The minutes of the meeting with Mayasheel Constructions discuss progress on two projects in Assam and Nagaland. For the Assam project, 5.45KM of overlay work will be submitted along with designs for 5 box culverts. Overloading will be discouraged by the toll plaza. For Nagaland, breast wall and retaining wall designs and dimensions need to be submitted to NHIDCL and the contractor, and 12KM of P&P work needs approval before submitting the remaining 5KM to NHIDCL for verification.
Original Description:
MOM
Original Title
Minutes of the Meeting @ Mayasheel Dated 14-12-2020
The minutes of the meeting with Mayasheel Constructions discuss progress on two projects in Assam and Nagaland. For the Assam project, 5.45KM of overlay work will be submitted along with designs for 5 box culverts. Overloading will be discouraged by the toll plaza. For Nagaland, breast wall and retaining wall designs and dimensions need to be submitted to NHIDCL and the contractor, and 12KM of P&P work needs approval before submitting the remaining 5KM to NHIDCL for verification.
The minutes of the meeting with Mayasheel Constructions discuss progress on two projects in Assam and Nagaland. For the Assam project, 5.45KM of overlay work will be submitted along with designs for 5 box culverts. Overloading will be discouraged by the toll plaza. For Nagaland, breast wall and retaining wall designs and dimensions need to be submitted to NHIDCL and the contractor, and 12KM of P&P work needs approval before submitting the remaining 5KM to NHIDCL for verification.
PFA minutes of the meeting of todays discussion with Mayasheel Constructions
Attendees:- Mr. A K Gard , Mr. Nagesh , Mr. S Maitra Minutes of the meeting : Assam Project :- 1. Out of 6.75 KM overlay , 5.45 KM shall be submitted . 2. 5 box culvert to be submitted with design calculations to NHIDCL, working drawings for these culverts already submitted to the contractor . 3. Traffic :- As the toll plaza is being proposed in the considered section , overloading shall be discouraged by toll plaza authority . Hence axle load survey has not been conducted. Nagaland :- 1. Breast wall , Retaining wall GAD with design calculation to be submitted to NHIDCL. 2. Breast wall , Retaining wall Chainage , length , height to be submitted to the contractor . 3. Design of breast wall , retaining wall with PCC and plum concrete to be submitted to contractor . 4. P & P of 12 Km to be submitted to NHIDCL after getting approval from safety and proof. Rest 5 Km to be verified and submitted to the NHIDCL.