This document provides details of a sewerage infrastructure project in Jhalawar, Rajasthan, India. The project includes construction of a sewerage network, sewage pumping stations (SPS), and upgrading an existing sewage treatment plant (STP) along with 10 years of operation and maintenance. The contractor is M/s PC Snehal Construction Pvt. Ltd. and the contract amount is Rs. 143,72,13,637. Work commenced on August 26, 2017 and is scheduled to be completed by February 11, 2020. Topography survey details of the STP, SPS sites and their areas are also provided.
This document provides details of a sewerage infrastructure project in Jhalawar, Rajasthan, India. The project includes construction of a sewerage network, sewage pumping stations (SPS), and upgrading an existing sewage treatment plant (STP) along with 10 years of operation and maintenance. The contractor is M/s PC Snehal Construction Pvt. Ltd. and the contract amount is Rs. 143,72,13,637. Work commenced on August 26, 2017 and is scheduled to be completed by February 11, 2020. Topography survey details of the STP, SPS sites and their areas are also provided.
This document provides details of a sewerage infrastructure project in Jhalawar, Rajasthan, India. The project includes construction of a sewerage network, sewage pumping stations (SPS), and upgrading an existing sewage treatment plant (STP) along with 10 years of operation and maintenance. The contractor is M/s PC Snehal Construction Pvt. Ltd. and the contract amount is Rs. 143,72,13,637. Work commenced on August 26, 2017 and is scheduled to be completed by February 11, 2020. Topography survey details of the STP, SPS sites and their areas are also provided.
Rajasthan Urban Infrastrucutre Development Project (RUSDIP Phase III)
IPIU Jhalawar Name of work: Construction of Sewerage Network,SPS & Up-grading the Existing STP, allied works with O&M for entire system for 10 yrs at Jhalawar & Jhlarapatan. Package No.: RUSDP/Program/JHL/02 Name of Contractor: M/s PC Snehal Construction Pvt. Ltd. Amount of Contract: Rs. 143,72,13,637/- Date of Commencement : 26/08/2017 Stipulated date of complement: 11/02/2020
Topography Survey Detail
S.No. Location Sqm Hect
1 Structures Total Deduct Deduct Deduct Net a STP-JHALAWAR 8985.521 0 0 0 8985.52 0.90 b STP-JHALARAPATAN 17221.1057 0 0 0 17221.11 1.72 c SPS1 3850.508 0 0 0 3850.51 0.39 d SPS2 4837.657 0 0 0 4837.66 0.48 e1 SPS3-1st 1420.934 0 0 0 1420.93 0.14 e2 SPS3 -2nd 1800 0 0 0 1800.00 0.18 f SPS4 5352.242 0 0 0 5352.24 0.54 g SPS5 4200 0 0 0 4200.00 0.42 Total 47667.97 4.77