Professional Documents
Culture Documents
PLT Test Center Technical Requirements - CCT
PLT Test Center Technical Requirements - CCT
Version 18.3.1
March 2018
PearsonVUE.com
Copyright © 2011-2018 Pearson Education, Inc. or its affiliate(s). All rights reserved. pvuecopyright@pearson.com
PLT Program: Test Centre Minimum Technical Requirements
Any Windows user account that interacts with the VTS software on
the Administration, Proctor or exam delivery workstation is required
to have local administrator rights on that workstation. This includes both
installing and running the VTS software.
System requirements
Pearson recommends purchasing equipment that meets or exceeds
the Recommended Specifications. The minimum requirements will change
periodically based on the needs of our exam sponsors.
Hardware configuration
All-in-one PC’s are permitted as long they meet the minimum Technical
Specification and do not have a Touch screen. Pearson VUE highly
recommends that All-in-one PC’s meet the Recommended Technical
Specifications.
Software licenses
All test centres are required to have Windows operating systems that have
completed online activation. Application software installed on exam delivery
workstations must also have current licensing. Windows operating systems
must pass Genuine Windows Validation.
Network configuration
It is strongly recommended that all machines with VTS Software installed
remain in the same domain or workgroup, VLAN, and subnet. Network
configurations that do not follow this guideline may experience decreased
exam delivery performance. You may be asked to make changes to your
network configuration to comply with this guideline as part of problem
resolution.
The following ports/URLs are also required to be open for the software
to function properly:
sg.pearsonvue.com
4172, TCP/UDP
80, TCP - HTTP
443, TCP - HTTPS
Internet bandwidth
All exam deliveries will require a Broadband Quality Internet Connection.
A minimum base connection speed of 3 Mbps down/1.5 Mbps up
is required.
Desktop • Exam delivery workstations must have a graphics adapter that supports
Graphics GPU Scaling (ability to Maintain Aspect Ratio)
Adapter • Exam delivery workstations must have the GPU Scaling feature enabled
in the graphics adapter software
• The latest version of graphics drivers must be installed
Requirements
Monitor • Must allow for the following display resolution settings and be set
to the highest resolution:
o 1920 x 1080 (set to this resolution)
o 1280 x 1024
o 1024 x 768
• Monitor must be connected to the computer using DVI,
DisplayPort, or HDMI
Desktop Graphics • Exam delivery workstations must have a graphics adapter that
Adapter supports GPU Scaling (ability to Maintain Aspect Ratio)
• Exam delivery workstations must have the GPU Scaling feature
enabled in the graphics adapter software
• The latest version of graphics drivers must be installed
USB Hub
Many USB devices must be plugged into the Administration workstation. Since
the Administration workstation may not have enough USB ports and due to
the power draw from the Palm Vein device, we recommend that you install
a powered USB Hub. Installation instructions should be provided with each
unit and should involve simply connecting the hub to the Administration
workstation with a USB cable and plugging the hub into a power outlet.
that the Palm Vein device or other admissions equipment are not working,
use the recommended USB configuration listed below. By splitting up the
mouse and keyboard and matching one with the signature pad and one with
the admissions camera you will achieve the lowest power draw combination.
USB 2.0 standard supports 500Ma on a single USB port and a total of 900
on a single USB hub. The Palm Vein device draws the max of 500Ma by itself.
Beware of plugging this device into the front USB ports as these are
notorious for having a lower power output than ports or hubs on the back of
the workstation.
Back
Signature Pad
Network port (NIC)
Keyboard
Open Admissions camera
Palm Vein Mouse
Video Adapter must support DirectX 11 or higher and OpenGL 2.0 or higher.
Latest drivers installed.
Graphics 512MB dedicated Video RAM or more.
Adapter Note: OpenGL 2.0 or higher is required regardless of whether it is an “integrated
chipset” or a machine with a dedicated video card.
All computers and monitors should be connected via DVI, DisplayPort, or HDMI.
Display 17” monitor or larger
5 available USB 2.0 ports for: 7 available USB 2.0 ports for:
• English QWERTY Keyboard • English QWERTY Keyboard
• 2 Button Wheel Mouse • 2 Button Wheel Mouse
• Signature Pad admissions equipment • Signature Pad admissions
USB Ports
• Camera admissions equipment equipment
• Palm Vein admissions equipment • Camera admissions equipment
• Palm Vein admissions equipment
• 2 spare ports
100Mbps Full Duplex WIRED connection 1Gbps Full Duplex WIRED connection
Network to the network switch. to the network switch.
Connection Strongly Recommended: All machines with VTS Software installed should remain
in the same domain or workgroup, VLAN, and subnet.
Symbols used
The symbols used throughout this document are described below.
Admissions area
• The admissions area and/or exam delivery room must be next
door to each other (or in very close proximity, for example, two
rooms opposite each other). This ensures higher testing
security.
• Do not turn off the Monitor for the Video Server at any time.
It must always remain powered ON. We recommend you attach
a label to the Video Monitor near the power switch instructing
others to always leave it on.
Lockers
• PVTC Select sites are required to have one locker per exam
delivery Workstation for storage of candidates’ personal
belongings. It is not acceptable to use a shared locker or drawer,
where multiple candidates use the same locker/drawer.
• Each locker must have its own key and locker number,
which will be provided to the candidate.