Quantity Sheet: Estimate Take-Off Sheet
Quantity Sheet: Estimate Take-Off Sheet
Description Q = Qty L = Length W = Width D = Depth T = Thickness H = Height Calculation Total/ Unit
Earthwork in Excavation in
1 3 0.6 0.6 0.35 0.378 Cu M
Foundation:
10 Plaster 2 1 0.025 1 2 Sq M
2 1.9 0.025 0.475 2 Sq M
10 0.8 0.025 0.4 3.2 Sq M
Total 7 Sq M
PREPARED BY OG 1 OF 1 Date:12/6/2020