APPLICATION FOR ENVIRONMENTAL CLEARANCE

OF

PROPOSED SYNTHETIC ORGANIC CHEMICALS


MANUFACTURING
BY

“AQUAPHARM CHEMICALS PRIVATE LTD”


Plot No. L-45/5,L-45/6, L45-7 MIDC, Mahad
Taluka-Mahad District- Raigad

FORM 1

Submitted to

State Level Expert Appraisal Committee (SEAC-I), Maharashtra

Submitted by

M/s. Aquapharm Chemicals Private Limited


January 2021
Form 1 for proposed Synthetic Organic Chemicals Manufacturing Unit by M/s. Aquapharm Chemicals
Private Limited at
L-45/5,6,7, MIDC Mahad, Tal. Mahad & Dist. Pune, Maharashtra.

Form – 1

(I) Basic Information: -

Sr. Items Details


No.
1. Name of the project “M/s. Aquapharm Chemicals Private Limited.”
Proposed Synthetic Organic Chemical Manufacturing Unit
at Plot No. L-45/5, L-45/6, L-45/7, MIDC, Mahad, Taluka-
Mahad & District. Raigad, Maharashtra.
2. S.No. in the schedule 5(f) Synthetic organic chemicals industry (dyes & dye
intermediates; bulk drugs and intermediates excluding
drug formulations; synthetic rubbers; basic organic
chemicals, other synthetic organic chemicals and chemical
intermediates).
3. Proposed capacity/ Proposed production capacity: 105980 MTPA
area/length/tonnage to be
handled/ command area/lease Proposed Plot Area-46171.00 Sq. M
area/ number of wells to be drilled
Proposed BUA-27225 Sq.M

4. New / Expansion / Modernization New


5. Existing Capacity/ Area etc. Not Applicable
6. Category of Project i.e. ‘A’ or ‘B’ B
7. Does it attract the general No
condition? If Yes, please specify.
8. Does it attract the specific No
condition? If Yes, please specify
9. Location Plot L-45/5, L-45/6, L-45/7, MIDC- Mahad, Tal.Mahad &
Dist. Raigad, Maharashtra, 402309
(Annexure-II: Location map of the project site)
Plot/Survey/Khasra No. L-45/5, L-45/6, L-45/7
Village Mahad
Taluka Mahad
District Raigad
State Maharashtra
10. Nearest railway station/airport along Road distance to nearest-
with distance in kms. Sape Wamne Railway Station- 18.07 km
Airport Lohegaon: 64.55 Kms

1
Form 1 for proposed Synthetic Organic Chemicals Manufacturing Unit by M/s. Aquapharm Chemicals
Private Limited at
L-45/5,6,7, MIDC Mahad, Tal. Mahad & Dist. Pune, Maharashtra.

11. Nearest town, city, district Nearest Town: Mahad (12 Kms),
headquarters along with distance in City : Mahad (12 Km)
kms. District HQ: Alibaug (110 Kms)
12. Village panchayats, Zila Parishad, Industrial Area Mahad
Municipal Corporation, Local body
(complete postal addresses with
telephone nos. to be given)
13. Name of the applicant M/s. Aqupharm Chemicals Private Limited
14. Registered address Amar Synergy, 9th &10th Floor,
12B, Sadhu Vaswani Road, Pune -411001
(Annexure III: -Company Registration Certificate)
15. Address for correspondence: Amar Synergy, 9th &10th Floor,
12B, Sadhu Vaswani Road, Pune -411001
Name Gurupad Revansiddappa Kondaguli
Designation (Owner/Partner/CEO) Project Head
Address Amar Synergy, 9th &10th Floor,
12B, Sadhu Vaswani Road, Pune -411001
Pin Code 411001
E-mail kondaguli.gurupad@aquapharm.net
Telephone No. 020- 66090000
Fax No. 020-26053396
16. Details of Alternatives Sites None. Project site is located in Mahad MIDC area. Industrial
examined, if any. Location of these Area is already identified for chemical and other type of
sites should be shown on a Topo industries.
sheet
17. Interlinked Project No
18. Whether separate application of Not Applicable
interlinked project has been
submitted?
19. If Yes, date of Submission Not Applicable
20. If no, reason Not Applicable
21. Whether the proposal involves No
approval/clearances under: if yes,
details of the same and their status
to be given.
The Forest (Conservation) Act, 1980?
The Wildlife (Protection) Act, 1972?
The C.R.Z Notification, 1991?
22. Whether there is any Government No
Order /Policy relevant/ relating to
the site?

2
Form 1 for proposed Synthetic Organic Chemicals Manufacturing Unit by M/s. Aquapharm Chemicals
Private Limited at
L-45/5,6,7, MIDC Mahad, Tal. Mahad & Dist. Pune, Maharashtra.

23. Forest land involved (hectares) No


24. Whether there is any litigation No
pending against the project and/or
land in which the project is propose
to be set up?
Name of the court
Case No.
Orders/directions of the Court, if any
and its relevance with the proposed
project.

(II) Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause
physical changes in the locality (topography, land use, changes in water bodies, etc.)

Sr. Information/Checklist confirmation Yes/ Details thereof (with approximate quantities


No. No /rates, wherever possible) with source of
information data
1.1 Permanent or temporary change in No Present land use of site and area is already
land use, land cover or topography declared as industrial use by MIDC. Proposed
including increase in intensity of land project will set up on 46171.00 Sq. M. of area and
use (with respect to local land use proposed built up area would be 27225 Sq. M.
plan) After development of proposed project site land
cover will increase and it is permanently change
to industrial use.
1.2 Clearance of existing land, Yes The site of 46171.00 Sq. M. is barren land with
vegetation and buildings? natural grass and bushes which will be cleared
during site development.
1.3 Creation of new land uses? No Present land use of site and area is already
declared as industrial use by MIDC.
1.4 Pre-construction investigations e.g. No Geotech investigation will be carried out
bore houses, soil testing? prior to start of construction. Geo-hydrogeolical
survey & soil testing will be done during baseline
survey of EIA studies.
1.5 Construction works? Yes Proposed construction of 27225 Sq.Mt will be
carried out over plot area 46171.00 Sq. M.
1.6 Demolition works? No -

3
Form 1 for proposed Synthetic Organic Chemicals Manufacturing Unit by M/s. Aquapharm Chemicals
Private Limited at
L-45/5,6,7, MIDC Mahad, Tal. Mahad & Dist. Pune, Maharashtra.

Sr. Information/Checklist confirmation Yes/ Details thereof (with approximate quantities


No. No /rates, wherever possible) with source of
information data
1.7 Temporary sites used for No For Construction works 75 nos. workers will
construction works or housing of require and they will commute from nearby
construction workers? villages and mostly Mahad city
1.8 Above ground buildings, structures Yes 27225 Sq.Mt. of area will be the ground
or Earthworks including linear coverage and constructed above the ground
structures, cut and fill or excavations within plot area of 46171.00 Sq. M.
Underground works including
1.9 No --
mining or tunneling?
1.10 Reclamation works? No --
1.11 Dredging? No --
1.12 Offshore structures? No --
1.13 Production and manufacturing Yes It is synthetic organic chemical manufacturing
processes? industry. Base chemicals will procure from local
market and converted into finished good
products
The list of finished products for Aquapharm
Chemicals includes-
A. Alkyl Phosphonates
1. PBTC (100% Basis)
2. Isopropenyl Phosphonic Acid (100% Basis) OR
Alkyl Phosphonates derivatives and family
(100% Basis)

B. Amine Phosphonate
1,1’-Bis(phosphono) dimethylamine (100% Basis)
1,1’-Bis(phosphono) morpholine (100% Basis)
Ploy Amino Poly Ether Polymethylene
Phosphonic Acid (100% Basis)
Diethylene Triamine Penta Methylene
Phosponic Acid (100% Basis)
Ethylene Diamine Tetramethylene Phosphonic
Acid (100% Basis) OR Amine Phosphonates
derivatives and family (100% Basis)
C. Salt of Alkyl Phosphonate
HEDP salts Liquids (100% Basis)
HEDP Salts Powder (100% Basis)

4
Form 1 for proposed Synthetic Organic Chemicals Manufacturing Unit by M/s. Aquapharm Chemicals
Private Limited at
L-45/5,6,7, MIDC Mahad, Tal. Mahad & Dist. Pune, Maharashtra.

Sr. Information/Checklist confirmation Yes/ Details thereof (with approximate quantities


No. No /rates, wherever possible) with source of
information data
OR Salts of Alkyl Phosphonates, derivatives and
family (100% Basis)
D. Salt of Amine Phosphonate
DETMP Salts (100% Basis)
ATMP Salts (100% Basis)
EDTMP Salts (100% Basis)
Or Salts of Amine Phosphonate, derivatives and
family (100% Basis)
E. Polymer
Poly Maleic (100% Basis)
Poly Acrylic (100% Basis)
Or Polymer derivatives and family (100% Basis)
F. Eco Friendly Products
GLDA (100% Basis)
MGDA (100% Basis)
IDS (100% Basis)
EDDS (100% Basis)
Iminodiacetic Acid
Salts of Eco Friendly Products
G. Methylene Bisthiocyanate
H. 2-(Thiocyanatomethylthio) benzothiazole
I. Halogen Derivaties
Methylene Di- Bromide (100% Basis)
2-Chloropropionic Acid (100% Basis)
OR Halogen Derivatives & Family (100% Basis) I.
J. J. Corrosion Inhibitor
Butanetetracarboxylic Acid (100% Basis)
Chloro Tolyltriazole (100% Basis)
Hydrolyzed Polymaleic Acid (100% Basis)
OR Corrosion Inhibitor & Family Derivatives
(100% Basis)
K. Scale Inhabitor
Dicyandiamide-formaldehyde poly condensate
Dimethylamine-epichlorohydrin copolymer
PolyDADMAC
Didecyl Dimethyl Ammonium Chloride
OR Group of Quarternery Ammonium
Compound Family & Derivatives (100%)
1. "3-hydroxyIminodisuccinic acid
tetrasodium salt

5
Form 1 for proposed Synthetic Organic Chemicals Manufacturing Unit by M/s. Aquapharm Chemicals
Private Limited at
L-45/5,6,7, MIDC Mahad, Tal. Mahad & Dist. Pune, Maharashtra.

Sr. Information/Checklist confirmation Yes/ Details thereof (with approximate quantities


No. No /rates, wherever possible) with source of
information data
(HIDS.Na4)"
2. HEIDA/EDG-A 2020
The detailed list of proposed products is
attached as Annexure I
(Annexure IV: -Detailed Manufacturing process)
1.14 Facilities for storage of goods or Yes Industry has proposed to construct 4920 Sq.Mt.
materials? of area finished goods. 1760 Sq.Mt. of the area
for raw material storage
(Annexure V: - Master Layout Plan)
1.15 Facilities for treatment or disposal of Yes Construction Phase:
solid waste or liquid effluents? Sewage: From labour force daily 3 KLD of
sewage will generate.
Before start of construction septic tank followed
by soak pit will be constructed on site for labour
force.
Construction Waste- the construction waste in
the form of metal-2 MT; debris & stony waste- 4
MT. wooden box/plastic/paper/corrugated box-
5 MT etc. will be stock at designated area of the
site. Metal waste & debris/stony waste shall be
utilized within site for road construction and site
levelling. Other waste sale to authorized scrap
vendor for segregation and disposal as per
standard practice.
Domestic dry waste of 3 kg/day will be handed
over to scrap vendor and wet waste of 5 kg/day
send to the local MSW facility for treatment and
disposal
Operation Phase:
1. Sewage: 13 CMD of sewage will be
generated from proposed activity for
that industry has proposed to install STP
of capacity 20 CMD. The treated sewage
will be used for gardening purpose.
2. Effluent: From the proposed activity
there will be no process trade effluent
generation. Effluent of 53 CMD will
generate from CT & Boiler blow down,
reactor washing and DM plant rejects.

6
Form 1 for proposed Synthetic Organic Chemicals Manufacturing Unit by M/s. Aquapharm Chemicals
Private Limited at
L-45/5,6,7, MIDC Mahad, Tal. Mahad & Dist. Pune, Maharashtra.

Sr. Information/Checklist confirmation Yes/ Details thereof (with approximate quantities


No. No /rates, wherever possible) with source of
information data
Generated effluent will be treated in
biological ETP followed by RO, MEE
&ATFD to achieve Zero Liquid Discharge.
ATFD condensate and RO permeate will
use for CT make up.
1.16 Facilities for long term housing of No Workers will be hired from nearby areas. No
operational workers? residential activity proposed.
1.17 New road, rail or sea traffic during No All required infrastructure such as road,
construction or operation? electricity and water supply already provided by
MIDC.
MIDC has already constructed 30 meter access
road.
1.18 New road, rail, air waterborne or No -
other transport infrastructure
including new or altered routes and
stations, ports, airports etc.?
1.19 Closure or diversion of existing No -
transport routes or infrastructure
leading to changes in traffic
movements?
1.20 New or diverted transmission lines No -
or pipelines?
1.21 Impoundment, damming, culverting, No -
realignment or other changes to the
hydrology of watercourses or
aquifers?
1.22 Stream crossings? No
1.23 Abstraction or transfers of water No Required 750 KLD of water would be supplied by
form ground or surface waters? MIDC.
1.24 Changes in water bodies or the land Yes There will be no change in water bodies however
surface affecting drainage or run- due to the proposed construction there will be
off? increment in runoff.
1.25 Transport of personnel or materials Yes Construction Phase-
for construction, operation or Daily 5 nos. of construction carrying material
decommissioning? trucks will ply in between local market to site.

7
Form 1 for proposed Synthetic Organic Chemicals Manufacturing Unit by M/s. Aquapharm Chemicals
Private Limited at
L-45/5,6,7, MIDC Mahad, Tal. Mahad & Dist. Pune, Maharashtra.

Sr. Information/Checklist confirmation Yes/ Details thereof (with approximate quantities


No. No /rates, wherever possible) with source of
information data
Workers of 75 nos. will commute to site on 2W
and 4 W.
Operation Phase-
During operation phase 150 nos. of workers
commute to the site through Bus (5 nos.), 4W &
2W.
Approximately 15 nos. of trucks will ply from
local market to the site to carry raw materials
and finished goods
1.26 Long-term dismantling or No -
decommissioning or restoration
works?
1.27 Ongoing activity during No -
decommissioning which could have
an impact on the environment?
1.28 Influx of people to an area in either No In the proposed project 100 workers and 150
temporarily or permanently? staff from local areas will be employed. Hence
there will be no influx of people in the area.
1.29 Introduction of alien species? No Not Applicable
1.30 Loss of native species or genetic No -
diversity?
1.31 Any other actions? No -

2.Use of Natural resources for construction or operation of the Project (such as land, water,
materials or energy, especially any resources which are non-renewable or in short supply):

Sr. Information/checklist confirmation Yes/ Details thereof (with approximate quantities


No. No /rates, wherever possible) with source of
information data
2.1 Land especially undeveloped or No Site is in MIDC area and it is already allocated for
agricultural land (ha) industrial purpose.
2.2 Water (expected source & Yes Construction phase: 10 KLD
competing users) unit: KLD Source of water: Tanker
During construction phase daily 20 CMD of
water will require for construction work

8
Form 1 for proposed Synthetic Organic Chemicals Manufacturing Unit by M/s. Aquapharm Chemicals
Private Limited at
L-45/5,6,7, MIDC Mahad, Tal. Mahad & Dist. Pune, Maharashtra.

Sr. Information/checklist confirmation Yes/ Details thereof (with approximate quantities


No. No /rates, wherever possible) with source of
information data
purpose and it will get through water tanker or
MIDC pipeline.
For domestic purpose daily 3.5 CMD of water
will require and it will supply in packed drinking
water through authorized agency,

Operation Phase:
Operation Phase-
Mahad industrial area has all the necessary
infrastructure. It has good water supply
distribution network.
Quantity: 750 CMD.
Source: MIDC.
2.3 Minerals (MT) No -
2.4 Construction material – stone, Yes Construction Material:
aggregates, sand / soil (expected Sand/ Stone/Bricks: 35 CUM
source – MT) Aggregates-75 CUM
Cement-20 MT
Metal: 150 MT
Construction material will be procured from local
market.
2.5 Forests and timber (source – MT) No -
2.6 Energy including electricity and fuels Yes Construction Phase-
(source, competing users) Unit: fuel Construction Work – 15 MVA
(MT), energy (MW) Source: MSEB
Operation Phase-
Electricity: The electrical power
Connected Load 500kW
Demand Load 350 kW
Source of power: MSEDCL
Fuel type:
Quantity: Coal for Boiler- 3000 Kg/hr
Diesel for DG set – 450 Lit/ Hr
2.7 Any other natural resources (use No --
appropriate standard units)

9
Form 1 for proposed Synthetic Organic Chemicals Manufacturing Unit by M/s. Aquapharm Chemicals
Private Limited at
L-45/5,6,7, MIDC Mahad, Tal. Mahad & Dist. Pune, Maharashtra.

3. Use, storage, transport, handling or production of substances or materials, which could be


harmful to human health or the environment or raise concerns about actual or perceived risks
to human health.

Sr. Information/Checklist confirmation Yes/ Details thereof (with approximate


No. No quantities/ rates, wherever possible)
with source of information data
3.1 Use of substances or materials, which are Yes Detailed product wise raw materials list
hazardous (as per MSIHC rules) to human with chemical characteristics will
health or the environment (flora, fauna, and present in EIA.
water supplies)
3.2 Changes in occurrence of disease or affect No Since there will be no influx of people
disease vectors (e.g. insect or water borne there will be no chances of occurrence of
diseases) disease or affect disease vectors.
3.3 Affect the welfare of people e.g. by changing Yes The proposed Project will generate
living conditions? employment for about 150 direct
employment and 100 indirect
employment hence improving living
conditions of the employees and support
ancillary business in the surrounding
areas.
3.4 Vulnerable groups of people who could be No -
affected by the project e.g. hospital patients,
children, the elderly etc.,
3.5 Any other causes No -

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

Sr. Information/Checklist confirmation Yes/ Details thereof (with approximate


No. No quantities/rates, wherever possible) with
source of information data
4.1 Spoil, overburden or mine wastes Yes Approximately 100 cum soil will be excavated.
Top soil will be preserved for landscaping and
partly will be used for land leveling
4.2 Municipal waste (domestic and or Yes Construction phase domestic waste
commercial wastes) The construction waste -in the form of metal-2
MT; debris & stony waste- 4 MT; wooden
box/plastic/paper/ corrugated box- 5 MT etc.
will be stock at designated area of the site. Metal
waste & debris/stony waste shall be utilized

10
Form 1 for proposed Synthetic Organic Chemicals Manufacturing Unit by M/s. Aquapharm Chemicals
Private Limited at
L-45/5,6,7, MIDC Mahad, Tal. Mahad & Dist. Pune, Maharashtra.

Sr. Information/Checklist confirmation Yes/ Details thereof (with approximate


No. No quantities/rates, wherever possible) with
source of information data
within site for road construction and site
levelling. Other waste sale to authorized scrap
vendor for segregation and disposal as per
standard practice
Operation Phase:
Biodegradable wet waste-10 kg/day
Non-biodegradable waste-.15kg/day
After segregation at source Non-biodegradable
waste will be handed over to the scrap vendor.
Biodegradable wet waste sent to the local MSW
facility for treatment & disposal
Non-Hazardous Proposed Disposal
wastes Quantities
Wooden scrap 1500 Sale to
Kg/day Authorized
Recycler
Metallic Scrap 500 Sale to
Kg/day Authorized
Recycler
Waste Cotton 100 Sale to
Authorized
Recycler
Dry Waste 50 Sale to
Authorized
Recycler
Insulation/Packing 15 By Authorized
Waste Vendor
Wet Waste 10 Sale to
vermicutural
or compost
Coal Ash from 15 Send to Brick
Boiler Manufacturer

4.3 Hazardous wastes (as per Hazardous Yes Cate Hazardous


Waste Management Rules) gory Waste Qty UOM
Sludge and
3.3 filters 3.5 MT/M

11
Form 1 for proposed Synthetic Organic Chemicals Manufacturing Unit by M/s. Aquapharm Chemicals
Private Limited at
L-45/5,6,7, MIDC Mahad, Tal. Mahad & Dist. Pune, Maharashtra.

Sr. Information/Checklist confirmation Yes/ Details thereof (with approximate


No. No quantities/rates, wherever possible) with
source of information data
contaminated
with oil
5.1 Used or spent oil 3 MT/A
Discarded
15.2 asbestos 2 MT/A
20.2 Spent solvents 50 MT/A
Distillation
20.3 residues 300 MT/A
Off specification
28.4 products 25 MT/A
Date-expired
28.5 products 50 MT/A
Empty
barrels/containe
rs/liners
contaminated
with
hazardous
chemicals
33.1 /wastes 6 MT/A
Raw material
used chemical,
33.1 barrel 30000 Nos/Y
33.1 MS Drums 2 MT/Day
Oil Soaked
33.2 Cotton Waste 2 MT/A
35.3 ETP Sludge 160 MT/A
37.3 MEE/ATFD Salts- 200 MT/A
Lead Acid
Batteries of
Forklift 50 Nos/Y
E-Waste 5 MT/A
Silica & Resin 0.5 MT/A
Filter & Filter
material which
have organic
contamination 1 MT/A
Paint
contaminated
empty drums/
buckets/ tiffin 500 Nos/Y
Boiler Soot 3 MT/A

12
Form 1 for proposed Synthetic Organic Chemicals Manufacturing Unit by M/s. Aquapharm Chemicals
Private Limited at
L-45/5,6,7, MIDC Mahad, Tal. Mahad & Dist. Pune, Maharashtra.

Sr. Information/Checklist confirmation Yes/ Details thereof (with approximate


No. No quantities/rates, wherever possible) with
source of information data
The detailed list of Hazardous waste is attached
as ANNEXURE VI

4.4 Other industrial process wastes No -

4.5 Surplus product No -


4.6 Sewage sludge or other sludge from Yes About 8-10 kg of treated sludge from STP will
effluent treatment be used for gardening. Treated waste water
from STP will be used for gardening.
4.7 Construction or demolition wastes Yes The construction waste -in the form of metal-2
MT; debris & stony waste- 4 MT; wooden
box/plastic/paper/ corrugated box- 5 MT etc.
will be stock at designated area of the site. Metal
waste & debris/stony waste shall be utilized
within site for road construction and site
levelling. Other waste sale to authorized scrap
vendor for segregation and disposal as per
standard practice
4.8 Redundant machinery or equipment No -
4.9 Contaminated soils or other No -
materials
4.10 Agricultural wastes No -
4.11 Other solid wastes No -

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

Sr. Information/Checklist confirmation Yes/ Details thereof (with approximate


No. No quantities/rates, wherever possible) with
source of information data
5.1 Emissions from combustion of fossil Yes Emission from Boiler – Ash-0.8 MT/Day
fuels from stationary or mobile SO2- 250 kg/Day
sources
5.2 Emissions from production processes Yes Emission from Process:

Methanol- 138 Kg/Day


Acetone – 158 kg/Day

13
Form 1 for proposed Synthetic Organic Chemicals Manufacturing Unit by M/s. Aquapharm Chemicals
Private Limited at
L-45/5,6,7, MIDC Mahad, Tal. Mahad & Dist. Pune, Maharashtra.

Sodium Chloride-324 Kg/Day


Sodium Bromide-323 Kg/Day
HCL- 846 Kg/Day
5.3 Emissions from materials handling - No Pulverized coal will transport through closed
including storage or transport loop conveyor belt.
Finished goods will transport in closed packed
drums
5.4 Emissions from construction activities Yes During construction phase
including plant and equipment TPM- 1.8 kg/hr
SO2- 0.027 kg/hr
NOx- 0.035 kg/hr
5.5 Dust or odors from handling of Yes Construction phase-
materials including construction Marginal dust will be generated during
materials, sewage and waste Construction activity which will be confined
within the plot boundary and will be controlled
by water sprinkling.
Sewage will be treated in septic tank followed
by soak pit
5.6 Emissions from incineration of waste No No waste will be incinerated on site
5.7 Emissions from burning of waste in No Open burning of waste shall be prohibited.
open air (e.g. slash materials,
construction debris)
5.8 Emissions from any other sources No Not Applicable

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

Sr. Information/Checklist confirmation Yes/ Details thereof (with approximate quantities/


No. No rates, wherever possible) with source of
information data with source of information
data
6.1 From operation of equipment e.g. Yes Pressure release valve and stirrer of reactor are
engines, ventilation plant, crushers the only noise & vibration generation activity in
proposed project operation. Noise level should
be maintained <75 dB(A).
6.2 From industrial or similar processes No -
6.3 From construction or demolition Yes Construction equipment’s mainly pumps,
generator, compressor, bulldozers, excavator,
will create noise & vibration. Maximum noise
level of these instruments should be maintained
85dB(A) from the 10 feet of source.

14
Form 1 for proposed Synthetic Organic Chemicals Manufacturing Unit by M/s. Aquapharm Chemicals
Private Limited at
L-45/5,6,7, MIDC Mahad, Tal. Mahad & Dist. Pune, Maharashtra.

Sr. Information/Checklist confirmation Yes/ Details thereof (with approximate quantities/


No. No rates, wherever possible) with source of
information data with source of information
data
6.4 From blasting or piling No -
6.5 From construction or operational Yes During construction & operation phase,
traffic vehicular movement will create noise, measures
for proper traffic management will be takes
place.
Unnecessary blowing horns strictly prohibited
during transportation of vehicle. Speed limit of
20 kmph will be confined within the project site.
6.6 From lighting or cooling systems Yes During operation of cooling tower circulating
water within tower may generate noise.
Pressure releasee valve of reactor etc.
6.7 From any other sources No -

7.Risks of contamination of land or water from releases of pollutants into the ground or into
sewers, surface waters, groundwater, coastal waters or the sea:

Sr. Information/Checklist confirmation Yes/ Details thereof (with approximate


No. No quantities/rates, wherever possible) with
source of information data
7.1 From handling, storage, use or spillage Yes Handling of raw chemical & finished product will
of hazardous materials lead to risk. It will be taken care as per the HWM
and Handling rule 2016 and MSIHC Rule, 1989 &
2000.
7.2 From discharge of sewage or other No Construction phase-
effluents to water or the land The generated 3 KLD of sewage will be collected
(expected mode and place of in septic tank followed by soak pit.
discharge)
Operation Phase-
Approximately 8-10 kg of treated sewage will be
used for gardening purpose.

From the proposed activity there will be no


process trade effluent generation. Effluent of 53
CMD will generate from CT & Boiler blow down,
reactor washing and DM plant rejects.
Generated effluent will be treated in biological
ETP followed by RO, MEE & ATFD to achieve Zero

15
Form 1 for proposed Synthetic Organic Chemicals Manufacturing Unit by M/s. Aquapharm Chemicals
Private Limited at
L-45/5,6,7, MIDC Mahad, Tal. Mahad & Dist. Pune, Maharashtra.

Liquid Discharge. ATFD condensate and RO


permeate will use for CT make up.
7.3 By deposition of pollutants emitted to Yes Emission from boiler stack will lead to the air
air into the land or into water pollution therefore 40 meter stack with Multi-
cyclone system will be provided.
7.4 From any other sources No -
7.5 Is there a risk of long-term build - up No -
of pollutants in the environment from
these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human
health or the environment

Sr. Information/Checklist Yes/ Details thereof (with approximate quantities/


No. confirmation No rates, wherever possible) with source of
information data
8.1 From explosions, spillages, fires etc. Yes Risk is involved due to fire, spillages and
from storage, handling, use or explosion of chemicals. Proper firefighting will
production of hazardous substances be designed in conformity with the
recommendation of the Tariff Advisory
Committee (TAC) of Insurance Association of
India. Codes and Standards of National Fire
Protection Association (NFPA) will be followed
as applicable.

The HW generated from the operational phases


is being disposed-off as per Hazardous Waste
(Management, Handling &Transboundary
Movement) Rules, 2008.
8.2 From any other causes Yes There is a risk of accident during construction.
However proper safety measures will be taken.
8.3 Could the project be affected by No • The site is not prone to landslides.
natural disasters causing • Earthquake proneness: The area falls under
environmental damage (e.g.floods, Zone IV- High damage risk zone-as per
earthquakes, landslides, cloudburst IS1893 (Part 1) - 2002, National Disaster
etc)? Management Authority (NDMA)
• The site is not prone to flooding

9. Factors which should be considered (such as consequential development) which could lead to
environmental effects or the potential for cumulative impacts with other existing or planned
activities in the locality

16
Form 1 for proposed Synthetic Organic Chemicals Manufacturing Unit by M/s. Aquapharm Chemicals
Private Limited at
L-45/5,6,7, MIDC Mahad, Tal. Mahad & Dist. Pune, Maharashtra.

Sr. Information/Checklist Yes/ Details thereof (with approximate quantities


No. confirmation No /crates, wherever possible) with source of
information data
9.1 Lead to development of Site is located in Mahad MIDC area, Mahad,
supporting facilities, ancillary No Maharashtra.
development or development Ancillary Business like Hotels, Food stalls
stimulated by the project which would develop around the project site.
could have impact on the
environment e.g.:

 Supporting infrastructure
(roads, power supply, waste
or waste water treatment,
etc.)
 Housing development

 Extractive industries
 Supply industries

 Other
9.2 Lead to after-use of the site, which No Present land use of site is already industrial.
could have an impact on the Hence no change of land use is envisaged.
environment
9.3 Set a precedent for later Yes The said project will be developed in an
developments environment sustainable manner
9.4 Have cumulative effects due to Yes There may be impact due in the near future due
proximity to other existing or to additional industries in the immediate
planned projects with similar vicinity of the project site.
effects

III. Environmental Sensitivity

Sr. Areas Name/ Aerial distance (within 15


No. Identity km.) Proposed project
location boundary
1 Areas protected under international -- --
conventions, national or local legislation for
their ecological, landscape, cultural or other
related value

17
Form 1 for proposed Synthetic Organic Chemicals Manufacturing Unit by M/s. Aquapharm Chemicals
Private Limited at
L-45/5,6,7, MIDC Mahad, Tal. Mahad & Dist. Pune, Maharashtra.

Sr. Areas Name/ Aerial distance (within 15


No. Identity km.) Proposed project
location boundary
2 Areas which are important or sensitive for Yes Kal River- 1.5 km
ecological reasons - Wetlands, watercourses or Open jungle(RF) is close to
other water bodies, coastal zone, biospheres, the plot boundary.
mountains, forests
3 Areas used by protected, important or sensitive
species of flora or fauna for breeding, nesting,
foraging, resting, over wintering, migration
4 Inland, coastal, marine or underground waters.
5 State, National boundaries. -- --
6 Routes or facilities used by the public for access SH 70 1.63 km
to recreation or other tourist, pilgrim areas. NH 66 Mumbai 8.24 km
Goa Highway
7 Defense installations -- --
8 Densely populated or built-up area Mahad Town 12 km SW
Raigad City 53 km NW
9 Areas occupied by sensitive man-made land uses Primary Health 3.53 Km SW
(hospitals, schools, places of worship, Care
community facilities) MMA Hospital 6.95 km SW
MIDC
Kalbhairav 0.42 Km NE
Temple Amshet
Bhagwan 0.93 km SW
Buddha Vihar
Amshet
Vishwakarma 0.85Km NE
Temple
Om Polytechnic 0.47 km NE
Mahatma
Jyotirao Phule
Sharirk Shikshan 0.63 km SW
Mahavidyalay
10 Areas containing important, high quality or Kal River 1.5 Km NE
scarce resources.
Chavdar Tale 12.36 Km SW
(ground water resources, surface resources,
forestry, agriculture, fisheries, tourism, minerals) Kotaswari Talav 12.41 Km
Hapus Tale 12.94 km SW

18
Form 1 for proposed Synthetic Organic Chemicals Manufacturing Unit by M/s. Aquapharm Chemicals
Private Limited at
L-45/5,6,7, MIDC Mahad, Tal. Mahad & Dist. Pune, Maharashtra.

Sr. Areas Name/ Aerial distance (within 15


No. Identity km.) Proposed project
location boundary
DAD Vidhyalaya 3.88 Km NE
& LGM College
Dr. Babasaheb 10.12 Km NE
Ambedkar
College of Arts,
Commerce and
Science, Mahad
11 Areas already subjected to pollution or -- --
environmental damage. (those where existing
legal environmental standards are exceeded)
12 Areas susceptible to natural hazard which could -- The project area falls
cause the project to present environmental under seismic zone IV as
problems. (earthquakes, subsidence, landslides, per the Seismic Zoning
erosion, flooding or extreme or adverse climatic Map of India (IS June
conditions) 2014). There is Savitri
river (1.75 Km S). There is
no major mountains,
hence landslide are not
envisaged.

(IV) Proposed Terms of Reference for EIA studies

1. Executive summary of the project – giving a idea of the objectives of the proposal, use of resources,
justification, etc. In addition, it should provide a compilation of EIA report, including EMP and the
post project monitoring plan in brief
2. Detailed project description comprising of site selection, land requirement along with break up,
master layout plan of the industry, process description along with process flow diagram, raw
material requirement & it source, chemical reaction balance of the project, water budgeting along
with flow diagram, detailed on material balance & solid waste generation, process technology,
details of proposed source-specific pollution control schemes.
3. Details on water conservation & management viz. Rain water harvesting
4. Three months non-monsoon baseline study w.r.t environmental attributes air, water, noise, soil,
biological environment, socio-economic

Sr. Components Parameters Frequency of Methodology adopted


No Monitoring

19
Form 1 for proposed Synthetic Organic Chemicals Manufacturing Unit by M/s. Aquapharm Chemicals
Private Limited at
L-45/5,6,7, MIDC Mahad, Tal. Mahad & Dist. Pune, Maharashtra.

1. Ambient air quality PM2.5, PM10, Ambient air quality PM10/PM2.5: Gravimetric
SO2, NOx , O3, samples are monitored method
CO, nMHC at 6 locations for 24 SO2: Modified West and
hours twice a week for Gaeke Method (IS: 5182,
the study period. Part II)
NOx: Jacobs and Hochheiser
1- Upwind (1no) Method (IS 5182 Part VI)
2- Downwind(3nos) Ozone – Online Ozone meter
3- Crosswind (3 nos) Other Parameters
CO, Pb, Hg and as per
standard ToR
2 Meteorology Surface: Wind Primary data: Monitoring data for primary
speed and Hourly continuous data IS: 8829
direction, readings during the
temperature, study period at plant
relative site
humidity and Secondary data
rainfall collected from National
Data Centre Pune for
nearest observatory
3 Water quality Physical, Primary data :- Standard methods for
Chemical and Ground water samples Examination of Water and
Bacteriological were collected from 6 Wastewater’ published by
parameters. locations and surface American Public Health
water samples were Association (APHA)
collected from 2
locations
4 Ecology Flora & Fauna Field survey conducted Reconnaissance survey,
with in study once during the study Quadrate Study and direct
area period and the data &indirect evidence of faunal
collected from members.
secondary sources.
5 Noise Noise levels in Continuous 24 – hourly IS:4954 as adopted by CPCB.
dB(A) monitoring at 6
locations once during
the study period

20
Form 1 for proposed Synthetic Organic Chemicals Manufacturing Unit by M/s. Aquapharm Chemicals
Private Limited at
L-45/5,6,7, MIDC Mahad, Tal. Mahad & Dist. Pune, Maharashtra.

6 Soil Physico- Sampling at 8 locations BIS specifications


chemical around project site once
during the study period.
7 Land use pattern Land use for Based on data published Toposheets
different in Primary Census Satellite imageries
categories Abstract and satellite
imagery LISS –III
8 Socio –economic Socio – Based on data collected Based on Census Data 2011
aspects economic from the year 2011 and physical survey within
characteristics Census Abstract. the area
of local Physical survey with local
population people
9 Geology Geology and Based on data collected Hydrogeological study
hydrogeology from field survey once conducted
of the area during the study period
and from secondary
sources.

5. Topography details of the project area.


6. Land use & land cover on the basis of satellite imagery
7. Geological features and geo-hydrological status of the study area.
8. Anticipated environmental impacts & mitigation measures
9. Post project environmental monitoring programme; it gives detailed idea and strategy to
implementing mitigation measures.
10. Details of in-house monitoring capabilities and the recognized agencies if proposed for conducting
monitoring.
11. Details on risk assessment and damage control during different phases of the project and
proposed safeguard measures.
12. Details of the emergency preparedness plan and on-site & off-site disaster management plan.
13. Details of occupational health surveillance program
14. Traffic survey
15. Details on plan for corporate social responsibility including the villages, population spread,
SC/ST/Backward communities, up-gradation of existing schools, establishing new schools with
facilities (such as laboratories, toilets etc) link roads, community halls, primary health facilities,
health camps etc.
16. EMP devised to mitigate the adverse impacts of the project should be provided along with item-
wise cost of its implementation (capital and recurring costs).

21
Form 1 for proposed Synthetic Organic Chemicals Manufacturing Unit by M/s. Aquapharm Chemicals
Private Limited at
L-45/5,6,7, MIDC Mahad, Tal. Mahad & Dist. Pune, Maharashtra.

“I hereby given undertaking that the data and information given in the application and enclosures are
true to the best of my knowledge and belief and I am aware that if any part of the data and
information submitted is found to be false or misleading at any stage, the project will be rejected and
clearance given, if any to the project will be revoked at our risk and cost”.

Date: 18-01-2021
Place: Pune

Signature of the applicant

M/s. Aquapharm Chemicals Pvt Ltd

22
Annexure 1- List Of Products

Sr.No. Product Name UoM Existing Consented Proposed Total Remarks


Revision
A. Alkyl Phosphonates
1 PBTC (100% Basis) MT/A 0 0 5040 5040 Alkyl Phosphonates
Derivatives
2 Isopropenyl MT/A 0 0 1440 1440 Alkyl Phosphonates
Phosphonic Acid (100% Derivatives
Basis)
OR Alkyl Phosphonates MT/A 0 0 6480 6480 Manufacturing of
derivatives and family individual chemicals
(100% Basis) or group of Alkyl
Phosphonates
chemicals
B. Amine Phosphonate
1 1,1'-Bis(phosphono) MT/A 0 0 1440 1440 Amine Phosphonate
dimethylamine (100% Derivatives
Basis)
2 1,1'-Bis(phosphono) MT/A 0 0 1440 1440 Amine Phosphonate
morpholine (100% Derivatives
Basis)
3 Ploy Amino Poly Ether MT/A 0 0 1800 1800 Amine Phosphonate
Polymethylene Derivatives
Phosphonic Acid (100%
Basis)
4 Diethylene Triamine MT/A 0 0 3600 3600 Amine Phosphonate
Penta Methylene Derivatives
Phosponic Acid (100%
Basis)
5 Ethylene Diamine MT/A 0 0 360 360 Amine Phosphonate
Tetramethylene Derivatives
Phosphonic Acid (100%
Basis)
OR Amine MT/A 0 0 8640 8640 Manufacturing of
Phosphonates individual chemicals
derivatives and family or group of Amine
(100% Basis) Phosphonate
chemicals
C.Salt of Alkyl Phosphonate
1 HEDP salts Liquids MT/A 0 0 7200 7200 Salt of Alkyl
(100% Basis) Phosphonate
Derivatives
2 HEDP Salts Powder MT/A 0 0 10800 10800 Salt of Alkyl
(100% Basis) Phosphonate
Derivatives
3 Poly (Isopropenyl MT/A 0 0 1440 1440 Confirm with VVM
Phosphonic Acid)
(100% Basis)
OR Salts of Alkyl MT/A 0 0 19440 19440
Phosphonates,
derivatives and family
(100% Basis)
D.Salt of Amine Phosphonate
1 DETMP Salts (100% MT/A 0 0 3600 3600 Salt of Amine
Basis) Phosphonate
Derivatives
2 ATMP Salts (100% MT/A 0 0 3600 3600 Salt of Amine
Basis) Phosphonate
Derivatives
3 EDTMP Salts (100% MT/A 0 0 360 360 Salt of Amine
Basis) Phosphonate
Derivatives
Or Salts of Amine MT/A 0 7560 7560 Manufacturing of
Phosphonate, individual chemicals
derivatives and family or group of Salts of
(100% Basis) Amine Phosphonate,
derivatives and family
(100% Basis)
E. Polymer
1 Poly Maleic (100% MT/A 0 0 5400 5400 Polymer Derivatives
Basis)
2 Poly Acrylic (100% MT/A 0 0 7200 7200 Polymer Derivatives
Basis)
Or Polymer derivatives MT/A 0 0 12600 12600 Manufacturing of
and family (100% individual chemicals
Basis) or group of polymer
derivatives and family
(100% Basis)
F. Eco Friendly Products
1 GLDA (100% Basis) MT/A 0 0 10800 10800 Glutamic acid, N,N-
diacetic tetrasodium
salt; GLDA-4Na
2 MGDA (100% Basis) MT/A 0 0 10800 10800 Methylglycine N,N-
diacetic trisodium
salt; MGDA-3Na
3 IDS (100% Basis) MT/A 0 0 1440 1440 Iminodisuccinic acid
tetra sodium salt; IDS-
4Na
4 EDDS (100% Basis) MT/A 0 0 1440 1440 Ethylenediamine N,N-
disuccinic acid
trisodium salt; EDDS-
3Na
5 Iminodiacetic Acid MT/A 0 0 1440 1440 Derivaties of Eco
Friendly Products
Salts of Eco Friendly MT/A 0 0 25920 25920 Salts of Eco Friendly
Products Products
G. Methylene Bisthiocyanate MT/A 0 0 540 540
H. 2-(Thiocyanatomethylthio) MT/A 0 0 1080 1080 Confirm with R&D
benzothiazole whether it is part o
MBT or new product
I. Halogen Derivaties
1 Methylene Di- Bromide MT/A 0 0 1080 1080 Halogen Derivaties
(100% Basis)
2 2-Chloropropionic Acid MT/A 0 0 3600 3600 Halogen Derivaties
(100% Basis)
OR Halogen MT/A 0 0 4680 4680 Manufacturing of
Derivatives & Family individual chemicals
(100% Basis) or group of halogen
derivatives and family
(100% Basis)
J. Corrosion Inhibitor
1 Butanetetracarboxylic MT/A 0 0 1440 1440 Corrosion Inhibitor
Acid (100% Basis) Family Derivatives
2 Chloro Tolyltriazole MT/A 0 0 1800 1800 Corrosion Inhibitor
(100% Basis) Family Derivatives
3 Hydrolyzed Polymaleic MT/A 0 0 1800 1800 Corrosion Inhibitor
Acid (100% Basis) Family Derivatives
OR Corrosion Inhibitor MT/A 0 0 5040 5040 Manufacturing of
& Family Derivatives individual chemicals
(100% Basis) or Corrosion Inhibitor
& Family Derivatives
(100% Basis)
K. Scale Inhabitor
1 Polyepoxysuccinic Acid MT/A 0 0 1800 1800 Scale Inhabitor Family
(PESA) (100% Basis)
OR Scale Inhabitor MT/A 0 0 1800 1800 Manufacturing of
derivaties & Family individual chemicals
(100%) or Scale Inhibitor &
Family Derivatives
(100% Basis)
L. Quarternery Ammonium Compound
1 Dicyandiamide- MT/A 0 0 1800 1800 Quarternery
formaldehyde poly Ammonium
condensate Compound
Derivatives
2 Dimethylamine- MT/A 0 0 1800 1800 Quarternery
epichlorohydrin Ammonium
copolymer Compound
Derivatives
3 PolyDADMAC MT/A 0 0 1800 1800 Quarternery
Ammonium
Compound
Derivatives
4 Didecyl Dimethyl MT/A 0 0 1800 1800 Quarternery
Ammonium Chloride Ammonium
Compound
Derivatives
OR Group of MT/A 0 0 7200 7200 Quarternery
Quarternery Ammonium
Ammonium Compound Compound
Family & Derivatives Derivatives
(100%)

1 3- MT/A 0 0 4000 4000


hydroxyIminodisuccinic
acid tetrasodium salt
(HIDS.Na4)
2 HEIDA/EDG-A 2020 MT/A 0 0 1000 1000

Total 105980
Production
Capacity
Annexure 2- Location Map

PLOT L-45/5,6,7 MAHAD MIDC,


MAHAD,
RAIGAD,MAHARASHTRA,40230
9
Annexure 3- Certificate Of Incorporation
PRODUCT:1,1'-Bis(phosphono) dimethylamine (100%Basis)

Description:

1) Charge DMF in clean dry reactor.


2) Add H3PO3 in reactor start stirring.
3) Heat mass to 70deg & start addition of Pcl3.
4) After half addition slightly thick mass observe in reactor.
5) Continue addition upto completion then cure mass at 70deg for 1hrs.
6) Add water for quenching in reactor at 70deg.Exotherm observe.
7) After water addition add this mass in Acetone then cure for 1hrs .white slurry observe.
8) Filter this white slurry & filtrate take for solvent recovery.
9) Dry this wet cake for constant weight.
10) Analyze for purity.

FlowChart
DMF
Pcl3
H3PO3
Recovery
Reacti By-Product
on
Acetone
reacto
Water r

DMAMDP(100%Basi
s

6
PRODUCT:1,1'-Bis(phosphono) morpholine (100% bases)

Description:

1) Charge Formylmorpholine in clean dry reactor.


2) Add H3PO3 in reactor start stirring & add Accl slightly exotherm observe.
3) Heat mass to 50deg & start addition of Pcl3.
4) After half addition slightly thick mass observe in reactor.
5) Continue addition upto completion then cure mass at 50-55deg for 1hrs.
6) Distilled out acetyl chloride & add water for quenching in reactor at 50deg.Exotherm
observe.
7) After water addition add this mass in Acetone then cure for 1hrs .white slurry observe.
8) Filter this white slurry & filtrate take for solvent recovery.
9) Dry this wet cake for constant weight.
10) Analyze for purity.

FlowChart
Formylmorpholine
Pcl3
H3PO3
Recovery
Accl Reacti By-Product
on
Acetone
reacto
Water r

MMDP(100%Basis

6
PRODUCT: Chloro-tolyltriazole (Cl-TT)

Description:
Charge tolyltriazole & water in to reactor. Start stirring & heating of reactor and then add hypochlorite slowly in the reactor
under stirring. After complete addition of hypochlorite ensure the dissolution of the mass. Start heating of the reactor using
the steam. Maintain the reaction to temp about 65 – 700C. Digest the reaction mass by applying heating for 5hrs.Then cool
& analyze the mass

FlowChart

Tolyltriazole Reactor
Water
React NaOCl (10% as Cl )
ion

Product

6
PRODUCT: PolyDADMAC

Description:
Charge DADMAC & water in to reactor. Start stirring & heating of reactor and then add ammonium per sulfate solution slowly
in the reactor under stirring below 700C temperature. After complete addition of catalyst maintain the reaction temperature
about 70-750C. Digest the reaction mass by applying heating for 3hrs.Then cool & analyze the mass

FlowChart

DADMAC ( 60%)
Reactor Ammonium per sulfate solution
Water
React
ion

Product

6
PRODUCT: MGDA

Description:
Prepare DL Alanine & MCA solution in separate reactor by c.lye below 30deg & PH approx 13. Charge DL
Alanine solution in reaction reactor & heat to 65deg.Add MCA in reaction reactor in 3hrs at 65-70deg by
maintain pH 9-10.After MCA addition cure mass at 75-80deg for 4hrs.PH adjust to 10.Distilled out water up
to 73% solid. Cool mass to 85deg.Filter mass at 850C.Wash wet cake NaCl by water. Dilute product to 40%
& analyze. Distilled water & NaCl wash water recycle for next batch.

Flow Chart

Water
Alanine Reactor
MCA
C.lye (49%) C.lye(49%)
Water
Water
Distilltion

Concentrated
Product

Product

6
PRODUCT ; DDAC (100% basis)

• Description :
Charge 391kg N-Dimethyl Decyl amine in reactor.Start Stirring.To this start addition of 373Kg
1-Chlorodecane slowly at Room temp.) .To this mixture add 760 Kg Isopropyl Alcohol .Heat the
mixture Slowly to 80-85 deg.C cure the Reaction mas at 85 deg.C for 9 hrsAfter 48 hrs digestion
add 38 kg 1- Chlorodecane and after 72 hrs digestion again add 38 kg 1- chlorodecane.Check the
Unreacted Amine content in RM It should below 1%Arrange Distillation to concentrate the mass
for 78-80% as product.Analyze the material for all parameters.Filter the material.Cool & pack in
suitable containers.

Flow chart ;

1. N,N Dimethyl
Decyl amine
2. Chlorodecane
3. IPA
Reactor Product DDAC

First Step 100% Basis

75 deg. C for 8 hrs


PRODUCT ; S,S – EDDS (100% basis)

• Description :
Charged L- Asp. Acid & water,start stirring.& adjust pH 10.5 by using 49 % NaOH. to get clear
solution Then Start addition of Ethylene Dibromide (EDB)After addn was over,start heating &
maintain the temp to ~ 85 degC & cure the mass further for 6 hours
Check pH of RM in between & maintain it ~ 10.5 by adding 49% NaOH. After 6 hrs curing raised
the temprature to Reflux Condition (103 deg. C ) for one hr.Monitor reaction by Ca
sequestration. & % Assay, % Nabr content by Autotitrator.
Cool the RM at 25 degC and added DM water to get product conc. 5 – 6 % RM slowely Acidify by
conc . HCL at pH 2-3 Solid S,S EDDS product precipitated Cool to 25 degC and filter it.
Wash the product thrice with distilled water. Collect washing separately.

Flow chart ;

L Aspartic acid

Ethylene dibromide
Reactor Product EDDS
Water
First Step 100% Basis
caustic lye
75 deg. C for 8 hrs
calcium hydroxide

Conc. Hydrochloric acid

Biproduct

(Mother Liquor)
Annexure 5- Master Layout Plan
STAMP OF APPROVAL :
LEGEND
SR.NO. BUILDING TYPE TYPE SIZE HT. B/U AREA
AREA STATEMENT
1 SECURITY CABIN R.C.C. 7.3X5,2.5X2 3 20
AREA OF PLOT NO. L- 45 / 5, 6, 7 = 46171.00 SQ. M. 2 ADMIN.,Q.C.,CANTEEN R.C.C. 30X20 4 1800

AMENITY SPACE (5%) = 2309.00 SQ. M. 3 FINISHED GOODS GODOWNS STR.SHED 60X58 12&6 4920

OPEN SPACE (10%) = 4618.00 SQ. M. 4 RAW MATERIALS GODOWNS STR.SHED 35X30 12&6 1760
5 PHOSPONATE PLANT(3nos) R.C.C.,G+4 18X30 25 12150
PARKING SPACE (12%) = 5541.00 SQ. M. REVISION NO. DATE.

6 UTILITY BUILDING STR.SHED 66X15 6 1980 AS/CLIENT INPUT 1 16-10-20

9.2
ADDED PHOSPONATE PLANT(2nos) 2 19-10-20
7 P.C.C.PANEL ROOM STR.SHED 25X9 12&6 225
8 COAL SHED STR.SHED 50X15 7 900
9 BOILER STR.SHED 55X11 9 900
43.3

10 M.C.C.CONTROL ROOM R.C.C.,G+1 20X10 4 400


11 DRIER PLANT STR.SHED 15X15 5NOSX6 1100
ETP 12 FURNACE OIL STORAGE STR.SHED 15X10 PLINTH 150

Area 2015 sqmt. 13 D.M.PLANT STR.SHED 15X7.5 7 170

15.1
14 WATER TANK + PUMP HOUSE 15X22 450
69.0 20.0 15 COOLING TOWER 15X20 300

66.0 TOTAL 27225 SQ.M.

10.0
15.0

MCC CONTROL 9M
SID

6.0
NORTH LINE & KEY PLAN
UTILITY ROOM 10 EM
AR
6 GIN

NORTH

.0
----- 6.0 M WIDE ROAD -----

15
WATER
35.0 18.0 7.0 18.0 7.0 18.0 TANK DRAWN BY CHECKED BY
RAW G+4 G+4 G+4 1512 L. LTRS
.0 14 PUMP 7.0
BHASME
OPEN
RAW
MATERIAL
MATERIAL
STORAGE 13
PL DM
HOUSE PROJECT

30.0
30.0

30.0

30.0

30.0
15X15M PHOSPONATE PHOSPONATE PHOSPONATE
GODOWN PLANT 1 PLANT 2 PLANT 3 POLYMER PLANT AN PROPOSED INDUSTRIAL
20X30M PCL3& 18X30M 18X30M 18X30M (IN FUTURE) T PROJECT FOR
ACCL. RAW 25M HT. 25M HT. 25M HT. 40X30M
12M HT.

7.5
MATERIAL AQUAPHARM CHEMICALS
STORAGE PVT LTD.
4 15X15MX6M HT
5 44.0 IN PLOT NO. : L 45 / 5, 6 & 7,
MAHAD INDUSTRIAL AREA
DIST-RAIGAD

----- 15 M WIDE ROAD -----

SHEET TITLE
15.0 MASTER PLAN
COOLING
OPEN SPACE
30.0 TOWER

20.0
ADMIN., Q.C.
46.0
WEIGH BRIDGE

15X20M
20.0

CANTEEN 2 OWNER'S SIGN.

30X20MX4M. HT. 60.0 15


38.0

1800 SQ.M.
FINISHED GOODS
----- 15 M WIDE ROAD -----

GODOWN
14.9

15.0 55.0
58.0

64.8

PARKING CABIN 40X38X12M HT IN FUTURE


EXPANSTION
SPACE FURNACE
9.0 3 3600 SQ.M.

10.0
OIL12

11.0
TRANSFORMERS

STORAGE 9 BOILER
PCC PANEL
ROOM

SPACE
D.G.SET
FOR

FILLING ARCHITECT'S SIGN.

SHED
FINISHED 15.0
25.0

GOODS
20.0

30X20MX6M. HT. TANK DRIER 50.0

15.0
30X20M CHIMNEY

GIN
7 900 SQ.M. PLANT P.R.BERI

15.0 600 SQ.M. 11 FOR


M.S.(U.S.A.); F.I.E, M.A.C.I.
REGD. NO. CA/76/2745

E MAR
1 COAL SHED

P. R. BERI
REGD. NO. CA/76/2745
M.S.(U.S.A.); F.I.E, M.A.C.I.

15.0
Builtspace Designs
SECURITY beri
11.0

Pvt. Ltd.
SECURITY 11M SIDE MARGIN 9M SIDE MARGIN CABIN 8
MAIN
CABIN GATE 1

9M SID
Builtspace Designs
METERING SERVICES beri Pvt. Ltd.
KIOSK GATE KOLHAPUR PUNE

SCALE : 1:100 DATE : 20-02-2020


----- 25 M WIDE ROAD ----- OPEN SPACE SHEET NO.

FOR APPROVAL COAL STORAGE


1663 / 6 - PR02
MASTER PLAN REVISION
NUMBER 1 2
Annexure VI- List of Hazardous Waste
Sr No Category Quantity UoM Other Details
Sludge and filters
1 3.3 contaminated with oil 3.5 MT/M
2 5.1 Used or spent oil 3 MT/A
3 15.2 Discarded asbestos 2 MT/A
4 20.2 Spent solvents 50 MT/A
5 20.3 Distillation residues 300 MT/A
6 28.4 Off specification products 25 MT/A
7 28.5 Date-expired products 50 MT/A
Empty
barrels/containers/liners
contaminated with
hazardous chemicals
8 33.1 /wastes 6 MT/A
Raw material used chemical,
9 33.1 barrel 30000 Nos/Y
10 33.1 MS Drums 2 MT/Day
11 33.2 Oil Soaked Cotton Waste 2 MT/A
12 35.3 ETP Sludge 160 MT/A
13 37.3 MEE/ATFD Salts- 200 MT/A
14 Lead Acid Batteries of Forklift 50 Nos/Y
15 E-Waste 5 MT/A
16 Silica & Resin 0.5 MT/A
Filter & Filter material which
17 have organic contamination 1 MT/A
Paint contaminated empty
18 drums/ buckets/ tiffin 500 Nos/Y
19 Boiler Soot 3 MT/A