2110 General Design Requirements

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Orange County Utilities

STANDARDS AND CONSTRUCTION SPECIFICATIONS MANUAL

CHAPTER 2 GENERAL REQUIREMENTS AND DESIGN STANDARDS


Section 2110: General Submittal Requirements February 11, 2011

PART 1 - GENERAL
A. This Section covers water, wastewater and reclaimed water improvements that are
constructed in compliance with SITE DEVELOPMENT ORDINANCES and
SUBDIVISION REGULATIONS, as amended, and are dedicated to UTILITIES. Such
water, wastewater and reclaimed water improvements shall be designed, reviewed,
constructed and accepted in accordance with the criteria established herein.
B. Design and Plan Review
Design of water, wastewater and reclaimed water improvements associated with
COUNTY approved subdivisions shall be in compliance with Chapter 2 – “General
Requirements and Design Standards”, and Chapter 3 – “Construction Specifications” of
this MANUAL. PLANS will be reviewed and approved by UTILITIES as part of the
subdivision or commercial site plan review process. Refer to SUBDIVISION
REGULATIONS and SITE DEVELOPMENT ORDINANCES for other requirements
governing plan review and approval.
C. Compliance with Other Regulatory Requirements
It shall be the responsibility of the DEVELOPER/CONTRACTOR to obtain and comply
with all applicable federal, state and local regulatory permits. All development projects
shall be subject to “Chapter 21, ‘Highways, Bridges and Miscellaneous Public Places’,
Orange County Code”.
For all projects greater than or equal to an acre in size (including work area, stockpile,
lay-down area) the DEVELOPER/CONTRACTOR must file and pay for a Notice of
Intent (NOI) to use Generic Permit for Stormwater Discharge from Large and Small
Construction Activities from FDEP, comply with the conditions and requirements of the
Generic Permit, prepare and follow a Stormwater Pollution Prevention Plan (SWPPP)
and upon final stabilization of the work, submit a Notice of Termination (NOT) for the
project.
http://www.dep.state.fl.us/water/stormwater/npdes/construction1.htm

Section 2110
1 of 1

You might also like