BAR CHA

%
% WEIGHT WEIGHT
SCOPE OF WORK QTY. UNIT ACCMP. TO DATE Jun-18 july Aug.
CLEARING AND
GRUBBING 14,113.00 sq.m. 100%
BACKFILLING
4,800.00 sq.m. 100%

BASE PREPARATION 9,527.00 sq.m. 100%

CONCRETE PAVEMENT 5,354.00 sq.m. 100%

CONCRETE SIDE WALK 2,836.00 l.m. 100%

CURBS AND GUTTERS 2,836.00 l.m. 100%

STORM DRAINAGE 1,800.00 l.m. 100%

MANHOLE 60.00 units 100%

WATER DISTRIBUTION 1,583.00 l.m. 100%

GROUTED RIP RAP 719.00 l.m. 100%

PERIMETER FENCE 1,502.00 l.m. 100%

ENTRANCE GATE 2.00 units 100%

Prepared By: Checked By:


Engr. Eranio Villaos Arch. Benny Magadia UAP
Project In-Charge Head Planning Design
BAR CHART SCHEDULE OF REMAINING WORKS @ PHASE-2 (GH)
DURATION

Sep. Oct. Nov. Dec. Jan-19 Feb. Mar. Apr. May June July Aug. Sep.

;
Noted By: Approve By:
Engr. Erwin L. Laqui Richard K. Lim
Head technical Dept. CEO
2 (GH)

Oct. Nov. Dec-19