Contents
Notice for Empanelment of Safety Consultants .................................................... 4
GENERAL INFORMATION ............................................................................... 6
TERMS OF REFERENCE................................................................................. 18
Appendix-IA ....................................................................................... 31
ANNEXURE: I ...................................................................................... 33
ANNEXURE: I(A) ................................................................................... 35
ANNEXURE-II ...................................................................................... 36
ANNEXURE-III...................................................................................... 37
ANNEXURE-IV ..................................................................................... 38
ANNEXURE-V ...................................................................................... 39
ANNEXURE-VI ..................................................................................... 40
9. For participating in the tender, the authorized signatory holding Power of Attorney
or Person granting Power of Attorney shall be the Digital Signatory. In case the
authorized signatory holding/granting Power of Attorney and Digital Signatory are
not the same, the bid shall be considered nonresponsive. The procedure for applying
online on e-tender portal is available at https://etenders.gov.in.
10. The firm/team once empanelled shall remain valid for five years or till such time
they continue to satisfy the terms & conditions of this empanelment and there is no
material changes from their respective empanelment proposal, whichever is earlier.
11. The empanelment shall be done by NHAI for the respective Zones. The Applicants
shall have the option of getting themselves empanelled under any or all the Zones
and shall have to specify their preference in Annexure-VII of RFP.
12. Bidding Schedule
(i) Period of downloading of Bid / Sale of Tender Document – 21.10.2020 to
07.12.2020 (up to 11.00 Hrs)
(ii) Last for submitting Pre bid queries: 02.11.2020 (up to 17.00 Hrs)
(iii) Deadline for submission of bids (Due date): Online: 07.12.2020 (up to 11.00
Hrs)
NB: The Safety Consultant teams empanelled by NHAI vide circular nos.
NHAI/RSC/2012/Empanelment/102582 Dated 10.07.2017 and
NHAI/RSC/2012/Empanelment/4460 Dated 17.05.2019 have been discontinued.
These firms may apply afresh for empanelment under this RFP.
The teams empanelled vide NHAI circular no. 12.21/2020 dated 19.06.2020 need
not to apply for this RFP.
2. The PPP projects on DBFOT / HAM/ EPC basis basically constitute up-gradation
involving construction of 2/4/6-lane highway including bridges and tunnels; widening
and rehabilitation of bridges and culverts; construction of high embankment/
elevated structures/ ROBs/RUBs/VUPs/LVUPs/PUPs/CUPs, wayside amenities etc.
along the existing highways including provision of realignment and bypasses.
Similarly, OMT projects constitute operation and maintenance of 2/4/6 – lane
highway including bridges and tunnels. The construction works under such projects
involve use of modern equipment and construction practices / techniques. As per
the terms and conditions of the Concession Agreement(s), the Concessionaires are
required to develop, implement and administer a surveillance and safety programme
for providing a safe environment on or around the Project Highway and or comply
with the safety requirements set forth in Schedule – L of DBFOT/ HAM Agreements
and Clause 10.1.5 & 10.1.6 of EPC Agreement and Schedule – H of OMT/ TOT
Agreement in development, construction, operation &maintenance phases of a
Project. However, the safety audit work shall be carried out as per relevant safety
provision of the contract.
4. Consultants who have been debarred by MoRTH or any of its implementing agencies
including NHAI and the debarment is in force as on the date of application, need not
apply as their application shall not be entertained.
8. In order to avoid conflict of interest, any firm associated with the Concessionaire of
any of the project highway as its Design Consultant and / or Construction Supervision
Consultant shall not be eligible to participate in the financial bidding for the same
project, even after empanelment, at the project specific / RFP stage.
9. Those Consultants who were engaged by the Ministry/ NHAI for any project as Design
Consultants for preparation of Detailed Project Reports or Supervision Independent
Engineer or Consultant shall not be permitted to submit proposal for providing the
consultancy services as Safety Consultant for the same project, even after
empanelment at the project specific / RFP stage.
10. Consultants have an obligation to disclose any such situation factual or potential
conflict that impacts their capacity to serve the best interest of NHAI, or that may
reasonably be perceived as having this effect. Failure to disclose said situations may
lead to disqualification/delisting of the Consultant or the termination of its Contract
and/ or any other action as deemed fit by NHAI at any stage.
11. It is NHAI’s policy that the Consultants observe the highest standard of ethics during
the selection and execution of such contracts, if assigned work on the basis of
competitive financial bid after empanelment. In pursuance of this policy, the NHAI:
(a) Defines, for the purpose of this paragraph, the terms set forth below as follows:
(i) “Corrupt practice” means the offering, giving, receiving, or soliciting,
directly or indirectly, anything of value to influence the action of a public
official in the selection process or in contract execution;
(ii) “Fraudulent practice” means a misrepresentation or omission of facts in order
to influence a selection process or the execution of a contract:
(iii) “Collusive practices” means a scheme or arrangement between two or more
consultants with or without the knowledge of the Client, designed to establish
prices at artificial, non-competitive levels;
(iv) “Coercive practices” means harming or threatening to harm, directly or
indirectly, persons or their property to influence their participation in a
procurement process, or affect the execution of a contract.
(b) Will reject a proposal for empanelment, if it determines that the Consultant
recommended for award has, directly or through an agent, engaged in
12. Consultants shall not be under a declaration of ineligibility for corrupt and fraudulent
practices. Furthermore, the Consultants shall be aware of the provisions on fraud
and corruption as stated above.
13. Consultants shall furnish information on commissions and gratuities, if any, paid or
to be paid to agents relating to this proposal and during execution of the assignment,
if the Consultant is empanelled.
14. The Consultants may request a clarification of any of the conditions in the request
for empanelment document as indicated in clause 19. Any request for clarification
must be sent through e-mail to the NHAI’s address indicated above. NHAI will
respond to such requests by providing clarification / amendment through e-mail or
through NHAI web-site.
15. At any time before the submission of proposals, NHAI may for any reason, whether
at its own initiative or in response to a clarification requested by a consulting firm,
modify the documents by amendment. Any amendment shall be issued as Addendum
and would be hosted on NHAI website, which will be binding on them. NHAI may at
its discretion extend the deadline for submission of the proposal.
16.1 Consulting firms interested in empanelment can download the application format
from e-tender portal https://etender.gov.in or NHAI website
https://www.nhai.gov.in. The applicant shall be required to submit along with
application form a non-refundable fee of INR 10,000/- (Rupees Ten Thousand only)
by way of online payment only (payment through other modes shall not be
accepted), in favour of “National Highways Authority of India” in Current Account
no. 8598201005819, IFSC – CNRB0008598 maintained with Canara Bank
Extension, NHAI, Sector-10, Dwarka, New Delhi-110075, with payment remark of
“Application Fee towards empanelment of Safety Consultant”. The online
payment receipt shall be submitted along with the submission of application form.
The applicants shall not submit more than one application for the same team. The
Name of bank, date of payment, transaction number etc. should be clearly visible in
the receipt. The application form without proof of payment of application fee will
be rejected without any intimation.
16.2 Submission of proposals for more than one team: Since a firm can submit only one
proposal at e-tenders portal, the proposals for multiple teams of the same firm shall
be submitted as follows:
a) An applicant/ firm shall prepare proposals as per RFP, complete in all respects,
for each team.
b) The firm then shall scan and upload the proposals of all teams as one bid on e-
tenders portal.
c) In case of multiple teams, the Applicant firms shall submit application fee of
₹10,000/- (Rupees Ten Thousand only) for each team proposed as mentioned in
clause 16.1.
d) The firms shall also enclose with bid, details of team & payment details for each
team as per Annexure-I (A).
k. The firm/team once empanelled shall remain valid for 5 years or till such time they
continue to satisfy the terms &conditions of this empanelment, whichever is earlier,
and there is no material change from their respective empanelment proposal.
N.B.: The bidders may submit the bid at any time on e-tenders website.
19. DELETED.
20.1 The consultant should bring in the expertise of road safety auditor and traffic
planners. The applicants should demonstrate experience in review of road/ bridge
projects designs from safety consideration and conducting safety audits of on-going
road projects/ work zone safety audit/ Traffic Planning etc.
(i) A firm must have at least the team of following two key personnel each of age
not more than 65 years, required for performing the safety consultants’ job for
single NHAI contract package. The proposed key personnel must be employee of
the firm.
S. Position No.
No.
1 Sr. Road Safety Auditor-cum-Team Leader 1
2 Traffic Planner 1
Total 2
(iii) Sub-Key Personnel: The team of 2 Key Personnel shall be assisted by a Sub-Key
Personnel i.e. Road Safety Assistant/Apprentice of age not more than 40 years. The
firm/applicant shall identify suitable sub-key personnel and submit his/her CV with
the proposal. The sub-key personnel shall be deployed by the consultant after the
award of work. The Sub-Key Personnel shall fulfil the following criteria:
indicating the project title, actual service provided by the firm for the project
claimed to have executed.
d) The firm shall furnish the Curriculum Vitae (CV) of the proposed key personnel
as per format given at Annexure II. The CVs must be signed by key personnel
and counter-signed by authorised representative in ink on each and every page
and should not be older than three months from the date of submission of
application. Photograph of the key personnel shall be affixed on their
respective CV. The contact address with telephone / mobile number, e-mail
ID of the key personnel should also be furnished. The CVs must indicate the
actual service provided by the key personnel in detail. A key person associated
with more than one firm shall not be considered and his CV will be rejected
without assigning any reason. The firm shall also enclose copies of CVs as
extracted from INFRACON.
e) The firm is also required to furnish duly notarised undertaking regarding
correctness of information, non-debarment/blacklisting etc. of the firm on
non-judicial stamp paper as per format given on Annexure-V.
f) It is suggested that the firm should fill up Annexure-I, vis-à-vis the supporting
details vide Annexure II, III, IV V & VII and any other information with due care
so as to avoid any ambiguity. The empanelment shall be done by NHAI for the
respective Zones. The Applicants shall have the option of getting themselves
empanelled under any or all the Zones and shall have to specify their
preference in Annexure-VII of RFP.
g) In case spaces available in the Annexure-I, II, III, IV & V are limited to
accommodate all the information, separate sheets may be used for the
purpose so that relevant information submitted are adequate, neat and
legible.
h) The applications not complying with the above mentioned stipulations and
found to be deficient in any respect shall be summarily rejected without any
intimation.
i) Consulting firms should note that only authenticated information should be
provided in the prescribed format. Information provided by the consulting
firms will be verified through RTI or any other means and if any of the
information provided by the consultant is found incorrect/false, then it may
lead to rejection of a firm’s proposal summarily at any stage even after
empanelment or award of work. Firms/ Personnel submitting false/incorrect
information, or suppressing the information shall be debarred from
empanelment for two years and shall not be eligible to participate in
empanelling/bidding in any project of National Highways undertaken by
NHAI.
j) All the applications should be submitted online only on e-tender portal
https://etenders.gov.in (as per NHAI circular no. 9.1.11/2019 dated
06.06.2019) with all pages sequentially numbered as mentioned. All pages of
the application document shall be initialled by authorised signatory of the
applicant. It should also have an index giving page wise information of above
documents and strictly in sequence given in the format at Annexure I.
Incomplete application shall be summarily rejected.
k) The NHAI reserves the right to reject any or all applications without assigning
any reasons thereof. After evaluation, a panel of consultants will be formed
depending on the capacity and experience of the consultants who shall be
eligible to participate in competitive financial bidding for appointment of
safety consultants for BOT (DBFOT) /HAM/ EPC/ OMT/TOT/O&M/Item Rate
projects as and when necessary.
20.3 The Eligibility Requirement, mentioned above is for the purpose of initial screening
of the Applications only. However, it is specified herein that
(i) Firms having more than one team may submit separate proposals for each team, for
empanelment, without duplication of any of the key personnel as described in clause
16.1 & 16.2. The proposed key personnel should be of the firm itself.
(ii) Each team of two key personnel of a firm shall not be eligible for award of more
than four NHAI contract packages at any point of time. Further, a firm shall not be
allowed to propose more than one team for the same NHAI contract package.
(iii) A contract package may include a number of projects subject to the following
parameters/ conditions.
(a) The total length is not more than 350 Km,
(b) No of projects clubbed are not more than 4,
(c) The projects are in close proximity or continuity,
(d) The projects are of similar stage i.e. Development/ Construction stage, on
HAM/BOT and Maintenance stage on OMT/ TOT, and,
(e) EPC and O&M projects are not included / clubbed
(iv) The contract package so formed by clubbing together projects stretches shall be
decided by Regional Officer. The man-months shall be in-accordance with clause
6.2 of TOR of this RFP.
(v) The projects awarded by NHAI, MoRTH and NHIDCL for NH works shall be considered
for maximum no. of projects/packages that could be awarded to any of the teams
of Safety Consultant or any individual Key personnel of the Team.
(vi) For the purpose of calculation of maximum no. of projects/packages, the work
awarded and in progress will be taken into consideration as utilized capacity.
(vii) The bidder shall submit the details in the formats given in the annexures in order to
certify the number of Safety Consultancy Projects, awarded by
MoRTH/NHAI/NHIDCL which are in progress.
(viii) The bidder shall submit, for each proposed Key personnel, details of projects in
hand during submission of financial bids at Regional Office level. All engagements
of key personnel (including those with MoRTH/NHIDCL & NHAI) shall be counted
against four contract packages.
20.4 Test of Responsiveness
Prior to evaluation of Applications, the Authority shall determine whether each
Application is responsive to the requirements of this RFP. An Application shall be
considered responsive only if:
a) it is received by the Application Due Date including any extension thereof;
b) it is accompanied by the application fee receipt;
c) it contains copies of firm credential & CVs both as extracted from INFRACON
portal;
d) it contains 15 days Road Safety Audit Training Certificate from IAHE/IIT/NIT/CRRI
for both Key personnel;
e) it contains CVs of proposed key personnel & Annexure-IV and both CVs and
Annexure-IV are to be duly signed by the Key Personnel;
f) all Key Personnel are below 65 years of age;
g) it contains copy of partnership deed (in case of partnership);
h) it contains power of attorney (POA) for signing the application.
i) It is digitally signed by person holding Power of Attorney.
j) all the pages of the Application are signed by the Authorised Signatory, stamped
& serially numbered.
k) it contains all the information (complete in all respects) as requested in this RFP
(in formats same as those specified);
l) it does not contain any condition or qualification; and
m) it is not non-responsive in terms hereof.
21. Evaluation criteria and marking system: The Evaluation criteria and marking
system for empanelment of consultants shall be as under:
S. Criteria Marks
No.
(i) Experience of the Firm in terms of strength of key personnel 20
Total 100
a) It is clarified that for the purpose of similar positions, the provision contained in
the standard RFP of NHAI for appointment of DPR Consultant/IE/AE/Supervision
Consultant shall be followed.
b) It is mandatory for all key personnel to have completed at least 15 days’
certification course on Road Safety Audit from IAHE/ IITs/ NITs/ CRRI. The CV of
the proposed key personnel not having completed minimum 15 days certification
course shall not be evaluated. For clarification, it is specified herein that the
certification training course may be either from a single institution or from
multiple institutions.
c) The applicant firms shall carry out self-evaluation of their proposals with due cross
reference to the above mentioned criteria and submit the same along with the
application.
d) The minimum qualifying marks for each CV and total marks obtained in 21.1 (i) & (ii)
shall be 75%.
22. Foreign firms & Joint Venture / Association of Firms:
Foreign firms shall be considered for empanelment only when the firm has a lawfully
established representative office in India. No joint venture/ associate shall be
allowed.
1. General
4. During Construction
The audit during the construction stage shall be carried out in reference to the
provisions made in IRC: SP:55 (Guidelines on Traffic Management in Work Zones) and
following the latest IRC manual for road safety audit, i.e. IRC: SP:88 or any
modifications thereof.
4.1 Review the Construction Staging Plan prepared by the concessionaire in support of
project implementation at stages. Examine the Traffic Management Plan/ Traffic
Control Plan prepared and submitted by the Concessionaire befitting to the
Construction Staging Plans, and identify any gaps or opportunity for improvement
prior to approval of the TMP/ TCP by relevant authority and accordingly prepare an
Construction stage safety audit report for TMP/TCP as per the latest IRC: SP:88
(Manual for Road Safety Audit) following the template given in this TOR.
4.2 Carryout a Construction Stage Road Safety Audit according to template given in this
TOR based on latest IRC:SP:88 to ensure correct implementation of the TMP and
recommend any interim enhancement that may be required. Inspect the project
highway keeping into consideration the construction staging plan for the project as
prepared by the Concessionaire and identify the safety concerns/implications of the
construction planning including TMP/TCP and recommend enhancement, as
required. This shall be including the additional requirements at locations identified
as accident prone locations during “development period” based on the accident data
analysis as well as the identified black-spots.
4.3 Carry out construction stage road safety audit normally once in every four months
to assess the adequacy and acceptability of the implemented TMP/TCP adopted in
construction zone(s) recommending any other road safety measures that are
necessary, till the construction is almost complete for PCOD. However, if the
physical progress in the construction is slower than that stated in contract, the
frequency of audit during construction period shall be modified to be commensurate
to the physical progress as specified here: i.e. at 15%, 30%, 45%, 60%, 75%, 90%, and
Pre-opening audit at 95-100% as required by Regional Officer/Project Director.
4.4 Consultant shall submit the Draft RSA Report to the Regional Officer, Independent
Engineer and concerned Project Director within 7 (seven) days of audit as per the
template given in this TOR.
4.5 Review the comments from Concessionaire, Independent Engineer and NHAI
(Regional Officer/Project Director) on the draft Road Safety Audit Report, and
address the comments, if any. Also, conduct the Audit Completion Meeting with
recorded minutes for acceptance/compliance by RO/Concessionaire/Contractor.
Including all these comments/compliances, furnish the Final Safety Audit Report.
4.6 In addition to the Road Safety Audit Report for various Construction Stages,
Consultants shall also prepare, as part of the RSA Report, the detailed status of
compliance of audit recommendations of the development stage and any previous
audit of construction stage. The scope for each of such inspection/audit shall include
but not be limited to identifying any gaps in provision of safety features, as per the
recommendations of audit at development stage and previous construction stage
safety audits.
4.7 At the stage of physical progress of 95-100% of construction (as will be suggested by
Regional Officer/Project Director), the Consultant shall conduct a Pre-Opening Stage
Audit following the template given in this TOR.
4.8 The construction stage audit shall also include the specific requirements laid out in
Attachment A of the RFP.
5.0 Maintenance/Operation Period
The Consultants shall carryout the Existing Road/Operation Stage Audit and
Investigation of Accident Prone Locations, which will involve the following activities,
but not limited to:
5.1 Carryout an audit of existing road/ operation stage at the end of 6th month, 24th
month and 36th month from the date of opening the highway to traffic, and submit
Draft RSA report to Regional Officer, concerned Project Director, and Independent
Engineer, with a copy to Concessionaire/Contractor, following the template given in
this TOR.
6. Project Team
6.1 The services will be required generally for a single contract package of of upto 350
km of length having upto 4 four National Highway Stretches. Some of the packages
can be of less/more in length, and the firm shall deploy at least the following key
personnel as mentioned in Clause 6.2. If the length of the project package is shorter
than 60km or longer than 100km, the time duration for Key Professionals will be
decreased/increased as per the provision in Clause 6.2.
6.2 The qualification and experience requirements of the following Key professionals will
be evaluated, and are given below with man-months input required for 60-100 km
standard project length.
S. Minimum Man-Months*
Position No
No. Operation/
++Development ++Construction
Maintenance
Sr. Road Safety
1 Auditor-cum-Road 1 2.0 Months 3.0 Months 1.0 Month
Safety Team Leader
Total 2
* The minimum man month requirements are indicative only for standard package length.
For every extra 50km length (with minimum increase of 20km) or part thereof, the man-
month duration of two key-professionals will increase 10% subject to a maximum of 50% (see
Table below).
++ Ideally all design stage audits are to be completed during Development Period only. As
mentioned in Clause 3.4 and 7.1 of ToR, due to any reason whatsoever, if some of the
designs are delayed, the Safety Consultants shall be responsible for carrying out the audit
for such designs.
6.3 It is necessary that the bidder shall retain the same experts throughout the contract
period. It is hereby clarified that only the named Key Personnel shall be deployed
and no substitute shall be used at any stage of safety audit work. Any work carried
out by any person other than the named Key Personnel shall be summarily rejected
by NHAI and no payment shall become due for such work in any circumstances
whatsoever.
6.4 Coordinator:- The firm shall designate its Senior Technical Director or an
appropriate Senior officer who has experience in Road/ Bridge construction as the
coordinator for the assignment. The coordinator on date of commencement of
services under this assignment shall visit the site and acquaint with the project/
assignment and hold audit commencement meeting with the respective Regional
Officer and Road Safety Audit team. Thereafter, the coordinator shall be responsible
for coordination of activities under the contract, interaction with NHAI and signing
all letters/ reports on behalf of the firm. The inputs including site visits/ visits to
NHAI, New Delhi during the entire period of services/ contract, the Coordinator shall
be incidental to this assignment and no separate payment shall be made in this
regard. Finally, on completion of road safety audit work, Coordinator along with
Road Safety Audit team shall hold a closing meeting with Regional Officer, Project
Director and IE/AE of the Project.
6.5 The Consultant shall as a part of this assignment will conduct two road safety
awareness/training programs/workshops in the project stretch for NHAI officers,
staff of Independent Engineer and Concessionaire/Contractor. The cost of such
programmed for maximum 60 persons from the project teams shall be deemed to be
included in the financial proposal of the Consultant.
7.1 Schedule ‘L’ prescribes the timelines for the assignments of Safety Consultants for
various stages of a project (development, construction and operation). In case of
development period, Para 4.3 of Schedule ‘L’ envisages that safety audit shall be
completed in a period of 3 months. However, the drawings containing the design
details to be provided by the Concessionaire (Ref. Para 4.2 of Schedule ‘L’) and
collection of any data required for various audits is an ongoing process during the
entire construction period of the project. Hence, the Safety Consultant shall review
the set of drawings/ designs as and when provided to him by NHAI during the
development/construction period of the project from safety perspective. Input of
key personnel can be intermittent as per the project requirement. However bidder
will have to indicate the man-month of personnel with breakup of cost for each
personnel to be engaged in the work plan as part of their financial bid in Annexure-
IV of Form-7 of financial RFP. It may be noted that CVs of only those key personnel
having intermittent input will be considered, if the safety consultancy assignments
in hand as on 7 days prior to PDD do not exceed 3 (three). The firm shall have to
furnish information regarding deployment of their proposed key personnel with their
intermittent inputs in the other projects in hand and the personnel deployed thereon
in the prescribed form of the RFP.
7.2 Schedule ‘H’ describes the function of safety consultants for OMT projects.
7.2.1 The safety audit during development period shall be completed in a period of
three months and a report thereof (the “Safety Report”) shall be submitted to the
Regional Officer, in five copies, with a copy to concerned Project Director, NHAI.
However, as mentioned above in clauses 3.4, 6.2 and 7.1 above, the road safety
audit for design stage may continue beyond the development stage. One copy each
of the safety report shall be forwarded by the Regional Officer to the Concessionaire
and the Independent Engineer forthwith. Ideally all designs are to be completed and
audited during Development stage. Due to any reason whatsoever, if some of the
designs are forwarded to Safety Consultants in Construction stage also, these are
also to be audited by Safety Consultants and shall give recommendations as part of
Development Stage Safety Audit.
7.3 The firms/ organizations shall make their own assessment of key and support
personnel to undertake the assignment. Additional staff or personnel, if required
(e.g. for Fire, Mechanical safety, etc.) to complete the assignment in the prescribed
time, must be provided, within the total quoted cost only. NHAI shall not be
responsible for any wrong assessment by the firms/ organizations and shall not in
any case bear any additional cost arising there from. The firms should assess the
inputs at site and office for each expert and support staff for completing the
assignment within the above timelines, which shall be indicated by the firm in the
Financial Proposal. The firms should make its own arrangements for office space,
equipment, computer hardware/ software, etc. A certificate has to be recorded by
the Regional Officer, NHAI about the presence of named experts and support staff
at site (for their intermittent inputs) for release of payment as per cost breakup
given by the Consultant.
8. Deliverables
3 Safety Consultant shall conduct the Audit Within 15 days of receiving comments
Completion Meeting with recorded by NHAI/IE/ Concessionaire or audit
minutes for acceptance/compliance by completion meeting, whichever is later.
RO/PD/Concessionaire/ Contractor.
Including all these, furnish the Final
Safety Report for Design Stage Audit as
per the standard template of RSA report
given in this TOR.
8.4 All reports including primary data shall be compiled, classified and submitted by the
firm to RO, NHAI in soft form apart from the reports in hard form including a copy to
Road Safety Cell, NHAI. The reports shall remain the property of NHAI and shall not
be used for any purpose other than that intended under these terms of reference.
All the reports will be submitted electronically in addition to 5 hard copies.
8.5 It may be noted that the empanelled firms shall be required to ensure timely
completion of the safety consultancy services of the projects awarded to them in bid
stage, in an effective manner strictly as per the contract. The performance appraisal
26 National Highways Authority of India
October 2020 RFP for Empanelment of Safety Consultants
of the safety consultant shall be carried out by the Road Safety Cell based on the
report of the concerned Regional Officer / Project Director of NHAI. The firms shall
be liable for cancellation of empanelment and debarment in the event of defaults
attributable to the firm for non-timely completion/ poor performance of services,
for a period of two years.
Attachment A
Task A: Review Contractual Provisions and Establish Work zone Safety Audit Procedure
Review and understand various safety provisions as provided in the contract documents of
the particular projects. This should include an appreciation and understanding of the safety
provisions as given in various acts, rules and regulations of GoI/State Government where
project is situated including MoRTH/Indian Roads Congress (IRC) specifications/codes;
safety instructions issued by NHAI from time to time; and safety provisions under the EMP(s)
for the project.
(i) Review the existing systems being followed/adopted by the Concessionaire and
IEs in planning, execution, documentations and reporting through collection and
assessment of primary and secondary data/information.
(ii) Identify the major hazards and risks associated with various roads construction
activities and establish a work zone safety audit procedure, satisfactory to NHAI.
Task B: Conduct detailed Work Zone Safety Audit and Recommend Remedial Actions
(iii) Carry out a detailed assessment of worksite* safety conditions through site visits in
line with the identified risks and hazards associated with various road construction
activities. This review and assessment must include, but may not be limited, to the
following aspects pertaining to:
(a) Traffic Management Plan: The Consultant will review the relevance, adequacy
and implementation of the Traffic Management Plan(s) prepared by the
Contractors. The procedures followed by the Independent Engineer (IE) /
Authority Engineer (AE) with regard to the approval and ensuring compliance on
ground also need to be reviewed.
(b) Traffic Safety Measures: The review should assess the adequacy and quality of
various safety measures such as signage, delineation, barricading and lighting in
the construction zones in line with the provisions covered in the contract
agreement and latest IRC guidelines and other good International practices. The
assessment should include various safety aspects/issues pertaining to night time
safety measures and safety at/near excavations, structure construction sites,
diversions and settlement areas apart from assessing maintenance of existing
road surface and riding quality at diversions/detours.
*A worksite includes the highway and service roads (including structures),
access/haul roads, main and ancillary campsites (including labor camps), all
plant sites (including crusher operated by the project contractors), quarries
operated by the project contractors, borrow areas, material stack yards and
workshops. The assessment of access/haul roads is to be done on sample basis
only. A worksite audit doesn’t include safety aspects pertaining to design and
construction stage engineering aspects (such as quality of works).
(c) Worker’s Safety: Based on contractual provisions and applicable legal provisions,
the review should cover aspects pertaining to provisions and use of Personal
Protective Equipment such as helmets, masks, safety harness/belts, boots,
gloves, eye and hearing protection devices. The assessment should also include
review of safety provisions during operations such as loading and unloading of
materials; bar bending and cutting; gas cutting/welding, pile driving, excavation
work; working near equipment/machinery; working at heights (including aspects
pertaining to ladder, scaffolding, working platform, railing safety); safety during
concrete works (including reinforcement erection, formwork and concrete
pouring/pumping); drilling and blasting; safety during placement of traffic
28 National Highways Authority of India
October 2020 RFP for Empanelment of Safety Consultants
control devices; tree cutting etc. The compliance with regard to occupational
health and safety precautions in relation to hazards associated with dust, toxic
fumes, noise, vibration and biological factors (snake and insect bites) should also
be assessed.
(d) Safety during construction of structures including design and suitability of
temporary structural arrangements, structures construction methodologies, etc.
Adequacy of the process of review and approval of the Concessionaire proposals
with respect to structures construction methodology (ies) including design of
temporary structures and erection arrangements by the IE/AE also to be
reviewed.
(e) Fire Safety Practices: The assessment should include (a) the risks and hazards
associated with storage, transportation, handling and use of various inflammable
materials/explosives and (b) precautions and preparedness in case of the fire
accident/s at camp/s, plant sites, construction sites and quarries.
(f) Electrical Safety Practices: This should include electrical safety review at plant
sites, camp sites and work sites and near habitations.
(g) Mechanical Safety Practices: The review should include general safety
precautions/practices during plant, machinery, equipment and vehicle
operations and condition of such mechanical devices that are being used for the
contract operations. This will include review of the fitness of various plant and
machinery (static and mobile), practices with respect to periodic maintenance
and licensing/certification of fitness of equipment, as well as suitability of
machinery operators including practices with respect to adherence to licence
/certification/ formal training of operators.
(h) Dust Control and Suppression Arrangements.
(i) Storage, transportation, handling and use of various toxic and hazardous
materials (including spill management) used in road construction.
(j) Safety of road-side residents and passers-by.
(k) First aid: The review should include the provision of the first aid arrangements
(including life-saving equipment), availability of qualified staff and health
checks-up of workers (such as those for drivers/operators), as specified
under the regulatory framework.
(l) Emergency Response Arrangements: The review should include an assessment
with regards to planning, procedures/processes, warning systems and
record keeping.
(m) Accident records: The review should look at whether accident records are being
maintained by the Concessionaires/Contractors and shared with the NHAI
on a regular basis.
(n) Housekeeping (including circulation pattern, storage of materials and disposal of
hazardous wastes).
(o) Any other
(iv) Assess the knowledge and awareness of safety requirements at various levels of the
Concessionaires and IE’s/AE’s staff, and make recommendations for improving the
same if and where required.
(v) Assess the role of IEs and NHAI Project Implementation Units (PIUs) and Headquarter,
and performance and response of the IE’s/AE’s (including approval system, issuing
of instructions and record keeping) in ensuring/enforcing worksite safety, and make
recommendations thereto as required.
(vi) Identify and make comprehensive list of items/aspects and areas/sections of safety
deficiency in individual contracts of the project.
(vii) Recommend specific actions that are required to overcome safety deficiencies and
to strengthen/improve safety conditions in the project’s contracts.
(viii) Identify and suggest a comprehensive list of items/aspects to be covered in the
monthly reviews and reports. Also, identify and prepare a comprehensive checklist
of items to be monitored on monthly basis at site for rating the contractors’
performance on work sites safety management.
(ix) Reassess whether the recommendations made in the Audit Reports (contract
specific) have been implemented or not (including reasons) in the project sites.
Task E: Organize and conduct a One day Workshop on half yearly basis on findings of Safety
Audits and follow up action, which will be attended by the representatives from
NHAI, Concessionaire/Contractor, IE/AE and local NGOs etc. (Cost for holding such
Workshops: to be included in the financial proposal)
Appendix-IA
Letter comprising the Application
Dear Sir,
1. With reference to your invitation of RFP dated _________, we, having examined the
RFP document and understood its contents, hereby submit our Application for the
aforesaid project. The Application is unconditional and unqualified.
3. We shall make available to the Authority any additional information it may find
necessary or require to supplement or authenticate the Application.
5. We believe that based on our RFP submission, our self-evaluation score is [____],
the details of self-evaluation along with cross reference pages of our RFP
document is given at Annex [___] towards our claims for qualifying marks. We
understand that the Authority’s evaluation shall be limited to verification of our
claims of marks from the cross reference pages of the document given by us in
the above Annexure.
7. We agree and understand that the Application is subject to the provisions of the
RFP document. In no case, we shall have any claim or right of whatsoever nature if
we are not empanelled.
8. We agree and undertake to abide by all the terms and conditions of the RFP
document.
We submit this Application under and in accordance with the terms of the RFP document.
Yours faithfully,
Date:
Place:
ANNEXURE: I
GENERAL INFORMATION
1. Name and address of the consultant/consulting firm, INFRACON Registration no.
(Enclose INFRACON Registration details and copy of the Firm’s credentials as
extracted from INFRACON portal)
2. Whether Proprietary/Partnership The details of the same needs to be indicated.
3. Name of the authorized signatory/ contact person /representative duly certified by
the head of the consulting firm/lead partner. (Enclose Power of Attorney in favour
of Authorised signatory).
4. Profile of the firm (Please elaborate field of activities)
5. In case of foreign firm, address of representative office in India with documentary
proof from the head office abroad.
6. In case of foreign firm, certificate for accepting payment in Indian currency for
domestic funded projects.
7. Structure, Organization & Relevant Experience of Firm:
(i) Date, month and year of incorporation of firm.
(ii) Standing of the firm (As on the due date of submission of this RFP) in years
(iii) Firms Relevant Experience in terms of No. of years since establishment
(iv) No. of key personnel in the firm in senior positions associated with
preparation of DPR/ Supervision/ Construction/Safety Audit/ Work zone
safety audit/ traffic planning etc. of 2/4/6 lane Highway Projects
(v) No. of full time key personnel who are in the payroll of the firm as on
the due date of submission of this RFP
(vi) The detailed qualifications and experience of each of the key personnel in
years in
highway sector (tenure in years in senior position e.g. Team Leader, Dy.
Team Leader, Resident/Highway Engineer, key personnel, Retired CE/SE/EE
also needs to be indicated separately in each of the key personnel).
Note
i) Ref. Page no. of documentary proof in the application may be indicated against
each item.
ii) The consultant shall submit, a copy of original document defining constitution
or legal status, place of registration, principal place of business and Power of
Attorney (PoA), In case of a proprietary firm and partnership, the document
related to registration of the firm with concerned government department
shall be submitted. In case of a company, Memorandum of
Association/Understanding and Article of Association, Name of directors and
shareholders shall also be furnished.
iii) Please mention number of projects completed by the firm in last 5
years with documentary proof from client. For each project one sheet of
Annexure-Ill should be filled up properly giving as much details as possible.
iv) The applicant shall furnish contact particulars of the relevant Officers of the
clients for which the works have been executed, to enable NHAI to verify the
claim of the applicant.
v) The applicant should also furnish copies of work orders/contracts from the
client stating the project title, project value and the brief scope of work
of the project along with successful completion certificate mentioning start
and end date of the work duly signed by the client organizations project in-
Date:
Place:
ANNEXURE: I(A)
Date:
Place:
Note:
a) No change in the team combination proposed here in Annexure I-A shall be
considered during subsequent stages of evaluation and if empanelled.
b) In case of multiple teams, the Applicant firms shall submit application fee of ₹5000/-
for each team proposed through online mode as mentioned in clause 16 of General
Information.
c) The application fee receipt of online payment of is to be submitted with the
respective team’s proposal.
ANNEXURE-II
CURRICULUM VITAE (CV) OF KEY PERSONNEL TO BE SUBMITTED WITH PROPOSAL
Date:
Place:
(Name and designation of
Managing Director / Head of the firm
/ authorized signatory)
(Name of the firm, Address
Lead Partner in case of Partnership)
ANNEXURE-III
RELEVANT SERVICES CARRIED OUT BY THE FIRM WHICH ILLUSTRATES THEIR PERFORMANCE
DURING LAST 5 YEARS
1. Project Name
2. Country
3. Project location within country
4. Date of Agreement
5. Name and address of client
6. Key Personnel provided
a) No. of key personnel
b) No. of man months
7. Date of commencement
8. Date of completion
9. Details and Nature of consultancy services:
10. Number of assignment in hand as on date of Agreement with proof shall be
submitted
11. Whether project was done alone or as a JV or in association with other firm/firms:
12. Name of Lead Partner in case of JV/Association
13. JV Share of the firm in case of JV
14. No. of man months of key personnel provided by associated firm(s)
15. Name of key personnel involved and functions performed:
16. Function performed by the firm
17. Narrative description of project (Indicating details of projects including length,
scope of work, nature of work and qualitative performance)
18. Detailed description of actual services provided by the firm under different
categories of assignments.
19. Was the project completed within the stipulated time
20. Reason for delay in completion, it any:
Date:
Place:
ANNEXURE-IV
DETAILED INFORMATION IN RESPECT OF KEY PERSONNEL
AVAILABLE WITH THE FIRM
Date:
Place:
(Name of Designation of
*In case of Masters/Doctorate, please mention the discipline like Master (Structure), Masters
(Traffic & Transport) etc.
**Separate sheets may be enclosed for the details.
ANNEXURE-V
UNDERTAKING REGARDING CORRECTNESS OF INFORMATION,
NON-DEBARREMENT/BLACKLISTING ETC. OF FIRM
Sub. : Empanelment of Safety Consultant for PPP Projects on DBFOT /HAM/ EPC/ OMT basis
- Undertaking - Reg.
Dear Sir,
1.We, having examined the empanelment document for the aforesaid work and
understood its contents, hereby submit my/ our Application for appointment of
Safety Consultant for` 'PPP Projects on DBFOT / HAM/ EPC/ OMT basis. The
Application is unconditional and unqualified.
2. All information provided in the application, appendices and annexure is true and
correct and all documents accompanying such application are true copies of their
respective originals.
3. I/We acknowledge the right of the NHAI to reject our application without assigning
any reason or otherwise and hereby waive our right to challenge the same on any
account whatsoever.
4. We certify that in the last three years, we have
neither failed to perform on any contract, as evidenced by imposition of a penalty
or a judicial pronouncement or arbitration award, nor been expelled from any
project or contract nor have had any contract terminated for breach on our part.
5. I/We agree and undertake to abide by all the terms and conditions of the
empanelment document.
Yours faithfully,
Date:
Place:
ANNEXURE-VI
Details of Zones
Yours faithfully,
Date:
Place:
N.B.: Applicants need to specify their choice of region for empanelment under respective
Regional Offices, NHAI by placing the Tick (√) sign in the fourth column above. In case the
applicant does not opt [place the Tick (√)] any zone, his/her application for empanelment
shall be considered for all zones.
97
Template for
Collection and Analysis of Road Accident Data
to Identify the Blackspots/Accident Prone Locations
Template for Collection and Analysis of Road Accident Data to Identify
the Blackspots/Accident Prone Locations
Contents
1.0 Introduction ................................................................................................................................................ 1
2.0 safety Consultant Team .............................................................................................................................. 1
3.0 DESCRIPTION OF Project ROAD................................................................................................................... 1
4.0 collection of Accident Data ......................................................................................................................... 1
5.0 Classification of Accidents........................................................................................................................... 2
6.0 Identification of BLACKSPOT/Accident Prone Locations................................................................................... 3
6.1 Based on Accident Severity Index (ASI) ........................................................................................................ 3
6.1.1 Determination of Accident Severity Index (ASI) .................................................................................... 3
6.1.2 Identification of Blackspots/Accident Prone Locations ......................................................................... 4
6.2 Based on MoRTH Protocol ............................................................................................................................ 5
7.0 Trend between accident records and traffic voulme at blackspot/Accicent prone locations and
prioritization ........................................................................................................................................................... 6
7.1 Trend between accident records and traffic volume ................................................................................... 6
7.2 Prioritization of Blackspots ........................................................................................................................... 7
8.0 Recommendations of mitigation measures ...................................................................................................... 8
List of Annexures
Annexure-I - Road Accident Data of the last three years
Annexure-II- Location-wise Summary of Road Accident Data for the last three years
i
Template for Collection and Analysis of Road Accident Data to Identify
the Blackspots/Accident Prone Locations
1.0 INTRODUCTION
This report elucidates the road accident characteristics on the project road. This report also
includes identification of blackspots/Accident Prone Locations based on number of accidents
and fatality. Accident records is also related with the traffic volume on the project road to
determine accident trends in relation to the traffic volume.
The following are the key professionals of this safety consultant assignment:
Table 1 Name of the key/sub-key professionals of the safety consultant
Write project road description in a few sentences including start and end locations as well as
start and end chainages. (An index plan of the project highway may be included on the
Google map).
There are -----------(actual) number of local police stations namely ……, ………, and ………
in the jurisdiction of the project road. Detailed road accident data is collected in the NHAI’s
road accident format from the FIRs of the road accidents for the last three years.
1
Template for Collection and Analysis of Road Accident Data to Identify
the Blackspots/Accident Prone Locations
The data collected from the police station (i.e. from FIR), which is in their own format and in
regional language. This has been translated into English language and transferred on the
format of NHAI’s road accident format (Annexure-I).
The accidents are classified according to the degree of serious injuries or death during the
crash/accident. The accident severity rating used by police is as follows:
A fatal accident is one where at least one fatality happened.
Grievous injury accident is one where an injury requiring hospitalisation and reporting
to police station.
Minor injury accident is one where injury requiring no hospitalization/reporting to
police station.
Non-injury accident is that in which only the vehicle was damaged and nobody was
injured during accident.
The accident details of the project highway collected from the police stations for the last
three years are summarized location-wise (for each kilometer stretch of the project road)
and annexed as Annexure-II. This is known as kilometer analysis.
2
Template for Collection and Analysis of Road Accident Data to Identify
the Blackspots/Accident Prone Locations
3
Template for Collection and Analysis of Road Accident Data to Identify
the Blackspots/Accident Prone Locations
[ ]
= ̅ )
)
Where V =V1, V2………… Vn are the ASI values of locations 1, 2……………...n.
Blackspots or accident-prone locations are the locations, which have the ASI values more than the
threshold value and are indicated in Table below
Table:- Identification of Blackspots based on ASI Value
Average
Standard Deviation (σ)
Average+(1.5xStandard Deviation)
4
Template for Collection and Analysis of Road Accident Data to Identify
the Blackspots/Accident Prone Locations
The Ministry of Road Transport & Highways (MoRTH) defined the protocol for identification of road
accident blackspots on National Highways in their Circular No. RW/NH/15017/109/ 2015/P&M
(RSCE) dated 28.10.2015, as follows:
Road Accident Blackspot is a stretch of National Highway of about 500m in length in which either 5
road accidents (in all three years put together involving fatalities/grievous injuries) took place
during the last 3 calendar years or 10 fatalities (in all three years put together) took place during
the last 3 calendar years.
Table – Identification of Blackspots based on MoRTH Protocol
5
Template for Collection and Analysis of Road Accident Data to Identify
the Blackspots/Accident Prone Locations
Table – Number of accidents and traffic volume at each blackspot/accident prone location
6
Template for Collection and Analysis of Road Accident Data to Identify
the Blackspots/Accident Prone Locations
Plot the total number of accidents and traffic volume year wise at each blackspot location to
appreciate their trend.
Blackspot location at Km
60
50
40
30
20
10
0
Year -1 Year-2 Year-3
Figure 1 Trend between total number of accidents and traffic volume at Blackspot location
at Km …………………………
7
Template for Collection and Analysis of Road Accident Data to Identify
the Blackspots/Accident Prone Locations
Based on analysis in above sections and site observations including the prioritization of the locations,
mitigation measures are recommended for each blackspot location and summarized in Table below:
8
Template for Collection and Analysis of Road Accident Data to Identify
the Blackspots/Accident Prone Locations
Annexure-I:
ROAD ACCIDENT DATA OF THE LAST THREE YEARS
9
Template for Collection and Analysis of Road Accident Data to Identify
the Blackspots/Accident Prone Locations
Annexure -I
Accident Data Collection Format
NATIONAL HIGHWAYS AUTHORITY OF INDIA
Road Section :______________________ NH:________ PIU:__________________ RO:______________
B:1-Overturning, 2-Head on collision, 3-Rear end collision,4-Collision brush/Side Wipe, 5-Right turn collision, 6-Skidding,7-Left turn merging, 8-Others(Please Specify).
D:1-Drunken, 2-Overspeeding, 3-Vehicle out of control,4-Fault of driver of motor vehicle/driver of other vehicle/cyclist/pedestrian/passenger,5-Defect in mechanicle condition of motor vehicle/road.
E:1-Single lane, 2-Two lanes, 3-Three lanes or more without central divider(median), 4-Four lanes or more with central divider.
F:1-Straight road, 2-Slight Curve, 3-Sharp Curve, 4-Flat Road, 5-Gentle incline,6-Steep incline, 7-Hump, 8-Dip.
G:1-T Junction, 2-Y Junction, 3-Four arm junction, 4-Staggered junction,5-Junction with more than 4 arms, 6-Roundabout junction, 7-Manned Rail crossing,8-Unmanned Rail crossing.
H:1-Fine, 2-Mist/Fog, 3-Cloud, 4-Light rain, 5-Heavy rain, 6-Hail/sleet, 7-Snow,8-Strong Wind, 9-Dust Storm, 10-Very Hot, 11-Very Cold, 12-Other extraordinaryweather condition.
A B C D E F G H No of affected persons
Annexure-II:
SUMMARY OF ROAD ACCIDENT DATA
FOR THE LAST THREE YEARS LOCATION-WISE
FOR EACH KILOMTER STRETCH
Template for Collection and Analysis of Road Accident Data to Identify
the Blackspots/Accident Prone Locations
Annexure -II
Summary of Accident Data for the last three Years Location-wise for each Kilometer stretch
NATIONAL HIGHWAYS AUTHORITY OF INDIA
Road Section :______________________ NH:________ PIU:__________________ RO:______________
Content
Sl No Description Page No
1.0 Introduction………………………………………………………………………………. 1
2.0 Audit Team……………………………………………………………………………….. 1
3.0 Project Background……………………………………………………………………. 1
4.0 Audit Details…………………………………………………………………………….. 1
5.0 Safety Audit …………………………………………………………………,………….. 1
5.1 Horizontal & Vertical Alignment………………………………………………… 2
5.2 Typical cross sections…………………………………………………………… 4
5.3 New/existing road interface……………………………………………………. 5
5.4 Staged Works………………………………………………………………….. 5
5.5 Intersections……………………………………………………………………… 5
5.6 Interchanges……………………………………………………………………. 6
5.7 Adjacent Land………………………………………………………………….. 6
5.8 Roadside Hazards……………………………………………………………. 7
5.9 Vulnerable road users (pedestrians, bicyclists,
two wheelers and three wheelers and animal drawn carts)……………… 7
5.10 Signs, pavement marking and delineation…………………………………. 9
5.11 Parking…………………………………………………………………………… 10
5.12 Emergency service vehicle access…………………………………………… 10
5.13 Lighting and night time issues………………………………………………… 10
5.14 Drainage…………………………………………………………………………… 10
5.15 General road safety considerations……………………………………………. 10
6.0 Certification……………………………………………………………………………… 11
1
Template for Road Safety Audit Report (Design Stage)
5.1.1 The left hand curve near km 128.9 has a much shorter radius Very Review the design to increase the radius Desirable
than any other curve in this section of the highway. It will be of this curve.
High
one of the “sharpest” curves on the entire highway. Some
drivers/riders, especially those travelling westwards (downhill) If this is not feasible, ensure that the Highly
may be caught by surprise at the small radius of this curve, shoulders are paved on both sides of the Desirable
and run- off-road crashes could result. The drawings are silent highway for at least 100 m either side of
about what is intended to address this risk. the apex of the curve. Ensure the outer
shoulder is sloped to match the super
elevation of the carriageway at that point.
2
Template for Road Safety Audit Report (Design Stage)
5.1.2 The vertical grade has been changed at short distance and High Revise the entire vertical profile that there Highly
even with broken back curves as shown here with a reason of shall be more than 150m distance Desirable
minimizing the profile correction course. Traffic plying through between two vertical intersection points.
this road section could be multi-axle trucks, and sometimes
even carrying liquid commodities, where the frequent changes
of vertical grade will make the centre of gravity to oscillate,
leading to toppling of vehicles.
3
Template for Road Safety Audit Report (Design Stage)
5.2.1 The drawings show a 1.5m wide unpaved shoulder along both High Review the proposed cross section to Desirable .
sides of the highway. Unpaved shoulders discourage provide a paved 1.5m wide shoulder
vulnerable road users from walking/riding on them as shown in along both sides of the highway for the
picture (especially during the monsoon period). They become entire project highway.
damaged when heavy vehicles drive on them. This can lead to
deep drop-offs from the pavement which in turn becomes a If paved shoulder cannot be provided for Highly
hazard for small vehicles. There are many pedestrians, entire project highway, provide at least for Desirable
bicyclists and motorcyclists using this highway. They need the the section where pedestrians and
protection of a paved shoulder. bicyclists are predominately present like
villages and settlements.
4
Template for Road Safety Audit Report (Design Stage)
5
Template for Road Safety Audit Report (Design Stage)
5.5 Intersections
5.5.1 The junction near km 93.2 is a Y junction. Y junction promotes Very Redesign this intersection to eliminate the Highly
high turning speed from main road to side road and side road High Y junction and convert it preferably to a T Desirable
to main road. Also, being a Y junction, the traffic approaching junction, whereby side road to main road
from side cannot see the main road traffic so as to Giveaway and main road to side traffic would not
to main road traffic turn at high speed as shown in the revised
layout.
5.6 Interchanges
6
Template for Road Safety Audit Report (Design Stage)
5.8.1 There are steep undrivable roadsides in the hill section Very Provide adequate delineation of the Essential
between km 130 – 134 (approx.). These are within the clear High section between Km 130 - 134 using
zone for this highway and they are roadside hazards. The Chevron signs, delineator posts as well as
drawings are silent about any safety improvements along this centre lines, edge lines and advanced
area. The slopes cannot be “softened” due to the topography. warning signs
7
Template for Road Safety Audit Report (Design Stage)
5.9 Vulnerable road users (pedestrians, bicyclists, two wheelers and three wheelers and animal drawn carts)
8
Template for Road Safety Audit Report (Design Stage)
5.10. The direction information signs are very critical for junction for High Provide direction information (both Essential
1 the safe operation as it involves many turning movements Advance information sign and Flag type
having major decision making at such points. The design of direction sign) and other hazard markers
direction board shown in the DPR is not as per IRC standards. as shown in IRC 67.
Also, obsolete Red reflector signs are used. Signs are
positioned in close distance. All direction signs are to be redesigned as Essential
per the guidance given in IRC 67 for the
actual approach speed to have boards of
optimum size.
9
Template for Road Safety Audit Report (Design Stage)
10
Template for Road Safety Audit Report (Design Stage)
5.11 Parking
5.14 Drainage
11
Template for Road Safety Audit Report (Design Stage)
6.0 Certification
The Audit Team has carried out this DPR stage road safety audit according to the IRC Manual on
Road Safety Audit.
Signed
Team Leader on behalf of the RSA Team (Dated……)
12
Template for Road Safety Audit Report (Design Stage)
Annexure 1:
Checklist for Detailed Design Stage Audit
13
Template for Road Safety Audit Report (Design Stage)
Will the design speed be “safe” with regard to horizontal and vertical
alignment?
Does the alignment (horizontal and vertical) give sufficient forward visibility
for the selected design speed? (Check for inadequate stopping sight
distances)?
Does the vertical alignment pose excessive demands on the power of heavy
vehicles? Has it been designed so those maximum grades are interspersed
with recovery grades?
2. Typical cross sections
Are the widths of the carriageway, shoulders, medians (if any), service
roads in accordance with standards and adequate for the function of the
road and volume and the mix of traffic likely to use it?
Check whether bridges have footpaths and they have proper
gradients/crash barriers/parapets.
a) Existing Bridges
b) New proposed Bridges
c) Approaches of proposed VUP/PUPs
Note any location where the cross-section standard changes abruptly along
the route or is otherwise inconsistent with driver expectations.
Have the shoulders and side slopes been designed to a safe standard and
note any locations with inadequate shoulder width?
Have the side drains been designed to a safe standard? Are the batter
slopes and drains safe for run-off vehicles to traverse?
Check whether the cross-section has adequate provision for the Vulnerable
Road Users including persons with disabilities:
14
Template for Road Safety Audit Report (Design Stage)
Will the transition from old road to the new scheme be “safe”?
4. Staged Works
Are the Median openings for U-turn proposed to minimize wrong way
movements?
15
Template for Road Safety Audit Report (Design Stage)
Are sight lines within each intersection adequate and free of obstruction by
fixed objects such as buildings, overpass structures, traffic signs or
vegetation?
Is the design free of all Y junctions?
Are sight lines open and free of obstruction at all merges and diverges?
Are the distances between decisions making points sufficient for safety?
Is the signing scheme for each interchange clear and will it be easily
understood by road users?
Are all roadside hazards in the interchange identified and safely protected?
7. Adjacent Land
Is fencing provided in rural areas to keep animals from straying onto the
road?
8. Roadside Hazards
16
Template for Road Safety Audit Report (Design Stage)
Do all vulnerable road users have connectivity along their route, with
suitable lateral clearance to motor traffic?
Will pedestrians (particularly the young, old and disabled) be able to safely
walk along both sides of the road?
Is the design free of “squeeze” points where vulnerable road users may be
exposed to traffic?
Will pedestrians (particularly the young, old and disabled) be able to safely
cross the road?
Are dropped kerbs provided at all intersections and mid-block locations
where pedestrians are to cross?
If formal crossings are proposed, are these conspicuous on each approach?
Are the correct signs and pavement markings proposed for each pedestrian
facility?
Will each crossing facility be well illuminated at night so that pedestrians can
be well seen by drivers/riders?
If mid-block traffic signals are proposed, will these have pedestrian push
buttons?
Are pedestrian paths to be provided through medians to permit pedestrians
to cross “at road level” and to assist disabled pedestrians with improved
access?
Has adequate provision been made for safe parking and stopping by three-
wheelers/cycle rickshaws?
10. Signs, Pavement Markings and Delineation
Do all signs (regulatory, warning and direction) shown in the DPR accord
with the 6 C’s (Conspicuous, Clear, Comprehensible, Credible, Consistent,
Correct ) of good signage and as per IRC: 67?
Are Informatory signs provided for the category /function road proposed?
(Check for Shoulder mounted and Gantry Signs)
Will all larger (more than 100mm diameter) sign supports be located outside
the clear zone, or else be frangible?
Is good delineation (curve warning signs, advisory speed signs, guide posts
17
Template for Road Safety Audit Report (Design Stage)
Are the directional arrows marked on the pavement guiding the driver or
creating confusion to the driver?
Are there locations where there is a lack of “Hazard markings’ at approach
end of island, medians and culverts/bridges etc.?
Have retro-reflective markers/road studs been installed? Where coloured
markers are used, have they been installed correctly?
If chevron alignment markers are installed, have the correct types of
markers been used?
Do the drawings also indicate high quality reflective material (red on left,
white on right) atop each guide post?
11. Parking
Has provision been made for safe access and movements by emergency
vehicles?
Are median openings frequent, visible and well signed?
13. Lighting and night time issues
Will all signs be located where they can be easily seen at night?
Are the critical locations (intersections, pedestrian facilities, Bus bays, bus
stops, truck lay bye, toll plaza etc.) proposed to be lit?
18
Template for Road Safety Audit Report (Design Stage)
Will drains be covered, or located outside the clear zone, or shielded behind
crash barrier?
15. General road safety considerations
Is the new road as safe as practical given the local weather (sunrise,
sunset, snow, fog, rain, wind)?
Is the road surface free of gravel and sand, and with good skid resistance?
19
Template for Road Safety Audit Report (Construction Stage)
Content
Sl No Description Page No
1.0 Introduction…………………………………………………………………………………… 1
2.0 Audit Team………………………………………………………………………………….... 1
3.0 Project Background…………………………………………………………………………. 1
4.0 Audit Details………………………………………………………………………………….. 1
5.0 Safety Audit …………………………………………………………………,……..……….. 1
5.1 Traffic management plan (design and implementation)………………………..….. 2
5.2 Speed control …………………………………………………………………………… 3
5.3 Signs, signals, pavement marking and delineation ………………………………….4
5.4 Diversions from one carriageway to the other………………………..………… … 5
5.5 Road Surface ………………………………………………………………………….. 6
5.6 Crash barriers …………………………………………………………………………. 6
5.7 Work site access ……………………………………………………………………….. 7
5.8 Road worker safety……………………………………………………………………….8
5.9 Vulnerable road users (pedestrians, bicyclists, two wheelers and
three wheelers, and animal drawn carts) through the work site………………… 8
5.10 Safety at night ………………………………………………………………………… 10
6.0 Certification……………………………………………………………………………………… 11
Annexure-1 Audit Checklist for Safety Audit……………………………………………………. 13-18
Template for Road Safety Audit Report (Construction Stage)
1
Template for Road Safety Audit Report (Construction Stage)
5.1.1 No “Two Way Traffic” warning signs are shown in the TMP to Very Install duplicate pairs of Two Way Essential
warn/inform drivers in both directions when contra-flow High Traffic” warning signs (both sides of
arrangements exist. There will be significant lengths of two way the carriageway) at spacing as
operation along this highway and for significant lengths of time. indicated in IRC SP 55 in the entire
Allowing drivers to forget they are on a two way road can lead to a length of each contra flow section.
high risk of head on collisions
Make sure these signs to face both Essential
directions of traffic through the contra
flow sections
2
Template for Road Safety Audit Report (Construction Stage)
5.2.1 There are no speed restriction or repeater speed restriction signs Very Install duplicate pairs of 40km/h speed Essential
shown in the worksite. Consistent application of a suggested High restriction signs at spacings at not
40km/h speed limit through each work zone along with traffic more than 300m through each work
calming measure are required. zone
3
Template for Road Safety Audit Report (Construction Stage)
5.3.1 Many of the road signs were not standard. Many were made of old Very Provide standard diversion boards as Highly
material such as corrugated iron. High given in IRC SP 55 Desirable
4
Template for Road Safety Audit Report (Construction Stage)
5.4.1 At this location, traffic has to be transferred from one carriageway High Provide transition length as per the Highly
to other, where absolutely no measures have been provided. The taper rate given in IRC SP 55 for Desirable
situation is highly dangerous being a remote area without any transfer of traffic
5
Template for Road Safety Audit Report (Construction Stage)
6
Template for Road Safety Audit Report (Construction Stage)
5.8.1 While on-site it was noted that most of the road workers were not Very Require the Contractor to supply Highly
wearing safety vests. Reflective safety vests are essential for road High reflective safety vests and other PPE Desirable
workers. They must be seen by drivers/riders in sufficient time to for all workers on the site.
avoid collisions.
Direct all workers to wear the vests at Highly
all time when working Desirable
7
Template for Road Safety Audit Report (Construction Stage)
5.9 Vulnerable road users (pedestrians, bicyclists, two wheelers and three wheelers, and animal drawn carts) through the work site
5.9.1 Concrete filled barrels were used as delineators and to hold some Very Ensure that the work zone is clearly Highly
“Diversion” signs at eight work sites. These are highly dangerous if High conspicuous and that any barricade Desirable
struck by a small vehicle or especially a motorcyclist. used is located well beyond the
diversion and is a forgiving device (ie
not concrete).
8
Template for Road Safety Audit Report (Construction Stage)
5.10.1 Poor quality signs were being used at each worksite. Some Very Provide retro reflective sign as given in Highly
65% of the signs used were not reflective and could not be High IRC SP 55. Being a road sign, it shall Desirable
seen at night during the night time inspection. The use of non- be retro reflective in nature for night
reflective signs (and some were made of rough sawn timber time performance
and corrugated iron) increases the risk of night time collisions.
At most diversions, the existing line making is still very visible
and it directs drivers/riders straight into the barricades. Efforts must be made to remove Highly
misleading pavement marking lines in Desirable
existing carriageway
5.10.2 At four locations substantial amounts of road building materials High Direct the Contractor to store all Highly
being stored on the road. They occupied useful lane space and material off the road (and preferably Desirable
they were not delineated. There is a risk that a driver/rider could outside the clear zone of the road).
9
Template for Road Safety Audit Report (Construction Stage)
10
6.0 Certification
The Audit Team has carried out this worksite safety according to the IRC Manual on Road Safety
Audit and Guidelines for Traffic Management for Workzones (IRC SP 55)
Signed
Team Leader on behalf of the RSA Team (Dated……..)
11
Annexure 1:
Checklist for Construction Stage Audit
12
Annexure 1: Checklist for Construction Stage Audit
Has a traffic management plan (TMP) been prepared for the road work site
as per IRC SP 55 ?
Does the TMP provide work site protection (barriers) for all road users under
all traffic conditions?
Has the TMP been implemented correctly at the road work site?
Is the termination zone adequately signed to advise road users that they are
past the road works and may return to normal road/highway speeds?
Are the flagmen highly conspicuous and placed where they can give clear
instructions to approaching drivers/riders in advance of the work site?
Has the safety buffer zone been provided as per IRC: SP: 55?
2. Speed control
Are there sufficient numbers of repeater speed restriction signs through the
length of the work site?
Is the signed speed appropriate for safe traffic movement through the work
site?
Have local Police been requested to enforce the signed speed limit through
the worksite?
Are all necessary warning, direction and regulatory signs in place as shown
in the TMP?
Are all existing road signs (those that are unnecessary during the works)
covered to avoid distraction or misinformation?
Are all “Men At Work” signs removed or covered when work is finished for
13
Annexure 1: Checklist for Construction Stage Audit
If the signals generate traffic queues, can the end of the queue be easily
seen by approaching drivers/riders?
Are pavement markings consistent and clear through the length of the work
site for both day and night?
Is delineation through the site safe for all road users under all anticipated
conditions?
With several layers of asphalt typically to be laid for new roads, is temporary
lane marking being used on each new layer to guide drivers/riders as an
interim safety initiative, especially at night?
4. Diversions from one carriageway to the other
Is the carriageway (on which the work is to take place) fully closed at all
intersections?
Are drivers/riders from the side roads given adequate warning of the two
way traffic operation on the sole carriageway open on the main road?
Is the carriageway (on which the work is to take place) fully and clearly
closed off to all traffic?
Are all drivers/riders in both directions on the other carriageway adequately
reminded they are on a two way section of road (such as with “Two Way”
warning signs)?
Is the management of all two way traffic sections through the road work site
safe for all road users both day and night?
5. Road Surface
Is the road surface suitable for safe movement by all road users, especially
two and three wheelers?
Are paved surfaces swept and kept free of gravel and sand?
Has a suitable paved surface been provided along with correct lane
markings to guide drivers/riders through diversions?
Have signs and markers/road studes been used to highlight changes in road
surface to approaching drivers/riders?
14
Annexure 1: Checklist for Construction Stage Audit
6. Crash barriers
Are all crash barriers necessary and are they installed correctly?
Have safe terminals (that are suitable for the operating speeds through the
work site) been placed on the end of each section of barrier?
7. Work site access
Are work site access points located with adequate sight distances for
entering and exiting work vehicles?
Are appropriate traffic controls in place where works traffic and public traffic
interact?
8. Road worker safety
Are all workers and supervisors at the works site wearing good and required
PPE as per HSE norms and as per the requirement of activity being
performed?
Is safe ladder provided for workers at site to reach the working
platform/area?
Is working platform provided for safe working with toe guard and railing to
prevent worker’s fall?
Is there a suitable safety zone in advance of and beside the work site?
9. Vulnerable road users (pedestrians, bicyclists, two wheelers and three wheelers, and animal
drawn carts) through the work site
Is the construction layouts and practices allows adequate visibility funnel for
an approaching driver to see a small vehicle waiting to cross the
carriageway from side road or storage space of median?
10. Safety at night
Are the road works conspicuous to all road users after dark?
15
Annexure 1: Checklist for Construction Stage Audit
16
Template for Road Safety Audit Report (Pre-opening Stage)
Content
Sl No Description Page No
1.0 Introduction…………………………………………………………………. 1
2.0 Audit Team……………………………………………………………….... 1
3.0 Project Background………………………………………………………. 1
4.0 Audit Details……………………………………………………………….. 1
5.0 Safety Audit …………………………………………………………..……….. 1
5.1 New/Existing Road Interface …………………………………..….. 2
5.2 Intersections ……………………………………………………… 4
5.3 Interchanges ………………………………………………………….. 5
5.4 Signs, pavement marking and delineation ……………………… 5
5.5 Roadside hazards …………………………………………………… 6
5.6 Vulnerable road users (pedestrians, bicyclists, two wheelers and
three wheelers, and animal drawn carts) ……………………… 10
5.7 Drainage ………………………………………… 11
5.8 Landscaping ……………………………………… 11
5.9 Lighting and night time issues …………………………… 11
5.10 Access to property and developments ………………… 12
5.11 General road safety considerations……………… 12.
6.0 Certification…………………………………………………… 13
Annexure-1 Audit Checklist for Safety Audit…………………… 13-18
Template for Road Safety Audit Report (Pre-opening Stage)
1
Template for Road Safety Audit Report (Pre-opening Stage)
5.1.1 When a side road traffic joins the main road, it has to wait to get Very Provide side road profile near to flat Highly
a gap. In the picture shown here, it would be impossible for 2 High gradient that vehicle can wait comfortably Desirable
wheelers to stop to wait in climbing position., rather they take the
risk to enter the main road leading to major accidents
Remove all objects that falls within visibility Essential
funnelto ensure visibility between main road
and side road traffic
2
Template for Road Safety Audit Report (Pre-opening Stage)
5.1.2 Four informal openings appear to have been created through the High Provide formal safe U turn facility as given Highly
median – possibly by nearby people who wish to minimise their in IRC SP 84 Desirable
travel distances. However such informal openings create high
risk situations as they are not provided with proper signages,
they do not have sheltered turn lanes in which turning vehicles
can slow and stop. In addition the median often becomes
damaged and sand/gravel is drawn onto the road, creating a
skidding hazard.
3
Template for Road Safety Audit Report (Pre-opening Stage)
5.2 Intersections
5.2.1 The two intersecting roads having more or less same traffic and Very Convert cross road junction into roundabout Highly
the road junction has been developed as per the figure shown High as shown here, which can be made within desirable
here. But four armed cross road junction without control is the outer extremities of present
highly unsafe in operation. Right angle collision on high speed construction, even though it involves
without being deflected could be fatal, especially in off peak dismantling islands already made.
hours and at nights
4
Template for Road Safety Audit Report (Pre-opening Stage)
5.3. Interchanges
5.4.1 The curves in the hill area have been delineated inconsistently. High Ensure that chevron alignment signs are Essential
Several (such as at km 124.4 and km 125.5) have many installed consistently at all curves as
Chevron signs installed. However, others have Chevron signs in stipulated in IRC SP 73
one direction only and the other direction is not delineated.
Several curves that need Chevron signs have none. At one
curve the Chevron signs are incorrectly installed on the inside of
the curve. Such inconsistent delineation can cause some
drivers/riders to be caught by surprise and run-off-road crashes
5
Template for Road Safety Audit Report (Pre-opening Stage)
could result.
Install Chevron signs according to spacing Essential
criteria given in IRC 67 for various radii
5.4.2 The “Right Hand Curve” warning sign for the curve at km 101.1 High Relocate this warning sign to a position Highly
is located too far from the curve. It is almost 300m from the approx. 50m before the curve Desirable
curve Most drivers/riders will forget the message by the time
they reach the curve.
6
Template for Road Safety Audit Report (Pre-opening Stage)
5.4.3 The “Left Hand Curve” warning sign for the curve at km 121.1 High Install chevron signs with spacing as given Highly
conflicts with the nearby chevron alignment marker which points in IRC 67; for which curve length shall be Desirable
to the right. Some drivers could be confused by the apparent start of transition to end of transition
mixed messages.
7
Template for Road Safety Audit Report (Pre-opening Stage)
5.5.1 The terminals ends of these barriers are the old style “fish tail” High Replace the “fish tail” end terminals with a Highly
end. These have a bad history of spearing an impacting vehicle suitable end terminal as per IRC 119. Desirable
and they should not be used. In addition, barrier has not been
installed at the other two bridges (on either approach).
8
Template for Road Safety Audit Report (Pre-opening Stage)
9
Template for Road Safety Audit Report (Pre-opening Stage)
5.5.2 Crash barrier has been installed to shield a number of roadside High This section of barrier needs to be Highly
hazards. Most of the barrier installations appear adequate but extended by at least 20m in order to shield Desirable
there are six sections (all between km12-14) that are too short. the direction sign
The barrier is too short to fully shield the hazard and it is
possible that some errant vehicles may pass behind or in front of Lengthen these six sections of barrier so Highly
the barrier to strike the hazard. that the required barrier length as needed Desirable
The ramped down terminals are another safety concern that for each hazard is satisfied.
should not have been installed.
10
Template for Road Safety Audit Report (Pre-opening Stage)
5.6 Vulnerable road users (pedestrians, bicyclists, two wheelers and three wheelers, and animal drawn carts)
5.6.1 This highway passes through a number of villages; traffic Very Replace any non- standard road humps Essential
calming has been installed in three of these villages. It is High with flat topped road humps as given in IRC
understood that the other towns and villages will also be traffic 99.
11
Template for Road Safety Audit Report (Pre-opening Stage)
5.7 Drainage
5.7.1 An uncovered concrete drain exists along the central median for Very Fully cover the drain with a suitable drivable Highly
more than 5km. It is a roadside hazard within the clear zone. It is High cover. Desirable
12
Template for Road Safety Audit Report (Pre-opening Stage)
5.8 Landscaping
13
Template for Road Safety Audit Report (Pre-opening Stage)
14
6.0 Certification
The Audit Team has carried out this pre-opening stage road safety audit according to the IRC
Manual on Road Safety Audit.
Signed
Team Leader on behalf of the RSA Team (Dated……)
15
Annexure 1:
Checklist for Pre-opening Stage Audit
16
Annexure 1: Checklist for Pre-opening Stage Audit
Is the interface between the new road and the old road as safe as practical?
Where drivers/riders depart the new road and return to the existing network,
are they provided with sufficient delineation and pavement markings to
compensate for possible increased speeds?
2. Intersections
Are pedestrian signals installed at each signalised intersection and are they
easy to see, with adequate WALK time and clearance time?
Are correct advanced warning and suitable direction signs installed on each
approach to each roundabout?
At other intersections are Stop and/or Give Way signs conspicuous and
correctly installed to make priority clear?
3. Interchanges
Are sight lines open and free of obstruction at all merges and diverges?
Are the direction signs for each interchange clear and easily understood at
the anticipated operating speeds?
4. Signs, Pavement Markings and Delineation
Is there a need for any more signs to warn, inform, guide, control or
delineate?
Have all unnecessary old signs and markings (including those from the road
works) been removed?
Are the speed zones provided with clear speed restriction signs of a suitable
value?
Are road signs and road markings tested for retro-reflectivity and conforming
to relevant IRC standards
Have potentially confusing situations been removed or resolved safely?
17
Annexure 1: Checklist for Pre-opening Stage Audit
Are guide posts correctly installed in accordance with the layouts shown in
the standard drawings?
Are chevron alignment markers installed where necessary and in
accordance with the layouts shown in the standard drawings?
Is there consistency and uniformity of delineation and markings throughout
the scheme?
Have initiatives been taken to delineate the road and to maximise the
chance that vehicles will remain on the road?
5. Roadside hazards
Are all roadside hazards adequately treated i.e. they adequately provided
with signs?
Is safety barrier installed where necessary?
Do the trees and other vegetation obstruct driver and pedestrian sight lines,
which are essential for safe traffic operation?
Is there adequate delineation/visibility of barriers and fences during night
times?
Is any thick growth of vegetation by the roadside enough far back from the
edge of the pavement to enable a driver to take protective steps in time if
any human or animal should run across the road from behind or within the
vegetation?
Are there any sharp edged or pointed fixtures or tops of supporting verticals
on the median crash barriers or on dividers which can hurt a motor cyclist in
case of a collision or crash or loss of balance?
Are there any village name boards or direction boards by the roadside with
pointed ends to hurt a passenger in a bus on window seat?
Bridges/Canal crossings: Are the open spaces by the side of ends of
Parapets covered by protective crash barriers or walls to prevent vehicles
going into the river or canal?
Is the vegetation removed and paving in the median at openings in median
at junctions or for U Turns or for pedestrian crossings for a length of 120 m
on either side of opening to afford complete visibility to drivers?
Is the height of vegetation in the median less than 60 cm on curves?
Is the median clear of any trees with trunks with girth greater than 30 cm? If
not, are such locations enveloped by protective crash barriers?
Are fixing details of pipe railing such that the entire length of pipe is smooth
and continuous without any projection on road ward side?
Are entrances to abandoned roads properly fenced off?
6. Vulnerable road users (pedestrians, bicyclists, two wheelers and three wheelers, and animal
drawn carts)
Do all vulnerable road users have connectivity along the road, with suitable
lateral clearance to motor traffic?
18
Annexure 1: Checklist for Pre-opening Stage Audit
Will pedestrians (particularly the young, old and disabled) be able to safely
walk along the road?
Are pedestrian crossing places marked, and are pedestrians channeled to
these crossings?
Is the new road free of “squeeze” points where vulnerable road users may
be exposed to traffic?
Will pedestrians (particularly the young, old and disabled) be able to safely
cross the road?
Are dropped kerbs provided at all intersections and mid-block locations
where pedestrians are to cross?
Is the number and placement of the pedestrian facilities adequate and safe
for the situation and the pedestrian numbers?
Is each pedestrian facility clearly marked and conspicuous on each
approach?
Are the correct signs and pavement markings installed at each pedestrian
facility?
Is each crossing facility well illuminated at night so that pedestrians can be
seen by drivers/riders?
Do all mid-block traffic signals have pedestrian push buttons to allow
pedestrians to register their demand to cross the road?
Are medians in urban areas free of barriers, suitably wide and with a
suitable surface to act as an effective pedestrian refuge?
Does the new road appear to have sufficient cross fall or camber and
adequate drainage to prevent ponding of rainwater from occurring?
Are all drains safe (covered, underground or outside the clear zone)?
8. Landscaping
19
Annexure 1: Checklist for Pre-opening Stage Audit
Does the landscaping permit clear sight lines at all intersections, pedestrian
facilities and median openings?
9. Lighting and night time issues
Are the critical locations (intersections, pedestrian facilities, bus bays, bus
stops, truck lay bye, toll plaza,etc) conspicuous at night?
Is lighting provided on road sections passing through built up areas, service
roads, above and below the grade separator, underpass,etc
Is the new road free of visual deceit for road users at night?
Are the lighting columns frangible? If not are they outside the clear zone?
Are there any lighting poles in the median(less than 2m wide) unprotected
by crash barriers?
10. Access to property and developments
Is fencing provided and adequate to keep animals off the road, especially in
rural areas?
11. General road safety considerations
Is the new road as safe as practical given the local weather (sunrise,
sunset, snow, fog, dust storms, or monsoonal storms)?
Is the project free of all “visual deceit”?
Is the road surface free of gravel and sand, and with good skid resistance?
Have the batter slopes of cuttings been treated to minimise the risk of rocks
falling onto the new road?
Check that all temporary arrangements, signages, etc, have been removed
and replacesd by permanent arrangements.
20
Template for Road Safety Audit Report (Existing Road)
Content
Sl No Description Page No
1.0 Introduction………………………………………………………………. 1
2.0 Audit Team…………………………………………………………….... 1
3.0 Project Background……………………………………………………. 1
4.0 Audit Details…………………………………………………………….. 1
5.0 Safety Audit ……………………………………………………..……….. 1
5.1 Sight Distances ………………………………………………..…..….. 2
5.2 Intersections ………………………………………………………… 3
5.3 Interchanges ………………………………………………………….. 4
5.4 Cross sections ………………………..………………………….…… 5
5.5 Roadside hazards ……………………………………………………… 5
5.6 Drainage ………………………………………………………..……………. 5
5.7 Signs, pavement markings and
delineation……………………………………………….. 5
5.8 Vulnerable road users (pedestrians, bicyclists, two wheelers and
three wheelers, and animal drawn carts) ............................................. 6
5.9 Access to property and developments …………………………….… 6
5.10 Lighting and night time issues ……………………………………… 6
5.11 General road safety considerations ……………………………. 6
6.0 Certification………………………………………………………………… 7
Annexure-1 Audit Checklist for Safety Audit………………………………… 9-11
Template for Road Safety Audit Report (Existing Road)
1
Template for Road Safety Audit Report (Existing Road)
5.1.1 The storage lane for side road and U-turn provided here is Essential
Reduce “wide area effect” in the storage lane Highly
highly unsafe as deceleration length, comprising 130m to be converted with 40m storage lane + desirable
storage lane and 50m taper with 30m median opening is too 15m taper + 20m median opening
much than the required. More over the median planation Provide Hazard marker at the exposed Essential
upto the obscure the visibility of vehicle on other carriageway median tip
side. Median tip is exposed.
Remove median planation for 120m from Essential
median tip to enhance visibility in median
side
If alteration of physical islands is not possible Essential
immediately, the wide area effect can be
avoided by the marking as shown below.
2
Template for Road Safety Audit Report (Existing Road)
5.2 Intersections
5.2.1 Intersection at km 3+500 Reduce the median opening to 20m and Highly
through movement is deflected geometrically Desirable
The wide median opening and also side road without
and establish junction control by splitter
channelization in the junction promote reckless movement.
island and brining side road more
Because of the junction layout, the traffic bound to Hazira get
perpendicular.
confused.
Highly
Desirable
3
Template for Road Safety Audit Report (Existing Road)
5.3 Interchange
5.3.1 KRIBHCO Railway Over Bridge/Flyover at km 12+920 Very High Deflect the traffic that approaching from slip Highly
by another 4.5m to enhance the between Desirable
The sight line is obstructed between traffic approach from traffic approach from slip road and that
slip road and that coming out of ROB/flyover vent. The corner coming out of VUP/flyover vent
island is not properly shaped to prevent illegitimate
movement Provide psychological traffic calming Essential
measures for traffic approaching through slip
road
4
Template for Road Safety Audit Report (Existing Road)
5.6 Drainage
5.7.1 Undivided Carriageway at km 21+000 Provide new Jersey barrier type median to Highly
segregate the opposing traffic and avoid Desirable
The carriageway upon the Tapi bridge and approach is reckless over taking on bridge and its
of 4-lane width without physical separation, causing approach
reckless over taking. There is no clue about the
approaching bridge and footpath is not user-friendly. Provide No-overtaking sign on bridge Essential
approach
5
Template for Road Safety Audit Report (Existing Road)
5.8 Vulnerable road users (pedestrians, bicyclists, two wheelers and three wheelers, and animal drawn carts)
6
Template for Road Safety Audit Report (Existing Road)
7
6.0 Certification
The Audit Team has carried out this pre-opening stage road safety audit according to the IRC
Manual on Road Safety Audit.
Signed
Team Leader on behalf of the RSA Team (Dated……)
8
Annexure 1:
Checklist for Safety Audit of Existing Roads
9
Annexure 1: Checklist for Safety Audit of Existing Roads
Are all sight distances adequate for the speed of traffic using this road?
Are sight lines open and free of obstruction at all merges and diverges?
Are the distances between decision-making points sufficient for safety at the
operating speed?
Is the direction sign for each interchange clear and easily understood at the
operating speed?
4. Cross sections
Are lane widths, shoulder widths and bridge widths, “safe” for the traffic
volume and mix?
Are medians and islands of adequate width for the safety of likely users?
Are the shoulders suitable for use by all vehicles and road users, including
pedestrians, cyclists and animals?
Is appropriate super elevation and extra width of carriageway provided on
curves?
5. Roadside Hazards
Are all larger (more than 100mm diameter) sign supports located outside
the clear zone if they are not frangible?
10
Annexure 1: Checklist for Safety Audit of Existing Roads
Do all signs and pavement markings satisfy the 6C’s of good signage and
pavement marking practice?
Are road signs and road markings tested for retro-reflectivity and conforming
to relevant IRC standards
Is the road well delineated (warning signs, plastic guide posts, chevron
alignment markers) installed as necessary and spaced in accordance with
installation guidelines?
Is there a need for more signs to warn, inform, guide, control or delineate?
8. Vulnerable road users (pedestrians, bicyclists, two wheelers and three wheelers, and animal
drawn carts)
Do all vulnerable road users have connectivity along the road, with suitable
lateral clearance to motor traffic?
Are pedestrians (particularly the young, old and disabled) able to safely walk
along the road?
Is the road free of “squeeze” points where vulnerable road users are
exposed to nearby moving traffic?
Are pedestrians (particularly the young, old and disabled) able to safely
cross the road?
Is the number and placement of the pedestrian facilities adequate and safe
for the situation and the pedestrian numbers?
Are all the formal crossings clearly marked and conspicuous on each
approach?
Are the correct signs and pavement markings installed at each pedestrian
facility?
Has adequate provision been made for safe parking and stopping by three-
wheelers/cycle rickshaws?
Is the road allows adequate visibility for an approaching driver to see a
pedestrian waiting to cross the road?
Is the road allows adequate visibility funnel for an approaching driver to see
a vehicle waiting to cross the carriageway from side road or storage space
11
Annexure 1: Checklist for Safety Audit of Existing Roads
Are the lighting columns frangible? If not, are they located outside the clear
zone?
Are all signs easy to see and read at night?
Are the critical locations (intersections, pedestrian facilities, bus bays, bus
stops, truck lay bye, toll plaza,etc) conspicuous at night?
Is lighting provided on road sections passing through built up areas, service
roads, above and below the grade separator, underpass,etc
Is the “through route” well signed, line marked and obvious to road users at
night?
Is the road free of visual deceit for road users at night?
Are the lighting columns frangible? If not are they outside the clear zone?
Is there a need for more signs to warn, inform, guide, control or delineate?
Are there any lighting poles in the median(less than 2m wide) unprotected
by crash barriers?
11. General road safety considerations
Is the road as safe as practical given the local weather conditions (sunrise,
sunset, snow, fog, storms, wind)?
Is the road surface free of gravel and sand, and with good skid resistance?
12