2 dia. pcs 24 170.10 4,082.40

PVC Wye, 4 x 3 dia. pcs 6 189.00 1,134.00


PVC elbow, 1/4 bend, 4 dia pcs 52 122.85 6,388.20

PVC elbow, 1/8 bend, 4 dia pcs 40 117.18 4,687.20

PVC elbow, 1/4 bend, 2 dia pcs 28 43.47 1,217.16

PVC coupling, 4 x 4 dia pcs 24 151.20 3,628.80

PVC coupling, 3 x 3 dia pcs 45 113.40 5,103.00

PVC coupling, 2 x 2 dia pcs 28 56.70 1,587.60

PVC sanitary tee, 4 x 4 dia. pcs 4 43.47 173.88

PVC tee, 2 x 2 dia. pcs 12 71.82 861.84

PVC Wye, 3 x 3 dia. pcs 4 151.20 604.80

PVC pipe, 2" dia x 3m. pcs 56 415.80 23,284.80

PVC pipe, 3" dia x 3m. pcs 10 661.50 6,615.00

PVC pipe, 4" dia x 3m. pcs 36 770.00 27,720.00

Concrete pipe 300" dia w/ mortar and cement pcs 60 2,012.50 120,750.00

Solvent Cement, 400 cc can 20 323.75 6,475.00

Pipe Jointing Epoxy gal 3 2,537.50 7,612.50

Hacksaw Blade pcs 10 195.75 1,957.50

Catch basin ( 0.50 x 0.50 x 0.60 mtrs.) sets 9 1,701.00 15,309.00

Septic tank ( 1.20 x 2.40 x 1.50 mtrs.) lot 1 67,340.00 67,340.00

2.00 Water line, PPR PN-20, Fushion Type 145,331.58

PPR PIPE 1/2" x 4.00 m. pcs 33 498.75 16,458.75

PPR PIPE 3/4" x 4.00 m. pcs 18 1,400.00 25,200.00


2.00 Water line, PPR PN-20, Fushion Type 148,180.00
PPR PIPE 1/2" x 4.00 m. pcs 33 510.00 16,830.00
PPR PIPE 3/4" x 4.00 m. pcs 18 1,400.00 25,200.00
PPR PIPE 1" x 4.00 m. pcs 10 1,925.00 19,250.00
COUPLING 1/2" dia. pcs 40 115.00 4,600.00
COUPLING 3/4" dia. pcs 25 455.00 11,375.00
COUPLING 1" dia. pcs 14 770.00 10,780.00
COUPLING REDUCER 32-20 pcs 8 300.00 2,400.00
CAP 1/2" dia pcs 37 25.00 925.00
EQUAL ELBOW 90 DEG 20 pcs 60 28.00 1,680.00
EQUAL ELBOW 90 DEG 25 pcs 30 38.00 1,140.00
EQUAL ELBOW 90 DEG 32 pcs 12 65.00 780.00
EQUAL TEE 20 pcs 24 30.00 720.00
EQUAL TEE 25 pcs 10 45.00 450.00
STRAIGHT FEMALE ADAPTER 20 X 1/2" pcs 24 220.00 5,280.00
STRAIGHT FEMALE ADAPTER 25 X 1/2" pcs 10 225.00 2,250.00
PLASTIC PIPE CLAMP 25 pcs 70 15.00 1,050.00
PLASTIC PIPE CLAMP 32 pcs 30 20.00 600.00
UNION PATENTE 1" dia. pcs 6 1,330.00 7,980.00
STOP VALVE 20 pcs 14 630.00 8,820.00
STOP VALVE 25 pcs 3 860.00 2,580.00
STOP VALVE 32 pcs 1 1,540.00 1,540.00
CHECK VALVE 32 pc 1 1,680.00 1,680.00
Tapelon Tape 1/2" pcs 40 30.00 1,200.00
PPR TOOL 020-063 set 1 10,400.00 10,400.00

3.00 Plumbing Fixtures installation 275,870.00


Bathtub (OSM) unit 1 910.00 910.00
3.00 Plumbing Fixtures installation 276,889.00
Bathtub (OSM) unit 1 910.00 910.00
Water closet tank type (OSM) unit 11 800.00 8,800.00
Kitchen sink w/ faucet (OSM) unit 2 650.00 1,300.00
Faucets (OSM) unit 7 180.00 1,260.00
Lavatory, (OSM) unit 10 650.00 6,500.00
Lavatory faucet (OSM) pcs 10 220.00 2,200.00
Shower (OSM) sets 12 750.00 9,000.00
Water heater tank (OSM) sets 2 4,500.00 9,000.00
Angle Valve, 1/2" dia. pcs 25 350.00 8,750.00
Flexible Supply pipe hose, 1/2 dia pcs 8 275.00 2,200.00
Flexible Supply pipe hose, 3/8 dia pcs 10 250.00 2,500.00
Gutter Strainer, pcs 9 440.00 3,960.00
Floor Strainer, Brass 4" x 4" pcs 19 841.00 15,979.00
Floor Strainer, Brass 6" x 6" pcs 2 1,750.00 3,500.00
Lavatory P-trap, brass, 1-1/4" dia pcs 13 550.00 7,150.00
Teflon Tape, 1/2" pcs 60 30.00 1,800.00
Sealant pcs 14 320.00 4,480.00
Pressure tank 80 gals. cap.Stainless sets 1 68,000.00 68,000.00
Booster pump 1HP w/ pressure switch sets 1 49,500.00 49,500.00
Float Valve sets 2 1,800.00 3,600.00
Cistern (1.20 x 1.20 x 1.20 m.) lot 1 66,500.00 66,500.00

II GENERAL REQUIREMENTS PHP 58,000.00


1 Mobilization / demobilization lot 1 10,000.00 10,000.00
2 Temfacil lot 1 30,000.00 30,000.00
3 Power & Water supply lot 1 12,000.00 12,000.00
4 Clearing works lot 1 6,000.00 6,000.00

III SUB-TOTAL PHP 803,587.00


IV EVAT 96,430.44
V GRAND TOTAL COST 900,017.44
Prepared by:

ARCHT. FLYNN B. ARANA, UAP, RMP


Plumbing Designer/ Contractor
ARCHIPHILS, CO.
24-Oct-13

PROJECT : PROPOSED Townhouse Renovation (PLUMBING)

Location: Prime Townhouses, St. Paul Street, San Antonio Village, Makati City

TO: ARCHT. MANNY HERMANO + ARCHT. EDGAR LEE Design

PLUMBING MATERIALS & LABOR

SCOPE OF WORKS: QTY UNIT MATERIAL LABOR UNIT COST TOTAL COST

GENERAL REQUIREMENTS 12,000.00

Mobilization 1 lot 3,000.00 3,000.00 3,000.00

Demobilization 1 lot 2,000.00 2,000.00 2,000.00

Plumbing Design and Seal 1 lot -

Plumbing Permit (N.I.C.) 1 lot - -

As-built plans 1 lot 7,500.00 7,000.00 7,000.00

SITE WORKS SUB TOTAL 45,000.00

Removal of Existing soil pipe and water lines including pressure pump and bladder tank. 1 lot 5,000.00 8,000.00 8,000.00

Chipping, Drilling Works 1 lot 8,000.00 10,000.00 10,000.00

Re-plastering of chipped walls and flooring 1 lot 7,000.00 8,000.00 15,000.00 15,000.00

Hauling of Unsuitable debris 1 lot 6,000.00 12,000.00 12,000.00

SOIL, WASTE & VENTS, Crown Pipe, S-1000 SUB TOTAL 89,875.00

PVC PIPES

100 mm Dia. X 3.00 mtrs. 8 pcs 580.00 300.00 880.00 7,040.00

50 mm Dia. X 3.00 mtrs. 22 pcs 310.00 150.00 460.00 10,120.00

ELBOWS 1/8 Bend - -

100 mm Dia 6 pcs 110.00 60.00 170.00 1,020.00

50 mm dia. 12 pcs 35.00 20.00 55.00 660.00

ELBOW 1/4 BEND

100 mm Dia. 8 pcs 120.00 60.00 180.00 1,440.00

50 mm Dia. 28 pcs 35.00 20.00 55.00 1,540.00

LONG SWEEP ELBOW

100 mm Dia. 4 pcs 220.00 110.00 330.00 1,320.00

SANITARY TEE - -

100 mm Dia. 5 pcs 190.00 90.00 280.00 1,400.00

50 mm Dia. 9 pcs 60.00 30.00 90.00 810.00

TEE

50 mm dia 10 pcs 60.00 30.00 90.00 900.00

WYE

100 mm Dia. 8 pcs 210.00 110.00 320.00 2,560.00

50 mm Dia. 6 pcs 55.00 30.00 85.00 510.00

WYE Reducer

100 mm x 50 mm Dia. 10 pcs 220.00 110.00 330.00 3,300.00

COUPLING

100 mm Dia 8 pcs 80.00 40.00 120.00 960.00

50 mm Dia. 24 pcs 25.00 15.00 40.00 960.00

COUPLING Reducer

100 mm x 50 mm Dia 5 pcs 110.00 60.00 170.00 850.00


P-TRAP

2" Dia. P-Trap 12 pcs 120.00 70.00 190.00 2,280.00

1-1/2" Dia. P-Trap 10 pcs 115.00 55.00 170.00 1,700.00


PLUG

100 mm Dia 5 pcs 80.00 35.00 115.00 575.00

50 mm Dia 5 pcs 60.00 30.00 90.00 450.00


Adhessive

Solvent Cement, 400 cc 6 can 480.00 200.00 680.00 4,080.00

Epoxy 3 sets 800.00 450.00 1,250.00 3,750.00


OTHERS pcs

Clean Out, 4" PVC 6 pcs 900.00 370.00 1,270.00 7,620.00

GreaseTraps, SS, 7 GPM 2 sets 11,000.00 2,000.00 13,000.00 26,000.00

Floor Drain, 4" x 4" Brass fin, SS 11 kgs 350.00 200.00 550.00 6,050.00
HANGERS

100 mm dia Clamp w/ Rod and Metal Screw & Tox 12 sets 165.00 80.00 245.00 2,940.00

Water lines, IPS PPR PN-20, Spurway SUB TOTAL 80,853.00

PIPES - -

25 mm Dia. x 4.00 mtrs. (External dia.) 4 Lengths 580.00 240.00 820.00 3,280.00

20 mm Dia. x 4.00 mtrs. (External dia.) 32 Lengths 380.00 160.00 540.00 17,280.00

TEE Equal - -

25 mm Dia. 6 pcs 53.00 22.00 75.00 450.00

20 mm Dia. 26 pcs 40.00 18.00 58.00 1,508.00


ELBOW Equal

25 mm Dia. 10 pcs 47.00 20.00 67.00 670.00

20 mm Dia. 56 pcs 29.00 13.00 42.00 2,352.00


COUPLING

25 mm Dia. 5 pcs 35.00 15.00 50.00 250.00

20 mm Dia. 30 pcs 25.00 10.00 35.00 1,050.00


REDUCER TEE

25 mm x 20 mm Dia. 2 pcs 104.00 45.00 149.00 298.00


REDUCER COUPLING

25 mm x 20 mm dia. 2 pcs 43.00 19.00 62.00 124.00


CAP

20 mm Dia. 20 pcs 32.00 14.00 46.00 920.00

25 mm Dia. 1 pcs 34.00 15.00 49.00 49.00


TEE FEMALE THREAD

20 mm dia 18 pcs 290.00 130.00 420.00 7,560.00


STRAIGHT FEMALE ADAPTER

25 mm Dia. 4 pcs 750.00 200.00 950.00 3,800.00


NIPPLE

1/2" Dia. X 100 mm 18 pcs 150.00 65.00 215.00 3,870.00

3/4" Dia. X 100 mm 1 pcs 180.00 80.00 260.00 260.00


OTHERS

1/2" dia. Flexible hose 14 pcs 140.00 63.00 203.00 2,842.00

Angle Valve 1/2" dia. 14 pcs 270.00 110.00 380.00 5,320.00

Teflon Tape 40 Rolls 12.00 6.00 18.00 720.00

Fushion Welding Machine 1 lot 2,500.00 600.00 3,100.00 3,100.00


HANGERS

25 mm dia Clamp w/ Metal Screw & Tox 40 sets 150.00 65.00 215.00 8,600.00
GATE VALVE / Check Valve

Gate Valve 25 mm dia. 3 sets 750.00 250.00 1,000.00 3,000.00

Gate Valve 20 mm dia. 8 sets 600.00 200.00 800.00 6,400.00

Check valves 25 mm dia. 3 sets 800.00 250.00 1,050.00 3,150.00


PUMP AND BLADDER INSTALLATION

Existing pump (to be re-used). 1 lot 1,500.00 1,500.00 1,500.00

Existing bladder tank (to be re-used). 1 lot 2,500.00 2,500.00 2,500.00


PLUMBING FIXTURES INSTALLATION (OSM) SUB TOTAL 15,400.00

Water Closet with Tank 5 sets 800.00 800.00 4,000.00

Bidet Hose type 5 sets 400.00 400.00 2,000.00

Shower w/ Mixing Valve 4 sets 800.00 800.00 3,200.00

Lavatory, complete w/ faucet 5 sets 800.00 800.00 4,000.00


Bathtub, complete w/ faucet 1 sets 800.00 800.00 800.00

Kitchen Sink w/ Faucet 2 pcs 600.00 600.00 1,200.00


Hosebibb 1 pc. 200.00 200.00 200.00
DIRECT COST (LABOR & MATERIALS) SUB TOTAL 243,128.00
INDIRECT COST TOTAL PHP 43,763.04
OVERHEAD , SUPERVISION & PROFIT 36,469.20

CONTINGENCY 7,293.84
EVAT
GRAND TOTAL PHP 286,891.04
AMOUNT IN WORDS: TWO HUNDRED EIGHTY-SIX THOUSAND AND EIGHT HUNDRED NINETY-ONE & 04/100 PESOS ONLY.
Note: Hot and cold potable water system was considered in the design. Heated water shall be coming from the
solar panel above roof, supplied from the existing over head water tank to be re-used.
General Conditions and Mode of Payments:
1. Water and Electric Consumption shall be borne by the Owner/Client.
2. Existing soil stock pipe , vent stock, and house sewer line shall be re-used.
3. Existing downspouts, gutters, and drainage system shall be re-used.
4. New water line system shall be tapped to existing water meter.
5. Solar water heater and its system shall be done by other trade contractor, including expose copper pipe.
6. Other items that are not mentioned in this breakdown shall be charged separately if requested,
shall be agreed and approved upon by the Owner/ Client and the Plumbing Contractor.
7. OSM-Owner supplied Materials.
8. Down payment shall be fifty (40 %) of the Contract Price. Balance shall be in progress Billing.
9. Duration of plumbing installation shall not exceed on the General contractor's Project Schedule.
10. VAT is not included in this proposal.

Prepared by: Conforme:

Archt.
Manny
ARCHT. FLYNN B. ARANA, UAP, RMP Hermano

Principal
Master Plumber Architect
Design and Build-Plumbing Contractor
FRONT OF PLUMBING PERMIT FORM
BACK OF PLUMBING PERMIT FORM
Basic knowledge as Professional:
Securing PTR-Professional Tax Receipt:
 Beginner – Present your Master Plumbers PRC I.D. Together with
 duplicate to the City Treasurer’s Office for Professional Tax
 Renewal – Just present your OLD PTR to the same window (Orig.)
 When? – Every January of each year. If late surcharge per month
 of delay will be added.
 Note: DO NOT LOSE the Original, and/or the rest of your PTR
 Official Receipt/s,
 Why? – Because if you do, you will start from the beginning again.
 How if I pass the board ten years ago before I secure my PTR?
 Answer: Cost of PTR per year (Current) multiply by Ten years,
 that is how much you will pay the Treasurer’s Office.
 Always Secure Residence Certificate for employed (Cedula ).
Signing Plumbing Permit Forms:
 Always SIGN the upper box intended for the Plumbing Designer.
 If not the in-charge of the project, Do Not Sign the lower box. But,
it can be negotiated and that is another fee for you.
How to charge your Client based on the Project Plumbing
Cost for your Professional Design Services fee:

For Plumbing Design Services:


1. Compute a Probable Plumbing Cost of your Project.
2. Make your Own Standard Average Costing Per Toilet , Kitchen,
Septic Tank, Cistern and other appurtenances per size of structure
for you could easily come up to your “Ball Park Figure”.
3. Then apply the available Table of Fees under Plumbing Uniform Rate
approved and implemented on March 4, 2001 by NAMPAP & BOMP.
4. Then now You would know how much Professional Fee you are going
to charge your Client.

Sample Computation for Design Fee:


1. Say: Project Cost determined by “Ball Park Figure” is:
PHP 1,000,000.00
Under Plumbing Uniform Rate: for 2%
============
Professional Fee PHP 20,000.00

Note: Is this Fee commensurate to your job? Will you not supervise your
design? This Worth will run for 6 to 8 months project duration.
Sample Computation for Purely Sign and Seal Services:
For a Two Storey Residential with 7-Water closets, 7-Showers,
7-Lavatories, 1-Kitchen Sink, 1-Laundry Sink, 1-Bar Sink, 3-Faucets
1-Water Meter.

 Based on the Given Uniform Rate: First Plumbing Unit will be


charged of P 500.00 / Unit. And succeeding Plumbing Unit say;
an additional of Water Closet, Urinal, Shower and so on will
be charged of P 200.00 / unit.
 Now, Based on the given Plumbing Units above you have:
28 Unit of Plumbing Fixtures.

 Computation:
First Plumbing Unit 1 Unit x P 500.00 / unit = P 500.00
Succeeding Units 27 Units x P 200.00 / unit = P 5,400.00
=======
P 5,900.00

Plus:
Signing for the Project In-charge: P 1,500.00
=======
Total Master Plumber’s Professional Fee: PHP 7,400.00
“Need to Revisit for Revision:”
Computation for Plumbing Design Fee for a Small House:
 A Plumbing Approximate Cost Total P 30,000.00
Below P 250,000.00 4%
========
P 1,200.00
Expenses:
Draftsman’s Fee: P 700.00
Estimate & Specs. 500.00
Plotting: 120.00
Blue Print ( 1 x 6 sets) 72.00
Xerox 20.00
Fare 100.00 P 1,512.00
========
Balance: (Negative) P 312.00
Computation for Sign and Seal only for a Small House:
1-Water Closet, 1-Shower, 1-Lavatory,1-Kitchen Sink, 1-Hosebibb,
 Therefore:
First Plumbing Unit: 1 x P 500.00 / Unit = P 500.00
Succeeding Units: 4 x P 200.oo / Unit = P 800.00
 Plus:
Project In-charge Signing Fee P 300.00
=======
 Total Professional Fee: = P 1,600.00
How to create Owner-Master Plumber Contract Agreement

Contract Content:
Put Clients name and address and Your Name and address.
The name of your project and what is your involvement to the project.
Date of signing.
The Scope of works to the given job.

If Design Services only?


Put your Total Professional Fee, and other fees including mode of
payments from Down Payment, Succeeding Payment and
Final Payment Scheme.

If Design with Installation Services?


Attach the Detailed Bill of Materials and Labor that will serve as
reference for billing purposes and accomplishment report.
And will serve as Total Project Contract Price.
Mode of payment, Down payment with NTP, Balance in Progress Billing.
Other Clause in the Contract is subject between your Agreement to your
Client including force majeure, stoppage of work, delay of payments
and additional works and so on.
Project Duration, Warranty.
Note: Indicate Retention only if your Client looks for it.
June 18, 2013

PROJECT: Proposed Commercial Building


LOCATION: Makati City
ATTENTION:
RE: PLUMBING DESIGN SERVICES

Dear Sir,

We would like to submit our best offer for the Design Services of your Plumbing System both for DWV and CWL for the project mentioned above.
Breakdown of Professional Fees as follows, to wit;

•FOR PLUMBING SYSTEM DESIGN FEE COMPUTATION:


Water Closet 8 P300 2400 Pump 2 500 1000
Urinal 6 200 1200 Cistern 1 500 500
Down Spouts 29 100 2900 Elev. Tank 1 500 500
Lavatory/pantry 8 200 1600 Septic Tank 1 500 500
Floor Drains 38 100 3800 Water Meter 18 100 1800
Catch Basin 33 200 6600 Faucet 5 200 1000
Sub-total 16,500.00 6,300.00

= PHP 23,500.00
•DRAFTING CHARGE: PHP 7,000.00
•PLOTTING , BLUEPRINTING, ZEROX PHP 3,500.00
GRAND TOTAL PHP 34,500.00

CONTRACT AMOUNT: THIRY-FOUR THOUSAND FIVE HUNDRED PESOS only.


MODE OF PAYMENT AND CONDITIONS:
•Upon signing of Contract a down payment of P10,000.00 shall be released.
•Upon submission of final drawings, a fee of P14,000.00 to be released.
•Upon submission of Signed and sealed plans, BOQ and Specs, the balance of P10,500.00 Shall be released.
•If required for site visit, the designer shall be paid of P2,000.00 per site visit within Metro-Manila. Travel expense and accommodation,
shall be borne by the Client-Owner if outside Metro-Manila.
.

Submitted by: Conforme:


Archt. Flynn B. Arana, uap,rmp _______________________________
Principal-Plumbing Designer Name and Signature
August 23, 2013
PROJECT: AMISTAD SPA (DESIGN & PLUMBING INSTALLATION)
LOCATION: 2/F Maybank Tomas Morato St., Quezon City
OWNER: AMISTAD
CONULTANT: ______________________________
RE: THIRD PROGRESS BILLING (Updated)
Dear Sir,
We would like to request for the release of payment for our Third Progress Billing (Updated) f
or the project mentioned above, to wit;

ORIGINAL CONTRACT PRICE: PHP 550,000.00


Accomplishment to Date:
As of August 23, 2013 is NINETY- SIX PT. FORTY-TWO
PERCENT (96.42 %) 530,300.00
(See attached Progress Report-4)

DEDUCTIVE:
•Recoupment from the Down Payment:
P 165,000.00 x 96.42 % = P 159,093.00
•First Progress Billing 100,000.00
•Second Progress Billing 130,000.00
•Less Retention (10%) From original contract 55,000.00
SUB-TOTAL : PHP 86,207.00

ADDITIONAL:
•Change Order No. 1(All pipe revisions, additional plumbing fixtures) P 23,493.00
•Change Order No. 2(Repair works at restaurant, 2 nights) 2,340.00
•Change Order No. 3(Removal of existing fixtures at old spa) 4,875.00
•Change Order No. 4(Repair of pipe hole at restaurant, 1 night) 1,170.00
SUB-TOTAL-2: P 31,818.00
AMOUNT DUE THIS BILLING PHP 118,025.00

•For 2 sets f 1.5 HP Pumps w/ Bladder tank of 24 Gals cap.(Optional) 120,000.00


AMOUNT DUE THIS BILLING:( If with pump) P 238,085.00

Submitted by: CONFORME BY:

Archt. Flynn B. Arana, uap,rmp ___________________


Plumbing Contractor General Contractor
END OF LECTURE
FOR
I hope that you have learned from this lecture in
designing THE PLUMBING SYSTEM for a Two Storey
Residential w/ Lower Ground Building and, preparation
of PLUMBING DOCUMENTS in securing PLUMBING
PERMIT, and PLUMBING PROFESSIONAL FEES
computation for a REGISTERED MASTER PLUMBER.

Maraming Salamat po.

ARCHT. FLYNN B. ARANA, uap, rmp, fsp, mepf


Resource Speaker
BASIC PRINCIPLES
TO CONSIDER IN
PLUMBING DESIGN SYSTEM
IMPORTANT IN PLUMBING SYSTEM:
(ILLUSTRATIONS AND MEANINGS)
VENTILATION:
VENT STACK THRU ROOF:
PROPER SLOPE OF PIPE:
DON’TS IN PLUMBING SYSTEM:
COMPLETE PLUMBING SYSTEM:
END OF LECTURE
FOR BASIC PRINCIPLES IN
PLUMBING SYSTEM
INSTALLATION

ARCHT. FLYNN B. ARANA, uap, rmp, fsp, mepf


Resource Speaker