Surface Preparation & Coating Application Record

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

SURFACE PREPARATION &

COATING APPLICATION RECORD

PROJECT TITLE : RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE 1)


PAGE - 1 of 2

Inspector Name : Report No.:

Procedure Reference : Test Date :


Project Specification No. : Qualification :
Paint System : RAL Code:
Description of Item Treated :

Release Note Nos.:


Material : Carbon Steel Stainless steel Galvanized steel Others

Activity Performed :

Equipment Used :
Hand W/Brush Wheelabrator Blast Machine Pencil Blast Orbital Blast

After Cooler Power Brush Disc Grinder Needle Gun Hand Sanding
Brush Power Sander H.P. Water Pum H.P.Washer Steam Cleaner
Air compressor Roller Conv. Spray Airless Spray Orbital Spray

Additional Test Performed and its result :


Adhesion Test ( Pull off) :
Holiday Detection Test :

Remarks :

Weather Condition Time Hrs. Dry Bulb 0C Wet Bulb 0C Dew Point 0C % RH Substrate Temp 0C
Start
Midway
Completion
SURFACE PREPARATION &
COATING APPLICATION RECORD

PROJECT TITLE : RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE 1)


PAGE - 2 of 2

Method of surface Preparation Performed : BLAST POWER HAND SOLVENT WASH

Surface Treated ( This Record) : FULL SPOT SPOT/SWEEP REPAIR

Preparation Standard Specified for surface roughness: SA 2 1/2 SSPC SP7

Abrasive Type : Batch Nos : Abrasive Supplier :

Test Performed Results Method /Equipment I.D. No./ Cal. Date

Surface Cleanliness:
Affix Testex Record

Surface Preparation Standard:

Surface Profile : mic

Salt Test: mg

Affix Testex Record


Particle Size: (Abrs): mm

Dust Test::

Coating Application : Supplier :

Product Name : Colour :

Colour Check : Compliant / Not Appropriate Shelf Life :

Batch Number : Base : Cure :

Solvent Added : Type : % V/s :

Solvent Batch Nos.: WFT Checked : Yes / No

Equipment : Time : ( Mins)


Mfgr.Mixing Instructions :

Induction : ( Mins) Pot Life : ( Hrs. )

Dry Film Thickness Test Model / ID No.: Cal. Date : Print Out Report No.:

Results : Accept / Reject Nos of Readings : % Under : % Over :

Specified DFT Min. DFT : Mean DFT : Max DFT :

Recorded DFT Min. DFT : Mean DFT : Max DFT :

CPP Quality Control :

The Treatment to the surface noted herewith has been carried out in accordance Name :

with the CPP specification and Painting procedure and we offer for Signature:

Third Party acceptance Date

Date : ( Stamp)

Third Party Inspector

On behalf of CPP we confirm that the surface preparation and painting / coating c Name :

arried out as per company requirements and offer for Company approval Signature:

Date

Date : ( Stamp)

Company

We have observed the surface preparation and application of coatings carried out Name :

are as per Company requirements . Signature:

Date

You might also like