Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

INSPECTION RESULT SUMMARY OF SURVEY CAMP AT KAMPONG MUARA ILO

No Description Finding Suggestion Photograph

1 General House Keeping General appearance still are not tidy 1. Need to be arranged all materials on tidy
( Clean lines, garbage, etc ) condition, there some obstruction of condition, no block / obstruction
materials on accsess / gangway 2. Arrange curtain line as separation between
Waste management office space with sleeping quarter / matresses
3. Arrange a good electric cable line as well
4. Arrange recreation room, dedicated smoking
area, etc...
5. Provide enough waste bin, segregated, send its
and dispose to Samarinda
2 Radio & other Communication No VHF Radio 1. Radio to be fixed as the main two way communi-
Devices cation system on remote area as supporting of
Journey Management , Daily production and incase
of emergency
No Hand set ( HT ) 2. Provide sufficient Hand set on the field
Limited signal of mobile phone 3. Not easy to utilize of satellite phone on field
Immarsat Phone Satellite ( 2 sets )

3 Accomodation / Sleeping Mattresses laid down on the floor with 1. Arrange enough space for each person
Quarter more less 90 cm each one of space 2. Arrange the curtain for sleeping quarter splitted
Not enough space of luggages of working or other spaces
Mosquito net available for all 3. Provide the cloth drying line/hanger area to kept
Not fully cover all ceiling space to comfort & avoid mosquito perching
reduce of hotness 4. Provide locker or rack for cloth
5. Add more cover of ceiling space to reduce hotness
condition
4 Electric Power and installation No Genset room , grounded system, 1. Arrange qualified electrician to fixing electric
( provide own electric line ) Fuel store, and electric panel installation, utilize proper cable and right procedure
Genset Power : 3500 Watt Not use proper electric cable for 2. Set up Genset room, grounded, electric panel,
or 3.5 KVA Max. capacity installation, plugging, and connection breaker system
Not proper & tidy of electric line 3. Comply safety electric procedure
Not sufficient lighting
5 Safety Signs & Procedure Not provide & posted yet sufficient 1. Provide & improve all missing of HSE requirements
Safety equipments safety signs & procedure 2. Comply the HSE Procedure
No dedicated & sign of smoking area 3. Increase & Kept high HSE standard
No designated of Muster point
No HSE Notice Board
No Emergency procedure & contact
persons
No smoke detector installed in sleeping
quarter
There are 2 F/Extingusher 3 kg, Powder
type, No CO2.
No Emergency Light installed prohibited access
must be closed & put sign
6 Escape Way + Point Errow No Escape way access + Point errow 1. Rear door must be closed as safety reason &
Emergency Exit No emergency exit prepared to utilized totally prohibited to be used
in case of emergency 2. Only one emergency exit & escape way on right
side through to walk way and muster point, provide
point errow & proper route
3. Escape way to be constructed and connect to
walk way c/w hand rail

7 Medical Facility Available one field medic on camp 1. Arrange an emergency procedure option / medical
( Medical staff & Equipment ) Available basic medical emergency evacuation on site
equipments ( Responder Bag, O2 bottle, 2. Conduct F/A Training for survey team & medevac
and stretcher ) and F/A Kit procedure
No emergency procedure option & 3. Provide radio communication as emergency
procedure posted support for daily report & emergency cases
Available standby sea truck in case of
emergency

8 Food and Dining Room No kitchen activity and Dining room 1. Conduct and ensure local catering comply and
Kitchen, Diswashing on camp ( N/A ) encourage hygiene procedure
No diswashing activity 2. Regular kitchen inspection & hygiene
Arrange local catering & dining room
and separated house
9 Fresh water consumption Fresh water supplied from out side of 1. Regular water analysis to be performed to ensure
and water drinking supply Kampong Muara Ilo, physically clear no chemical hazardous and bacteria as monthly
and tasteless no smelling basis ( Sept was done )
Water tank storage used local village 2. To check water source origin as supplier
property & water pipe line through to
survey camp
Water drinking supplied from out side
of branded potable water drinking
( AQUA )

10 Toilet / Shower & Laundry Only 1 Toilet and 1 Shower on place 1. Need to add more toilet as priority to reduce
facilities for 16 people totally including sea truck waste time of queuing in the morning as particularly
member 2. Water analysis to be performed to ensure free
No Laundry activity on camp, all arrange of chemical hazardous or skin toxic to people
from local villager & separated house
No grey water disposal of Laundry &
Kitchen activities

Date of Inspection 11-Sep-12 Performed By M.Fadlan Irfan ( HSE TEPI )

You might also like