KELOMPOK TRB 2 (KELAS H)

Kelompok Nama NRP


Shabrian Wiendy Pratama 04311640000058
37 Hario Bagoes Wirandoro 04311640000084
Thomi Habibi 04311640000087
GRUP KERJA @ 3 orang 37
SOFTWare SACS I.
Kriteria Umum:
1 Recommended Practice API RP 2A-WSD
2 Material Struktur AISC ASD 9th
3 Tipe Platform Wellhead
4 Jumlah kaki jacket 4
5 Kedalaman perairan (LWL) feet 95
6 Orientasi Platform (-) 450

Kriteria Desain Deck:


1 Jumlah deck: 2
2 Luasan Deck:
Luasan Sub cellar deck -
Luasan Cellar deck 2800 ft2
Luasan Main deck 2800 ft2
3 a. Beban Hidup Area Deck Kondisi Operasi
Sub cellar deck psf -
Cellar deck psf 110
Main deckpsf 100
b. Beban Hidup Area Deck Kondisi Badai
Sub cellar deck - II.
Cellar deck 80 psf
Main deck 80
4 Jumlah crane 1

5 a. Beban Crane Kondisi Operasi

Beban vertikal 200,0 kips


Beban momen 28000,0 kips-in
b. Beban Crane Kondisi Badai
Beban vertikal 120,0 kips
Beban momen 0,0 kips-in
6 Beban Angin
Kondisi Operasi 45 mph
Kondisi Badai 75 mph

7 Beban Perpipaan
Main Deck 100 psf
Cellar Deck 75 psf
Sub cellar deck

8 Helideck 1
Type Sikorsky/Hughes
Rules API RP 2L

9 Work over rig (WOR)


Dead load Normal cond. 250 kips
Dead load Extreem cond. 250 kips
Operating Load Normal 250 kips
Operating Extreem Normal 0 kips
Kriteria Desain Jacket
1 a. Beban Gelombang & Arus Kondisi Operasi
Tinggi gelombang significant 12 ft
Periode gelombang 8det
Total pasang surut 5.5 ft
Kecepatan arus (permukaan) 3.5 knot
Kecepatan arus (dasar laut) 2 knot
b. Beban Gelombang & Arus Kondisi Badai
Tinggi gelombang maksimum 18 ft
Periode gelombang 11 det
Total pasang surut 5.5 ft
Kecepatan arus (permukaan) 4 knot
Kecepatan arus (dasar laut) 2.0 knot
Storm surge 1 ft
2 Marine Growth
Menambah OD tubular member 3.5 inch
3 Corrotion Allowance API RP 2A-WSD
4 Hydrodynamic Coefficient API RP 2A-WSD
5 Shielding Effect Coefficient API RP 2A-WSD
6 Blockage Factor API RP 2A-WSD
7 Scouring Effect Tollerance 5 ft
8 Riser
Jumlah 4
Diameter luar 20"
Ketebalan 5/8''
8 Conductor
Jumlah 4
Diameter luar 30"
Ketebalan 5/8"
9 Data Tanah C
10 Bater 1 :10 XYZ
11 Barge bumper 1
EQUIPMENT LIST

CELLAR DECK
No. Description Jumlah Berat (Kip) Ukuran
1 Gas Cooler 1 15.68 OD 38'' x 20'-0''
2 Emergency generator 1 20.16 22'-0'' x 9'-0'' x 10'-11''
3 Battery box 1 1 1.79 2'-3'' x 2'-3'' x 1'-9''
4 Battery box 2 1 1.79 2'-3'' x 2'-3'' x 1'-9''
5 Vertical separators 1 1 36.77 OD 54'' x 8'-4''
6 Vertical separators 2 1 36.77 OD 54'' x 8'-4''
7 Maintenance building 1 44.80 12'-3'' x 6'-4'' x 8'-0''
8 Switch gear 1 7.84 5'-0'' x 2'-2'' x 8'-10''
9 Switch gear building 1 5.04 26'-0'' x 24'-0'' x 14'-0''
10 Switch gear building 1 6.72 7'-0'' x 18'-0'' x 13'-6''
11 Diesel fuel tank 1 58.24 10'-0'' x 10'-0'' x 10'-0''
12 Toilet 1 2.24 4'-0'' x 6'-0'' x 8'-0''
13 Transformer-1 1 92.00 16'-6' x 12'-10'' x 12'-0''
14 Transformer-2 1 12.00 9'-0'' x 5'-0'' x 6'-9''
15 Vertical air receiver 1 1.20 OD 38'' x 6'-4''

MAIN DECK
No. Description Jumlah Berat (Kip) Ukuran
1 Battery box 1 1 1.79 2'-3'' x 2'-1' x 1'-9''
2 Battery box 2 1 1.79 2'-3'' x 2'-1' x 1'-9''
3 Air compressor package 1 5'-8'' x 3'-6'' x 6'-0''
3.36
4 Load break switch 1 1.19 4'-6'' x 2'-5'' x 6'-5''
5 Container room-1 1 23.52 34'-0'' x 10'-0'' x 20'-0'
6 Container room-2 1 23.52 34'-0'' x 10'-0'' x 20'-0'
7 Process control room 1 9.24 16'-0'' x 14'-0'' x 12'-0''
8 Transformer 1 19.23 12'-6'' x 8'-0'' x 8'-0''
9 Instrument storage 1 5.60 8'-0'' x 6'-8'' x 6'-6''
10 Fresh water tank 1 7.09 11'-6'' x 8'-0'' x 10'-0''
11 Air receiver 1 1.20 OD 36'' x 75''
12 Ansul drum chemical skid 1 9'-3'' x 5'-2'' x 4'-5''
2.47
13 Mechanical storage 1 7.84 8'-2'' x 8'-1'' x 8'-9''
14 Life capsule 1 2.69 …
15 Communication microwave 1 10'-4'' x 10'-0'' x 9'-10''
5.38
16 Communication tower 1 17.92 10'-5'' x 10'-5'' x 100'-0''
17 Fuel tank 1 13.44 5'-7'' x 4'-5'' x 4'-7''
18 Power instrument storage 1 8'-2'' x 8'-2'' x 9'-0''
4.44
19 Toilet 1 2.24 5'-0'' x 4'-0'' x 8'-0''
20 Flare bridge 1 … …
EQUIPMENT SIZE

I. CELLAR DECK
SIZE
No. Description Jumlah Berat (Kip) Ukuran LENGTH WIDTH
feet inch feet
1 Gas Cooler 1 15.68 OD 38'' x 20'-0'' 38
2 Emergency generator 1 20.16 22'-0'' x 9'-0'' x 10'-11'' 22 9
3 Battery box 1 1 1.79 2'-3'' x 2'-3'' x 1'-9'' 2 3 2
4 Battery box 2 1 1.79 2'-3'' x 2'-3'' x 1'-9'' 2 3 2
5 Vertical separators 1 1 36.77 OD 54'' x 8'-4'' 54
6 Vertical separators 2 1 36.77 OD 54'' x 8'-4'' 54
7 Maintenance building 1 44.80 12'-3'' x 6'-4'' x 8'-0'' 12 3 6
8 Switch gear 1 7.84 5'-0'' x 2'-2'' x 8'-10'' 5 2
9 Switch gear building 1 5.04 26'-0'' x 24'-0'' x 14'-0'' 26 24
10 Switch gear building 1 6.72 7'-0'' x 18'-0'' x 13'-6'' 7 18
11 Diesel fuel tank 1 58.24 10'-0'' x 10'-0'' x 10'-0'' 10 10
12 Toilet 1 2.24 4'-0'' x 6'-0'' x 8'-0'' 4 6
13 Transformer-1 1 92.00 16'-6' x 12'-10'' x 12'-0'' 16 6 12
14 Transformer-2 1 12.00 9'-0'' x 5'-0'' x 6'-9'' 9 5
15 Vertical air receiver 1 1.20 OD 38'' x 6'-4'' 38

II. MAIN DECK


SIZE
No. Description Jumlah Berat (Kip) Ukuran LENGTH WIDTH
feet inch feet
1 Battery box 1 1 1.79 2'-3'' x 2'-1' x 1'-9'' 2 3 2
2 Battery box 2 1 1.79 2'-3'' x 2'-1' x 1'-9'' 2 3 2
3 Air compressor package 1 5'-8'' x 3'-6'' x 6'-0''
3.36 5 8 3
4 Load break switch 1 1.19 4'-6'' x 2'-5'' x 6'-5'' 4 6 2
5 Container room-1 1 23.52 34'-0'' x 10'-0'' x 20'-0' 34 10
6 Container room-2 1 23.52 34'-0'' x 10'-0'' x 20'-0' 34 10
7 Process control room 1 9.24 16'-0'' x 14'-0'' x 12'-0'' 16 14
8 Transformer 1 19.23 12'-6'' x 8'-0'' x 8'-0'' 12 6 8
9 Instrument storage 1 5.60 8'-0'' x 6'-8'' x 6'-6'' 8 6
10 Fresh water tank 1 7.09 11'-6'' x 8'-0'' x 10'-0'' 11 6 8
11 Air receiver 1 1.20 OD 36'' x 75'' 36
12 Ansul drum chemical skid 1 9'-3'' x 5'-2'' x 4'-5''
2.47 9 3 5
13 Mechanical storage 1 7.84 8'-2'' x 8'-1'' x 8'-9'' 8 2 8
14 Life capsule 1 2.69 …
15 Communication 1 10'-4'' x 10'-0'' x 9'-10''
5.38 10 4 10
microwave
16 Communication tower 1 17.92 10'-5'' x 10'-5'' x 100'-0'' 10 5 10
17 Fuel tank 1 13.44 5'-7'' x 4'-5'' x 4'-7'' 5 7 4
18 Power instrument 1 8'-2'' x 8'-2'' x 9'-0''
4.44 8 2 8
storage
19 Toilet 1 2.24 5'-0'' x 4'-0'' x 8'-0'' 5 4
20 Flare bridge 1 … …
EQUIPMENT SIZE (COUNT)

I. CELLAR DECK
SIZE
WIDTH HEIGHT No. Description Jumlah Berat (Kip)
inch feet inch
38 20 1 Gas Cooler 1 15.68
10 11 2 Emergency generator 1 20.16
3 1 9 3 Battery box 1 1 1.79
3 1 9 4 Battery box 2 1 1.79
54 8 4 5 Vertical separators 1 1 36.77
54 8 4 6 Vertical separators 2 1 36.77
4 8 7 Maintenance building 1 44.80
2 8 10 8 Switch gear 1 7.84
14 9 Switch gear building 1 5.04
13 6 10 Switch gear building 1 6.72
10 11 Diesel fuel tank 1 58.24
8 12 Toilet 1 2.24
10 12 13 Transformer-1 1 92.00
6 9 14 Transformer-2 1 12.00
38 6 4 15 Vertical air receiver 1 1.20

II. MAIN DECK


SIZE
WIDTH HEIGHT No. Description Jumlah Berat (Kip)
inch feet inch
1 1 9 1 Battery box 1 1 1.79
1 1 9 2 Battery box 2 1 1.79
3 Air compressor 1
6 6 3.36
package
5 6 5 4 Load break switch 1 1.19
20 5 Container room-1 1 23.52
20 6 Container room-2 1 23.52
12 7 Process control room 1 9.24
0 8 0 8 Transformer 1 19.23
8 6 6 9 Instrument storage 1 5.60
10 10 Fresh water tank 1 7.09
36 75 11 Air receiver 1 1.20
12 Ansul drum chemical 1
2 4 5 2.47
skid
1 8 9 13 Mechanical storage 1 7.84
14 Life capsule 1 2.69
15 Communication 1
9 10 5.38
microwave
5 100 16 Communication tower 1 17.92
5 4 7 17 Fuel tank 1 13.44
18 Power instrument 1
2 9 0 4.44
storage
8 19 Toilet 1 2.24
20 Flare bridge 1 …
EQUIPMENT SIZE (COUNT) EQUIPMENT

SIZE
Ukuran I. CELLAR DECK
LENGTH (ft) WIDTH (ft) HEIGHT (ft)
No. Description
OD 38'' x 20'-0'' 3.17 3.17 20 1 Gas Cooler
22'-0'' x 9'-0'' x 10'-11'' 22 9 10.92 2 Emergency generator
2'-3'' x 2'-3'' x 1'-9'' 2.25 2.25 1.75 3 Battery box 1
2'-3'' x 2'-3'' x 1'-9'' 2.25 2.25 1.75 4 Battery box 2
OD 54'' x 8'-4'' 4.50 4.50 8.33 5 Vertical separators 1
OD 54'' x 8'-4'' 4.50 4.50 8.33 6 Vertical separators 2
12'-3'' x 6'-4'' x 8'-0'' 12.25 6.33 8 7 Maintenance building
5'-0'' x 2'-2'' x 8'-10'' 5 2.17 8.83 8 Switch gear
26'-0'' x 24'-0'' x 14'-0'' 26 24 14 9 Switch gear building
7'-0'' x 18'-0'' x 13'-6'' 7 18 13.50 10 Switch gear building
10'-0'' x 10'-0'' x 10'-0'' 10.00 10.00 10 11 Diesel fuel tank
4'-0'' x 6'-0'' x 8'-0'' 4.00 6.00 8 12 Toilet
16'-6' x 12'-10'' x 12'-0'' 16.50 12.83 12 13 Transformer-1
9'-0'' x 5'-0'' x 6'-9'' 9.00 5.00 6.75 14 Transformer-2
OD 38'' x 6'-4'' 3.17 3.17 6.33 15 Vertical air receiver
Total

SIZE
Ukuran II. MAIN DECK
LENGTH (ft) WIDTH (ft) HEIGHT (ft)
No. Description
2'-3'' x 2'-1' x 1'-9'' 2.25 2.08 1.75 1 Battery box 1
2'-3'' x 2'-1' x 1'-9'' 2.25 2.08 1.75 2 Battery box 2
5'-8'' x 3'-6'' x 6'-0'' 3 Air compressor package
5.67 3.50 6
4'-6'' x 2'-5'' x 6'-5'' 4.50 2.42 6.42 4 Load break switch
34'-0'' x 10'-0'' x 20'-0' 34.00 10.00 20 5 Container room-1
34'-0'' x 10'-0'' x 20'-0' 34.00 10.00 20 6 Container room-2
16'-0'' x 14'-0'' x 12'-0'' 16.00 14.00 12 7 Process control room
12'-6'' x 8'-0'' x 8'-0'' 12.50 8.00 8 8 Transformer
8'-0'' x 6'-8'' x 6'-6'' 8.00 6.67 6.50 9 Instrument storage
11'-6'' x 8'-0'' x 10'-0'' 11.50 8.00 10 10 Fresh water tank
OD 36'' x 75'' 3.00 3.00 6.25 11 Air receiver
9'-3'' x 5'-2'' x 4'-5'' 12 Ansul drum chemical skid
9.25 5.17 4.42
8'-2'' x 8'-1'' x 8'-9'' 8.17 8.08 8.75 13 Mechanical storage
… 0.00 0.00 0 14 Life capsule
10'-4'' x 10'-0'' x 9'-10'' 15 Communication microwave
10.33 10.00 9.83
10'-5'' x 10'-5'' x 100'-0'' 10.42 10.42 100 16 Communication tower
5'-7'' x 4'-5'' x 4'-7'' 5.58 4.42 4.58 17 Fuel tank
8'-2'' x 8'-2'' x 9'-0'' 18 Power instrument storage
8.17 8.17 9
5'-0'' x 4'-0'' x 8'-0'' 5.00 4.00 8 19 Toilet
… 0.00 0.00 0 20 Flare bridge
Total
EQUIPMENT AREAS

Amount Weigth (kips) Area (ft2) Luas Yang Digunakan Area (ft2)
1 15.68 7.87 Cellar Deck 1474.83
1 20.16 198 Main Deck 1633.48
1 1.79 5.06
1 1.79 5.06
1 36.77 15.90
1 36.77 15.90
1 44.80 77.58
1 7.84 10.83
1 5.04 624
1 6.72 126
1 58.24 100
1 2.24 24
1 92.00 211.75
1 12.00 45
1 1.20 7.87
Total 1474.83

Amount Weigth (kips) Area (ft2)


1 1.79 4.69
1 1.79 4.69
1
3.36 19.83
1 1.19 10.88
1 23.52 340
1 23.52 340
1 9.24 224
1 19.23 100
1 5.60 53.33
1 7.09 92
1 1.20 7
1
2.47 47.79
1 7.84 66.01
1 2.69 0
1
5.38 103.33
1 17.92 108.51
1 13.44 24.66
1
4.44 66.69
1 2.24 20
1 … 0
Total 1633.48
Ukuran Riser dan Conductor

No Description Amount Diameter (ft) Width(ft)


1 Riser 4 1.667 0.052
2 Conductor 4 2.5 0.052
DECK SIZE
Deck Area (ft2)
Cellar Deck 2800 ft2
Main Deck 2800 ft2

Possible Size for Cellar Deck (1800 ft2) Ukuran Deck Length Width
Length Width Area (ft2) Cellar Deck 50 56
50 56 2800 Main Deck 50 56

Possible Size for Main Deck (1800 ft2)


Length Width Area (ft2)
50 56 2800
Area (ft2) Selisih
2800 0
2800 0
II. MAIN DECK
SIZE
Coordinate COG Moment to Deck CG (kips.ft)
No. Description Jumlah Berat (Kip)
LENGTH (ft) WIDTH (ft) HEIGHT (ft)
X Y Z Wx Wy Wz
1 Battery box 1 1 1.79 2.25 2.08 1.75 -2.46 -9.457 0.875 -4.4034 -16.92803 1.56625
2 Battery box 2 1 1.79 2.25 2.08 1.75 -4.54 -9.457 0.875 -8.1266 -16.92803 1.56625
3 Air compressor package 1 3.36 5.67 3.50 6.00 14 -18 3 47.04 -60.48 10.08
4 Load break switch 1 1.19 4.50 2.42 6.42 -21 -9.325 3.208333 -24.99 -11.09675 3.8179167
5 Container room-1 1 23.52 34.00 10.00 20.00 6.195 -6.75 10 145.7064 -158.76 235.2
6 Container room-2 1 0.00 0.00 0.00 0.00 0 0 0 0 0 0
7 Process control room 1 9.24 16.00 14.00 12.00 19.25 -6.277 6 177.87 -57.99948 55.44
8 Transformer 1 19.23 12.50 8.00 8.00 -1.921 18 4 -36.94083 346.14 76.92
9 Instrument storage 1 5.60 8.00 6.67 6.50 -12.25 -6.693 3.25 -68.6 -37.4808 18.2
10 Fresh water tank 1 7.09 11.50 8.00 10.00 -5.562 -18 5 -39.45127 -127.674 35.465
11 Air receiver 1 0.00 0.00 0.00 0.00 0 0 0 0 0 0
12 Ansul drum chemical skid 1 2.47 9.25 5.17 4.42 21 7.559 2.208333 51.912 18.68585 5.459
13 Mechanical storage 1 7.84 8.17 8.08 8.75 10.5 15.886 4.375 82.32 124.5462 34.3
14 Life capsule 1 0.00 0.00 0.00 0.00 0 0 0 0 0 0
15 Communication microwave 1 0.00 0.00 0.00 0.00 0 0 0 0 0 0
16 Communication tower 1 0.00 0.00 0.00 0.00 0 0 0 0 0 0
17 Fuel tank 1 13.44 5.58 4.42 4.58 -14 1.288 2.291667 -188.16 17.31072 30.8
18 Power instrument storage 1 4.44 8.17 8.17 9.00 -21 -1.795 4.5 -93.303 -7.975185 19.9935
19 Toilet 1 2.24 5.00 4.00 8.00 -14 -18 4 -31.36 -40.32 8.96
20 Flare bridge 1 0 0.00 0.00 0.00 0 0 0 0 0 0
TOTAL 103.25 9.513304 -28.95947 537.76792
Xo Yo Zo
COG 0.09 -0.28 5.21
TRIBUTARY AREA ON CELLAR DECK
SIZE
No. Description Jumlah Berat (Kip) Ukuran Area (ft2)
LENGTH (ft) WIDTH (ft) HEIGHT (ft)

1 Gas Cooler 1 OD 38'' x


15.68 3.17 3.17 20.00 7.87
20'-0''
2 Emergency 1 22'-0'' x 9'-
20.16 22.00 9.00 10.92 198.00
generator 0'' x 10'-11''
3 Battery box 1 1 2'-3'' x 2'-3''
1.79 2.25 2.25 1.75 5.06
x 1'-9''
4 Battery box 2 1 2'-3'' x 2'-3''
1.79 2.25 2.25 1.75 5.06
x 1'-9''
5 Vertical 1 OD 54'' x 8'-
36.77 4.50 4.50 8.33 15.90
separators 1 4''
6 Vertical 1 OD 54'' x 8'-
36.77 4.50 4.50 8.33 15.90
separators 2 4''
7 Maintenance 1 12'-3'' x 6'-
44.80 12.25 6.33 8.00 77.58
building 4'' x 8'-0''
8 Switch gear 1 5'-0'' x 2'-2''
7.84 5.00 2.17 8.83 10.83
x 8'-10''
9 Switch gear 1 26'-0'' x 24'-
5.04 26.00 24.00 14.00 624.00
building 0'' x 14'-0''
10 Switch gear 1 7'-0'' x 18'-
6.72 7.00 18.00 13.50 126.00
building 0'' x 13'-6''
11 Diesel fuel tank 1 10'-0'' x 10'-
58.24 10.00 10.00 10.00 100.00
0'' x 10'-0''
12 Toilet 1 4'-0'' x 6'-0''
2.24 4.00 6.00 8.00 24.00
x 8'-0''
13 Transformer-1 1 16'-6' x 12'-
92.00 16.50 12.83 12.00 211.75
10'' x 12'-0''
14 Transformer-2 1 9'-0'' x 5'-0''
12.00 9.00 5.00 6.75 45.00
x 6'-9''
15 Vertical air 1 OD 38'' x 6'-
1.20 3.17 3.17 6.33 7.87
receiver 4''
TRIBUTARY AREA ON MAIN DECK
SIZE
No. Description Jumlah Berat (Kip) Ukuran Area (ft2)
LENGTH (ft) WIDTH (ft) HEIGHT (ft)

1 Battery box 1 1 2'-3'' x 2'-1'


1.79 2.25 2.08 1.75 4.69
x 1'-9''
2 Battery box 2 1 2'-3'' x 2'-1'
1.79 2.25 2.08 1.75 4.69
x 1'-9''
3 Air compressor 1 5'-8'' x 3'-6''
3.36 5.67 3.50 6.00 19.83
package x 6'-0''
4 Load break 1 4'-6'' x 2'-5''
1.19 4.50 2.42 6.42 10.88
switch x 6'-5''
5 Container room- 1 34'-0'' x 10'-
23.52 34.00 10.00 20.00 340.00
1 0'' x 20'-0'
6 Container room- 1 34'-0'' x 10'-
23.52 34.00 10.00 20.00 340.00
2 0'' x 20'-0'
7 Process control 1 16'-0'' x 14'-
9.24 16.00 14.00 12.00 224.00
room 0'' x 12'-0''
8 Transformer 1 12'-6'' x 8'-
19.23 12.50 8.00 8.00 100.00
0'' x 8'-0''
9 Instrument 1 8'-0'' x 6'-8''
5.60 8.00 6.67 6.50 53.33
storage x 6'-6''
10 Fresh water 1 11'-6'' x 8'-
7.09 11.50 8.00 10.00 92.00
tank 0'' x 10'-0''
11 Air receiver 1 OD 36'' x
1.20 3.00 3.00 6.25 7.07
75''
12 Ansul drum 1 9'-3'' x 5'-2''
2.47 9.25 5.17 4.42 47.79
chemical skid x 4'-5''
13 Mechanical 1 8'-2'' x 8'-1''
7.84 8.17 8.08 8.75 66.01
storage x 8'-9''
14 Life capsule 1 2.69 … 0.00 0.00 0.00 0.00
15 Communication 1 10'-4'' x 10'-
5.38 10.33 10.00 9.83 103.33
microwave 0'' x 9'-10''
16 Communication 1 10'-5'' x 10'-
17.92 10.42 10.42 100.00 108.51
tower 5'' x 100'-0''
17 Fuel tank 1 5'-7'' x 4'-5''
13.44 5.58 4.42 4.58 24.66
x 4'-7''
18 Power 1 8'-2'' x 8'-2''
instrument 4.44 x 9'-0'' 8.17 8.17 9.00 66.69
storage
19 Toilet 1 5'-0'' x 4'-0''
2.24 5.00 4.00 8.00 20.00
x 8'-0''
20 Flare bridge 1 … … 0.00 0.00 0.00 0.00
Beban Equipment yang Mengenai Secondary Girder pada Cellar Deck
Eq 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Total
Kips 15.68 20.16 1.79 1.79 36.77 36.77 44.80 7.84 5.04 6.72 58.24 2.24 92.00 12.00 1.20
ft2 7.87 198.00 5.06 5.06 15.90 15.90 77.58 10.83 624.00 126.00 100.00 24.00 211.75 45.00 7.87
0
1

0
2

0.570 0.570
3

0.333 1.166 11.950 13.450


4

0.017 13.085 13.102


5

0.578 3.767 4.345


6
SECONDARY GIRDER

22.264 2.623 10.533 35.420


7

0.578 14.168 0.127 0.498 10.535 35.914


8

10.0074
9.252 0.653 4.049 13.955
9
10

0.653 0.146 0.799


11

0.653 0.577 5.724


4.493333
0.653 0.146 3.071
12

2.271733
13

0.311 3.937
3.626662
4.000538
14

4.000538
15

3.626662
3.626662
Total 10.0074 11.25386 0.903 1.183 23.42038 23.42038 25.036 2.751 0 3.4219 28.8839 0.8690 0 6.765067 0 137.9148
Beban Equipment yang Mengenai Secondary Girder pada Main Deck
Eq 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Kips 1.79 1.79 3.36 1.19 23.52 23.52 9.24 19.23 5.60 7.09 1.20 2.47 7.84 2.69 5.38 17.92 13.44 4.44 2.24 Total

ft2 4.69 4.69 19.83 10.88 340.00 340.00 224.00 100.00 53.33 92.00 7.07 47.79 66.01 0.00 103.33 108.51 24.66 66.69 20.00

0.797209
1

0.797209
0.663774 1.046957 1.71073
2

0.114999 0.797209 0.912


3

1.601 4.544363 0.812 6.958


4

1.601 0.153 0.114999 1.869


5

0.01833 0.260 1.455 1.733


6
SECONDARY GIRDER

0.608695 0.334515 3.918 1.455 6.317


7

0.209 3.918 0.008 4.157


8

0.021766
4.099 0.062 4.161
9
10

4.099 1.210 5.309


11

3.352 1.567 4.920

1.436 1.170469 1.210 3.817


14 13 12

1.170469 0.092587 1.263056


1.98394
1.170469 0.813471
15

1.263366
1.170469 0.092897
Total 0.627025 0.356282 1.436442 0.663774 11.759 0 4.681875 8.158 3.202 3.071 0 0.998955 3.987108 0 0 0 4.77436 2.641374 0.812 47.170
Beban Equipment yang Mengenai Main Girder pada Cellar Deck
Eq 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Total
kips 15.68 20.16 1.79 1.79 36.77 36.77 44.80 7.84 5.04 6.72 58.24 2.24 92.00 12.00 1.20
ft2 7.87 198.00 5.06 5.06 15.90 15.90 77.58 10.83 624.00 126.00 100.00 24.00 211.75 45.00 7.87
MG 1 0.000

MG 2 0.903398 1.183787 2.343967 1.70768 6.139

MG3 4.000538 4.000538

MG4 9.755782 0.863333 10.61912

Total 0.903 1.184 0.000 2.344 1.708 9.756 0.863 20.758

Cellar Deck

No Deskripsi Beban

1 Beban Equipment yang Mengenai Secondary Girder 137.9148

2 Beban Equipment yang Mengenai Main Girder 20.758

Total 158.673
Beban Equipment yang Mengenai Main Girder pada Main Deck
Eq 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
kips 1.79 1.79 3.36 1.19 23.52 23.52 9.24 19.23 5.60 7.09 1.20 2.47 7.84 2.69 5.38 17.92 13.44 4.44 2.24 Total

4.69 4.69 19.83 10.88 340.00 340.00 224.00 100.00 53.33 92.00 7.07 47.79 66.01 0.00 24.66 66.69 20.00
ft2
MG 1 0.663774 1.046957 1.71073

MG 2 2.462978 1.834412 4.29739

MG3 1.170469 0.813471 1.98394

MG4 1.037647 1.215431 0.998031 0.7 3.951109

Total 0 0 1.037647 0.663774 1.215431 0 1.170469 2.462978 0 0.998031 0 0.813471 1.834412 0 0 0 0 1.046957 0.7 11.94317

Main Deck

No Deskripsi Beban

1 Beban Equipment yang Mengenai Secondary Girder 47.170

2 Beban Equipment yang Mengenai Main Girder 11.943

Total 59.113
MAIN DECK SCANTLINGS (Gratings)
a. Deck Flooring

Jarak antara Secondary Girder 3.5 ft = 42 in


Tegangan Yield Baja A36(𝜎_𝑦 ) 36 ksi = 5184 ksf
Luasan Main Deck = 2800 ft2

Beban Hidup Kondisi Operasi = 100 psf


Beban Pipa = 100 psf +
= 200 psf = 0.2 ksf = -0.00138889 ksi
qTOTAL
= 560000 pounds

b. Menghitung Momen Max

Mmax = 0.204167 ksf = 2.45 ksi

c. Menghitung Tegangan Izin

𝜎_𝛼 = 21.6 ksi

d. Menghitung Modulus Penampang

S = 0.113426

e. Menghitung Tebal Pelat ℎ= √(6𝑆/𝑏)

h = 0.8249579113843 in
Dari tabel tebal pelat didapatkan tebal pelat yang mendekati adalah = 7/8 In
Berat pelat tiap ft2 = 36.78 psf = -0.00026 ksi
Decimal Nominal Thickness, In
1/8 0.125
3/16 0.1875
1/4 0.25
5/16 0.3125
3/8 0.375
7/16 0.4375
1/2 0.5
9/16 0.5625
5/8 0.625
3/4 0.75
7/8 0.875
1 1
CELLAR DECK SCANTLINGS (Gratings)
a. Deck Flooring

Jarak antara Secondary Girder 3.5 ft = 42 in


Tegangan Yield Baja A36(𝜎_𝑦 ) 36 ksi = 5184 ksf
Luasan Main Deck = 2800 ft2

Beban Hidup Kondis = 110 psf


Beban Pipa = 75 psf +
= 185 ` = 0.185 ksf = 0.00128 ksi
TOTAL
= 518000 pounds

b. Menghitung Momen Max

Mmax = 0.188854 ksf = 2.26625 ksi

c. Menghitung Tegangan Izin

𝜎_𝛼 = 21.6 ksi

d. Menghitung Modulus Penampang

S = 0.104919

e. Menghitung Tebal Pelat

ℎ= √(6𝑆/𝑏)

h = 0.793419 in
Dari tabel tebal pelat didapatkan tebal pelat yang mendekati adalah = 3/4 In
Berat pelat tiap ft2 = 31.68 psf = 0.00022 ksi
Decimal Nominal Thickness, In
1/8 0.125
3/16 0.1875
1/4 0.25
5/16 0.3125
3/8 0.375
7/16 0.4375
1/2 0.5
9/16 0.5625
5/8 0.625
3/4 0.75
7/8 0.875
1 1
PERHITUNGAN AREA HELIDECK

Tipe = Hughes 269A/B berat 1.67 kilopounds


Rotor Diameter (RD) = 25.3 ft = 7.7 m

Possible Size for Helideck


Length Width Area (ft2)
18 18 324

Jarak antara girder = 3 ft


12.65
1.333333
0.666667
RD = c = 25.3
a=b = x
𝑥= √(𝑐^2/2) 5.5

𝑥= √( 〖 25.3 〗 ^2/2)

x = 17.8898 ft
x=a=b = 18 ft
HELIDECK DECK SCANTLINGS (Gratings)
a. Deck Flooring

Jarak antara girder 3 ft = 36 in


Tegangan Yield Baja A36 (𝜎_𝑦 ) 36 ksi = 5184 ksf
Rotor Diameter = 7.71144 m = 25.3 ft
Luasan Helideck = 324 ft2

Beban Hidup Kondisi Operasi = 40 psf = 0.04 ksf = 0.00028 ksi


= 12,960 ponds
Beban Heli = 1670 ponds = 5.154320988 psf = -3.5794E-05 ksi

b. Menghitung Momen Max

(Sumber : API RP 2L-1996 (2006)


Mmax = 0.02613 ksi

c. Menghitung Tegangan Izin

𝜎_𝛼 = 21.6 ksi

d. Menghitung Modulus Penampang

S = 0.00121

e. Menghitung Tebal Pelat

ℎ= √(6𝑆/𝑏)

h = 0.085203 In
Dari tabel tebal pelat didapatkan tebal pelat yang mendekati adalah = 1/8 In
Berat pelat tiap ft2 = 6.16 psf = 4.277778E-05 ksi
(Sumber : API RP 2L-1996 (2006)

Decimal Nominal Thickness, In


1/8 0.125
3/16 0.1875
1/4 0.25
5/16 0.3125
3/8 0.375
7/16 0.4375
1/2 0.5
9/16 0.5625
5/8 0.625
3/4 0.75
7/8 0.875
1 1
GIRDER MAIN DECK
a. q Total Secondary Girder

Jarak antara span di main girder 36 ft = 432 in


Tegangan Yield Baja A36(𝜎_𝑦 ) 36 ksi = 5184 ksf
Jarak antara secondary girder 3.5 ft = 42 in
Luasan Main Deck = 2800 ft2
Berat pelat tiap ft2 36.78 psf
Beban Hidup Kondisi Oper = 100 psf = -0.00069 ksi = -0.029 kips/in
Beban Pipa = 100 psf = -0.00069 ksi = -0.029 kips/in
Beban Pelat = 36.78 psf = -0.00026 ksi = -0.011 kips/in
Beban Peralatan = -0.015 kips/in
= -0.084 kips/in
qTOTAL

b. Menghitung Momen Max

Mmax = 1301.43 kips.in Support Reaction = -18.07541 kips

c. Menghitung Tegangan Izin

𝜎_𝛼 = 21.6 ksi

d. Menghitung Modulus Penampang

3
Smin = 60.25137 in

e. menentukan profil beam


Selected Beam Profile : AISC Manual 13th Edition. Table 1-1
W 18 x 40 W Shapes

Modulus of Sectional Area S = 68.4 in3


Linear Weight of Beam WS = 40 lb/f
WS = 0.0033 kips/in

f. mengecek tegangan maksimum


Maximum momen beam (Mmax be= 51.84 kips-in
(Ws*L²)/12
= 19.78 ksi < 21.6
Cek Tegangan maksimum (σmax)
OK

a. q Total Main Girder


Jarak antara span di main girder 42 ft = 504 in
Tegangan Yield Baja A36 (𝜎_𝑦 )(𝜎_𝑦 )(𝜎_𝑦 ) 36 ksi = 0.036 ksf
Luasan Main Deck = 2800 ft2
Berat pelat tiap ft2 = 36.78 psf

Reaksi dari Secondary Gi = -0.72 kips


Berat secondary girder (m = -0.001 kips/in
Reaksi dari SG dan Self- = -18.795 kips
MOMENT CALCULATION
No. P (kips) a (ft) b (ft) L (ft) MA (kips.ft)
MB (kips.ft)
MSG03 -18.80 0 42 42 0.00 0.00
MSG04 -18.80 3.5 38.5 42 55.28 -5.03
MSG05 -18.80 7 35 42 91.37 -18.27
MSG06 -18.80 10.5 31.5 42 111.01 -37.00
MSG07 -18.80 14 28 42 116.95 -58.47
MSG08 -18.80 17.5 24.5 42 111.92 -79.95
MSG09 -18.80 21 21 42 98.68 -98.68
MSG10 -18.80 24.5 17.5 42 79.95 -111.92
MSG11 -18.80 28 14 42 58.47 -116.95
MSG12 -18.80 31.5 10.5 42 37.00 -111.01
MSG13 -18.80 35 7 42 18.27 -91.37
MSG14 -18.80 38.5 3.5 42 5.03 -55.28
MSG15 -18.80 42 0 42 0.00 0.00
Total 783.93 -783.93 kips-ft
CCW (+) MPmax 9407.1 -9407.10 kips-in
MPAmax MPBmax
Beban Peralatan = -0.009 kips/in
Berat secondary girder tot = -0.0214 kips/in
qTOTAL = -0.030 kips/in

b. Menghitung Momen Max

Mmax = -634.0904 kips.in


Mmax + Mp max = -1E+04 kips.in
c. Menghitung Tegangan Izin

𝜎_𝛼 = 21.6 ksi

d. Menghitung Modulus Penampang

S = -464.8701 in3

e. menentukan profil beam


AISC Manual 13th Edition. Table 1-1
Selected Beam Profile : W 24 x 192 W Shapes
Modulus of Sectional Area S = 491 in3
Linear Weight of Beam WS = 192 lb/f
WS = 0.0160 kips/in

f. mengecek tegangan maksimum


Maximum momen beam (Mmax be= 338.688 kips-in
(Ws*L²)/12
Cek Tegangan = 19.76 ksi < 21.6
maksimum (σmax)
OK
GIRDER CELLAR DECK
a. q Total Secondary Girder

Jarak antara span di main girder 36 ft = 432 in


Tegangan Yield Baja A36 (𝜎_𝑦 ) 36 ksi = 0.036 ksf
Jarak antara secondary girder 3.5 ft = 42 in
Luasan Main Deck = 2800 ft2
Berat pelat tiap ft2 31.68 psf
Beban Hidup Kondis = 110 psf = -0.00076 ksi = -0.032 kips/in
Beban Pipa = 75 psf = -0.00052 ksi = -0.022 kips/in
Beban Pelat = 31.68 psf = -0.00022 ksi = -0.009 kips/in
Beban Peralatan = -0.08 kips/in
= -0.145 kips/in
qTOTAL

b. Menghitung Momen Max

Mmax = 2257.9981596 kips.in Support Reaction = -31.36109 kips

c. Menghitung Tegangan Izin

𝜎_𝛼 = 21.6 ksi

d. Menghitung Modulus Penampang

S = 104.53695183 In3

e. menentukan profil beam


Selected Beam Profile : AISC Manual 13th Edition. Table 1-
W 24 x 55 1 W Shapes

Modulus of Sectional Area S = 114 in3


Linear Weight of Beam WS = 55 lb/f
WS = 0.0046 kips/in

f. mengecek tegangan maksimum


Maximum momen beam (Mmax b= 71.28 kips-in
(Ws*L²)/12
= 20.43 ksi < 21.6
Cek Tegangan maksimum (σmax)
OK
a. q Total Main Girder
Jarak antara span di main girder 42 ft = 504 in
Tegangan Yield Baja A36 (𝜎_𝑦 ) (𝜎_𝑦 )(𝜎_𝑦 ) 36 ksi = 0.036 ksf
Luasan Main Deck = 2800 ft2
Berat pelat tiap ft2 = 31.68 psf

Reaksi dari Seconda = -0.99 kips


Berat secondary gir = -0.002 kips/in
Reaksi dari SG dan = -32.351 kips
MOMENT CALCULATION
No. P (kips) a (ft) b (ft) L (ft) MA (kips.ft)
MB (kips.ft)
MSG03 -32.35 0 42 42 0.00 0.00
MSG04 -32.35 3.5 38.5 42 95.14 -8.65
MSG05 -32.35 7 35 42 157.26 -31.45
MSG06 -32.35 10.5 31.5 42 191.07 -63.69
MSG07 -32.35 14 28 42 201.30 -100.65
MSG08 -32.35 17.5 24.5 42 192.65 -137.60
MSG09 -32.35 21 21 42 169.84 -169.84
MSG10 -32.35 24.5 17.5 42 137.60 -192.65
MSG11 -32.35 28 14 42 100.65 -201.30
MSG12 -32.35 31.5 10.5 42 63.69 -191.07
MSG13 -32.35 35 7 42 31.45 -157.26
MSG14 -32.35 38.5 3.5 42 8.65 -95.14
MSG15 -32.35 42 0 42 0.00 0.00
Total 1349.31 -1349.31 kips-ft
CCW (+) MPmax 16191.7 -16191.72 kips-in
MPAmax MPBmax
Beban Peralatan = -0.021 kips/in
Berat secondary gird = -0.029 kips/in
qTOTAL = -0.051 kips/in

𝜎_𝛼

b. Menghitung Momen Max

Mmax = -1069.702861 kips.in


Mmax + Mp max = -2E+04 kips.in
c. Menghitung Tegangan Izin

𝜎_𝛼 = 21.6 ksi

d. Menghitung Modulus Penampang

S = -799.1398694 in3

e. menentukan profil beam


AISC Manual 13th Edition. Table 1-
Selected Beam Profile : W 30 x 261 1 W Shapes

Modulus of Sectional Area S = 829 in3


Linear Weight of Beam WS = 261 lb/f
WS = 0.0218 kips/in

f. mengecek tegangan maksimum


Maximum momen beam (Mmax b= 460.404 kips-in
(Ws*L²)/12
Cek Tegangan = 20.27 ksi < 21.6
maksimum (σmax)
OK
GIRDER HELI DECK
a. q Total Secondary Girder

Jarak antara Secondary Girder 18 ft = 216 in


Tegangan Yield Baja A36 (𝜎_𝑦 ) 36 ksi = 0.036 ksf
Jarak antara Secondary Girder 3 ft = 36 in
Luasan Heli Deck = 324 ft2
Berat pelat tiap ft2 6.16 psf
Beban Heli = 1670 ponds = 5.154 psf = -3.579E-05 ksi = -0.00129 kips/in
Beban Hidup Kondis = 40 psf = 0.0003 ksi = -0.01 kips/in
Beban Pelat = 6.16 psf = 4.3E-05 ksi = -0.0015 kips/in
qTOTAL = -0.0128 kips/in

b. Menghitung Momen Max

Mmax = 49.87752 kips.in Reaction Support = -1.38548667 kips

c. Menghitung Tegangan Izin

𝜎_𝛼 = 21.6 ksi

d. Menghitung Modulus Penampang

S = 2.309144 In3

e. menentukan profil beam (Sumber : API RP 2L-1996 (2006)


Selected Beam Profile : AISC Manual 13th Edition. Table 1-1 W
W 4 x 13 Shapes

Modulus of Sectional Area S = 5.46 in3


Linear Weight of Beam WS = 13 lb/f
WS = 0.0011 kips/in

f. mengecek tegangan maksimum


Maximum momen beam (Mma
= 4.212 kips-in
(Ws*L²)/12
Cek Tegangan maksimum = 9.91 ksi < 21.6
(σmax) OK
GIRDER HELI DECK
a. q Total Main Girder

Jarak antara Secondary Girder 18 ft = 216 in


Tegangan Yield Baja A36 (𝜎_𝑦 ) 36 ksi = 0.036 ksf
Luasan Heli Deck = 324 ft 2

Berat pelat tiap ft2 6.16 psf


Reaksi dari Seconda = -0.117 kips Berat secondary girder = -0.008 kips/in
Berat secondary gir = -0.001 kips/in qTOTAL = -0.008 kips/in
Reaksi dari SG dan = -1.502 kips

b. Menghitung Momen Reaksi SG


MOMENT CALCULATION
No. P (kips) a (ft) b (ft) L (ft) MA (kips.ft) MB (kips.ft)
MSG01 -1.50 0 18 18 0.00 0.00
MSG02 -1.50 3 15 18 3.13 -0.63
MSG03 -1.50 6 12 18 4.01 -2.00
MSG04 -1.50 9 9 18 3.38 -3.38
MSG05 -1.50 12 6 18 2.00 -4.01
MSG06 -1.50 15 3 18 0.63 -3.13
MSG07 -1.50 18 0 18 0.00 0.00
Total 13.15 -13.15 kips-ft
CCW (+) M Pmax 157.8 -157.76 kips-in
MPAmax MPBmax
c. Menghitung Moment Maksimum c. Menghitung Tegangan Izin

Mmax = -31.59 kips.in


Mmax + Mp max = -189.35 kips.in 𝜎_𝛼 = 21.6 ksi
d. Menghitung Modulus Penampang

S = 8.766255 In3
e. menentukan profil beam
Selected Beam Profile : AISC Manual 13th Edition. Table 1-1 W
W 8 x 15 Shapes

Modulus of Sectional Area S = 9.72 in3


Linear Weight of Beam WS = 15 lb/f
WS = 0.0013 kips/in

f. mengecek tegangan maksimum


Maximum momen beam (Mma
= 4.86 kips-in
(Ws*L²)/12
Cek Tegangan maksimum = 18.98 ksi < 21.6
(σmax) OK
ELEVATIONS LIST
Value Elevation (ft) Elevation (ft)
No. Name Descriptions
(ft) (from Seabed) (from LWL)
Plate Thickness 0.1
Heli
Deck Secondary Girder Depth 0.7
Main Girder Depth 0.7
1 156 66
(Top of Air Gap (Chakrabarti) 7
Steel Highest Equipment on Main 0.0
Plate)
Main Deck Elevation 147
Plate Thickness 0.4
Main Secondary Girder Depth 2.0
Deck Main Girder Depth 3.4
2 (Top 147 57
of Steel Clearance 7
Plate) Highest Equipment on Cellar 14
Cellar Deck Elevation 120
Plate Thickness 0.3
Secondary Girder Depth 1.7
cellar Main Girder Depth 3.1
Deck Air Gap (Chakrabarti) 5
4 (Top 120 30
of Steel Max Wave Amplitude 14.8
Plate) Tide at Storm 4.5
Storm Surge 1
Water Depth 90
Working 1 Level 98
st

4 Point Clearance (3 ft) 6 104 14


Elevation
Clearance (50% Storm Tide) 2.3
1st Level
Tide at Storm 4.5
5 (Jacket Storm Surge 1 98 8
Elevation Water Depth 90
)
1st Level 98
6 2nd Level Height (-z) 30 68 -22

2nd Level 68
7 3 Level Height (-z)
rd
30 38 -52

Mudline
10 Water Depth 90 0 -90
Elevation

Leg Water Depth 90


11 Extensio Scouring 3 -3 -93
n
Mudline 90
6OD
12 Pile Stub Elevation 10 -13.3 -103.3
Scouring 3
8.6
#NAME?
9

26.1
Main
27 Deck
(Top
of Steel
Plate)

29.9

30 Subcellar
Deck
(Top
of Steel
Plate)

110.5
MAIN DECK - MATERIAL TAKE OFF

EQUIPMENT
Pressure Load Linear Weight Area Weight
No. Description
(psf) (lb/ft) (ft )
2
(kips)
1 Battery box 1 1.79
2 Battery box 2 1.79
3 Air compressor package 3.36
4 Load break switch 1.19
5 Container room-1 23.52
6 Container room-2 0.00
7 Process control room 9.24
8 Transformer 19.23
9 Instrument storage 5.60
10 Fresh water tank 7.09
11 Air receiver 0.00
12 Ansul drum chemical skid 2.47
13 Mechanical storage 7.84
14 Life capsule 0.00
15 Communication microwave 0.00
16 Communication tower 0.00
17 Fuel tank 13.44
18 Power instrument storage 4.44
19 Toilet 2.24
20 Flare bridge 0.00
BLANKET LOAD
21 Live Load 100 2800 280.00
22 Piping Load 100 2800 280.00
23 Plate Self-Weight 36.78 2800 102.98

EQUIPMENT
Pressure Load Linear Weight Length Weight
No. Description
(psf) (lb/ft) (ft) (kips)
24 SG1 40 50.00 2.00
25 SG2 40 50.00 2.00
26 SG3 40 50.00 2.00
27 SG4 40 50.00 2.00
28 SG5 40 50.00 2.00
29 SG6 40 50.00 2.00
30 SG7 40 50.00 2.00
31 SG8 40 50.00 2.00
32 SG9 40 50.00 2.00
33 SG10 40 50.00 2.00
34 SG11 40 50.00 2.00
35 SG12 40 50.00 2.00
36 SG13 40 50.00 2.00
37 SG14 40 50.00 2.00
38 SG15 40 50.00 2.00
BLANKET LOAD
39 MG1 192 50 9.60
40 MG2 192 56 10.75
41 MG3 192 50 9.60
42 MG4 192 56 10.75
SUM 836.94
RIAL TAKE OFF

NT
Coordinate from center point Moment to Deck CG (kips.ft)
No.
x y z Wx Wy Wz
-2.46 -9.46 0.88 -4.40 -16.93 1.57 1
-4.54 -9.46 0.88 -8.13 -16.93 1.57 2
14.00 -18.00 3.00 47.04 -60.48 10.08 3
-21.00 -9.33 3.21 -24.99 -11.10 3.82 4
6.20 -6.75 10.00 145.71 -158.76 235.20 5
0.00 0.00 0.00 0.00 0.00 0.00 6
19.25 -6.28 6.00 177.87 -58.00 55.44 7
-1.92 18.00 4.00 -36.94 346.14 76.92 8
-12.25 -6.69 3.25 -68.60 -37.48 18.20 9
-5.56 -18.00 5.00 -39.45 -127.67 35.47 10
0.00 0.00 0.00 0.00 0.00 0.00 11
21.00 7.56 2.21 51.91 18.69 5.46 12
10.50 15.89 4.38 82.32 124.55 34.30 13
0.00 0.00 0.00 0.00 0.00 0.00 14
0.00 0.00 0.00 0.00 0.00 0.00 15
0.00 0.00 0.00 0.00 0.00 0.00
-14.00 1.29 2.29 -188.16 17.31 30.80 16
-21.00 -1.80 4.50 -93.30 -7.98 19.99 17
-14.00 -18.00 4.00 -31.36 -40.32 8.96 18
0.00 0.00 0.00 0.00 0.00 0.00
OAD
0 0 0 0.00 0.00 0.00
No.
0 0 0 0.00 0.00 0.00
0 0 0 0.00 0.00 0.00 19
20
NT 21
Coordinate from COG Moment to Deck CG (kips.ft) 22
x y z Wx Wy Wz 23
-24.50 0.00 0.00 -49.00 0.00 0.00 24
-21.00 0.00 0.00 -42.00 0.00 0.00 25
-17.50 0.00 0.00 -35.00 0.00 0.00 26
-14.00 0.00 0.00 -28.00 0.00 0.00 27
-10.50 0.00 0.00 -21.00 0.00 0.00 28
-7.00 0.00 0.00 -14.00 0.00 0.00 29
-3.50 0.00 0.00 -7.00 0.00 0.00 30
0.00 0.00 0.00 0.00 0.00 0.00 31
3.50 0.00 0.00 7.00 0.00 0.00 32
7.00 0.00 0.00 14.00 0.00 0.00 33
10.50 0.00 0.00 21.00 0.00 0.00
14.00 0.00 0.00 0.00 0.00 0.00 29
17.50 0.00 0.00 0.00 0.00 0.00 30
21.00 0.00 0.00 42.00 0.00 0.00 31
24.50 0.00 0.00 49.00 0.00 0.00 32
OAD
-21 0 0.00 -201.60 0.00 0.00
0 18 0.00 0.00 193.54 0.00
21 0 0.00 201.60 0.00 0.00
0 -18 0.00 0.00 -193.54 0.00
SUM -53.49 -28.96 537.77
COG -0.064 -0.035 0.643
CELLAR DECK - MATERIAL TAKE OFF

EQUIPMENT
Pressure Load Linear Weight Area Weight Coordinate from center point
Description
(psf) (lb/ft) (ft )
2
(kips) x y
Gas Cooler 15.68 0.00 13.30
Emergency generator 20.16 21.00 3.48
Battery box 1 1.79 -15.90 18.00
Battery box 2 1.79 -13.15 18.00
Vertical separators 1 36.77 -3.50 8.29
Vertical separators 1 36.77 1.50 8.29
Maintenance building 44.80 -11.84 -5.56
Switch gear 7.84 -2.42 18.00
Switch gear building 0.00 0.00 0.00
Switch gear building 6.72 8.46 19.86
Diesel fuel tank 58.24 -1.72 -14.79
Toilet 2.24 10.50 -18.00
Transformer-1 0.00 0.00 0.00
Transformer-2 12.00 11.50 -7.17
Vertical air receiver 0.00 0.00 0.00
BLANKET LOAD
Live Load 110 2800 308.00 0 0
Piping Load 75 2800 210.00 0 0
Plate Self-Weight 31.68 2800 88.70 0 0

EQUIPMENT
Pressure Load Linear Weight Length Weight Coordinate from COG
Description
(psf) (lb/ft) (ft) (kips) x y
SG1 55 50.00 2.75 -24.50 0.00
SG2 55 50.00 2.75 -21.00 0.00
SG3 55 50.00 2.75 -17.50 0.00
SG4 55 50.00 2.75 -14.00 0.00
SG5 55 50.00 2.75 -10.50 0.00
SG6 55 50.00 2.75 -7.00 0.00
SG7 55 50.00 2.75 -3.50 0.00
SG8 55 50.00 2.75 0.00 0.00
SG9 55 50.00 2.75 3.50 0.00
SG10 55 50.00 2.75 7.00 0.00
SG11 55 50.00 2.75 10.50 0.00
SG12 55 50.00 2.75 14.00 0.00
SG13 55 50.00 2.75 17.50 0.00
SG14 55 50.00 2.75 21.00 0.00
SG15 55 50.00 2.75 24.50 0.00
BLANKET LOAD
MG1 261 50 13.05 -21 0
MG2 261 56 14.62 0 18
MG3 261 50 13.05 21 0
MG4 261 56 14.62 0 -18
SUM 948.09
OFF HELI DE

ate from center point Moment to Deck CG (kips.ft)


No. Description
z Wx Wy Wz
-16.00 0.00 208.47 -250.88 1 Hughes 269A/B
-20.54 423.36 70.12 -414.12
-25.13 -28.47 32.22 -44.97 2 Live Load
-25.13 -23.55 32.22 -44.97 3 Plate Self-Weight
-21.83 -128.70 304.82 -802.81
-21.83 55.16 304.82 -802.81
-22.00 -530.55 -249.10 -985.60
No. Description
-21.58 -18.93 141.12 -169.21
0.00 0.00 0.00 0.00 4 SG1
-19.25 56.82 133.45 -129.36 5 SG2
-21.00 -100.29 -861.14 -1,223.04 6 SG3
-22.00 23.52 -40.32 -49.28 7 SG4
0.00 0.00 0.00 0.00 8 SG5
-22.63 138.00 -86.09 -271.50 9 SG6
0.00 0.00 0.00 0.00 10 SG7

0 0.00 0.00 0.00 16 MG1


0 0.00 0.00 0.00 17 MG2
0 0.00 0.00 0.00 18 MG3

dinate from COG Moment to Deck CG (kips.ft)


z Wx Wy Wz
-26.00 -67.38 0.00 -71.50
-26.00 -57.75 0.00 -71.50
-26.00 -48.13 0.00 -71.50
-26.00 -38.50 0.00 -71.50
-26.00 -28.88 0.00 -71.50
-26.00 -19.25 0.00 -71.50
-26.00 -9.63 0.00 -71.50
-26.00 0.00 0.00 -71.50
-26.00 9.63 0.00 -71.50
-26.00 19.25 0.00 -71.50
-26.00 28.88 0.00 -71.50
-26.00 0.00 0.00 0.00
-26.00 0.00 0.00 0.00
-26.00 57.75 0.00 -71.50
-26.00 67.38 0.00 -71.50
-26.00 -274.05 0 -339
-26.00 0.00 263 -380
-26.00 274.05 0 -339
-26.00 0.00 -263 -380
SUM -220.25 -9.41 -7556.70
COG -0.263 -0.011 -9.029
HELI DECK - MATERIAL TAKE OFF

EQUIPMENT
Pressure Load Linear Weight Area Weight Coordinate from center point Moment to Deck CG (k
(psf) (lb/ft) (ft )
2
(kips) x y z Wx
1.67 -21 18 0 -35.07
BLANKET LOAD
40 324 13.0 -21 18 0 -272.16
6.16 324 2.0 -21 18 0 -272.16

EQUIPMENT
Pressure Load Linear Weight Length Weight Coordinate from COG Moment to Deck CG (k
(psf) (lb/ft) (ft) (kips) x y z Wx
13 18.00 0.23 -30.00 18.00 35.00 -7.02
13 18.00 0.23 -27.00 18.00 35.00 -6.32
13 18.00 0.23 -24.00 18.00 35.00 -5.62
13 18.00 0.23 -21.00 18.00 35.00 -4.91
13 18.00 0.23 -18.00 18.00 35.00 -4.21
13 18.00 0.23 -15.00 18.00 35.00 -3.51
13 18.00 0.23 -12.00 18.00 35.00 -2.81
BLANKET LOAD
15 18 0.27 -30 18 35.00 -8.10
15 18 0.27 -12 18 35.00 -3.24
15 18 0.27 -21 27 35.00 -5.67

SUM 19.07 SUM -630.80


COG -0.754
Moment to Deck CG (kips.ft)
Wy Wz
30.06 0

233.28 0
233.28 0

Moment to Deck CG (kips.ft)


Wy Wz
4.21 8.19
4.21 8.19
4.21 8.19
4.21 8.19
4.21 8.19
4.21 8.19
4.21 8.19

4.86 9.45
4.86 9.45
7.29 9.45

543.11 85.68
0.649 0.102
MATERIAL TAKE OFF SUMMARY

No. Description Weight (kips) x (ft) y (ft) z (ft) Wx (kips-ft)


1 Main Deck 836.94 -0.06 -0.03 0.64 -53.49
2 Cellar Deck 948.09 -0.26 -0.01 -9.03 -249.50
4 Heli Deck 19.07 -0.75 0.65 0.10 -14.38
SUM 1,804.10 SUM -317.36
Xo
-0.18

RELATED TABLES FOR COLUMN


Table C-C2.2 Approximate Values of Effective Length Factor, K

(Page 240 - Commentary of AISC WSD Specification, 2005)


DECK LEG - HELI D

Wy (kips-ft) Wz (kips-ft)
The deck supported by single deck leg. This deck leg placed right at the COG
-28.96 537.77 must support all the weight.
-10.66 -8560.27
12.38 1.95
-27.24 -8020.55 Total Weight (W) =
Yo Yo Xo =
COG
-0.02 -4.45 Yo =

So,
DL4 =

AISC WSD (Manual and Specificaton) (2005), Chakrabarti (2005) and c


Factor, K Design

Assumptions
a. σy =
E =
b.
Concentric Load, no bending stress occurred, only axial c

c. Assumed as portal frame with one end pinned and the othe
AISC Specification 2005].

Design Steps
1
Guess the pre-eliminary Outside Diameter (OD) and Thick
of Gyration (r), and Sectional Modulus (S). OD/t should ha
good practice. [El-Reedy, 2014 Page 94; ISO 19902, 2007

OD/t =
OD =
t =
ID =
A =
05) r =
S =

2
Determine the Buckling Factor (k) and Length of Unbraced
in pre-eliminary design. While ISO 19902 recommended th
Alignment Chart (Figure C-C2.2) for d, rotation free and tra
1; ISO 19902, 2007 Page 100; AISC ASD, 2005 Page 240
Determine the Buckling Factor (k) and Length of Unbraced
in pre-eliminary design. While ISO 19902 recommended th
Alignment Chart (Figure C-C2.2) for d, rotation free and tra
1; ISO 19902, 2007 Page 100; AISC ASD, 2005 Page 240

For simplification, use k = 1.5 as recommended by Chakra


value is 1 as shown in Table C-C2.2 AISC ASD (2005). Th
ratio (Sr).

k =
L =
Sr =

3
Calculate the Local Buckling (fxe) for Axial Compression. [IS
114]

Cx =
E =
fxe =

fy =
Therefore, the fxe is valid because:
0.041379 ≤

4
Calculate the Column Buckling (fc) for Axial Compression.
Page 114]

𝒇_𝒄=(𝟏−𝟎.𝟐𝟕𝟖𝝀^𝟐)𝒇_𝒚
𝒄

λ =
fc =

5
Determine the stress (σc) caused by the concentric load of
leg. (σc = axial compressive stress due to forces from facto

P =
σc =

6 To check the validation of our first guess the pre-eliminary


members subjected to axial compressive forces shall be de
19902, 2007 Page 87]
To check the validation of our first guess the pre-eliminary
members subjected to axial compressive forces shall be de
19902, 2007 Page 87]

𝝈_𝒄≤𝒇_𝒄
/𝜸_(𝑹,𝒄)

σc ≤
0.276759 ≤

7
ISO 19902 required that the sum of the ratio of actual load
tubular members subjected to combined axial compression
the following condition at all cross-sections along their leng

(𝜸_(𝑹,𝒄) 𝝈_𝒄)/𝒇_𝒚𝒄 +(𝜸_(𝑹,𝒃)


√(𝝈_(𝒃,𝒚)^𝟐+𝝈_(𝒃,𝒛)^𝟐 ))/𝒇_𝒃
≤𝟏.𝟎

Since no bending load, (only axial compressive stress), the

γR,cσc/fyc =
DECK LEG - HELI DECK

k leg placed right at the COG of the heli deck. So it can be assumed that the deck leg
a =
b =
c =
19.07 kips d =
0.0 ft
0.0 ft a/a =
a/b =
a/c =
19.07 kips a/d =

05), Chakrabarti (2005) and checked using ISO 19902 (2007) for Column
Design Total Weight

COG

36 ksi Use Steel with,


29000 ksi (ASTM A36)
1
stress occurred, only axial compression stress.

h one end pinned and the other rotation-fixed K=1.0 [case (d) Table C-C2.2

side Diameter (OD) and Thickness (t). Then calculate its Net Area (A), Radius
Modulus (S). OD/t should have the value between 19 to 60 or less than 60 for
14 Page 94; ISO 19902, 2007; Chakrabarti, 2005 Page 330 Vol 1]

40 OK!
30 in (Outside Diameter)
3/4 in (Wall Thickness)
28 1/2 in (Inside Diameter)
68 8/9 in2 (Net Sectional Wall Area)
10 1/3 in (Radius of Gyration)
491.6918 in3 (Sectional Modulus)

or (k) and Length of Unbraced Member (L). Chakrabarti recommended k = 1.5


e ISO 19902 recommended the use of k = 1 if the leg is braced and Length
2.2) for d, rotation free and translation fixed. [Chakrabarti, 2005 Page 312 Vol.
0; AISC ASD, 2005 Page 240 Commen. C]
5 as recommended by Chakrabarti (2005) though the theoritical k
C-C2.2 AISC ASD (2005). Then Calculate the effective slenderness

1.5
108 in 𝑺_𝒓=𝒌𝑳/ Crane
𝒓
15.66 Heli DL4

(fxe) for Axial Compression. [ISO 19902, 2007 Page 88; El-Reedy, 2014 Page

0.6 (ideal tubular) 𝒇_𝒙𝒆=𝟐𝑪_𝒙 𝑬𝒕/𝑫


29000 ksi
870 ksi

36 ksi 𝒇_𝒚𝒄= 𝒇_𝒚 𝑓𝑜𝑟 𝑓_𝑦/𝑓_𝑥𝑒


ause: ≤0.17
0.17 AISC WSD (Manual and Specif

ng (fc) for Axial Compression. [ISO 19902, 2007 Page 88; El-Reedy, 2014
Assumptions
a.

𝝀=𝑺_𝒓/𝝅 b.
√(𝒇_𝒚𝒄/𝑬)
c.
0.175628
35.69 ksi

Design Steps
used by the concentric load of deck (DL) as axial compressive stress on deck 1
stress due to forces from factored actions) [ISO 19902, 2007 Page 87]

19.07 kips 𝝈_𝒄=𝑷


2/7 ksi /𝑨

r first guess the pre-eliminary OD and t, we need to make sure that tubular
compressive forces shall be designed to satisfy the following condition: [ISO
fc/γR,c
30.24687 OK! 2

sum of the ratio of actual load/allowable load should be less than 1 where
o combined axial compression and bending forces shall be designed to satisfy
cross-sections along their length: [ISO 19902, 2007 Page 95]

_(𝑹,𝒄) 𝝈_𝒄)/𝒇_𝒚𝒄 +(𝜸_(𝑹,𝒃)


𝝈_(𝒃,𝒚)^𝟐+𝝈_(𝒃,𝒛)^𝟐 ))/𝒇_𝒃
𝟏.𝟎

axial compressive stress), then the 2nd term of equation is 0.

3
0.009072 ≤ 1.0 OK!

𝒇_𝒄=(𝟏−𝟎.𝟐𝟕𝟖𝝀^𝟐
𝒄
5

7
DECK LEG - MAIN DECK

27.52 ft
27.79 ft DL3 DL3 DL4
27.8 ft
c c
27.53 ft

1
0.990284 e e
b
0.989928 a
0.999637

W = 837 kips
Xo = -0.06 ft
Yo = -0.03 ft

Determine Load Distribution of Deck Weight Using Moment Equilibrium

DL2 x b = DL1 x a
DL2 = (a/b) x DL1
DL2 = 0.990284 x DL1

DL3 x c = DL1 x a
DL3 = (a/c) x DL1
DL3 = 0.989928 x DL1

DL4 x d = DL1 x a
DL4 = (a/d) x DL1
DL4 = 0.999637 x DL1

DL1 + DL2 + DL3 + DL4 = W


3.980 x DL1 = 837
DL1 = 210.2934 kips
DL2 = 208.2502 kips
Therefore, DL3 = 208.1753 kips
DL4 = 210.217 kips
Add Corresponding Load of Legs from Deck Above (W/O Leg Weight)

Crane = 200.00 kips at DL2


Heli DL4 = 19.07 kips at DL4

So, DL1 = 210.3 kips


DL2 = 408.3 kips
DL3 = 208.2 kips
DL4 = 229.3 kips

MAX = 408.3 kips

C WSD (Manual and Specificaton) (2005), Chakrabarti (2005) and checked using ISO 19902 (2007) for Column
Design

ssumptions
σy = 36 ksi Use Steel with,
E = 29000 ksi (ASTM A36)

Concentric Load, no bending stress occurred, only axial compression stress.

Assumed as portal frame with one end pinned and the other rotation-fixed K=1.0 [case (d) Table C-C2.2
AISC Specification 2005].

esign Steps

Guess the pre-eliminary Outside Diameter (OD) and Thickness (t). Then calculate its Net Area (A), Radius
of Gyration (r), and Sectional Modulus (S). OD/t should have the value between 19 to 60 or less than 60 for
good practice. (El-Reedy, 2014 Page 94; ISO 19902, 2007; Chakrabarti, 2005 Page 330 Vol 1)

OD/t = 40 OK!
OD = 30 in (Outside Diameter)
t = 0.75 in (Wall Thickness)
ID = 28.5 in (Inside Diameter)
A = 68.91869 in2 (Net Sectional Wall Area)
r = 10.34484 in (Radius of Gyration)
S = 491.6918 in3 (Sectional Modulus)

Determine the Buckling Factor (k) and Length of Unbraced Member (L). Chakrabarti recommended k = 1.5
in pre-eliminary design. While ISO 19902 recommended the use of k = 1 if the leg is braced and Length
Alignment Chart (Figure C-C2.2) for d, rotation free and translation fixed. [Chakrabarti, 2005 Page 312 Vol.
1; ISO 19902, 2007 Page 100; AISC ASD, 2005 Page 240 Commen. C]

For simplification, use k = 1.5 as recommended by Chakrabarti (2005) though the theoritical k
value is 1 as shown in Table C-C2.2 AISC ASD (2005). Then Calculate the effective slenderness
ratio (Sr).

k = 1.5
L = 324 in 𝑺_𝒓=𝒌𝑳/
𝒓
Sr = 46.98

Calculate the Local Buckling (fxe) for Axial Compression. [ISO 19902, 2007 Page 88; El-Reedy, 2014 Page
114]

Cx = 0.6 (ideal tubular) 𝒇_𝒙𝒆=𝟐𝑪_𝒙 𝑬𝒕/𝑫


E = 29000 ksi
fxe = 870 ksi

fy = 36 ksi 𝒇_𝒚𝒄= 𝒇_𝒚 𝑓𝑜𝑟 𝑓_𝑦/𝑓_𝑥𝑒


Therefore, the fxe is valid because: ≤0.17
0.041379 ≤ 0.17

Calculate the Column Buckling (fc) for Axial Compression. [ISO 19902, 2007 Page 88; El-Reedy, 2014
Page 114]

𝒇_𝒄=(𝟏−𝟎.𝟐𝟕𝟖𝝀^𝟐)𝒇_𝒚 𝝀=𝑺_𝒓/𝝅
𝒄 √(𝒇_𝒚𝒄/𝑬)

λ = 0.526884
fc = 33.22 ksi
Determine the stress (σc) caused by the concentric load of deck (DL) as axial compressive stress on deck
leg. (σc = axial compressive stress due to forces from factored actions) [ISO 19902, 2007 Page 87]

P = 408.25 kips 𝝈_𝒄=𝑷


σc = 5.923651 ksi /𝑨

To check the validation of our first guess the pre-eliminary OD and t, we need to make sure that tubular
members subjected to axial compressive forces shall be designed to satisfy the following condition: [ISO
19902, 2007 Page 87]

𝝈_𝒄≤𝒇_𝒄
/𝜸_(𝑹,𝒄)

σc ≤ fc/γR,c
5.923651 ≤ 28.15399 OK!

ISO 19902 required that the sum of the ratio of actual load/allowable load should be less than 1 where
tubular members subjected to combined axial compression and bending forces shall be designed to satisfy
the following condition at all cross-sections along their length: [ISO 19902, 2007 Page 95]

(𝜸_(𝑹,𝒄) 𝝈_𝒄)/𝒇_𝒚𝒄 +(𝜸_(𝑹,𝒃)


√(𝝈_(𝒃,𝒚)^𝟐+𝝈_(𝒃,𝒛)^𝟐 ))/𝒇_𝒃
≤𝟏.𝟎

Since no bending load, (only axial compressive stress), then the 2nd term of equation is 0.

γR,cσc/fyc = 0.194164 ≤ 1.0 OK!


DECK LEG - CELLAR DECK

a = 27.42 ft DL2
DL4 b = 27.89 ft DL3 DL3
b
c = 27.9 ft
c
d = 27.43 ft

a/a = 1
e a/b = 0.983148
b
a/c = 0.982796
a/d = 0.999635

Total Weight W = 948 kips


Xo = -0.26 ft
COG
Yo = -0.01 ft

1 Determine Load Distribution of Deck Weight Using Moment Equilibrium

DL2 x b = DL1 x a
DL2 = (a/b) x DL1
DL2 = 0.983148 x DL1

DL3 x c = DL1 x a
DL3 = (a/c) x DL1
DL3 = 0.982796 x DL1

DL4 x d = DL1 x a
DL4 = (a/d) x DL1
DL4 = 0.999635 x DL1

DL1 + DL2 + DL3 + DL4 = W


3.966 x DL1 = 948
DL1 = 239.0788
DL2 = 235.0499
Therefore, DL3 = 234.9656
DL4 = 238.9917
2 Add Corresponding Load of Legs from Deck Above (W/O Leg Weight)

DL1 = 210.29 kips


DL2 = 408.25 kips
DL3 = 208.18 kips
DL4 = 229.29 kips DL1 = 449.4
So, DL2 = 643.3
DL3 = 443.1
DL4 = 468.3

MAX = 643.3

007) for Column AISC WSD (Manual and Specificaton) (2005), Chakrabarti (2005) and checked using ISO 19902 (
Design

Assumptions
a. σy = 36 ksi
E = 29000 ksi
b.
Concentric Load, no bending stress occurred, only axial compression stress.

d) Table C-C2.2 c. Assumed as portal frame with one end pinned and the other rotation-fixed K=1.0 [case
AISC Specification 2005].

Design Steps
1
t Area (A), Radius Guess the pre-eliminary Outside Diameter (OD) and Thickness (t). Then calculate its N
or less than 60 for of Gyration (r), and Sectional Modulus (S). OD/t should have the value between 19 to
30 Vol 1) good practice. (El-Reedy, 2014 Page 94; ISO 19902, 2007; Chakrabarti, 2005 Page

OD/t = 40
OD = 30 in
t = 0.75 in
ID = 28.5 in
l Area) A = 68.91869 in2
n) r = 10.34484 in
s) S = 491.6918 in3

2
ommended k = 1.5 Determine the Buckling Factor (k) and Length of Unbraced Member (L). Chakrabarti re
ced and Length in pre-eliminary design. While ISO 19902 recommended the use of k = 1 if the leg is b
2005 Page 312 Vol. Alignment Chart (Figure C-C2.2) for d, rotation free and translation fixed. [Chakrabart
1; ISO 19902, 2007 Page 100; AISC ASD, 2005 Page 240 Commen. C]

For simplification, use k = 1.5 as recommended by Chakrabarti (2005) though the theo
value is 1 as shown in Table C-C2.2 AISC ASD (2005). Then Calculate the effective sl
ratio (Sr).

k = 1.5
L = 192 in
Sr = 27.84

3
Reedy, 2014 Page Calculate the Local Buckling (fxe) for Axial Compression. [ISO 19902, 2007 Page 88; E
114]

Cx = 0.6 (ideal tubular)


E = 29000 ksi
fxe = 870 ksi

fy = 36 ksi 𝒇_𝒚𝒄= 𝒇_𝒚 𝑓𝑜𝑟 𝑓


Therefore, the fxe is valid because: ≤0.17
0.041379 ≤ 0.17

4
l-Reedy, 2014 Calculate the Column Buckling (fc) for Axial Compression. [ISO 19902, 2007 Page 88;
Page 114]

𝒇_𝒄=(𝟏−𝟎.𝟐𝟕𝟖𝝀^𝟐)𝒇_𝒚 𝝀=𝑺_𝒓/𝝅
𝒄 √(𝒇_𝒚𝒄/𝑬)

λ = 0.312228
fc = 35.02 ksi
5
ve stress on deck Determine the stress (σc) caused by the concentric load of deck (DL) as axial compres
7 Page 87] leg. (σc = axial compressive stress due to forces from factored actions) [ISO 19902, 20

P = 643.30 kips 𝝈_𝒄=𝑷


σc = 9.33419 ksi /𝑨

ure that tubular 6 To check the validation of our first guess the pre-eliminary OD and t, we need to make
g condition: [ISO members subjected to axial compressive forces shall be designed to satisfy the follow
19902, 2007 Page 87]

𝝈_𝒄≤𝒇_𝒄
/𝜸_(𝑹,𝒄)

σc ≤ fc/γR,c
9.33419 ≤ 29.68166

7
ss than 1 where ISO 19902 required that the sum of the ratio of actual load/allowable load should be
designed to satisfy tubular members subjected to combined axial compression and bending forces shall b
5] the following condition at all cross-sections along their length: [ISO 19902, 2007 Page

(𝜸_(𝑹,𝒄) 𝝈_𝒄)/𝒇_𝒚𝒄 +(𝜸_(𝑹,𝒃)


√(𝝈_(𝒃,𝒚)^𝟐+𝝈_(𝒃,𝒛)^𝟐 ))/𝒇_𝒃
≤𝟏.𝟎

. Since no bending load, (only axial compressive stress), then the 2nd term of equation is

γR,cσc/fyc = 0.305954 ≤ 1.0


ECK Deck Leg Summary

No. Deck OD (in)


DL2 DL2 DL3 DL3 1 Heli Deck 30
DL3 DL4 DL4 2 Main Deck 30
b bc c
3 Cellar Deck 30
c c

a ea e
DL1
a

ment Equilibrium

kips
kips
kips
kips
/O Leg Weight)

kips
kips
kips
kips

kips

checked using ISO 19902 (2007) for Column

Use Steel with,


(ASTM A36)

ompression stress.

er rotation-fixed K=1.0 [case (d) Table C-C2.2

ness (t). Then calculate its Net Area (A), Radius


ve the value between 19 to 60 or less than 60 for
7; Chakrabarti, 2005 Page 330 Vol 1)

OK!
(Outside Diameter)
(Wall Thickness)
(Inside Diameter)
(Net Sectional Wall Area)
(Radius of Gyration)
(Sectional Modulus)

Member (L). Chakrabarti recommended k = 1.5


e use of k = 1 if the leg is braced and Length
nslation fixed. [Chakrabarti, 2005 Page 312 Vol.
0 Commen. C]

barti (2005) though the theoritical k


en Calculate the effective slenderness

𝑺_𝒓=𝒌𝑳/
𝒓

SO 19902, 2007 Page 88; El-Reedy, 2014 Page

𝒇_𝒙𝒆=𝟐𝑪_𝒙 𝑬𝒕/𝑫

𝒇_𝒚𝒄= 𝒇_𝒚 𝑓𝑜𝑟 𝑓_𝑦/𝑓_𝑥𝑒


≤0.17

[ISO 19902, 2007 Page 88; El-Reedy, 2014


deck (DL) as axial compressive stress on deck
red actions) [ISO 19902, 2007 Page 87]

𝝈_𝒄=𝑷
/𝑨

OD and t, we need to make sure that tubular


esigned to satisfy the following condition: [ISO

OK!

d/allowable load should be less than 1 where


n and bending forces shall be designed to satisfy
th: [ISO 19902, 2007 Page 95]

en the 2nd term of equation is 0.

OK!
mmary

t (in)
0.75
0.75
0.75

ea e
PILE DIMENSION
TUGAS RANCANG BESAR II 2018/2019

Design Steps

1. Guess the Initial Pile Dimension and Penetration Depth (h). Pile OD should be equal or
less than Deck Leg and Jacket Leg inside diameter (d) (Chakrabarti, 2005).

OD = 30 in (Outside Diameter)
t = 0.75 in (Thickness)
d = 28.500 in (Inside Diameter)

A = 68.92 in2 (Net Area)


Ag = 706.86 in2
(Gross Area)
h = 10.00 ft (Penetration Depth)
As = 11309.7 in2 (Surface Area)

2. Calculate Ultimate Pile Capacity (Qu). This is the sum of end-bearing capacity (Qp) and skin
friction capacity (Qs) as mentioned in API RP 2A WSD (2000), and used by Chakrabarti (2005)
and Dawson (1983).

Soil Type B as shown in McClelland (1986) is an alluvium which is loose,


consists of competent sand, silt, and stiff clay. From table G.6.4.3.1 API RP
2A WSD (2000) for cohesionless soil with dense sand, we can approximate
the skin friction value (f) and end-bearing value (q).

f = 0.017 ksi 𝑄_𝑢=𝑄_𝑠+𝑄_


q = 1.736 ksi 𝑝
𝑄_𝑠=𝑓×𝐴_𝑠
Qs = 188.50 kips
Qp = 1227.18 kips
𝑄_𝑝=𝑞×𝐴_𝑔
Qu = 1415.68 kips

3. Calculate the total compressive force of pile (F). This is equal to the sum of pile weight (W)
(minus bouyancy), submerged soil weight (Ws), and maximum force from deck leg (DL).

DL = 643.30 kips (Force from Deck Leg)


1728
γsteel = 0.000284 kip/in 3
(A36 Steel Specific Weight)
γwater = 0.000037 kip/in 3
(Sea Water Specific Weight)
γsaturated = 0.000041 kip/in3 (Saturated Soil (Dawson) Specific Weight)

W = 1.70 kips (Pile Weight)


Ws = 3.10 kips (Soil Weight)

F = 648.10 kips (Total Compressive Force)

PILE DIMENSION
TUGAS RANCANG BESAR II 2018/2019

4. API RP 2A WSD (2000) requires the usage of Safety Factor (S.F.). For design environment
condition use S.F. = 1.5, and operating environment condition use S.F. = 2. The allowable pile
capacity (Qa) is equal to ultimate pile capacity (Qu) divided by the safety factor, or the ratio
between ultimate pile capacity and total compressive force should be greater than the safety
factor.

SF = 2 𝑄_𝑎=𝑄_𝑢/ 𝑄_𝑢/F≥S.F.
(S.F.).
Qu = 1415.68 kips
F = 648.10 kips

Qu/F = 2.18 > 2 OK!

5. So we can summarize the pile dimension as follows,

OD = 30 in D/t 40.00
t = 0.75 in OK!
h = 10.00 ft
JACKET LEGS
TUGAS RANCANG BESAR II 2018/2019

Design Steps

1. Guess the Initial Jacket Leg Diameter (OD) and Thickness (t). Jacket Leg Inside
Diameter (d) sized to accommodate pile.

McClelland (1986) recommended the use of D/t less than 45, Chakrabarti (2005) and
API (2000) recommended the use of D/t less than 60, while Reedy (2014)
recommended the use of D/t between 19 to 60.

ODpile = 30.000 in

As initial guess, Chakrabarti (2005) mentioned that jacket leg inside diameter (d) must be 3
or 4 in larger than pile outside diameter (OD pile). This provide the use of clearance or gap (ξ)
between the pile OD and jacket inside diameter of 1.5 to 2 in.

𝑂𝐷−2𝑡= 〖𝑂𝐷〗 _𝑝𝑖𝑙𝑒+2


ξ = 1.5 in 𝜉
ODmin = 34.535 in
𝑂𝐷−2(𝑂𝐷/45)= 〖𝑂𝐷〗 _𝑝𝑖𝑙
tmin = 0.767 in 𝑒+2𝜉
dmin = 33.000 in

So we can use initial jacket leg dimension as follows,

OD = 36.500 in
t = 0.625 in
d = 35.250 in OK! (not less than dmin)

2. API RP 2A requires an increment in diameter for marine growth. For tubular member
in the splash zone, we should add corrosion allowance to the thickness of the jacket
leg. API RP 2A recommended 1/8 to 3/16 in.

MGrowth = 3.500 in D/t 48.667


OD = 36.500 in OK!
ODMG = 40 in

tcor = 0.125 in
t = 0.625 in
t = 0.750 in

d = 35.000 in OK! (not less than dmin)

3. So we can use jacket leg dimension as follows,

OD = 40.000 in D/t 53.333


t = 0.750 in OK!
Check the slenderness ratio (Sr) of the jacket leg, must be less than 120 (API RP 2A
4.
(2000)).

L = 30.594 ft
k = 2
r = 1.167 ft

Sr = 52.447 OK!
JACKET BRACES
TUGAS RANCANG BESAR II 2018/2019

Assumptions

a. Use Steel with, σy = 36 ksi


(ASTM A36) E = 29000 ksi
b. Only plane batter in use, as for 2D approximation.

Design Steps

1. See figure 6.26 from "Handbook of Offshore Engineering" by Chakrabarti.


(2005). Calculate each of the required parameter. For K brace there is no other
diagonal bracing, only one diagonal bracing with Length L.

𝐿=√((𝑎+(𝑎/𝑆))^2+ℎ^2 ) 𝛼=(𝑎+𝑏)/2
𝑏=𝑎+2(ℎ/𝑆) ℎ

a = 42.000 ft (1st Level Horizontal Length)


h = 30.000 ft (True Level Height)
S = 10.000 (Apparent Batter)
b = 48.000 ft (2nd Level Horizontal Length)

α = 1.500 (Aspect Ratio)


L = 55.086 (Unbraced Length)

2. Chakrabarti recommended the use of slenderness ratio (S r) between 70 to 90. And


also 0.8 for the buckling factor (k). By approximating the value r = 0.35OD
(Chakrabarti, 2005), and by using 70 and 90 as the slenderness ratio, we can
estimate the required OD.

ODjacket = 40.000 in (Jacket Leg OD)


ODpile = 30.000 in (Pile OD)
k = 0.800 (Buckling Factor, Chakrabarti)

Chakrabarti also recommended that the selected OD for brace must have the
diameter ratio (β = ODbrace/ODjacket) more than 0.3.

70≤𝑘𝐿/(0.35×𝑂𝐷)≤90 〖𝑂𝐷〗 _70=𝑘𝐿/ 〖𝑂𝐷〗 _90=𝑘𝐿/


(0.35×70) (0.35×90)
𝛽= 〖𝑂𝐷〗 _𝑏𝑟𝑎𝑐𝑒/
(𝑂𝐷_𝑗𝑎𝑐𝑘𝑒𝑡 )≥0.3

OD70 = 21.585 in (max) β70 = 0.540


OD90 = 16.788 in (min) β90 = 0.420
JACKET BRACES
TUGAS RANCANG BESAR II 2018/2019

(Continued)..

3. Guess OD for brace that satisfies the D/t requirements, and its value is between the OD 70
and OD90. Bramlette and McClelland (1986) recommended the use of D/t less than 45,
Chakrabarti (2005) and API (2000) recommended the use of D/t less than 60, while
Reedy (2014) recommended the use of D/t between 19 to 60.

OD = 17.000 in D/t 34.000 OD90<OD<OD70


t = 0.500 in OK! OK!

β 0.425
OK!

4. API RP 2A requires an increment in diameter for marine growth. For tubular member in
the splash zone, we should add corrosion allowance to the thickness of the jacket leg.
API RP 2A recommended 1/8 to 3/16 in. And the slenderness ratio S r should be in
between 70 and 90.

MGrowth = 3.500 in D/t 34.400 OD90<OD<OD70


OD = 17.000 in OK! OK!
ODMG = 21.500 in
β 0.425 Sr 88.878
tcor = 0.125 in OK! OK!
t = 0.500 in
tmin = 0.625 in
tnom = 0.625 in
JACKET BRACES
TUGAS RANCANG BESAR II 2018/2019

72
SCANTLINGS PROPERTIES SUMMARY
TUGAS RANCANG BESAR II 2018/2019

Plate (Flooring)
ThicknessArea WeightPanel Size
Deck
(in) (psf) (ft2)
Cellar Deck 3/4 31.68 2800
Main Deck 7/8 36.78 2800
Heli Deck 1/8 6.16 324

Secondary Girders
Secondar Linear WeightDepth Web (in) Flange (in) Fillet Radius Area
Deck Shape
y Girder (lb/ft) (in) Thickness Width Thickness (in) (in2)

Cellar SG 1 -
W 24 x 55 55 23.600 0.395 7.010 0.505
Deck SG 17

Main SG 1 -
W 18 x 40 40 17.900 0.315 6.020 0.525
Deck SG 17

Heli SG 1 -
W 4 x 13 13 4.160 0.280 4.060 0.345
Deck SG 7

Main Girders
Linear WeightDepth Web (in) Flange (in) Fillet Area
Main
Deck Shape Thicknes Thicknes Radius
Girder (lb/ft) (in) Width (in) (in2)
s s
Cellar MG 1-
W 30 x 261 397 31.6 0.93 15.2 1.65
Deck MG4
Main MG 1-
W 24 x 192 593 25.5 0.81 13 1.46
Deck MG4
Heli MG 1-
W 8 x 15 279 8.11 0.245 4.02 0.315
Deck MG 3
DECK LEG - SUMMARY
TUGAS RANCANG BESAR II 2018/2019

No. Description L (in) OD (in) t (in)


1. Heli Deck 108 30 0.750
2. Main Deck 324 30 0.750
3. Cellar Deck 192 30 0.750
MODELING MEMBER NAMES
TUGAS RANCANG BESAR II 2018/2019
Name Descriptions Shape Depth (in) Flange Width (in)
CDSG Cellar Deck Secondary Girder W 24 x 55 23.600 7.010
MDSG Main Deck Secondary Girder W 18 x 40 17.900 6.020
HDSG Heli Deck Secondary Girder W 4 x 13 4.160 4.060
CSMG Cellar Deck Main Girder W 30 x 261 31.600 15.200
MDMG Main Deck Main Girder W 24 x 192 25.500 13.000
HDMG Heli Deck Main Girder W 8 x 15 8.110 4.020

Name Descriptions t (in)


CDP Cellar Deck Plate 3/4
MDP Main Deck Plate 7/8
HDP Heli Deck Plate 1/8

Name Descriptions OD (in) t (in) Di (in)


CDL Cellar Deck Leg 30 0.750 28.500
MDL Main Deck Leg 30 0.750 28.500
HDL Heli Deck Leg 30 0.750 28.500

Name Descriptions OD (in) t (in) Di (in)

PLE Pile 30.000 0.750 28.500


JLG Jacket Leg 40.000 0.750 38.500
BRC Jacket Leg Bracing 21.500 0.625 20.250
CON Conductor 30.000 0.625 28.750

RIS Riser 20.000 0.625 18.750