Standards 001
Standards 001
CLAMP CONNECTOR
(TAPE)
3-WIRE SECONDARY POWER LINE
SECONDARY RACK
SERVICE
ENTRANCE CAP
19.05mm
POLE CLAMP
19.05mm SS STRAP
1000mm
1000mm
HUAWEI F01S200
(see photo)
9000mm
Kw-H METER
(usually with cage)
FOC
19.05mm SS STRAP
U-GUARD
1R NEMA 3R
ENCLOSURE PROJECT TITLE
WITH TWIST LOCK
2300mm DETAILED DESIGN OF MOUNTING
19.05mm SS STRAP
HUAWEI F01S200
TEE CONDULET (with RISER POLE)
[NEMA 4]
1000mm
Revision Date
GL
OWNER/PROPONENT:
A Recommended by : Date:
NTS
EDWIN C. MABITAZAN
Planning & Engineering Head
1 OF 4
201mm
CLAMP CONNECTOR
(TAPE)
3-WIRE SECONDARY POWER LINE
SECONDARY RACK
SERVICE
ENTRANCE CAP
19.05mm
POLE CLAMP
48 INLINE CLOSURE
FIGURE 8 FOC
15m MAINTENANCE 15m MAINTENANCE
LOOP LOOP
19.05mm SS STRAP
25mmØ RSC PIPE
1000mm
FOAM SEALANT
19.05mm SS STRAP
HUAWEI F01S200
BACK OF THE CABINET (see photo)
WHERE IMC TO FMC 9000mm
WILL BE INSTALLED
(see photo)
Kw-H METER
(usually with cage)
100
METRO WORKS
ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines
Surveyed/Designed by : Date:
RONALD N. RIMPULA
AutoCAD Operator
Checked by : Date:
ALPHA T.MAMANSAG
NCR Design Engr. Head
ELEVATION Noted by :
ALLAN Q. GO
Date:
2 OF 4
NOTES
FASTENER 1 1. FACE THE CABINET DOOR TOWARDS SOUTH OR
NORTH IF POSSIBLE. THIS ENSURE THAT THE
CABINET RECEIVES THE MINIMUM SOLAR
RADIATIONS.
PROJECT TITLE
FASTENING PARTS ISOMETRIC VIEW
DETAILED DESIGN OF MOUNTING
HUAWEI F01S200 TO A POLE
Revision Date
OWNER/PROPONENT:
CONVERGE
I C T S O L U T I O N S I N C.
942.5 OR 670
# 99 Reliance Center E. Rodriguez Jr. Ave. (C-5)
Barangay Ugong, Pasig City Philippines
OWNER/PROPONENT:
METRO WORKS
ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines
Surveyed/Designed by : Date:
RONALD N. RIMPULA
AutoCAD Operator
Checked by : Date:
ALPHA T.MAMANSAG
NCR Design Engr. Head
Noted by : Date:
ALLAN Q. GO
Access Network Head
Recommended by : Date:
DISTANCE BETWEEN FASTENING PARTS DIMENSION OF HUAWEI CABINET
EDWIN C. MABITAZAN
Planning & Engineering Head
3 OF 4
DESIGNATION:
SERVICE ENTRANCE SYSTEM: 230V, 1-PHASE, 60Hz
230V, 60Hz, 2 WIRE, SINGLE PHASE CIRCUIT NO.
CIRCUIT BREAKER
ECB 40AT/2P WITH CIRCUIT NO. LOAD DESCRIPTION VA VOLTS AMPERES SIZES OF WIRES
KwHr METER GROUNDING BUS AT AF P KAIC
1 OUTLET 690 230 3 TERMINAL BLOCK 2 - 3.5mm2 x HHW-2+1 - 3.5mm2 x HHW-2 (G) COPPER WIRES
M 2 ETO 4830 RECTIFIER 1296 230 5.63 16 50 2 10 2 - 3.5mm2 x HHW-2
ETP4830
RECTIFIER
LOAD 2 ~ _
DC PDU
TERMINAL
BLOCK PROJECT TITLE
OPTIONAL RCD
DECOUPLING (100mA) LOAD 4
MAIN 40 AT/2P COIL 20AT/1P 20AT/1P
OLT 1
POWER DISTRIBUTION LABEL
20AT/1P
OLT 2
GENERATOR 20AT/1P
SPARE
40 AT/2P Revision Date
12AT/1P
TRANSFER SWITCH SPARE
BATTERY BANK
4-RU, 50AH
RCD (50mA)
BATTERY
CONNECTED IN SERIES
OWNER/PROPONENT:
TERMINAL
BLOCK
LOAD 1 CONVERGE
I C T S O L U T I O N S I N C.
4 OF 4
201
201
20
40
127
C
O C
N O
V N PROJECT TITLE
POLE TAG E V
R
G
POLE TAG E
R
· MEASUREMENTS ARE IN MILLIMETER(mm)
G
E
E · LETTERINGS ARE EMBOSSED IN ALUMINUM PLATE
· USE 19.05MM STAINLESS STRAPS ALUMINUM PLATE FOR POLE
· 40mmH X 127mmW X 0.60mm Thickness TAGGING
7500mm 2 11/22/18
3000mm 3000mm
OWNER/PROPONENT:
CONVERGE
I C T S O L U T I O N S I N C.
METRO WORKS
1500mm ICT CONSTRUCTION INC.
1200mm #99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines
Sheet No.
POLE 9.0 POLE 7.5
1 OF 1
10000mm MESSENGER WIRE
3-BOLT CABLE
SUSPENSION CLAMP
VARIABLE
GUY
TIMBLE
3-BOLT CABLE
SUSPENSION CLAMP
PROTECTIVE WRAP
MESSENGER WIRE (6000mm)
(OPTIONAL)
(A
SIDE GUYED IN BOTH DIRECTIONS PP 600m
RO m
XIM
AT
ELY
)
7 WAY MICRODUCT
PROJECT TITLE
VARIES
CATENARY DESIGN
Revision Date
STRAND (6000mm)
OWNER/PROPONENT:
CABLE SPACERS CABLE SPACERS
AND STRAPS AND STRAPS
CABLE TIES CABLE TIES
OR STRAPS OR STRAPS CONVERGE
I C T S O L U T I O N S I N C.
7 WAY MICRODUCT
METRO WORKS
175mm PROTECTIVE WRAP 175mm ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
(OPTIONAL) Barangay Ugong, Pasig City Philippines
Surveyed/Designed by : Date:
RONALD N. RIMPULA
AutoCAD Operator
Checked by : Date:
600mm ALPHA T.MAMANSAG
NCR Design Engr. Head
Noted by : Date:
ALLAN Q. GO
Access Network Head
Recommended by : Date:
EDWIN C. MABITAZAN
Planning & Engineering Head
1 OF 1
CONSTRUCTION METHOD: Pole Mount LCP and NAP
LCP 1: POLE-MOUNT CLOSURE NAP 1-1 : POLE-MOUNT CLOSURE NAP 1-8 : POLE-MOUNT CLOSURE
WITH 1:8 SPLITTER WITH 1:8 SPLITTER
WITH 1:8 SPLITTER
IN-LINE CLOSURE
DROP CABLE
TO NEXT LCP 2
ONU
PROJECT TITLE
Revision Date
AML (Actual Measured Loss) of the Feeder lines from CO must be secured first prior to actual build OWNER/PROPONENT:
· LCP and NAP pole-mount closure positions are fixed and installed facing road side
· 15m splicing loop on the feeder side and 15m Maintenance loop after POI, NO loop on succeeding LCPs and NAPs CONVERGE
I C T S O L U T I O N S I N C.
· Provide 30m maintenance loop for every 300m sub-feeder side located at CO side, # 99 Reliance Center E. Rodriguez Jr. Ave. (C-5)
Barangay Ugong, Pasig City Philippines
This will be fixed with black tie wraps. OWNER/PROPONENT:
· For future or expansion NAPs, PROVIDE 5m loop at the identified locations where they will be installed METRO WORKS
Place expansion loop on the side of the future NAP facing the central office; same for future LCPs ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines
Secure the expansion loop with 3 cable ties, separated 120° apart Surveyed/Designed by : Date:
· NAPs are installed per 160m, Joint Closure is assumed to be installed per 4km. Checked by :
RONALD N. RIMPULA
AutoCAD Operator
Date:
ALPHA T.MAMANSAG
Date:
ALLAN Q. GO
Access Network Head
Recommended by : Date:
EDWIN C. MABITAZAN
Planning & Engineering Head
1 OF 1
CONSTRUCTION NOTES:
1. SECURE ALL THE NECESSARY PERMITS AT ALL
CONCERNED AGENCY.
2. WORKS SHALL CONFORM WITH
TELECOMMUNICATION STANDARDS AND BUILDING /
OWNER REQUIREMENTS.
3. ALL WORKS SHALL FOLLOW THE STANDARDS,
UNLESS OTHERWISE SPECIFIED.
4. SITE INSTRUCTION WILL BE ENGINEER AT SITE
201mm DISCRETION AND APPROVAL.
5. SUPPLY AND INSTALL 7.5 CONVERGE CONCRETE
POLE AS SHOWN ON ATTACHED FIGURES INCLUDING
COLLAR BAND POLE HARDWARE AND ACCESSORIES
40mm
E
LETTER DETAIL
C
O
N
V
E
(LIGHT GREEN) R
G
E
POLE TAG
203mm X 50mm
refer to POLE TAG
drawing for details
7500mm
3000mm
PROJECT TITLE
LIFTING MARK
Revision Date
2.0 08/22/18
GL
OWNER/PROPONENT:
CONVERGE
1200mm I C T S O L U T I O N S I N C.
METRO WORKS
ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines
Surveyed/Designed by : Date:
292mm Checked by :
RONALD N. RIMPULA
AutoCAD Operator
Date:
ALPHA T.MAMANSAG
NCR Design Engr. Head
Noted by : Date:
ALLAN Q. GO
ELEVATION Recommended by :
Access Network Head
Date:
NTS EDWIN C. MABITAZAN
Planning & Engineering Head
1 OF 1
08/14/2019
CONSTRUCTION NOTES:
1. SECURE ALL THE NECESSARY PERMITS AT ALL
CONCERNED AGENCY.
2. WORKS SHALL CONFORM WITH
TELECOMMUNICATION STANDARDS AND BUILDING /
OWNER REQUIREMENTS.
201mm 3. ALL WORKS SHALL FOLLOW THE STANDARDS,
UNLESS OTHERWISE SPECIFIED.
4. SITE INSTRUCTION WILL BE ENGINEER AT SITE
DISCRETION AND APPROVAL.
COLLAR BAND 5. SUPPLY AND INSTALL 9.0 CONVERGE CONCRETE
LIGHT GREEN POLE AS SHOWN ON ATTACHED FIGURES INCLUDING
POLE HARDWARE AND ACCESSORIES
76mm
- AUGER THE APPROPRIATE SIZE HOLE
- SET POLE IN HOLE AND PLUMB STRAIGHT
- BACKFILL WITH SPECIFIC MATERIAL
BLACK ENDCAP
UV PROTECTED
50mm HDPE
50mm HDPE
MICRODUCT
MICRODUCT
C C
O O
C PLACE A DUCT N N
E 3000mm LENGTH OF
SEALANT
O 101.6Ømm U-GUARD V V
40mm N E E
V U GUARD R R
G
E G 3000mm
LETTER DETAIL R
E E
U GUARD
(LIGHT GREEN) G
E 3000mm
U GUARD
EXPOSED
3000mm
G I RISER PIPE
3000mm
G I RISER PIPE
POLE TAG
1000mm IN EVERY 203mm X 50mm
STAINLESS STEEL refer to POLE TAG
STRAP 19.05mm drawing for details
3.0 8/14/19
LIFTING MARK CONCRETE
ENCASED
GL OWNER/PROPONENT:
TO HANDHOLE
CONVERGE
I C T S O L U T I O N S I N C.
Sheet No.
NTS
1 OF 1
CONSTRUCTION NOTES:
1. SECURE ALL THE NECESSARY PERMITS AT ALL
CONCERNED AGENCY.
2. WORKS SHALL CONFORM WITH
201mm TELECOMMUNICATION STANDARDS AND BUILDING /
OWNER REQUIREMENTS.
3. ALL WORKS SHALL FOLLOW THE STANDARDS,
UNLESS OTHERWISE SPECIFIED.
COLLAR BAND 4. SITE INSTRUCTION WILL BE ENGINEER AT SITE
DISCRETION AND APPROVAL.
LIGHT GREEN 5. SUPPLY AND INSTALL 9.0 CONVERGE CONCRETE
POLE AS SHOWN ON ATTACHED FIGURES INCLUDING
76mm POLE HARDWARE AND ACCESSORIES
BLACK ENDCAP
UV PROTECTED
50mm HDPE
50mm HDPE
MICRODUCT
MICRODUCT
C
C O
C
V U GUARD V
E
V
E
E R
LETTER DETAIL R G
R
G 3000mm
U GUARD
E
(LIGHT GREEN) G E
E
3000mm
U GUARD
EXPOSED
3000mm
G I RISER PIPE
3000mm
G I RISER PIPE
POLE TAG
1000mm IN EVERY 203mm X 50mm
STAINLESS STEEL refer to POLE TAG
STRAP 19.05mm drawing for details
9000mm
PROJECT TITLE
SEE DETAILED
PLACING OF U-GUARD
3000mm LENGTH OF
G.I. RISER PIPE CONVERGE POLE 9.0 WITH RISER
(USED IN POI AND BACKBONE)
G.I. RISER PIPE
76.2mmØ x 3048mm
Revision Date
LIFTING MARK 3.0 8/14/19
CONCRETE
ENCASED
GL
OWNER/PROPONENT:
TO HANDHOLE
CONVERGE
I C T S O L U T I O N S I N C.
"GL" STRIP IN
RED PAINT
12mm X 150mm
LONG ELBOW 90°
2 RUN - 1 WAY14/10 MICRODUCT
METRO WORKS
ICT CONSTRUCTION INC.
INSIDE PVC 76.2mmØ PIPE #99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines
Surveyed/Designed by : Date:
310mm
RONALD N. RIMPULA
AutoCAD Operator
Checked by : Date:
ALPHA T.MAMANSAG
NCR Design Engr. Head
Noted by : Date:
ALLAN Q. GO
Access Network Head
Recommended by : Date:
NTS
Work Order No. Sheet No.
1 OF 1
CONSTRUCTION NOTES:
1. SECURE ALL THE NECESSARY PERMITS AT ALL
CONCERNED AGENCY.
2. WORKS SHALL CONFORM WITH
TELECOMMUNICATION STANDARDS AND BUILDING /
OWNER REQUIREMENTS.
201mm 3. ALL WORKS SHALL FOLLOW THE STANDARDS,
UNLESS OTHERWISE SPECIFIED.
4. SITE INSTRUCTION WILL BE ENGINEER AT SITE
DISCRETION AND APPROVAL.
COLLAR BAND 5. SUPPLY AND INSTALL 9.0 CONVERGE CONCRETE
LIGHT GREEN POLE AS SHOWN ON ATTACHED FIGURES INCLUDING
POLE HARDWARE AND ACCESSORIES
100 100
19
A SECTION OF
A-A
MICRODUCT HOLE
DETAILS
MICRODUCT HOLE
19mm X 100mm MICRODUCT
HOLE
POLE
ABC-D1234-A&B 25.4mm
IDENTIFICATION 90
SO 0
E
216mm
1
MANUFACTURER'S 158.75mm
40mm A&B 108mm
LOGO
D
CE
E
R T IFI
C
O LETTER DETAIL
N
V (LIGHT GREEN)
E
R PRODUCTION
G
E POLE TAG 310mm 01
234 TS NO.
P
-
XW
203mm X 50mm INSPECTION
A
90
SO 0
I
A&B
refer to POLE TAG MARK
9000mm
D
CE
R T FI
I
B7
A - 15
drawing for details
PRODUCT CODE
PROJECT TITLE
BUTT VIEW
Revision Date
2.0 08/22/18
LIFTING MARK
"GL" STRIP IN
RED PAINT MICRODUCT
12mm X 150mm HOLE OWNER/PROPONENT:
GL GL
100mm
CONVERGE
I C T S O L U T I O N S I N C.
1300mm
METRO WORKS
ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines
Surveyed/Designed by : Date:
RONALD N. RIMPULA
AutoCAD Operator
Checked by : Date:
310mm ALPHA T.MAMANSAG
NCR Design Engr. Head
Noted by : Date:
ALLAN Q. GO
1 OF 1
GROUNDING OF FIGURE 8 FOC
MESSENGER
MESSENGER
WIRE WIRE
FOC
NAP
FOC
PROJECT TITLE
SS STRAP
GROUND ROD
CLAMP 100 - 200mm
OWNER/PROPONENT:
CONVERGE
I C T S O L U T I O N S I N C.
· Ground messenger wire of Figure 8 FOC every end of aerial NAP (Grounding Rod is 1800mm) METRO WORKS
ICT CONSTRUCTION INC.
· KEEP insulation of messenger wire (DO NOT strip or remove cable sheath) #99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines
Surveyed/Designed by :
· EXTEND and CONNECT messenger wire directly to ground (ground rod) RONALD N. RIMPULA
AutoCAD Operator
Date:
Checked by : Date:
· SECURE messenger wire to the pole with three (3) stainless steel strap Noted by :
ALPHA T.MAMANSAG
NCR Design Engr. Head
Date:
ALLAN Q. GO
Access Network Head
Recommended by : Date:
EDWIN C. MABITAZAN
Planning & Engineering Head
1 OF 1
THIMBLE EYE
CABLE TIE
PROJECT TITLE
DROP WIRE
HOOK WITH NUT ON POLE
WITH NAP
Revision Date
STAINLESS STRAP
CONVERGE
I C T S O L U T I O N S I N C.
NOTE:
# 99 Reliance Center E. Rodriguez Jr. Ave. (C-5)
· Install Hooks with Nut together with pole Barangay Ugong, Pasig City Philippines
clamps on every pole where NAP is OWNER/PROPONENT:
installed
DROP WIRE CLAMP · Install two(2) hooks, one facing left and METRO WORKS
the other facing the right side of the ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
street Barangay Ugong, Pasig City Philippines
HOOK WITH NUT · Use cable tie for added support Work Order No.
Planning & Engineering Head
Sheet No.
1 OF 1
MATERIALS QTY
A BOLTS MACHINE (15.8mm x 152.4) 1.58cm x 15.24cm WITH NUT 2.0 EA
B BOLT CARRIAGE (9.52mm x 114.3mm) 0.95cm x 11.43cm 1.0 EA
C BRACE, BACK (1828.8mm) 1.83m 1.0 EA
D BRACE, DIAGONAL (2133.6mm) 2.13m 1.0 EA
E CLAMP, CABLE SUSPENSION STRAIGHT W/ BOLT & NUT 1.0 EA
F CROSS-ARM 10-PIN METAL 1.0 EA
G WASHER SQUARE (50.8mm x 50.8mm) 5.08cm x 5.08 cm 4.0 EA
H BOLT MACHINE (15.8mm x 88.9mm) 1.58cm x 8.89cm 1.0 EA
I CLAMP, CONCRETE POLE TYPE-CA 1.0 EA
J CLAMP, SPECIAL FOR REINFORCING LINK 1.0 EA
K BRACE MOUNT AT A 45° ANGLE 1.0 EA
PROJECT TITLE
DETAILED DRAWING OF
10 PIN ALLEY ARM
(CONCRETE POLE)
Revision Date
OWNER/PROPONENT:
METRO WORKS
ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines
Surveyed/Designed by : Date:
RONALD N. RIMPULA
AutoCAD Operator
Checked by : Date:
T-PIN
ALPHA T.MAMANSAG
NCR Design Engr. Head
Noted by : Date:
ALLAN Q. GO
Access Network Head
Recommended by : Date:
EDWIN C. MABITAZAN
Planning & Engineering Head
1 OF 1
MATERIALS 44 1/2" 26"
A BOLTS MACHINE 16mmØ x 150mm WITH NUT 1.0 EA 1.0 EA
B CABLE SUSPENSION CLAMP W/ BOLT & NUT 1.0 EA 1.0 EA
C EXTENSION ARM 1130mm 1.0 EA
D EXTENSION ARM 660mm 1.0 EA
E WASHER SQUARE 50mm x 50mm 1.0 EA 1.0 EA
F SPECIAL CLAMP FOR REINFORCING LINK 1.0 EA 1.0 EA
G BOLT MACHINE 16mm x 83mm WITH NUT 1.0 EA 1.0 EA
H CONCRETE POLE CLAMP TYPE-CA 1.0 EA 1.0 EA
PROJECT TITLE
DETAILED DRAWING OF
26" AND 44 21" EXTENSION ARM
Revision Date
OWNER/PROPONENT:
METRO WORKS
ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines
Surveyed/Designed by : Date:
RONALD N. RIMPULA
AutoCAD Operator
Checked by : Date:
ALPHA T.MAMANSAG
NCR Design Engr. Head
Noted by : Date:
ALLAN Q. GO
Access Network Head
Recommended by : Date:
EDWIN C. MABITAZAN
Planning & Engineering Head
1 OF 1
SEE DETAIL "A"
MATERIALS 6M 10 M 16 M
A CONCRETE POLE CLAMP W/ 2 BOLTS AND NUTS, TYPE 2A 1 EA 1 EA 1 EA
GUY GRIP, PREFORMED (5/16") 0.80cm. 4 EA
B GUY GRIP, PREFORMED (3/8") 0.95cm. 4 EA
GUY GRIP, PREFORMED (7/16") 1.11cm. 4 EA
INSULATOR, STRAIN NO. 504 1 EA
C
INSULATOR, STRAIN NO. 506 1 EA 1 EA
D PROTECTOR, GUY WIRE (7') 2.13m HDPE PIPE (YELLOW) 1 EA 1 EA 1 EA
WIRE, MESSENGER (5/16") 0.80cm. M
E WIRE, MESSENGER (3/8") 0.95cm. M
WIRE, MESSENGER (7/16") 1.11cm. M
F GUY GRIP SPACER (5/8") 1.6cm. 1 EA 1 EA 1 EA
E C
O
N
V
E
R
G PROJECT TITLE
E
F DETAILED DRAWING OF
E HEAD GUY
C
Revision Date
D OWNER/PROPONENT:
A
DETAIL "A" CONVERGE
I C T S O L U T I O N S I N C.
GL
# 99 Reliance Center E. Rodriguez Jr. Ave. (C-5)
Barangay Ugong, Pasig City Philippines
OWNER/PROPONENT:
METRO WORKS
ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines
Surveyed/Designed by : Date:
RONALD N. RIMPULA
AutoCAD Operator
Checked by : Date:
ALPHA T.MAMANSAG
NCR Design Engr. Head
310mm Noted by : Date:
ALLAN Q. GO
Access Network Head
Recommended by : Date:
HEAD GUY SYMBOL EDWIN C. MABITAZAN
Planning & Engineering Head
1 OF 1
FIG. 8 FOC
THIMBLE EYE
BOLT
PROJECT TITLE
DRAWING OF
GUY GRIP PULL-OFF
PULL-OFF
OWNER/PROPONENT:
CONVERGE
I C T S O L U T I O N S I N C.
METRO WORKS
ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines
Surveyed/Designed by : Date:
RONALD N. RIMPULA
AutoCAD Operator
Checked by : Date:
ALPHA T.MAMANSAG
NCR Design Engr. Head
Noted by : Date:
ALLAN Q. GO
Access Network Head
Recommended by : Date:
EDWIN C. MABITAZAN
Planning & Engineering Head
A DETAILED DRAWING OF
E SIDE GUY
C
Revision Date
MUST BE
GREATER
THAN 90°
F
D G OWNER/PROPONENT:
METRO WORKS
ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines
Surveyed/Designed by : Date:
RONALD N. RIMPULA
AutoCAD Operator
Checked by : Date:
ALPHA T.MAMANSAG
310mm NCR Design Engr. Head
Noted by : Date:
ALLAN Q. GO
Access Network Head
Recommended by : Date:
SIDE GUY SYMBOL EDWIN C. MABITAZAN
Planning & Engineering Head
1 OF 1
MATERIALS 10 M 16 M
A A CONCRETE POLE CLAMP W/ BOLTS AND NUTS, TYPE 2A 1 EA 1 EA
GUY GRIP, PREFORMED (3/8") 0.95cm. 4 EA
B
GUY GRIP, PREFORMED (7/16") 1.11cm. 4 EA
B C SIDEWALK FIXTURE (44 1/2") 113.03cm. 1 SET 1 SET
D CONCRETE POLE CLAMP W/ BOLTS & NUTS, TYPE CA 1 EA 1 EA
C H E INSULATOR, STRAIN NO. 506 1 EA 1 EA
WIRE, MESSENGER (3/8") 0.95cm. M
F
WIRE, MESSENGER (7/16") 1.11cm. M
G PROTECTOR, GUY WIRE (7") 2.13m HDPE PIPE (YELLOW) 1 EA 1 EA
D
H SPECIAL POLE CLAMP FOR REINFORCING LINKS 1 EA 1 EA
B C
I GUY GRIP SPACER (5/8") 1.6cm. 2 EA 2 EA
O
N
V
E
R
G PROJECT TITLE
E I
E
F DETAILED DRAWING OF
SIDEWALK HEAD GUY
B Revision Date
A D H
OWNER/PROPONENT:
G
CONVERGE
I C T S O L U T I O N S I N C.
GL
# 99 Reliance Center E. Rodriguez Jr. Ave. (C-5)
Barangay Ugong, Pasig City Philippines
OWNER/PROPONENT:
sw
10M METRO WORKS
ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines
Surveyed/Designed by : Date:
RONALD N. RIMPULA
AutoCAD Operator
Checked by : Date:
ALPHA T.MAMANSAG
Date:
ALLAN Q. GO
Access Network Head
Recommended by : Date:
SIDEWALK HEAD GUY EDWIN C. MABITAZAN
Planning & Engineering Head
1 OF 1
MATERIALS 10 M 16 M
A CABLE SUSPENSION CLAMP, CURVED W/ BOLTS & NUTS 1 EA 1 EA
A B CONCRETE POLE CLAMP W/ BOLTS AND NUTS, TYPE GCA 1 EA 1 EA
C INSULATOR, STRAIN NO. 506 1 EA 1 EA
D PROTECTOR, GUY WIRE (7") 2.13m HDPE PIPE (YELLOW) 1 EA 1 EA
F E SIDEWALK FIXTURE (44 1/2") 113.03cm. 1 SET 1 SET
GUY GRIP, PREFORMED (3/8") 0.95cm. 4 EA
E H F
GUY GRIP, PREFORMED (7/16") 1.11cm. 4 EA
G CONCRETE POLE CLAMP W/ BOLTS & NUTS, TYPE CA 1 EA 1 EA
H SPECIAL POLE CLAMP FOR REINFORCING LINKS 1 EA 1 EA
G I
WIRE, MESSENGER (3/8") 0.95cm. M
WIRE, MESSENGER (7/16") 1.11cm. M
F C
J GUY GRIP SPACER (5/8") 1.6cm. 1 EA 1 EA
O
N
V
E
R
G PROJECT TITLE
E
C B
I DETAILED DRAWING OF
SIDEWALK GUY
MUST BE
GREATER
F THAN 90°
Revision Date
J
A G H
OWNER/PROPONENT:
D
CONVERGE
I C T S O L U T I O N S I N C.
GL
# 99 Reliance Center E. Rodriguez Jr. Ave. (C-5)
Barangay Ugong, Pasig City Philippines
OWNER/PROPONENT:
METRO WORKS
10M
ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines
sw
Surveyed/Designed by : Date:
RONALD N. RIMPULA
AutoCAD Operator
Checked by : Date:
ALPHA T.MAMANSAG
310mm SYMBOL Noted by :
NCR Design Engr. Head
Date:
ALLAN Q. GO
Access Network Head
Recommended by : Date:
SIDEWALK GUY EDWIN C. MABITAZAN
Planning & Engineering Head
1 OF 1
FOR EXTENSION ARM
FOR BACKBOARD SIDEWALK GUYING
TERMINAL 10-PIN
CONCRETE POLE
CLAMP
RL DEG
PROJECT TITLE
OWNER/PROPONENT:
CONVERGE
I C T S O L U T I O N S I N C.
METRO WORKS
ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines
Surveyed/Designed by : Date:
RONALD N. RIMPULA
AutoCAD Operator
Checked by : Date:
2A CA GCA Noted by :
Recommended by :
ALPHA T.MAMANSAG
NCR Design Engr. Head
ALLAN Q. GO
Access Network Head
Date:
Date:
EDWIN C. MABITAZAN
Planning & Engineering Head
60
PSG001 30
4 4 4 4 40
4 PROJECT TITLE
LP 01
LCP Number STANDARD STENCIL
OF DOUBLE NAP
30
NAP Number Revision Date
6.5 15 6.5 20
NP 01
4 6.5 15 6.5
30
20
OWNER/PROPONENT:
CONVERGE
I C T S O L U T I O N S I N C.
NP 02
Barangay Ugong, Pasig City Philippines
OWNER/PROPONENT:
30 METRO WORKS
ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines
4 Surveyed/Designed by :
RONALD N. RIMPULA
Date:
AutoCAD Operator
Checked by : Date:
ALPHA T.MAMANSAG
NCR Design Engr. Head
Noted by : Date:
ALLAN Q. GO
Access Network Head
Recommended by : Date:
EDWIN C. MABITAZAN
Planning & Engineering Head
1 OF 1
NOTE:
· MEASUREMENTS IS IN MM
· FONT STYLE IS ARIAL
60
PSG001 30
4 4 4 4 40
4 PROJECT TITLE
LP 01
LCP Number STANDARD STENCIL
30 OF NAP
6.5 15 6.5 20
NP 01 30
OWNER/PROPONENT:
CONVERGE
I C T S O L U T I O N S I N C.
4 METRO WORKS
ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines
Surveyed/Designed by : Date:
RONALD N. RIMPULA
AutoCAD Operator
Checked by : Date:
ALPHA T.MAMANSAG
NCR Design Engr. Head
Noted by : Date:
ALLAN Q. GO
Access Network Head
Recommended by : Date:
EDWIN C. MABITAZAN
Planning & Engineering Head
1 OF 1