3- Set the machine according to the foundation plate and put the levelers under the
Base
5- Pour mortar C30 to the foundation hols and make sure the bolts in the central
place. Then the machine is well secured
6- Wait the mortar solidification for several days also ,for the lab room space
please note Preserve Length x Width 3790 MMX1310MM, (including the area of
control cabinet) the distance from left wall and right wall to the machine at least
600mm,the distance from back wall to the machine around 600-1000mm and
the distance from top roof to the machine around 300mm, the machine total
height is around 2500mm