8 Form work for slab 1.00 8.20 2.60 21.32 sqm. 685.86 14622.51
Total (B) 215486.50
3% contingencies & maintenance
11 work 6464.59
Name of the Project : Sundari Plot Hudai Tin tahara Jane Bato Nirman
Location : Lekhnath Municipality - 2
S.N. Description No. Length Breadth Height Quantity Unit Rate Amount (Rs.)
1 E/W in excavation work 1 87.00 1.00 0.20 17.40 cum. 350.20 6093.48
2 Stone Soling work 1 87.00 1.00 0.10 8.70 cum. 1957.50 17030.25
3 P.C.C.(1:3:6) work 1 87.00 1.00 0.10 8.70 cum. 6543.80 56931.06
4 Stone masonry work for foot trail step 20 1.00 0.50 0.20 1.00 cum. 6048.00 6048.00
3% contingencies & 1% maintenance
4 cost 3000.00
Total 89102.79
10 P.C.C.(1:2:4) work
TotaL (B) 183781.83
3% contingencies & maintenance
11 work
8 Form work for slab 1.00 6.90 3.00 20.70 sqm. 685.86 14197.28
9 stone soling work 1.00 6.90 1.50 0.10 1.04 cum. 4027.88 4188.99
10 P.C.C.(1:2:4) work 1.00 6.90 1.35 0.1 0.70 cum. 13207.25 9245.07
Total (B) 215569.63
3% contingencies & maintenance
11 work 6467.09
C Medium Rock
Norms No. B1-2
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md
Unskilled Md 3.00 735.00 2205.00
Sub-Total 2205.00
Tools & Plants @ 3% 66.15
Total (Dept. Rate) 2271.15
D Deep Foundation, Drain, Pipe line trench in B.M.S. including 10m lead & 1.5m lift
3 Item : Boulder Soling & levelling works in foundation including 30m lead.
Norms No. C10 (6-5)
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md
Unskilled Md 1.50 735.00 1102.50
Material Boulder Stone Cu.M 1.20 2000.00 2400.00
4 Item : Plain cement concrete works in foundation including material collection & 30m lead
A In (1:3:6)
Norms No. D1(7-2) ga
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.0 1050.00 1050.00
Unskilled Md 4.0 735.00 2940.00
Material Cement(N.S. marks) M.T 0.22 17515.00 3853.30
Agg. 40 mm Cu.M 0.65 1850.00 1202.50
Agg. 20 mm Cu.M 0.24 1850.00 444.00
Course Sand Cu.M 0.47 2100.00 987.00
Water Litre 120 0.18 22.05
Total (Dept. Rate) 10498.85
B In ( 1:2:4 )
Norms No. D1(7-2) gha
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.0 1050.00 1050.00
Unskilled Md 4.0 735.00 2940.00
Material Cement(OPC) M.T 0.32 15500.00 4960.00
Agg. 40 mm Cu.M 0.52 1850.00 962.00
Agg. 20 mm Cu.M 0.22 1850.00 407.00
Agg. 10 mm Cu.M 0.11 1850.00 203.50
Sand(crusher screen) Cu.M 0.445 2100.00 934.50
Water Litre 150 0.18 27.56
Total (Dept. Rate) 11484.56
Overhead @ 15% 13207.25
Plain cement concrete works in superstructure, Slab & Beams including material
5 Item :
collection with 30m lead.
A M15 (1:2:4)
Norms No. D2(7-4)ka
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 0.8 1050.00 840.00
Unskilled Md 7.0 735.00 5145.00
Material Cement (OPC) M.T 0.32 17515.00 5604.80
Agg. 40 mm(Crusher) Cu.M 0.52 1850.00 962.00
Agg. 20 mm(Crusher) Cu.M 0.22 1850.00 407.00
Agg. 10 mm(Crusher) Cu.M 0.11 1850.00 203.50
Sand(Crusher Screen) Cu.M 0.445 2100.00 934.50
Water Litre 150 0.18 27.56
Total (Dept. Rate) 14124.36
B M20 (1:1.5:3)
Norms No. D2(7-4)kha
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 0.8 1050.00 840.00
Unskilled Md 7.0 735.00 5145.00
Material Cement (OPC) M.T 0.4 15500.00 6200.00
Agg. 20 mm(Crusher) Cu.M 0.57 1850.00 1054.50
Agg. 10 mm(Crusher) Cu.M 0.29 1850.00 536.50
Sand(Crusher screen) Cu.M 0.425 2100.00 892.50
Water Litre 200 0.18 36.75
Sub-Total 14705.25
Total (Dept. Rate) 14705.25
Overhead @ 15% 16911.04
Stone masonry works including material collection, preparation of motar with 5m lift
6 Item :
& 10m lead
A Random Rubble in 1:4 c/s mortar
Norms No. C6(6ka) 1-2
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.5 1050.00 1575.00
Unskilled Md 5.0 735.00 3675.00
Material Cement(N.S. marks) M.T 0.159 15500.00 2464.50
Block stone Cu.M 1.00 2000.00 2000.00
Bond stone Cu.M 0.10 2000.00 200.00
Sand(Crusher Screen) Cu.M 0.45 2100.00 945.00
Water Litre 100 0.18 18.38
Sub-Total 10877.88
Total (Dept. Rate) 10877.88
Overhead @ 15% 12509.56
Brick masonry works including materials collection, preparation of mortar with 30m
7 Item :
transportation.
A Chimney Bhatta Bricks in c/s mortar 1:4
Norms No. C2(5-1)kha2 / 5(2)ka
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.5 1050.00 1575.00
Unskilled Md 2.2 735.00 1617.00
Material Cement(N.S. marks) M.T 0.1 17515.00 1751.50
Brick No. 560.00 18.08 10124.80
Sand(Crusher Screen) Cu.M 0.28 2100.00 588.00
Water Litre 130 0.18 23.89
Sub-Total 15680.19
Total (Dept. Rate) 15680.19
Form Works including selection of materials, centering & shuttering as per drawing
11 Item :
with 30m lead.
A Form works on Column by using local wood
Norms No. E1(8-3)Ka
Unit 10 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 3.748 1050.00 3935.40
Unskilled Md 5.622 735.00 4132.17
Material Local Wood Cu.M 0.070 40583.50 2840.85
Nails Kg 2.500 107.35 268.38
Sub-Total 11176.79 Per sq.m
Total (Dept. Rate) 11176.79 1117.68
C Form works on beam having beam height upto 0.8 m by using local wood
Norms No. E4(8-4)Kha
Unit 10 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 2.670 1050.00 2803.50
Unskilled Md 4.000 735.00 2940.00
Material Local Wood Cu.M 0.070 40583.50 2840.85
Nails Kg 2.500 95.00 237.50
Sub-Total 8821.85 Per sq.m
Total (Dept. Rate) 8821.85 882.18
Note:- It is assumed that the wood used in form work can be used 6 times and remaining 25% scrap
value.(0.526x1.1x.75)/6=0.07 cum.
D Form works by using iron props and 18mm thick Water proof Ply wood
Norms No. E6(8-4)Ka
Unit 100 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 17.200 1050.00 18060.00
Unskilled Md 25.700 735.00 18889.50
Material Local Wood Cu.M 0.232 40583.50 9415.37
18 mm plywood board Sq.m 16.500 1702.86 28097.27
Iron pipe(props) wall 1no Props
th1.65mm and pipesize asumed as 3.5m
50mm dia. no 4.400 1094.52 4815.88 long
Nails Kg 25.000 95.00 2375.00
Sub-Total 81653.02 Per sq.m
Total (Dept. Rate) 81653.02 816.53
Note:- It is assumed that the wood used in form work can be used 6 times and remaining 25% scrap
value.(1.6875x1.1x0.75)/6=0.232 cum.
It is asumed that the ply wood used in form work can be used 6 times and remaining 10% scrap value
100x1.1x0.9/6=16.5
It is asumed that the black Pipe used in form work can be used 15 times and remaining 25% scrap
value 88/15x0.75 =4.4
Note:- It is assumed that the wood used in form work can be used 6 times and remaining 25% scrap
value.(0.2885x1.1x.75)/6=.04 cum.
It is asumed that the ply wood used in form work can be used 6 times and remaining 10% scrap value
10x1.1x0.9/6=1.65
It is asumed that the black Pipe used in form work can be used 15 times and remaining 25% scrap
value 8/15x0.75 =0.4
Item : Supplying and fitting local wood plank for Expansion , contraction & Warping joints with 30m lead.
Reinforcement bar for RCC works including cutting, binding, bending & placing as
12 Item :
per drawing with 30m lead
Norms No. D9(7-5)
Unit 1M.T
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 12.0 1050.00 12600.00
Unskilled Md 12.0 735.00 8820.00
Material T.M.T. Bar Mt 1.05 74000.00 77700.00
Binding wire Kg. 10 90.00 900.00
Sub-Total 100020.00 Per Kg
Total (Dept. Rate) 100020.00 100.02
Overhead @ 15% 115.02
C 26 gauge 0.35mm
Unit 10 Sqm
Norms No. F1(9-1)
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.10 1050.00 1155.00
Unskilled Md 1.25 735.00 918.75
Material C.G.I sheet Sq.M 12.00 495.50 5946.01
Nutbolt with washer No. 30.00 18.08 542.40
8 mmJ hook No. 25.00 12.43 310.75
Bitumen Washer No. 25.00 0.73 18.36
Sub-Total 8891.28
Total (Dept. Rate) 8891.28 889.13
E 28 gauge 0.28mm
Unit 10 Sqm
Norms No. F1(9-1)
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.10 1050.00 1155.00
Unskilled Md 1.25 735.00 918.75
Material C.G.I sheet Sq.M 12.00 392.54 4710.48
Nutbolt with washer No. 30.00 18.08 542.40
8 mmJ hook No. 25.00 12.43 310.75
Bitumen Washer No. 25.00 0.73 18.36
Sub-Total 7655.74
Total (Dept. Rate) 7655.74 765.57
F 28 gauge Colour 0.28mm
Unit 10 Sqm
Norms No. 9/1, 69
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.10 1050.00 1155.00
Unskilled Md 1.25 735.00 918.75
Material 28 gauge C.G.I sheet Sq.M 12.00 511.59 6139.07
Nutbolt with washer No. 30.00 18.08 542.40
8 mmJ hook No. 25.00 12.43 310.75
Bitumen Washer No. 25.00 0.73 18.36
Sub-Total 9084.33
Total (Dept. Rate) 9084.33 908.43
14 Item : Ridge Plain sheet Roofing Works works including material collection.
A 24 Gauge Plain Sheet
Unit 10 Rm
Norms No. F4(9-2)
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 2.00 1050.00 2100.00
Unskilled Md 3.00 735.00 2205.00
Material Plain sheet 24 guage RM 12.00 602.44 7229.30 0.5mm
Nutbolt No. L.S 60.00
Sub-Total 11594.30
Total (Dept. Rate) 11594.30 1159.43
Note:- The breadth of plain sheet is to be assumed 60 cm.
B 150 mm -450mm wide plain G.I. Plain sheet Rain Gutter works including iron
bracket, Notbolt, Washer .
Norms No. F7
Unit 10 RM.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.75 1050.00 1837.50
Unskilled Md 2 735.00 1470.00
Material Plain Sheet, 28 g RM 13.5 354.71 4788.57 300mm wide
Bracket Nos 32 56.44 1806.19
with washer &
NutBolt with washer Nos 48 18.08 867.84 bolt
Sub-Total 10770.10
Total (Dept. Rate) 10770.10 1077.01
1.2 mm thick heavy Corrugated Fiber sheet Roofing works including material
16 Item : collection all complete works .
Unit 10 Sq.m
Norms No. F14
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.1 1050.00 1155.00
Unskilled Md 1.25 735.00 918.75
Material Fiber sheet 1.2 mm
heavy Sq.m 12 2918.11 35017.34
J Hook Nos 25 12.43 310.75
Bitumen Washer Nos 30 0.73 22.04
NutBolt with washer Nos. 30 18.08 542.40
Sub-Total 37966.28
Total (Dept. Rate) 37966.28 3796.63
1.2mm thick heavy Ridge Fiber plain sheet Roofing works including material
17 Item : collection all complete works .
Unit 10 RM
Norms No. F15
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 2 1050.00 2100.00
Unskilled Md 3 735.00 2205.00
Material Fiber sheet 1.2 mm
heavy Rm 12 1750.87 21010.41
Nutbolt Nos. LS 60.00
Sub-Total 25375.41
Total (Dept. Rate) 25375.41 2537.54
18 Item : Slate Roofing works including material collection with all complete works.
Unit 10 Sq.M
Norms No. F9(9-5)
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 4.00 1050.00 4200.00
Unskilled Md 5.00 735.00 3675.00
Material slate Sq.m 24.00 450.00 10800.00
Sub-Total 18675.00
Sub-Total (Dept. Rate) 18675.00 1867.50
19 Item: UPVC Roofing works including material collection with all complete
A 2mm thick UPVC Roofing Works
Norms No. F22
Unit 10 Sq.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.50 1050.00 1575.00
Unskilled Md 1.00 735.00 735.00
Material 2mm thick UPVC Sheet SqM 12.00 1459.60 17515.18
Clip No. 14.00 7.91 110.74
Screw No. 28.00 6.78 189.84
Sub-Total 20125.76
Total (Dept. Rate) 20125.76 2012.58
3mm thick UPVC Ridge covering works including material collection all complete
20 Item : works .
Unit 10 RM
Norms No. F15
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 2 1050.00 2100.00
Unskilled Md 3 735.00 2205.00
Material
UPVC ridge Cover3 mm Rm 12 1017.00 12204.00
Nutbolt Nos. LS 60.00
Sub-Total 16569.00
Total (Dept. Rate) 16569.00 1656.90
F 4mm th. glazed window shutter with 38*75mm local wood frame.
Norms No. G3(10-4)
Unit 2.23 Sq. M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 9.0 1050.00 9450.00
Unskilled Md 0.9 735.00 661.50
Material Local wood Cu.M 0.049 40583.50 1988.59
Hinges 75 No. 8.0 18.08 144.64
Tower bolt 100mm No. 4.0 54.24 216.96
Handle No. 2.0 30.51 61.02
Screw L.S 20.00
4 mm plain glass m2 1.085 1033.88 1121.76
Sub-Total 13664.47 per Sq.m.
Total (Dept. Rate) 13664.47 6127.57
G Flush door with 38mm th. Sal wood frame & 4mm commercial plywood shutter.
Norms No. G4(10-7)
Unit 2.245 Sq. M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 7.0 1050.00 7350.00
Unskilled Md 0.7 735.00 514.50
Material Salwood Cu.M 0.0346 194095.00 6715.69
Hinges 100mm No. 3.0 30.51 91.53
Tower bolt 150mm No. 2.0 79.10 158.20
Mortise lock(Brass) No. 0.0 1779.75 0.00
Screw L.S 20.00
4mm ply wood m2 4.65 255.43 1187.75
Sub-Total 16037.67 per Sq.m.
Total (Dept. Rate) 16037.67 7143.73
Flush door with 38mm th.local wood frame & 4mm commercial plywood on both
H side
Norms No. G4(10-7)
Unit 2.245 Sq. M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 7.0 1050.00 7350.00
Unskilled Md 0.7 735.00 514.50
Material Local wood Cu.M 0.0346 40583.50 1404.19
Hinges 100mm No. 3.0 30.51 91.53
Tower bolt 150mm No. 2.0 79.10 158.20
Mortise lock(Brass) No. 0.0 1779.75 0.00
Screw L.S 20.00
4mm ply wood m2 4.65 255.43 1187.75
Sub-Total 10726.17 per Sq.m.
Total (Dept. Rate) 10726.17 4777.80
I Door shutter with 38mm th.local wood frame & fixing of 26 gauge plain sheet in both
side.
Norms No. G4(10-9)
Unit 2.245 Sq. M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 7.0 1050.00 7350.00
Unskilled Md 0.7 735.00 514.50
Material local wood Cu.M 0.0346 40583.50 1404.19
Hinges 100mm No. 3.0 30.51 91.53
Tower bolt 150mm No. 2.0 79.10 158.20
Mortise lock(Brass) No. 0.0 1779.75 0.00
Screw L.S 20.00
Plain sheet(26 gauge) m2 4.65 501.10 2330.10
Sub-Total 11868.52 per Sq.m.
Total (Dept. Rate) 11868.52 5286.64
Mosquito proof door & window shutter with 38mm th.sal wood frame & 24 gauge
J
G.I wire.
Norms No. G4(10-10)
Unit 2.245 Sq. M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 5.0 1050.00 5250.00
Unskilled Md 0.5 735.00 367.50
Material Salwood Cu.M 0.026 194095.00 5046.47
Hinges 100mm No. 3.0 30.51 91.53
Tower bolt 150mm No. 2.0 79.10 158.20
Handle No. 2.0 30.51 61.02
Spring No. 1.0 180.80 180.80
Screw L.S 20.00
Mosquito proof jali m2 2.13 425.72 906.78
Sub-Total 12082.30 per Sq.m.
Total (Dept. Rate) 12082.30 5381.87
Mosquito proof door & window shutter with 38mm th.Shisham wood frame & 24
K
gauge G.I wire.
Norms No. G4(10-10)
Unit 2.245 Sq. M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 5.0 1050.00 5250.00
Unskilled Md 0.5 735.00 367.50
Material Shisham wood Cu.M 0.026 112928.00 2936.13
Hinges 100mm No. 3.0 30.51 91.53
Tower bolt 150mm No. 2.0 79.10 158.20
Handle No. 2.0 30.51 61.02
Spring No. 1.0 180.80 180.80
Screw L.S 10.00
Mosquito proof jali m2 2.13 425.72 906.78
Sub-Total 9961.95 per Sq.m.
Total (Dept. Rate) 9961.95 4437.40
4mm Commercial plywood ceilling with 50*75mm salwood size & 600*900mm frame
P size.
Norms No. N7(10-16)ka
Unit 35.58 Sq. M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 23.0 1050.00 24150.00
Unskilled Md 2.3 735.00 1690.50
Material Salwood Cu.M 0.45 194095.00 87342.75
listic No. L.s 50.00
nails No. L.s 40.00
4mm ply wood m2 37.50 255.43 9578.61
Sub-Total 122851.86
Total (Dept. Rate) 122851.86 3452.83
Commercial plywood ceilling with 50*75mm local wood size & 600*900mm frame
Q size.
Particular N7(10-16)ka
Unit 35.58 Sq. M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 23.0 1050.00 24150.00
Unskilled Md 2.3 735.00 1690.50
Material Local wood Cu.M 0.45 40583.50 18262.58
listic No. L.s 30.00
nails No. L.s 25.00
4mm ply wood m2 37.50 255.43 9578.61
Sub-Total 53736.69
Total (Dept. Rate) 53736.69 1510.31
50mm thick 1:2:4 Cement Concrete floor Carting including finishing by rubbing
B
Cement.
Norms No. H1(11-1)ga
Unit 10 Sqm
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.25 1050.00 1312.50
Unskilled Md 2.50 735.00 1837.50
Material cement(N.S.) M.T. 0.170 17515.00 2977.55
sand(Crusher screen) Cu.m 0.230 2100.00 483.00
Aggregate 20 mm M.T. 0.460 1850.00 851.00
Sub-Total 7461.55
Total (Dept. Rate) 7461.55 746.16
75mm thick 1:2:4 Cement Concrete floor Carting including finishing by rubbing
C
Cement.
Norms No. H1(11-1)gha
Unit 10 Sqm
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.25 1050.00 1312.50
Unskilled Md 3.00 735.00 2205.00
Material cement(N.S.) M.T. 0.260 17515.00 4553.90
sand(Crusher screen) Cu.m 0.340 2100.00 714.00
Aggregate 20 mm M.T. 0.680 1850.00 1258.00
Sub-Total 10043.40
Total (Dept. Rate) 10043.40 1004.34
25 mm th.mosaic flooring with 12.5mm th cement plaster (1:2) base course & 6 mm
D th marble chips with white cement (1:1) surface course including rubbing &
polishing
Norms No. H4(11-4)
Unit 10 Sqm
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 3.50 1050.00 3675.00
Unskilled Md 36.00 735.00 26460.00
Material Cement ( Nepali ) M.T. 0.089 17515.00 1558.84
sand(Crusher screen) Cu.m 0.122 2100.00 256.20
white cement M.T. 0.089 38420.00 3419.38
3mm marble chips Cu.m 0.061 24923.56 1520.34
oxalic acid kg 0.370 224.87 83.20
mein polish kg 0.118 423.75 50.00
terpaintain lit 0.538 113.00 60.79
rubbing stone
(Carborandum) L.S. 60.00
Sub-Total 37143.75
Total (Dept. Rate) 37143.75 3714.38
Note: 25kg chips in 1bag and 1 bag marble chips is asumed as 1 cft volume
13 mm th. marble with cement sand (1:2) surface course including rubbing &
F
polishing
Norms No. H34
Unit 10 Sqm
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 2.00 1050.00 2100.00
Unskilled Md 21.50 735.00 15802.50 13.5 for rubbing
Material Cement(N.S. marks) M.T. 0.130 17515.00 2276.95
sand (Crusher screen) Cu.m 0.183 2100.00 384.30
13 mm thick marble sqm 11.000 2189.40 24083.37
oxalic acid kg 0.370 224.87 83.20
mein polish kg 0.118 423.75 50.00
terpaintain lit 0.538 113.00 60.79
rubbing stone L.S. 60.00
Sub-Total 44901.12
Total (Dept. Rate) 44901.12 4490.11
G 16mm Granaite with 20mm thick cement sand (1:2) surface course including
rubbing & polishing
Norms No. H26(11-6)
Unit 10 Sqm
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 2.00 1050.00 2100.00
Unskilled Md 21.50 735.00 15802.50 13.5 for rubbing
Material Cement(N.S. marks) M.T. 0.130 17515.00 2276.95
sand (Crusher screen) Cu.m 0.183 2100.00 384.30
16 mm thick granaite sqm 11.000 4559.55 50155.05
oxalic acid kg 0.370 224.87 83.20
mein polish kg 0.118 423.75 50.00
terpaintain lit 0.538 113.00 60.79
rubbing stone 1.000 60.00
Sub-Total 70972.80
Total (Dept. Rate) 70972.80 7097.28
H 25-37.5 mm th Flagstone paving in 1:4 cement sand mortar
Norms No. H19(11-9)
Unit 10 Sqm
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 2.00 1050.00 2100.00
Unskilled Md 4.50 735.00 3307.50
Material Cement(N.S. marks) M.T. 0.060 17515.00 1050.90
sand (Crusher screen) Cu.m 0.165 2100.00 346.50
25-37.5mm Flag stone Sqm 11.000 1065.00 11715.00
Sub-Total 18519.90
Total (Dept. Rate) 18519.90 1851.99
Making & fixing 4.5*20 mm iron gril including one coat Red oxide paint after rubbing
B with sand paper.
Norms No. M2(24-1)kha
Unit 10 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
iron gril including labour
Material cost. Kg 10.00 3698.91 36989.14
1SqM=21.50kg Sub-Total 36989.14
Total (Dept. Rate) 36989.14 3698.91
Making & fixing of rolling shutter including one coat red oxide paint after rubbing
C with sand paper with all complete .
Norms No. M6(24-2)
Unit 10 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
18-20 gauge iron
shutter including labour
Material cost. Sqm 10.00 2171.15 21711.53
Total 21711.53
Total (Dept. Rate) 21711.53 2171.2
Box size 2x1x1m using heavy zinc coated Hexagonal mesh type 100x120mm , mesh
B wire 3mm, selvage wire 3.9mm lacing wire 2.4mm
Norms No. DoR SNo-24.2, Ref. to ss 2402(A),Sno 24.3 and SNo24.4
Unit Per box
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 0.54 1050.00 567.00
Unskilled Md 2.29 735.00 1683.15
Gabion wire machine
made10x12/3.0/3.9/2.4/
Material zn Sqm 11 305.10 3356.10
Filling Stone CuM 2.2 2000 4400.00
Sub-Total 10006.25
Total (Dept. Rate) 10006.25 5003.125
Box size 3x1x1m using heavy zinc coated Hexagonal mesh type 100x120mm , mesh
C wire 3mm, selvage wire 3.9mm lacing wire 2.4mm
Norms No. DoR SNo-24.2, Ref. to ss 2402(A),Sno 24.3 and SNo24.4
Unit Per box
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 0.6 1050.00 630.00
Unskilled Md 2.6 735.00 1911.00
Gabion wire machine
made10x12/3.0/3.9/2.4/
Material
zn Sqm 16 305.10 4128.00
Filling Stone CuM 3.3 2000 6600.00
Sub-Total 13269.00
Total (Dept. Rate) 13269.00 4423
28 Dismantalling Works
Item
Dismantalling of mud mortar masonary with deposition up to 10 mtr. Lead works
A
Norms No. L1(19-1)
Unit Cu.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Unskilled Md 1.060 735.00 779.10
Sub-Total 779.10
Total (Dept. Rate) 779.10
Plum Cement Concrete work. It includes all labour and material required for mixing, placing in
position, vibrating, compaction, finishing, curing and all other incidentals required to produce
concrete of specified strength as per the specification. Rate includes athe work of making,
fixing and removing of all centres and forms required for the work. (Concrete M15 grade + 40%
A Boulder in foundation)
Norms No. 41 (a) spec.cl.No11 (60% Concrete & 40% Boulder stone)
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 0.3 1050.00 315.00
Unskilled Md 4.0 735.00 2940.00
Material Cement(N.S. marks) M.T 0.192 17515.00 3362.88
Boulder stone 225 mm Cu.M 0.44 2000.00 880.00
Aggregate all Type Cu.M 0.51 1850.00 943.50
Sand (Crusher screen) Cu.M 0.27 2100.00 567.00
Sub-Total 9008.38
Total (Dept. Rate) 9008.38
B works.
Norms No. H24
Unit 10Sq.m.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.00 1050.00 1050.00
Unskilled Md 1.0 735.00 735.00
Material Putty Kg 21.28 45.20 961.86
Sub-Total 2746.86
Total (Dept. Rate) 2746.86 274.69
C works
Norms No. H24
Unit 10Sq.m.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 0.00 1050.00 0.00
Unskilled Md 0.0 735.00 0.00
Gypsum board false
Material ceiling works. Sq.m. 10 1277.15 12771.49
Sub-Total 12771.49
Total (Dept. Rate) 12771.49 1277.15
0.32 0.0528917 0.0397
0.53 0.4
ed 12"x12"
Vat @ 13%
G. Total
Pokhara Metropolitan City
Office of Execcutive Municipal
Province No. 4 , kaski , New Road
BOQ
Date: 2077/08/08
Project name: जय टोलमा कल्भर्ट निर्माण
Location : Pokhara -12 ,Near of Vetrenery ofiice
Vat @ 13%
G. Total
Metropolitan City
eccutive Municipal
, kaski , New Road
BOQ
: 2077/08/08