INTERVENTION REPORT Date : 24/12/2018 
EQUIPMENT
48‐P‐0‐0200 RECOVERED WO N° 169082
OIL PUMP
 

MAINTENANCE DEPARTMENT

REPORT OF THE REPAIR WORKS


AND MODIFICATION IN THE PUMP
48-P-0-0200

 
MAINTENANCE DEPARTMENT  Page 1 of 5
 
Local : BMS /CPF
INTERVENTION REPORT Date : 24/12/2018 
EQUIPMENT
48‐P‐0‐0200 RECOVERED WO N° 169082
OIL PUMP
 
1. INTRODUCTION 
The intervention was requested by the Exploitation Department (The exploitation 
Department asked to change the direction of the pump 48‐P‐0‐0200 holes by 90 degrees 
because there is a leak of oil to the second party dedicated to water). 
But after checking and investigation, we found that the turn 90 degree of the pump was not 
available and was not feasible. 
So we made this modification to eliminate the passage of water to the second part. 
2. REPORT OBJECT 
This report is relevant to our work on the pump 48‐P‐0‐0200  
3. REFERENCE DOCUMENT 
The following Documents Reference are attached  

0304‐PL‐101   Plot Plan for CPF  
0304‐FM‐253 P&ID Open Drains Reference 
FDP‐0304‐ME‐650 Drawings 
Marked Up P&ID and Process Isolation Certificates 
Marked Up P&ID and Mechanical Isolation Certificate 

 
MAINTENANCE DEPARTMENT  Page 2 of 5
 
Local : BMS /CPF
INTERVENTION REPORT Date : 24/12/2018 
EQUIPMENT
48‐P‐0‐0200 RECOVERED WO N° 169082
OIL PUMP
 

4. GENERAL INFORMATIONS 
MARK: FINDER PUMP  
MODEL: 1x2‐V‐PEP‐131‐BL  
DESIGN PRESSURE: 3.2 BARG 
DIFF PRESSURE: 2 BAR 
DESIGN TEMPERATURE: 90°C 
OPERATING TEMPERATURE: AMB 
DESIGN FLOW: 2.3 M3/hr. 
 
5. SEQUENCE OF WORK. 
TASK   DESCRIPTION  
Nº  
01   Opening the work order and Obtaining the permit to work. 
02   Checking the materials and work place 
03   Process isolate as per attached procedure 
04   Electrical insulation and removal of the cables. 
05   Mechanical Isolation as per attached procedure 
06   Remove the pump 
07   Close the manhole with steel cover
08   Transfer the pump to the workshop 
09  cleaning in the workshop ( the pump and filter) 
10   welding of a clamp with two tubes 01 inch as attached pictures
11   Fix the clamp in the pump by the stud bolts 
12   Reinstall the pump. 
13   Remove Electrical insulation.
14   Remove Mechanical Isolation. 
15   Test the pump. 
16   Clean the area after finishing a work.
17  Close the work order after the restart of the plant. 
 
 
 
 
 
 
 
 
MAINTENANCE DEPARTMENT  Page 3 of 5
 
Local : BMS /CPF
INTERVENTION REPORT Date : 24/12/2018 
EQUIPMENT
48‐P‐0‐0200 RECOVERED WO N° 169082
OIL PUMP
 
6. TOOLS AND MATERIAL. 

Mechanical tools 

Electrical tools 

Welding post 

Crane truck  

Crane 

Pick‐up 
7. MANPOWER :  
 03 mechanical technician. 
 01 Electrical technician. 
 01 welder El‐ Manara 
 01 welder helper El‐ Manara 
8. DURATION: 
 
16 hours including the test. 
9. STATUS DURING THE OPERATION : 
   

 
MAINTENANCE DEPARTMENT  Page 4 of 5
 
Local : BMS /CPF
INTERVENTION REPORT Date : 24/12/2018 
EQUIPMENT
48‐P‐0‐0200 RECOVERED WO N° 169082
OIL PUMP
 

 
 
MAINTENANCE DEPARTMENT  Page 5 of 5
 
2-Oct C.E.Kim C.H.Yang

clamp

elbow 90 °

tube support
tube 1 ''