Download as pdf or txt
Download as pdf or txt
You are on page 1of 23

201mm

CLAMP CONNECTOR
(TAPE)
3-WIRE SECONDARY POWER LINE

SECONDARY RACK

SERVICE
ENTRANCE CAP
19.05mm

POLE CLAMP

19.05mm SS STRAP
1000mm

PHOTO OF HUAWEI F01S200


19.05mm SS STRAP

25mmØ RSC PIPE

1000mm

HUAWEI F01S200
(see photo)
9000mm

Kw-H METER
(usually with cage)

FOC
19.05mm SS STRAP
U-GUARD

1R NEMA 3R
ENCLOSURE PROJECT TITLE
WITH TWIST LOCK
2300mm DETAILED DESIGN OF MOUNTING
19.05mm SS STRAP

HUAWEI F01S200
TEE CONDULET (with RISER POLE)
[NEMA 4]
1000mm
Revision Date

25mmØ RSC PIPE 2.0 11/5/18

GL

OWNER/PROPONENT:

LONG ELBOW 90°


1500mm
PVC PIPE
CONVERGE
I C T S O L U T I O N S I N C.
GROUND ROD 101.6mmØ
COPPER COATED # 99 Reliance Center E. Rodriguez Jr. Ave. (C-5)
5 Ω MAX RESISTANCE CONCRETE BASE Barangay Ugong, Pasig City Philippines
2500 PSI OWNER/PROPONENT:
(see "TOP VIEW A")
CONCRETE
BASE 2500 PSI METRO WORKS
ICT CONSTRUCTION INC.
100 310mm #99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines
500 300
Surveyed/Designed by : Date:
RONALD N. RIMPULA
100 AutoCAD Operator
Checked by : Date:
ALPHA T.MAMANSAG
NCR Design Engr. Head
Noted by : Date:
TOP VIEW
ELEVATION
ALLAN Q. GO
Access Network Head

A Recommended by : Date:
NTS
EDWIN C. MABITAZAN
Planning & Engineering Head

Work Order No. Sheet No.

1 OF 4
201mm

CLAMP CONNECTOR
(TAPE)
3-WIRE SECONDARY POWER LINE
SECONDARY RACK

SERVICE
ENTRANCE CAP
19.05mm

POLE CLAMP

48 INLINE CLOSURE
FIGURE 8 FOC
15m MAINTENANCE 15m MAINTENANCE
LOOP LOOP

19.05mm SS STRAP
25mmØ RSC PIPE
1000mm

FOAM SEALANT

19.05mm SS STRAP

PHOTO OF HUAWEI F01S200


50mmØ IMC PIPE
1000mm

HUAWEI F01S200
BACK OF THE CABINET (see photo)
WHERE IMC TO FMC 9000mm
WILL BE INSTALLED
(see photo)

Kw-H METER
(usually with cage)

FOC INSIDE 50mmØ FMC


ENTERS THRU PORT
(see photo)
1R NEMA 3R
ENCLOSURE
WITH TWIST LOCK
2300mm PROJECT TITLE
19.05mm SS STRAP

TEE CONDULET DETAILED DESIGN OF MOUNTING


[NEMA 4]
1000mm HUAWEI F01S200
(AERIAL)
25mmØ RSC PIPE
Revision Date
GL
3.1 03/19/19
CONCRETE
BASE 2500 PSI

100

CONCRETE BASE 1500mm


500 300
2500 PSI
GROUND ROD (see "TOP VIEW A") OWNER/PROPONENT:
100
COPPER COATED
5 Ω MAX RESISTANCE

TOP VIEW CONVERGE


I C T S O L U T I O N S I N C.
A
# 99 Reliance Center E. Rodriguez Jr. Ave. (C-5)
Barangay Ugong, Pasig City Philippines
50 310mm 50
OWNER/PROPONENT:

METRO WORKS
ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines

Surveyed/Designed by : Date:
RONALD N. RIMPULA
AutoCAD Operator
Checked by : Date:
ALPHA T.MAMANSAG
NCR Design Engr. Head

ELEVATION Noted by :
ALLAN Q. GO
Date:

NTS Access Network Head


Recommended by : Date:
EDWIN C. MABITAZAN
Planning & Engineering Head

Work Order No. Sheet No.

2 OF 4
NOTES
FASTENER 1 1. FACE THE CABINET DOOR TOWARDS SOUTH OR
NORTH IF POSSIBLE. THIS ENSURE THAT THE
CABINET RECEIVES THE MINIMUM SOLAR
RADIATIONS.

2. THE DIAMETER OF THE POLE IS REQUIRED TO BE


BETWEEN 250mm AND 350mm. (WHEN THE CABINET
IS FULLY CONFIGURED, ITS WEIGHT CAN REACH
143kg. THEREFORE, CONSIDER THE THE WEIGHT
BEARING CAPABILITY OF THE POLE WHEN
INSTALLING THE CABINET. THE CABINET CAN BE
INSTALLED ONLY WHEN THE POLE IS ABLE TO
FASTENER 2 SUPPORT THE CABINET.

3. CONFIRM THE INSTALLATION POSITION, AND THEN


INSTALL THE FASTENERS..

4. WHEN THE CABINET WITH THE BATTERY


COMPARTMENT, THE DISTANCE BETWEEN THE
HEXAGON FASTENER IS 942.5mm.
WELD NUT

PROJECT TITLE
FASTENING PARTS ISOMETRIC VIEW
DETAILED DESIGN OF MOUNTING
HUAWEI F01S200 TO A POLE

Revision Date

OWNER/PROPONENT:

CONVERGE
I C T S O L U T I O N S I N C.
942.5 OR 670
# 99 Reliance Center E. Rodriguez Jr. Ave. (C-5)
Barangay Ugong, Pasig City Philippines
OWNER/PROPONENT:

METRO WORKS
ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines

Surveyed/Designed by : Date:
RONALD N. RIMPULA
AutoCAD Operator
Checked by : Date:
ALPHA T.MAMANSAG
NCR Design Engr. Head
Noted by : Date:
ALLAN Q. GO
Access Network Head
Recommended by : Date:
DISTANCE BETWEEN FASTENING PARTS DIMENSION OF HUAWEI CABINET
EDWIN C. MABITAZAN
Planning & Engineering Head

Work Order No. Sheet No.

3 OF 4
DESIGNATION:
SERVICE ENTRANCE SYSTEM: 230V, 1-PHASE, 60Hz
230V, 60Hz, 2 WIRE, SINGLE PHASE CIRCUIT NO.

CIRCUIT BREAKER
ECB 40AT/2P WITH CIRCUIT NO. LOAD DESCRIPTION VA VOLTS AMPERES SIZES OF WIRES
KwHr METER GROUNDING BUS AT AF P KAIC

1 OUTLET 690 230 3 TERMINAL BLOCK 2 - 3.5mm2 x HHW-2+1 - 3.5mm2 x HHW-2 (G) COPPER WIRES
M 2 ETO 4830 RECTIFIER 1296 230 5.63 16 50 2 10 2 - 3.5mm2 x HHW-2

3 BATTERY HEATER 400 230 1.74 TERMINAL BLOCK 2 - 3.5mm2 x HHW-2

4 SPARE 1000 230 4.35 TERMINAL BLOCK 2 - 3.5mm2 x HHW-2


TOTAL 3,386 14.72

ETP4830
RECTIFIER
LOAD 2 ~ _
DC PDU
TERMINAL
BLOCK PROJECT TITLE
OPTIONAL RCD
DECOUPLING (100mA) LOAD 4
MAIN 40 AT/2P COIL 20AT/1P 20AT/1P
OLT 1
POWER DISTRIBUTION LABEL
20AT/1P
OLT 2

GENERATOR 20AT/1P
SPARE
40 AT/2P Revision Date
12AT/1P
TRANSFER SWITCH SPARE

BATTERY BANK
4-RU, 50AH
RCD (50mA)
BATTERY
CONNECTED IN SERIES

OWNER/PROPONENT:

TERMINAL
BLOCK
LOAD 1 CONVERGE
I C T S O L U T I O N S I N C.

# 99 Reliance Center E. Rodriguez Jr. Ave. (C-5)


TERMINAL
Barangay Ugong, Pasig City Philippines
BLOCK
OWNER/PROPONENT:
LOAD 3
METRO WORKS
ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
SURGE PROTECTOR Barangay Ugong, Pasig City Philippines
DEVICE 40KA
Surveyed/Designed by : Date:
RONALD N. RIMPULA
AutoCAD Operator
Checked by : Date:
ALPHA T.MAMANSAG
NCR Design Engr. Head
Noted by : Date:
ALLAN Q. GO
Access Network Head
Recommended by : Date:
EDWIN C. MABITAZAN
Planning & Engineering Head

Work Order No. Sheet No.

4 OF 4
201

201

20

40
127

C
O C
N O
V N PROJECT TITLE
POLE TAG E V
R
G
POLE TAG E
R
· MEASUREMENTS ARE IN MILLIMETER(mm)
G
E
E · LETTERINGS ARE EMBOSSED IN ALUMINUM PLATE
· USE 19.05MM STAINLESS STRAPS ALUMINUM PLATE FOR POLE
· 40mmH X 127mmW X 0.60mm Thickness TAGGING

9000mm Revision Date

7500mm 2 11/22/18

3000mm 3000mm

OWNER/PROPONENT:

CONVERGE
I C T S O L U T I O N S I N C.

# 99 Reliance Center E. Rodriguez Jr. Ave. (C-5)


Barangay Ugong, Pasig City Philippines
GL GL GL GL OWNER/PROPONENT:

METRO WORKS
1500mm ICT CONSTRUCTION INC.
1200mm #99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines

ACTUAL PHOTO Surveyed/Designed by : Date:


RONALD N. RIMPULA
AutoCAD Operator
Checked by : Date:
ALPHA T.MAMANSAG
NCR Design Engr. Head
292 Noted by : Date:
ALLAN Q. GO
310 Access Network Head
Recommended by : Date:
EDWIN C. MABITAZAN
ALUMINUM PLATE TAG ALUMINUM PLATE TAG Work Order No.
Planning & Engineering Head

Sheet No.
POLE 9.0 POLE 7.5
1 OF 1
10000mm MESSENGER WIRE

3-BOLT CABLE
SUSPENSION CLAMP
VARIABLE

DEAD END DEAD END


10000mm MESSENGER WIRE

GUY
TIMBLE

CABLE MESSENGER 3-BOLT GUY CLAMP

PLACE FALSE DEAD END PLACE FALSE DEAD END

HANGER STRAND (6000mm)


8000mm

3-BOLT CABLE
SUSPENSION CLAMP

7 / 1.6mm Gs 3-BOLT GUY CLAMP

LASHING WIRE 1600mm GUY


TIMBLE
CABLE TIES
12192mm POLE 12192mm POLE OR STRAPS CABLE SPACERS
AND STRAPS
CABLE SPACERS CABLE TIES
AND STRAPS OR STRAPS

PROTECTIVE WRAP
MESSENGER WIRE (6000mm)
(OPTIONAL)
(A
SIDE GUYED IN BOTH DIRECTIONS PP 600m
RO m
XIM
AT
ELY
)

7 WAY MICRODUCT

PROJECT TITLE

VARIES

CATENARY DESIGN

Revision Date

STRAND (6000mm)
OWNER/PROPONENT:
CABLE SPACERS CABLE SPACERS
AND STRAPS AND STRAPS
CABLE TIES CABLE TIES
OR STRAPS OR STRAPS CONVERGE
I C T S O L U T I O N S I N C.

# 99 Reliance Center E. Rodriguez Jr. Ave. (C-5)


Barangay Ugong, Pasig City Philippines
OWNER/PROPONENT:

7 WAY MICRODUCT
METRO WORKS
175mm PROTECTIVE WRAP 175mm ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
(OPTIONAL) Barangay Ugong, Pasig City Philippines

Surveyed/Designed by : Date:
RONALD N. RIMPULA
AutoCAD Operator
Checked by : Date:
600mm ALPHA T.MAMANSAG
NCR Design Engr. Head
Noted by : Date:
ALLAN Q. GO
Access Network Head
Recommended by : Date:
EDWIN C. MABITAZAN
Planning & Engineering Head

Work Order No. Sheet No.

1 OF 1
CONSTRUCTION METHOD: Pole Mount LCP and NAP

LCP 1: POLE-MOUNT CLOSURE NAP 1-1 : POLE-MOUNT CLOSURE NAP 1-8 : POLE-MOUNT CLOSURE
WITH 1:8 SPLITTER WITH 1:8 SPLITTER
WITH 1:8 SPLITTER

15M SPLICING LOOP


ON FEEDER SIDE

IN-LINE CLOSURE

15M MAINTENANCE LOOP


SIDE
FEEDER
LOOPON
SPLICING
15M
AFTER THE POI
FUTURE NAP POSITION

DROP CABLE

TO NEXT LCP 2

ONU

WALL OUTLET BOX

PROJECT TITLE

Pole Mount LCP and NAP

Revision Date

AML (Actual Measured Loss) of the Feeder lines from CO must be secured first prior to actual build OWNER/PROPONENT:

· LCP and NAP pole-mount closure positions are fixed and installed facing road side
· 15m splicing loop on the feeder side and 15m Maintenance loop after POI, NO loop on succeeding LCPs and NAPs CONVERGE
I C T S O L U T I O N S I N C.

· Provide 30m maintenance loop for every 300m sub-feeder side located at CO side, # 99 Reliance Center E. Rodriguez Jr. Ave. (C-5)
Barangay Ugong, Pasig City Philippines
This will be fixed with black tie wraps. OWNER/PROPONENT:

· For future or expansion NAPs, PROVIDE 5m loop at the identified locations where they will be installed METRO WORKS
Place expansion loop on the side of the future NAP facing the central office; same for future LCPs ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines
Secure the expansion loop with 3 cable ties, separated 120° apart Surveyed/Designed by : Date:

· NAPs are installed per 160m, Joint Closure is assumed to be installed per 4km. Checked by :
RONALD N. RIMPULA
AutoCAD Operator

Date:
ALPHA T.MAMANSAG

· Grounding system is assumed to be installed on every NAP. Noted by :


NCR Design Engr. Head

Date:
ALLAN Q. GO
Access Network Head
Recommended by : Date:
EDWIN C. MABITAZAN
Planning & Engineering Head

Work Order No. Sheet No.

1 OF 1
CONSTRUCTION NOTES:
1. SECURE ALL THE NECESSARY PERMITS AT ALL
CONCERNED AGENCY.
2. WORKS SHALL CONFORM WITH
TELECOMMUNICATION STANDARDS AND BUILDING /
OWNER REQUIREMENTS.
3. ALL WORKS SHALL FOLLOW THE STANDARDS,
UNLESS OTHERWISE SPECIFIED.
4. SITE INSTRUCTION WILL BE ENGINEER AT SITE
201mm DISCRETION AND APPROVAL.
5. SUPPLY AND INSTALL 7.5 CONVERGE CONCRETE
POLE AS SHOWN ON ATTACHED FIGURES INCLUDING
COLLAR BAND POLE HARDWARE AND ACCESSORIES

LIGHT GREEN - AUGER THE APPROPRIATE SIZE HOLE


- SET POLE IN HOLE AND PLUMB STRAIGHT
76mm - BACKFILL WITH SPECIFIC MATERIAL

GENERALLY THE NATIVE MATERIAL CAN BE USED


FOR BACKFILL.
POLE CLAMP
refer to POLE CLAMP DEPENDING ON SITE CONDITIONS, ALTERNATIVE
MATERIALS MAY BE REQUIRED
drawing for details

40mm
E
LETTER DETAIL
C
O
N
V
E
(LIGHT GREEN) R
G
E

POLE TAG
203mm X 50mm
refer to POLE TAG
drawing for details

7500mm

3000mm
PROJECT TITLE

CONVERGE POLE 7.5

LIFTING MARK
Revision Date

2.0 08/22/18

GL

OWNER/PROPONENT:

CONVERGE
1200mm I C T S O L U T I O N S I N C.

"GL" STRIP IN # 99 Reliance Center E. Rodriguez Jr. Ave. (C-5)


RED PAINT Barangay Ugong, Pasig City Philippines
12mm X 150mm OWNER/PROPONENT:

METRO WORKS
ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines

Surveyed/Designed by : Date:

292mm Checked by :
RONALD N. RIMPULA
AutoCAD Operator

Date:
ALPHA T.MAMANSAG
NCR Design Engr. Head
Noted by : Date:
ALLAN Q. GO

ELEVATION Recommended by :
Access Network Head
Date:
NTS EDWIN C. MABITAZAN
Planning & Engineering Head

Work Order No. Sheet No.

1 OF 1
08/14/2019
CONSTRUCTION NOTES:
1. SECURE ALL THE NECESSARY PERMITS AT ALL
CONCERNED AGENCY.
2. WORKS SHALL CONFORM WITH
TELECOMMUNICATION STANDARDS AND BUILDING /
OWNER REQUIREMENTS.
201mm 3. ALL WORKS SHALL FOLLOW THE STANDARDS,
UNLESS OTHERWISE SPECIFIED.
4. SITE INSTRUCTION WILL BE ENGINEER AT SITE
DISCRETION AND APPROVAL.
COLLAR BAND 5. SUPPLY AND INSTALL 9.0 CONVERGE CONCRETE
LIGHT GREEN POLE AS SHOWN ON ATTACHED FIGURES INCLUDING
POLE HARDWARE AND ACCESSORIES
76mm
- AUGER THE APPROPRIATE SIZE HOLE
- SET POLE IN HOLE AND PLUMB STRAIGHT
- BACKFILL WITH SPECIFIC MATERIAL

GENERALLY THE NATIVE MATERIAL CAN BE USED


POLE CLAMP FOR BACKFILL.
refer to POLE CLAMP
DEPENDING ON SITE CONDITIONS, ALTERNATIVE
drawing for details MATERIALS MAY BE REQUIRED

LIFTING MARK 50mm HDPE

BLACK ENDCAP
UV PROTECTED

2 RUN - 1 WAY14/10mm MICRODUCT

50mm HDPE
50mm HDPE

MICRODUCT
MICRODUCT

C C
O O
C PLACE A DUCT N N

E 3000mm LENGTH OF
SEALANT

O 101.6Ømm U-GUARD V V
40mm N E E
V U GUARD R R
G
E G 3000mm

LETTER DETAIL R
E E
U GUARD

(LIGHT GREEN) G
E 3000mm
U GUARD
EXPOSED

3000mm
G I RISER PIPE

3000mm
G I RISER PIPE

POLE TAG
1000mm IN EVERY 203mm X 50mm
STAINLESS STEEL refer to POLE TAG
STRAP 19.05mm drawing for details

9000m PROJECT TITLE


SEE DETAILED
PLACING OF U-GUARD
3000mm LENGTH OF
CONVERGE POLE 9.0 WITH RISER
G.I. RISER PIPE
(USED IN CO AND OUTDOOR OLT)
G.I. RISER PIPE
101.6mmØ x 3048mm
Revision Date

3.0 8/14/19
LIFTING MARK CONCRETE
ENCASED

GL OWNER/PROPONENT:

TO HANDHOLE
CONVERGE
I C T S O L U T I O N S I N C.

# 99 Reliance Center E. Rodriguez Jr. Ave. (C-5)


1500mm Barangay Ugong, Pasig City Philippines
PVC PIPE OWNER/PROPONENT:
50mm HDPE
101.6mmØ
"GL" STRIP IN
RED PAINT
LONG ELBOW 90° METRO WORKS
ICT CONSTRUCTION INC.
12mm X 150mm 2 RUN - 1 WAY14/10 MICRODUCT #99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines
INSIDE PVC 101.6mmØ PIPE
Surveyed/Designed by : Date:
RONALD N. RIMPULA
AutoCAD Operator
Checked by : Date:
310mm ALPHA T.MAMANSAG
NCR Design Engr. Head
Noted by : Date:
ALLAN Q. GO
Access Network Head
Recommended by : Date:

ELEVATION Work Order No.


EDWIN C. MABITAZAN
Planning & Engineering Head

Sheet No.
NTS

1 OF 1
CONSTRUCTION NOTES:
1. SECURE ALL THE NECESSARY PERMITS AT ALL
CONCERNED AGENCY.
2. WORKS SHALL CONFORM WITH
201mm TELECOMMUNICATION STANDARDS AND BUILDING /
OWNER REQUIREMENTS.
3. ALL WORKS SHALL FOLLOW THE STANDARDS,
UNLESS OTHERWISE SPECIFIED.
COLLAR BAND 4. SITE INSTRUCTION WILL BE ENGINEER AT SITE
DISCRETION AND APPROVAL.
LIGHT GREEN 5. SUPPLY AND INSTALL 9.0 CONVERGE CONCRETE
POLE AS SHOWN ON ATTACHED FIGURES INCLUDING
76mm POLE HARDWARE AND ACCESSORIES

- AUGER THE APPROPRIATE SIZE HOLE


- SET POLE IN HOLE AND PLUMB STRAIGHT
- BACKFILL WITH SPECIFIC MATERIAL
POLE CLAMP GENERALLY THE NATIVE MATERIAL CAN BE USED
refer to POLE CLAMP FOR BACKFILL.
drawing for details DEPENDING ON SITE CONDITIONS, ALTERNATIVE
MATERIALS MAY BE REQUIRED

LIFTING MARK 50mm HDPE

BLACK ENDCAP
UV PROTECTED

2 RUN - 1 WAY14/10mm MICRODUCT

50mm HDPE
50mm HDPE

MICRODUCT
MICRODUCT

C
C O
C

E O 76.2mmØ U-GUARD 3000mm LENGTH OF O


PLACE A DUCT N N
40mm N SEALANT

V U GUARD V
E
V
E
E R
LETTER DETAIL R G
R
G 3000mm
U GUARD
E
(LIGHT GREEN) G E
E
3000mm
U GUARD
EXPOSED

3000mm
G I RISER PIPE

3000mm
G I RISER PIPE

POLE TAG
1000mm IN EVERY 203mm X 50mm
STAINLESS STEEL refer to POLE TAG
STRAP 19.05mm drawing for details

9000mm
PROJECT TITLE
SEE DETAILED
PLACING OF U-GUARD
3000mm LENGTH OF
G.I. RISER PIPE CONVERGE POLE 9.0 WITH RISER
(USED IN POI AND BACKBONE)
G.I. RISER PIPE
76.2mmØ x 3048mm
Revision Date
LIFTING MARK 3.0 8/14/19
CONCRETE
ENCASED

GL
OWNER/PROPONENT:

TO HANDHOLE
CONVERGE
I C T S O L U T I O N S I N C.

1500mm # 99 Reliance Center E. Rodriguez Jr. Ave. (C-5)


PVC PIPE 76.2mmØ Barangay Ugong, Pasig City Philippines
50mm HDPE OWNER/PROPONENT:

"GL" STRIP IN
RED PAINT
12mm X 150mm
LONG ELBOW 90°
2 RUN - 1 WAY14/10 MICRODUCT
METRO WORKS
ICT CONSTRUCTION INC.
INSIDE PVC 76.2mmØ PIPE #99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines

Surveyed/Designed by : Date:

310mm
RONALD N. RIMPULA
AutoCAD Operator
Checked by : Date:
ALPHA T.MAMANSAG
NCR Design Engr. Head
Noted by : Date:
ALLAN Q. GO
Access Network Head
Recommended by : Date:

ELEVATION EDWIN C. MABITAZAN


Planning & Engineering Head

NTS
Work Order No. Sheet No.

1 OF 1
CONSTRUCTION NOTES:
1. SECURE ALL THE NECESSARY PERMITS AT ALL
CONCERNED AGENCY.
2. WORKS SHALL CONFORM WITH
TELECOMMUNICATION STANDARDS AND BUILDING /
OWNER REQUIREMENTS.
201mm 3. ALL WORKS SHALL FOLLOW THE STANDARDS,
UNLESS OTHERWISE SPECIFIED.
4. SITE INSTRUCTION WILL BE ENGINEER AT SITE
DISCRETION AND APPROVAL.
COLLAR BAND 5. SUPPLY AND INSTALL 9.0 CONVERGE CONCRETE
LIGHT GREEN POLE AS SHOWN ON ATTACHED FIGURES INCLUDING
POLE HARDWARE AND ACCESSORIES

- AUGER THE APPROPRIATE SIZE HOLE


VARIES - SET POLE IN HOLE AND PLUMB STRAIGHT
- BACKFILL WITH SPECIFIC MATERIAL

GENERALLY THE NATIVE MATERIAL CAN BE USED


FOR BACKFILL.

DEPENDING ON SITE CONDITIONS, ALTERNATIVE


MATERIALS MAY BE REQUIRED

2680mm POLE CLAMP A


refer to POLE CLAMP
drawing for details

100 100
19

A SECTION OF
A-A

MICRODUCT HOLE
DETAILS
MICRODUCT HOLE
19mm X 100mm MICRODUCT
HOLE
POLE
ABC-D1234-A&B 25.4mm
IDENTIFICATION 90
SO 0

E
216mm

1
MANUFACTURER'S 158.75mm
40mm A&B 108mm
LOGO

D
CE

E
R T IFI
C
O LETTER DETAIL
N
V (LIGHT GREEN)
E
R PRODUCTION
G
E POLE TAG 310mm 01
234 TS NO.

P
-
XW
203mm X 50mm INSPECTION

A
90
SO 0
I

A&B
refer to POLE TAG MARK
9000mm
D
CE

R T FI
I

B7
A - 15
drawing for details
PRODUCT CODE

MANUFACTURER'S 200mm POLE MARKING DETAILS


4800mm LOGO

PROJECT TITLE
BUTT VIEW

CONVERGE POLE 9.0


3000mm

Revision Date

2.0 08/22/18
LIFTING MARK

"GL" STRIP IN
RED PAINT MICRODUCT
12mm X 150mm HOLE OWNER/PROPONENT:

GL GL
100mm
CONVERGE
I C T S O L U T I O N S I N C.

# 99 Reliance Center E. Rodriguez Jr. Ave. (C-5)


1500mm MICRODUCT HOLE Barangay Ugong, Pasig City Philippines
19mm X 100mm OWNER/PROPONENT:

1300mm
METRO WORKS
ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines

Surveyed/Designed by : Date:
RONALD N. RIMPULA
AutoCAD Operator
Checked by : Date:
310mm ALPHA T.MAMANSAG
NCR Design Engr. Head
Noted by : Date:
ALLAN Q. GO

ELEVATION CROSS SECTION Recommended by :


Access Network Head
Date:
NTS NTS EDWIN C. MABITAZAN
Planning & Engineering Head

Work Order No. Sheet No.

1 OF 1
GROUNDING OF FIGURE 8 FOC

MESSENGER
MESSENGER
WIRE WIRE
FOC

NAP

FOC

PROJECT TITLE
SS STRAP

GROUNDING OF FIGURE 8 FOC


NAP
Revision Date

GROUND ROD
CLAMP 100 - 200mm

GROUND ROD 1000-1100mm

OWNER/PROPONENT:

CONVERGE
I C T S O L U T I O N S I N C.

# 99 Reliance Center E. Rodriguez Jr. Ave. (C-5)


Barangay Ugong, Pasig City Philippines
OWNER/PROPONENT:

· Ground messenger wire of Figure 8 FOC every end of aerial NAP (Grounding Rod is 1800mm) METRO WORKS
ICT CONSTRUCTION INC.
· KEEP insulation of messenger wire (DO NOT strip or remove cable sheath) #99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines

Surveyed/Designed by :
· EXTEND and CONNECT messenger wire directly to ground (ground rod) RONALD N. RIMPULA
AutoCAD Operator
Date:

Checked by : Date:

· SECURE messenger wire to the pole with three (3) stainless steel strap Noted by :
ALPHA T.MAMANSAG
NCR Design Engr. Head

Date:
ALLAN Q. GO
Access Network Head
Recommended by : Date:
EDWIN C. MABITAZAN
Planning & Engineering Head

Work Order No. Sheet No.

1 OF 1
THIMBLE EYE

CABLE TIE

GUY GRIP DROP WIRE CLAMP

HOOK WITH NUT


FIGURE 8 FOC

PROJECT TITLE

DROP WIRE
HOOK WITH NUT ON POLE
WITH NAP

Revision Date

STAINLESS STRAP

LCP / NAP OWNER/PROPONENT:


BRIDLE RING

CONVERGE
I C T S O L U T I O N S I N C.
NOTE:
# 99 Reliance Center E. Rodriguez Jr. Ave. (C-5)
· Install Hooks with Nut together with pole Barangay Ugong, Pasig City Philippines
clamps on every pole where NAP is OWNER/PROPONENT:

installed
DROP WIRE CLAMP · Install two(2) hooks, one facing left and METRO WORKS
the other facing the right side of the ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
street Barangay Ugong, Pasig City Philippines

· Minimum clearance between LCP/NAP to Surveyed/Designed by : Date:

ground is 3657.6mm RONALD N. RIMPULA


AutoCAD Operator
Checked by : Date:
· Install two (2) bridle rings on both sides ALPHA T.MAMANSAG
NCR Design Engr. Head

· Route the Figure 8 FOC opposite the drop Noted by : Date:


ALLAN Q. GO
cable ports side going to the main cable Recommended by :
Access Network Head
Date:
ports. EDWIN C. MABITAZAN

HOOK WITH NUT · Use cable tie for added support Work Order No.
Planning & Engineering Head

Sheet No.

1 OF 1
MATERIALS QTY
A BOLTS MACHINE (15.8mm x 152.4) 1.58cm x 15.24cm WITH NUT 2.0 EA
B BOLT CARRIAGE (9.52mm x 114.3mm) 0.95cm x 11.43cm 1.0 EA
C BRACE, BACK (1828.8mm) 1.83m 1.0 EA
D BRACE, DIAGONAL (2133.6mm) 2.13m 1.0 EA
E CLAMP, CABLE SUSPENSION STRAIGHT W/ BOLT & NUT 1.0 EA
F CROSS-ARM 10-PIN METAL 1.0 EA
G WASHER SQUARE (50.8mm x 50.8mm) 5.08cm x 5.08 cm 4.0 EA
H BOLT MACHINE (15.8mm x 88.9mm) 1.58cm x 8.89cm 1.0 EA
I CLAMP, CONCRETE POLE TYPE-CA 1.0 EA
J CLAMP, SPECIAL FOR REINFORCING LINK 1.0 EA
K BRACE MOUNT AT A 45° ANGLE 1.0 EA

PROJECT TITLE

DETAILED DRAWING OF
10 PIN ALLEY ARM
(CONCRETE POLE)

Revision Date

OWNER/PROPONENT:

10 PIN ALLEY ARM CONVERGE


I C T S O L U T I O N S I N C.

# 99 Reliance Center E. Rodriguez Jr. Ave. (C-5)


Barangay Ugong, Pasig City Philippines
OWNER/PROPONENT:

METRO WORKS
ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines

Surveyed/Designed by : Date:
RONALD N. RIMPULA
AutoCAD Operator
Checked by : Date:
T-PIN
ALPHA T.MAMANSAG
NCR Design Engr. Head
Noted by : Date:
ALLAN Q. GO
Access Network Head
Recommended by : Date:
EDWIN C. MABITAZAN
Planning & Engineering Head

SYMBOL Work Order No. Sheet No.

1 OF 1
MATERIALS 44 1/2" 26"
A BOLTS MACHINE 16mmØ x 150mm WITH NUT 1.0 EA 1.0 EA
B CABLE SUSPENSION CLAMP W/ BOLT & NUT 1.0 EA 1.0 EA
C EXTENSION ARM 1130mm 1.0 EA
D EXTENSION ARM 660mm 1.0 EA
E WASHER SQUARE 50mm x 50mm 1.0 EA 1.0 EA
F SPECIAL CLAMP FOR REINFORCING LINK 1.0 EA 1.0 EA
G BOLT MACHINE 16mm x 83mm WITH NUT 1.0 EA 1.0 EA
H CONCRETE POLE CLAMP TYPE-CA 1.0 EA 1.0 EA

PROJECT TITLE

DETAILED DRAWING OF
26" AND 44 21" EXTENSION ARM

Revision Date

OWNER/PROPONENT:

26" AND 441


2 " EXTENSION ARM CONVERGE
I C T S O L U T I O N S I N C.

# 99 Reliance Center E. Rodriguez Jr. Ave. (C-5)


Barangay Ugong, Pasig City Philippines
OWNER/PROPONENT:

METRO WORKS
ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines

Surveyed/Designed by : Date:
RONALD N. RIMPULA
AutoCAD Operator
Checked by : Date:
ALPHA T.MAMANSAG
NCR Design Engr. Head
Noted by : Date:
ALLAN Q. GO
Access Network Head
Recommended by : Date:
EDWIN C. MABITAZAN
Planning & Engineering Head

SYMBOL Work Order No. Sheet No.

1 OF 1
SEE DETAIL "A"
MATERIALS 6M 10 M 16 M
A CONCRETE POLE CLAMP W/ 2 BOLTS AND NUTS, TYPE 2A 1 EA 1 EA 1 EA
GUY GRIP, PREFORMED (5/16") 0.80cm. 4 EA
B GUY GRIP, PREFORMED (3/8") 0.95cm. 4 EA
GUY GRIP, PREFORMED (7/16") 1.11cm. 4 EA
INSULATOR, STRAIN NO. 504 1 EA
C
INSULATOR, STRAIN NO. 506 1 EA 1 EA
D PROTECTOR, GUY WIRE (7') 2.13m HDPE PIPE (YELLOW) 1 EA 1 EA 1 EA
WIRE, MESSENGER (5/16") 0.80cm. M
E WIRE, MESSENGER (3/8") 0.95cm. M
WIRE, MESSENGER (7/16") 1.11cm. M
F GUY GRIP SPACER (5/8") 1.6cm. 1 EA 1 EA 1 EA

E C
O
N
V
E
R
G PROJECT TITLE
E

F DETAILED DRAWING OF
E HEAD GUY
C
Revision Date

D OWNER/PROPONENT:
A
DETAIL "A" CONVERGE
I C T S O L U T I O N S I N C.
GL
# 99 Reliance Center E. Rodriguez Jr. Ave. (C-5)
Barangay Ugong, Pasig City Philippines
OWNER/PROPONENT:

METRO WORKS
ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines

Surveyed/Designed by : Date:
RONALD N. RIMPULA
AutoCAD Operator
Checked by : Date:
ALPHA T.MAMANSAG
NCR Design Engr. Head
310mm Noted by : Date:
ALLAN Q. GO
Access Network Head
Recommended by : Date:
HEAD GUY SYMBOL EDWIN C. MABITAZAN
Planning & Engineering Head

Work Order No. Sheet No.

1 OF 1
FIG. 8 FOC

THIMBLE NUT CURVED SUSPENSION


CLAMP

THIMBLE EYE

BOLT

PROJECT TITLE

DRAWING OF
GUY GRIP PULL-OFF

FIG. 8 FOC Revision Date


09/23/19

PULL-OFF

OWNER/PROPONENT:

CONVERGE
I C T S O L U T I O N S I N C.

# 99 Reliance Center E. Rodriguez Jr. Ave. (C-5)


Barangay Ugong, Pasig City Philippines
OWNER/PROPONENT:

METRO WORKS
ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines

Surveyed/Designed by : Date:
RONALD N. RIMPULA
AutoCAD Operator
Checked by : Date:
ALPHA T.MAMANSAG
NCR Design Engr. Head
Noted by : Date:
ALLAN Q. GO
Access Network Head
Recommended by : Date:
EDWIN C. MABITAZAN
Planning & Engineering Head

Work Order No. Sheet No.


MATERIALS 6M 10 M 16 M
SEE DETAIL "A" A CONCRETE POLE CLAMP W/ BOLTS AND NUTS, TYPE GCA 1 EA 1 EA 1 EA
GUY GRIP, PREFORMED (5/16") 0.80cm. 4 EA
B GUY GRIP, PREFORMED (3/8") 0.95cm. 4 EA
GUY GRIP, PREFORMED (7/16") 1.11cm. 4 EA
INSULATOR, STRAIN NO. 504 1 EA
C
INSULATOR, STRAIN NO. 506 1 EA 1 EA
D PROTECTOR, GUY WIRE (7') 2.13m HDPE PIPE (YELLOW) 1 EA 1 EA 1 EA
WIRE, MESSENGER (5/16") 0.80cm. M
E WIRE, MESSENGER (3/8") 0.95cm. M
WIRE, MESSENGER (7/16") 1.11cm. M
F GUY GRIP SPACER (5/8") 1.6cm. 1 EA 1 EA 1 EA
G CABLE SUSPENSION CLAMP, CURVED W/ BOLTS & NUTS 1 EA 1 EA 1 EA
E C
O
N
V
E
R
G PROJECT TITLE
E

A DETAILED DRAWING OF
E SIDE GUY
C
Revision Date
MUST BE
GREATER
THAN 90°

F
D G OWNER/PROPONENT:

DETAIL "A" CONVERGE


I C T S O L U T I O N S I N C.
GL

# 99 Reliance Center E. Rodriguez Jr. Ave. (C-5)


Barangay Ugong, Pasig City Philippines
OWNER/PROPONENT:

METRO WORKS
ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines

Surveyed/Designed by : Date:
RONALD N. RIMPULA
AutoCAD Operator
Checked by : Date:
ALPHA T.MAMANSAG
310mm NCR Design Engr. Head
Noted by : Date:
ALLAN Q. GO
Access Network Head
Recommended by : Date:
SIDE GUY SYMBOL EDWIN C. MABITAZAN
Planning & Engineering Head

Work Order No. Sheet No.

1 OF 1
MATERIALS 10 M 16 M
A A CONCRETE POLE CLAMP W/ BOLTS AND NUTS, TYPE 2A 1 EA 1 EA
GUY GRIP, PREFORMED (3/8") 0.95cm. 4 EA
B
GUY GRIP, PREFORMED (7/16") 1.11cm. 4 EA
B C SIDEWALK FIXTURE (44 1/2") 113.03cm. 1 SET 1 SET
D CONCRETE POLE CLAMP W/ BOLTS & NUTS, TYPE CA 1 EA 1 EA
C H E INSULATOR, STRAIN NO. 506 1 EA 1 EA
WIRE, MESSENGER (3/8") 0.95cm. M
F
WIRE, MESSENGER (7/16") 1.11cm. M
G PROTECTOR, GUY WIRE (7") 2.13m HDPE PIPE (YELLOW) 1 EA 1 EA
D
H SPECIAL POLE CLAMP FOR REINFORCING LINKS 1 EA 1 EA
B C
I GUY GRIP SPACER (5/8") 1.6cm. 2 EA 2 EA
O
N
V
E
R
G PROJECT TITLE
E I
E
F DETAILED DRAWING OF
SIDEWALK HEAD GUY

B Revision Date

A D H

OWNER/PROPONENT:

G
CONVERGE
I C T S O L U T I O N S I N C.
GL
# 99 Reliance Center E. Rodriguez Jr. Ave. (C-5)
Barangay Ugong, Pasig City Philippines
OWNER/PROPONENT:

sw
10M METRO WORKS
ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines

Surveyed/Designed by : Date:
RONALD N. RIMPULA
AutoCAD Operator
Checked by : Date:
ALPHA T.MAMANSAG

310mm SYMBOL Noted by :


NCR Design Engr. Head

Date:
ALLAN Q. GO
Access Network Head
Recommended by : Date:
SIDEWALK HEAD GUY EDWIN C. MABITAZAN
Planning & Engineering Head

Work Order No. Sheet No.

1 OF 1
MATERIALS 10 M 16 M
A CABLE SUSPENSION CLAMP, CURVED W/ BOLTS & NUTS 1 EA 1 EA
A B CONCRETE POLE CLAMP W/ BOLTS AND NUTS, TYPE GCA 1 EA 1 EA
C INSULATOR, STRAIN NO. 506 1 EA 1 EA
D PROTECTOR, GUY WIRE (7") 2.13m HDPE PIPE (YELLOW) 1 EA 1 EA
F E SIDEWALK FIXTURE (44 1/2") 113.03cm. 1 SET 1 SET
GUY GRIP, PREFORMED (3/8") 0.95cm. 4 EA
E H F
GUY GRIP, PREFORMED (7/16") 1.11cm. 4 EA
G CONCRETE POLE CLAMP W/ BOLTS & NUTS, TYPE CA 1 EA 1 EA
H SPECIAL POLE CLAMP FOR REINFORCING LINKS 1 EA 1 EA
G I
WIRE, MESSENGER (3/8") 0.95cm. M
WIRE, MESSENGER (7/16") 1.11cm. M
F C
J GUY GRIP SPACER (5/8") 1.6cm. 1 EA 1 EA
O
N
V
E
R
G PROJECT TITLE
E
C B
I DETAILED DRAWING OF
SIDEWALK GUY
MUST BE
GREATER

F THAN 90°

Revision Date
J

A G H

OWNER/PROPONENT:

D
CONVERGE
I C T S O L U T I O N S I N C.
GL
# 99 Reliance Center E. Rodriguez Jr. Ave. (C-5)
Barangay Ugong, Pasig City Philippines
OWNER/PROPONENT:

METRO WORKS
10M
ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines

sw
Surveyed/Designed by : Date:
RONALD N. RIMPULA
AutoCAD Operator
Checked by : Date:
ALPHA T.MAMANSAG
310mm SYMBOL Noted by :
NCR Design Engr. Head

Date:
ALLAN Q. GO
Access Network Head
Recommended by : Date:
SIDEWALK GUY EDWIN C. MABITAZAN
Planning & Engineering Head

Work Order No. Sheet No.

1 OF 1
FOR EXTENSION ARM
FOR BACKBOARD SIDEWALK GUYING
TERMINAL 10-PIN

CONCRETE POLE
CLAMP

RL DEG
PROJECT TITLE

TYPE OF CONCRETE CONCRETE POLE CLAMPS

POLE CLAMP CABLE SUSPENSION Revision Date


3-BOLT CURVE W/
BOLT & NUT

OWNER/PROPONENT:

CONVERGE
I C T S O L U T I O N S I N C.

FOR SIDEWALK # 99 Reliance Center E. Rodriguez Jr. Ave. (C-5)


FOR DEAD-END GUY FOR SIDE GUYING
GUYING Barangay Ugong, Pasig City Philippines
OWNER/PROPONENT:

METRO WORKS
ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines

Surveyed/Designed by : Date:
RONALD N. RIMPULA
AutoCAD Operator
Checked by : Date:

2A CA GCA Noted by :

Recommended by :
ALPHA T.MAMANSAG
NCR Design Engr. Head

ALLAN Q. GO
Access Network Head
Date:

Date:
EDWIN C. MABITAZAN
Planning & Engineering Head

Work Order No. Sheet No.


NOTE:
· MEASUREMENTS IS IN MM
· FONT STYLE IS ARIAL

60

C.O. Name &


OLT No.

PSG001 30

4 4 4 4 40
4 PROJECT TITLE

LP 01
LCP Number STANDARD STENCIL
OF DOUBLE NAP
30
NAP Number Revision Date

6.5 15 6.5 20

NP 01
4 6.5 15 6.5
30

20
OWNER/PROPONENT:

CONVERGE
I C T S O L U T I O N S I N C.

# 99 Reliance Center E. Rodriguez Jr. Ave. (C-5)

NP 02
Barangay Ugong, Pasig City Philippines
OWNER/PROPONENT:

30 METRO WORKS
ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines

4 Surveyed/Designed by :
RONALD N. RIMPULA
Date:

AutoCAD Operator
Checked by : Date:
ALPHA T.MAMANSAG
NCR Design Engr. Head
Noted by : Date:
ALLAN Q. GO
Access Network Head
Recommended by : Date:
EDWIN C. MABITAZAN
Planning & Engineering Head

Work Order No. Sheet No.

1 OF 1
NOTE:
· MEASUREMENTS IS IN MM
· FONT STYLE IS ARIAL

60

C.O. Name &


OLT No.

PSG001 30

4 4 4 4 40
4 PROJECT TITLE

LP 01
LCP Number STANDARD STENCIL
30 OF NAP

NAP Number Revision Date

6.5 15 6.5 20

NP 01 30
OWNER/PROPONENT:

CONVERGE
I C T S O L U T I O N S I N C.

6.5 15 6.5 # 99 Reliance Center E. Rodriguez Jr. Ave. (C-5)


Barangay Ugong, Pasig City Philippines
OWNER/PROPONENT:

4 METRO WORKS
ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines

Surveyed/Designed by : Date:
RONALD N. RIMPULA
AutoCAD Operator
Checked by : Date:
ALPHA T.MAMANSAG
NCR Design Engr. Head
Noted by : Date:
ALLAN Q. GO
Access Network Head
Recommended by : Date:
EDWIN C. MABITAZAN
Planning & Engineering Head

Work Order No. Sheet No.

1 OF 1