INTERVENTION REPORT Date : 24/12/2018
EQUIPMENT
48‐P‐0‐0200 RECOVERED WO N° 169082
OIL PUMP
MAINTENANCE DEPARTMENT
MAINTENANCE DEPARTMENT Page 1 of 5
Local : BMS /CPF
INTERVENTION REPORT Date : 24/12/2018
EQUIPMENT
48‐P‐0‐0200 RECOVERED WO N° 169082
OIL PUMP
1. INTRODUCTION
The intervention was requested by the Exploitation Department (The exploitation
Department asked to change the direction of the pump 48‐P‐0‐0200 holes by 90 degrees
because there is a leak of oil to the second party dedicated to water).
But after checking and investigation, we found that the turn 90 degree of the pump was not
available and was not feasible.
So we made this modification to eliminate the passage of water to the second part.
2. REPORT OBJECT
This report is relevant to our work on the pump 48‐P‐0‐0200
3. REFERENCE DOCUMENT
The following Documents Reference are attached
0304‐PL‐101 Plot Plan for CPF
0304‐FM‐253 P&ID Open Drains Reference
FDP‐0304‐ME‐650 Drawings
Marked Up P&ID and Process Isolation Certificates
Marked Up P&ID and Mechanical Isolation Certificate
MAINTENANCE DEPARTMENT Page 2 of 5
Local : BMS /CPF
INTERVENTION REPORT Date : 24/12/2018
EQUIPMENT
48‐P‐0‐0200 RECOVERED WO N° 169082
OIL PUMP
4. GENERAL INFORMATIONS
MARK: FINDER PUMP
MODEL: 1x2‐V‐PEP‐131‐BL
DESIGN PRESSURE: 3.2 BARG
DIFF PRESSURE: 2 BAR
DESIGN TEMPERATURE: 90°C
OPERATING TEMPERATURE: AMB
DESIGN FLOW: 2.3 M3/hr.
5. SEQUENCE OF WORK.
TASK DESCRIPTION
Nº
01 Opening the work order and Obtaining the permit to work.
02 Checking the materials and work place
03 Process isolate as per attached procedure
04 Electrical insulation and removal of the cables.
05 Mechanical Isolation as per attached procedure
06 Remove the pump
07 Close the manhole with steel cover
08 Transfer the pump to the workshop
09 cleaning in the workshop ( the pump and filter)
10 welding of a clamp with two tubes 01 inch as attached pictures
11 Fix the clamp in the pump by the stud bolts
12 Reinstall the pump.
13 Remove Electrical insulation.
14 Remove Mechanical Isolation.
15 Test the pump.
16 Clean the area after finishing a work.
17 Close the work order after the restart of the plant.
MAINTENANCE DEPARTMENT Page 3 of 5
Local : BMS /CPF
INTERVENTION REPORT Date : 24/12/2018
EQUIPMENT
48‐P‐0‐0200 RECOVERED WO N° 169082
OIL PUMP
6. TOOLS AND MATERIAL.
Mechanical tools
Electrical tools
Welding post
Crane truck
Crane
Pick‐up
7. MANPOWER :
03 mechanical technician.
01 Electrical technician.
01 welder El‐ Manara
01 welder helper El‐ Manara
8. DURATION:
16 hours including the test.
9. STATUS DURING THE OPERATION :
MAINTENANCE DEPARTMENT Page 4 of 5
Local : BMS /CPF
INTERVENTION REPORT Date : 24/12/2018
EQUIPMENT
48‐P‐0‐0200 RECOVERED WO N° 169082
OIL PUMP
MAINTENANCE DEPARTMENT Page 5 of 5
2-Oct C.E.Kim C.H.Yang
clamp
elbow 90 °
tube support
tube 1 ''