Pokhara Metropolitan City

Office of Execcutive Municipal


Province No. 4 , kaski , New Road
Detailed Estimate Sheet
Date: 2077/08/08
Project name: जय टोलमा कल्भर्ट निर्माण
Location : Pokhara -12 ,Near of Vetrenery ofiice

S. N. Description no Length Breadth Height Quantity Unit Rate Amount


1 E/w in excavation work 1 8.20 2.60 0.70 14.92 cum. 684.0545 10206.09
2 Stone Soling work 1 8.20 2.60 0.15 3.20 cum. 4027.88 12889.20
3 P.C.C. (1:2:4) work 1 8.20 2.60 0.10 2.13 cum. 13207.25 28131.44
4 Stone masonry work(1:4) 2 8.20 0.4 0.50 3.28 cum. 12509.56 41031.34
R.C.C. work (1:1.5:3) for culvert
1.00 2.60 0.20 4.26 cum. 16911.04
5 with all complete 8.20 72108.66
6 Reinforcement work
7 Reinforcement work 15cm c/c
12mm ø bar 80 2.60 0.89 185.12
10mm ø bar 26 8.20 0.62 132.18
Total in kg. 317.30 kg. 115.02 36497.26

8 Form work for slab 1.00 8.20 2.60 21.32 sqm. 685.86 14622.51
Total (B) 215486.50
3% contingencies & maintenance
11 work 6464.59

Vat @ 13% 28013.24


G. Total 249964.33

Prepared by Recommended by Approved by


Ishwar Timilisina Ward Sec Manju Dhungana Er Kripa Ranjit
Prepared by Recommended by Approved by
Ishwar Timilisina Ward Sec Manju Dhungana Er Kripa Ranjit
Lekhnath Municipality Estimate
Talchowk Kaski

Name of the Project : Sundari Plot Hudai Tin tahara Jane Bato Nirman
Location : Lekhnath Municipality - 2

S.N. Description No. Length Breadth Height Quantity Unit Rate Amount (Rs.)

1 E/W in excavation work 1 87.00 1.00 0.20 17.40 cum. 350.20 6093.48
2 Stone Soling work 1 87.00 1.00 0.10 8.70 cum. 1957.50 17030.25
3 P.C.C.(1:3:6) work 1 87.00 1.00 0.10 8.70 cum. 6543.80 56931.06
4 Stone masonry work for foot trail step 20 1.00 0.50 0.20 1.00 cum. 6048.00 6048.00
3% contingencies & 1% maintenance
4 cost 3000.00
Total 89102.79

Prepared by: Checked by: Approved by:


Pokhara Metropolitan City
Office of Execcutive Municipal
Province No. 4 , kaski , New Road
Detailed Measurement
Date: 2077/10/05
Project name: जय टोलमा कल्भर्ट निर्माण
Location : Pokhara -12 ,Near of Vetrenery ofiice

S. N. Description no Length Breadth Height Quantity Unit Rate Amount


1 E/w in excavation work 1 8.60 2.40 0.75 15.48 cum. 684.0545 10589.16
2 Stone Soling work 1 8.60 2.40 0.15 3.10 cum. 4027.88 12486.41
3 P.C.C. (1:2:4) work 1 8.60 2.40 0.10 2.06 cum. 13207.25 27206.93
4 Stone masonry work(1:4) 2 8.60 0.40 0.50 3.44 cum. 12509.56 43032.87
R.C.C. work (1:1.5:3) for culvert
1.00 2.45 0.178 3.75 cum. 16911.04
5 with all complete 8.60 63424.17
6 Reinforcement work
7 Reinforcement work 15cm c/c
12mm ø bar 80 2.40 0.89 170.88
10mm ø bar 28 8.60 0.62 149.30
Total in kg. 320.18 kg. 115.02 36827.60

8 Form work for slab 1.00 8.60 2.00 17.20


2.00 2.10 0.18 0.75
17.95 sqm. 685.86 12309.52
TotaL (B) 205876.66
3% contingencies & maintenance
11 work

Vat @ 13% 26763.97


G. Total 232640.63

Prepared by Recommended by Approved by


Ishwar Timilisina Ward Sec Manju Dhungana Er Kripa Ranjit
Prepared by Recommended by Approved by
Ishwar Timilisina Ward Sec Manju Dhungana Er Kripa Ranjit
Pokhara Metropolitan City
Office of Execcutive Municipal
Province No. 4 , kaski , New Road
Detailed Measurement
Date: 2077/10/05
Project name: जय टोलमा कल्भर्ट निर्माण
Location : Pokhara -12 ,Near of Vetrenery ofiice

S. N. Description no Length Breadth Height Quantity Unit Rate Amount


1 E/w in excavation work 1 8.60 2.10 0.70 12.64 cum. 684.0545 8646.45
2 Stone Soling work 1 8.60 2.10 0.10 1.81 cum. 4027.88 7290.45
3 P.C.C. (1:2:4) work 1 8.60 2.10 0.10 1.81 cum. 13207.25 23905.12
4 Stone masonry work(1:4) 2 8.60 0.3 0.45 2.32 cum. 12509.56 29022.17
R.C.C. work (1:1.5:3) for culvert
1.00 2.10 0.178 3.21 cum. 16911.04
5 with all complete 8.60 54363.57
6 Reinforcement work
7 Reinforcement work 15cm c/c
12mm ø bar 40 8.60 0.89 306.16
10mm ø bar 87 2.10 0.62 113.27
Total in kg. 419.43 kg. 115.02 48244.56

8 Form work for slab 1.00 8.60 2.00 17.20


2.00 2.10 0.18 0.75
17.95 sqm. 685.86 12309.52
9 stone soling work

10 P.C.C.(1:2:4) work
TotaL (B) 183781.83
3% contingencies & maintenance
11 work

Vat @ 13% 23891.64


Prepared by Recommended by Approved by
Ishwar Timilisina Ward Sec Manju Dhungana Er Kripa Ranjit
G. Total 207673.47

Prepared by Recommended by Approved by


Ishwar Timilisina Ward Sec Manju Dhungana Er Kripa Ranjit
Prepared by Recommended by Approved by
Ishwar Timilisina Ward Sec Manju Dhungana Er Kripa Ranjit
Pokhara Metropolitan City
Office of Execcutive Municipal
Province No. 4 , kaski , New Road
Detailed Estimate Sheet
Date: 2077/08/08
Project name: जय टोलमा कल्भर्ट निर्माण
Location : Pokhara -12 ,Near of Vetrenery ofiice

S. N. Description no Length Breadth Height Quantity Unit Rate Amount


1 E/w in excavation work 1 6.90 3.00 0.7 13.87 cum. 684.0545 9487.84
2 Stone Soling work 1 6.90 3.00 0.10 2.07 cum. 4027.88 8337.70
3 P.C.C. (1:2:4) work 1 6.90 3.00 0.10 2.07 cum. 13207.25 27339.00
4 Stone masonry work(1:4) 2 6.90 0.3 0.50 2.07 cum. 12509.56 25894.78
R.C.C. work (1:1.5:3) for culvert
1.00 3.00 0.20 4.14 cum. 16911.04
5 with all complete 6.90 70011.70
6 Reinforcement work
7 Reinforcement work 15cm c/c
12mm ø bar 40 6.90 0.89 245.64
10mm ø bar 87 3.00 0.62 161.82
Total in kg. 407.46 kg. 115.02 46867.27

8 Form work for slab 1.00 6.90 3.00 20.70 sqm. 685.86 14197.28
9 stone soling work 1.00 6.90 1.50 0.10 1.04 cum. 4027.88 4188.99

10 P.C.C.(1:2:4) work 1.00 6.90 1.35 0.1 0.70 cum. 13207.25 9245.07
Total (B) 215569.63
3% contingencies & maintenance
11 work 6467.09

Vat @ 13% 28024.05


G. Total 250060.77

Prepared by Recommended by Approved by


Ishwar Timilisina Ward Sec Manju Dhungana Er Kripa Ranjit
Prepared by Recommended by Approved by
Ishwar Timilisina Ward Sec Manju Dhungana Er Kripa Ranjit
Pokhara Metropolitan City
Office of Execcutive Municipal
Province No. 4 , kaski , New Road
BOQ
Date: 2077/08/08
Project name: जय टोलमा कल्भर्ट निर्माण
Location : Pokhara -12 ,Near of Vetrenery ofiice

S. N. Description no Quantity Unit Rate Amount


1 E/w in excavation work 1 14.92 cum. 684.0545 10206.09
2 Stone Soling work 1 3.2 cum. 4027.88 12889.20
3 P.C.C. (1:2:4) work 1 2.13 cum. 13207.25 28131.44
4 Stone masonry work(1:4) 2 3.28 cum. 12509.56 41031.34
R.C.C. work (1:1.5:3) for culvert
1.00 cum. 16911.04
5 with all complete 4.26 72108.66
6 Reinforcement work
7 Reinforcement work 15cm c/c
407.46 kg. 115.02 46867.27

8 Form work for slab 1.00 20.70 sqm. 685.86 14197.28


TotaL (B) 225431.28

Vat @ 13% 29306.07


G. Total 254737.34
Pokhara Metropolitan City
Office of Execcutive Municipal
Province No. 4 , kaski , New Road
BOQ
Date: 2077/08/08
Project name: जय टोलमा कल्भर्ट निर्माण
Location : Pokhara -12 ,Near of Vetrenery ofiice

S. N. Description no Quantity Unit Rate Amount


1 E/w in excavation work 1 13.87 cum. 684.0545 9487.84
2 Stone Soling work 1 2.07 cum. 4027.88 8337.70
3 P.C.C. (1:2:4) work 1 2.07 cum. 13207.25 27339.00
4 Stone masonry work(1:4) 2 2.07 cum. 12509.56 25894.78
R.C.C. work (1:1.5:3) for culvert
1.00 cum. 16911.04
5 with all complete 4.14 70011.70
6 Reinforcement work
7 Reinforcement work 15cm c/c
407.46 kg. 115.02 46867.27

8 Form work for slab 1.00 20.70 sqm. 685.86 14197.28


9 stone soling work 1.00 1.04 cum. 4027.88 4188.99

10 P.C.C.(1:2:4) work 1.00 0.70 cum. 13207.25 9245.07


TotaL (B) 215569.63

Vat @ 13% 28024.05


G. Total 243593.68
POKHARA METROPOLITAN CITY OFFICE
OFFICE OF MUNICIPAL EXECUTIVE
NEW ROAD-8, POKHARA
Rate Analysis General Works (077/078)
Site cleareance (Grass Cutting, Weep out their root, removal of debris, Levelling and
1 Item : lead of debris)
Norms No. A3
Unit 10Sq.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md
Unskilled Md 0.23 735.00 169.05
Sub-Total 169.05
Tools & Plants @ 3% 5.07

Total (Dept. Rate) 174.12 17.41

2 Item : Earthwork excavation in ………..including 10m lead & 1.5m lift


A Soft Soil having silt and clay
Norms No. B1-1
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md
Unskilled Md 0.70 735.00 514.50
Sub-Total 514.50
Tools & Plants @ 3% 15.44
Total (Dept. Rate) 529.94

B Boulder Mixed Soil


Norms No. B1-2
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md
Unskilled Md 0.80 735.00 588.00
Sub-Total 588.00
Tools & Plants @ 3% 17.64
Total (Dept. Rate) 605.64

C Medium Rock
Norms No. B1-2
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md
Unskilled Md 3.00 735.00 2205.00
Sub-Total 2205.00
Tools & Plants @ 3% 66.15
Total (Dept. Rate) 2271.15
D Deep Foundation, Drain, Pipe line trench in B.M.S. including 10m lead & 1.5m lift

Norms No. 2(14) WS


Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md
Unskilled Md 1.59 735.00 1168.65
Sub-Total 1168.65
Tools & Plants @ 3% 35.06
Total (Dept. Rate) 1203.71

3 Item : Boulder Soling & levelling works in foundation including 30m lead.
Norms No. C10 (6-5)
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md
Unskilled Md 1.50 735.00 1102.50
Material Boulder Stone Cu.M 1.20 2000.00 2400.00

Total (Dept. Rate) 3502.50 4027.875

4 Item : Plain cement concrete works in foundation including material collection & 30m lead
A In (1:3:6)
Norms No. D1(7-2) ga
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.0 1050.00 1050.00
Unskilled Md 4.0 735.00 2940.00
Material Cement(N.S. marks) M.T 0.22 17515.00 3853.30
Agg. 40 mm Cu.M 0.65 1850.00 1202.50
Agg. 20 mm Cu.M 0.24 1850.00 444.00
Course Sand Cu.M 0.47 2100.00 987.00
Water Litre 120 0.18 22.05
Total (Dept. Rate) 10498.85

B In ( 1:2:4 )
Norms No. D1(7-2) gha
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.0 1050.00 1050.00
Unskilled Md 4.0 735.00 2940.00
Material Cement(OPC) M.T 0.32 15500.00 4960.00
Agg. 40 mm Cu.M 0.52 1850.00 962.00
Agg. 20 mm Cu.M 0.22 1850.00 407.00
Agg. 10 mm Cu.M 0.11 1850.00 203.50
Sand(crusher screen) Cu.M 0.445 2100.00 934.50
Water Litre 150 0.18 27.56
Total (Dept. Rate) 11484.56
Overhead @ 15% 13207.25

Plain cement concrete works in superstructure, Slab & Beams including material
5 Item :
collection with 30m lead.
A M15 (1:2:4)
Norms No. D2(7-4)ka
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 0.8 1050.00 840.00
Unskilled Md 7.0 735.00 5145.00
Material Cement (OPC) M.T 0.32 17515.00 5604.80
Agg. 40 mm(Crusher) Cu.M 0.52 1850.00 962.00
Agg. 20 mm(Crusher) Cu.M 0.22 1850.00 407.00
Agg. 10 mm(Crusher) Cu.M 0.11 1850.00 203.50
Sand(Crusher Screen) Cu.M 0.445 2100.00 934.50
Water Litre 150 0.18 27.56
Total (Dept. Rate) 14124.36

B M20 (1:1.5:3)
Norms No. D2(7-4)kha
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 0.8 1050.00 840.00
Unskilled Md 7.0 735.00 5145.00
Material Cement (OPC) M.T 0.4 15500.00 6200.00
Agg. 20 mm(Crusher) Cu.M 0.57 1850.00 1054.50
Agg. 10 mm(Crusher) Cu.M 0.29 1850.00 536.50
Sand(Crusher screen) Cu.M 0.425 2100.00 892.50
Water Litre 200 0.18 36.75
Sub-Total 14705.25
Total (Dept. Rate) 14705.25
Overhead @ 15% 16911.04

Stone masonry works including material collection, preparation of motar with 5m lift
6 Item :
& 10m lead
A Random Rubble in 1:4 c/s mortar
Norms No. C6(6ka) 1-2
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.5 1050.00 1575.00
Unskilled Md 5.0 735.00 3675.00
Material Cement(N.S. marks) M.T 0.159 15500.00 2464.50
Block stone Cu.M 1.00 2000.00 2000.00
Bond stone Cu.M 0.10 2000.00 200.00
Sand(Crusher Screen) Cu.M 0.45 2100.00 945.00
Water Litre 100 0.18 18.38
Sub-Total 10877.88
Total (Dept. Rate) 10877.88
Overhead @ 15% 12509.56

B Random Rubble in 1:6 c/s mortar


Norms No. C6(6ka) 1-3
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.5 1050.00 1575.00
Unskilled Md 5.0 735.00 3675.00
Material Cement(N.S. marks) M.T 0.106 17515.00 1856.59
Block stone Cu.M 1.00 2000.00 2000.00
Bond stone Cu.M 0.10 2000.00 200.00
Sand(Crusher Screen) Cu.M 0.47 2100.00 987.00
Water Litre 70 0.18 12.86
Sub-Total 10306.45
Total (Dept. Rate) 10306.45

C Dry Stone masonry work


Norms No. C6(6ka) 2-1
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.0 1050.00 1050.00
Unskilled Md 2.0 735.00 1470.00
Material Block stone Cu.M 1.00 2000.00 2000.00
Bond stone Cu.M 0.10 2000.00 200.00
Sub-Total 4720.00
Total (Dept. Rate) 4720.00

D Stone masonry work in mud motar


Norms No. C6(6ka) 2-2
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.0 1050.00 1050.00
Unskilled Md 2.25 735.00 1653.75
Material Block stone Cu.M 1.00 2000.00 2000.00
Bond stone Cu.M 0.10 2000.00 200.00
Clay Cu.M 0.42 565.00 237.30
Water Litre 70 0.18 12.86
Sub-Total 5153.91
Total (Dept. Rate) 5153.91

Brick masonry works including materials collection, preparation of mortar with 30m
7 Item :
transportation.
A Chimney Bhatta Bricks in c/s mortar 1:4
Norms No. C2(5-1)kha2 / 5(2)ka
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.5 1050.00 1575.00
Unskilled Md 2.2 735.00 1617.00
Material Cement(N.S. marks) M.T 0.1 17515.00 1751.50
Brick No. 560.00 18.08 10124.80
Sand(Crusher Screen) Cu.M 0.28 2100.00 588.00
Water Litre 130 0.18 23.89
Sub-Total 15680.19
Total (Dept. Rate) 15680.19

B Chimney Bhatta Bricks in c/s mortar 1:6


Norms No. C2(5-1)kha3 / 5(2)ka
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.5 1050.00 1575.00
Unskilled Md 2.2 735.00 1617.00
Material Cement(N.S. marks) M.T 0.07 17515.00 1226.05
Brick No. 560.00 18.08 10124.80
Sand(Crusher Screen) Cu.M 0.3 2100.00 630.00
Water Litre 100 0.18 18.38
Sub-Total 15191.23
Total (Dept. Rate) 15191.23

C Machine Made(Chinese) Bricks in c/s mortar 1:4


Norms No. C1(5-1)ka2 / 5(2)ka
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.5 1050.00 1575.00
Unskilled Md 2.2 735.00 1617.00
Material Cement(N.S. marks) M.T 0.1 17515.00 1751.50
Brick No. 530.00 19.21 10181.30
Sand(Crusher Screen) Cu.M 0.27 2100.00 567.00
Water Litre 120 0.18 22.05
Sub-Total 15713.85
Total (Dept. Rate) 15713.85

D Machine Made(Chinaese) Bricks in c/s mortar 1:6


Norms No. C1(5-1)ka3 / 5(2)ka
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.5 1050.00 1575.00
Unskilled Md 2.2 735.00 1617.00
Material Cement(N.S. marks) M.T 0.07 17515.00 1226.05
Brick No. 530.00 19.21 10181.30
Sand(Crusher Screen) Cu.M 0.3 2100.00 630.00
Water Litre 100 0.18 18.38
Sub-Total 15247.73
Total (Dept. Rate) 15247.73

8 Item : 12.5mm th. Cement plaster works in…………


A Wall & floor in 1:3 C/S motar
Norms No. I1(12-1)ga
Unit 100 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 12.0 1050.00 12600.00
Unskilled Md 16.0 735.00 11760.00
Material Cement(N.S. marks) M.T 0.625 17515.00 10946.88
Sand for plaster works Cu.M 1.28 2250.00 2880.00
Sub-Total 38186.88
Total (Dept. Rate) 38186.88 381.87

B Wall & floor in 1:4 C/S motar


Norms No. I1(12-1)ga
Unit 100 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 12.0 1050.00 12600.00
Unskilled Md 16.0 735.00 11760.00
Material Cement(N.S. marks) M.T 0.538 17515.00 9423.07
Sand for plaster works Cu.M 1.46 2250.00 3285.00
Sub-Total 37068.07
Total (Dept. Rate) 37068.07 370.68

C Wall & floor in 1:6 C/S motar


Norms No. I1(12-1)gha
Unit 100 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 12.0 1050.00 12600.00
Unskilled Md 16.0 735.00 11760.00
Material Cement(N.S. marks) M.T 0.382 17515.00 6690.73
Sand for plaster works Cu.M 1.57 2250.00 3532.50
Sub-Total 34583.23
Total (Dept. Rate) 34583.23 345.83

D Ceiling in 1:4 C/S motar


Norms No. I7(12-1)kha
Unit 100 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 15.0 1050.00 15750.00
Unskilled Md 20.0 735.00 14700.00
Material Cement(N.S. marks) M.T 0.538 17515.00 9423.07
Sand for plaster works Cu.M 1.46 2250.00 3285.00
Sub-Total 43158.07
Total (Dept. Rate) 43158.07 431.58

9 1/8" thick Flush pointing works in…..


A Brick wall in 1:1 C/S motar
Norms No. I8(14-1)ka
Unit 100 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 10.5 1050.00 11025.00
Unskilled Md 12.0 735.00 8820.00
Material Cement(N.S. marks) M.T 0.316 17515.00 5534.74
Sand for plaster works Cu.M 0.22 2250.00 495.00
Sub-Total 25874.74
Total (Dept. Rate) 25874.74 258.75
B Brick wall in 1:2 C/S mortar
Norms No. I8(14-1)kha
Unit 100 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 10.5 1050.00 11025.00
Unskilled Md 12.0 735.00 8820.00
Material Cement(N.S. marks) M.T 0.21 17515.00 3678.15
Sand for plaster works Cu.M 0.29 2250.00 652.50
Sub-Total 24175.65
Total (Dept. Rate) 24175.65 241.76

C Boulder stone wall in 1:1 C/S motar


Norms No. I9(14-2)ka
Unit 100 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 10.0 1050.00 10500.00
Unskilled Md 14.0 735.00 10290.00
Material Cement(N.S. marks) M.T 0.612 17515.00 10719.18
Sand for plaster works Cu.M 0.43 2250.00 967.50
Sub-Total 32476.68
Total (Dept. Rate) 32476.68 324.77
D Boulder stone wall in 1:2 C/S motar
Norms No. I9(14-2)kha
Unit 100 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 10.0 1050.00 10500.00
Unskilled Md 14.0 735.00 10290.00
Material Cement(N.S. marks) M.T 0.408 17515.00 7146.12
Sand for plaster works Cu.M 0.57 2250.00 1282.50
Sub-Total 29218.62
Total (Dept. Rate) 29218.62 292.19

10 Item : 3mm thick cement punning works (1:1) .


Norms No. 14/6, 123
Unit 100 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 10.0 1050.00 10500.00
Unskilled Md 10.0 735.00 7350.00
Material Cement(N.S. marks) M.T 0.336 17515.00 5885.04
Sand for plaster works Cu.M 0.23 2250.00 517.50
Sub-Total 24252.54
Total (Dept. Rate) 24252.54 242.53

Form Works including selection of materials, centering & shuttering as per drawing
11 Item :
with 30m lead.
A Form works on Column by using local wood
Norms No. E1(8-3)Ka
Unit 10 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 3.748 1050.00 3935.40
Unskilled Md 5.622 735.00 4132.17
Material Local Wood Cu.M 0.070 40583.50 2840.85
Nails Kg 2.500 107.35 268.38
Sub-Total 11176.79 Per sq.m
Total (Dept. Rate) 11176.79 1117.68

B Form works on Column by using Ply Board


Norms No. E2(51)Kha
Unit 10 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.574 1050.00 1652.70
Unskilled Md 2.361 735.00 1735.34
Material Local Wood Cu.M 0.019 40583.50 771.09
18mm ply board SqM 0.693 1506.96 1044.32
Iron Pro No 0.540 968.60 523.04
Nails Kg 2.500 95.00 237.50
Sub-Total 5963.99 Per sq.m
Total (Dept. Rate) 5963.99 596.40
Overhead @15% 685.86

C Form works on beam having beam height upto 0.8 m by using local wood
Norms No. E4(8-4)Kha
Unit 10 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 2.670 1050.00 2803.50
Unskilled Md 4.000 735.00 2940.00
Material Local Wood Cu.M 0.070 40583.50 2840.85
Nails Kg 2.500 95.00 237.50
Sub-Total 8821.85 Per sq.m
Total (Dept. Rate) 8821.85 882.18

Note:- It is assumed that the wood used in form work can be used 6 times and remaining 25% scrap
value.(0.526x1.1x.75)/6=0.07 cum.

D Form works by using iron props and 18mm thick Water proof Ply wood
Norms No. E6(8-4)Ka
Unit 100 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 17.200 1050.00 18060.00
Unskilled Md 25.700 735.00 18889.50
Material Local Wood Cu.M 0.232 40583.50 9415.37
18 mm plywood board Sq.m 16.500 1702.86 28097.27
Iron pipe(props) wall 1no Props
th1.65mm and pipesize asumed as 3.5m
50mm dia. no 4.400 1094.52 4815.88 long
Nails Kg 25.000 95.00 2375.00
Sub-Total 81653.02 Per sq.m
Total (Dept. Rate) 81653.02 816.53
Note:- It is assumed that the wood used in form work can be used 6 times and remaining 25% scrap
value.(1.6875x1.1x0.75)/6=0.232 cum.
It is asumed that the ply wood used in form work can be used 6 times and remaining 10% scrap value
100x1.1x0.9/6=16.5
It is asumed that the black Pipe used in form work can be used 15 times and remaining 25% scrap
value 88/15x0.75 =4.4

E Form works on beam by using 18mm thick Ply wood


Norms No. E5(51)Ka
Unit 10 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 2.670 1050.00 2803.50
Unskilled Md 4.000 735.00 2940.00
Material Local Wood Cu.M 0.04 40583.50 1623.34
18 mm plywood board Sq.m 1.650 1702.86 2809.73
Iron pipe(props) wall 1no Props
th1.65mm and pipesize asumed as 3.5m
50mm dia. no 0.400 1094.52 437.81 long
Nails Kg 2.500 95.00 237.50
Sub-Total 10851.87 Per sq.m
Total (Dept. Rate) 10851.87 1085.19

Note:- It is assumed that the wood used in form work can be used 6 times and remaining 25% scrap
value.(0.2885x1.1x.75)/6=.04 cum.
It is asumed that the ply wood used in form work can be used 6 times and remaining 10% scrap value
10x1.1x0.9/6=1.65
It is asumed that the black Pipe used in form work can be used 15 times and remaining 25% scrap
value 8/15x0.75 =0.4

Item : Supplying and fitting local wood plank for Expansion , contraction & Warping joints with 30m lead.

Reinforcement bar for RCC works including cutting, binding, bending & placing as
12 Item :
per drawing with 30m lead
Norms No. D9(7-5)
Unit 1M.T
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 12.0 1050.00 12600.00
Unskilled Md 12.0 735.00 8820.00
Material T.M.T. Bar Mt 1.05 74000.00 77700.00
Binding wire Kg. 10 90.00 900.00
Sub-Total 100020.00 Per Kg
Total (Dept. Rate) 100020.00 100.02
Overhead @ 15% 115.02

13 Item : C.G.I sheet roofing works including material collection.


A 24 gauge 0.5mm
Unit 10 Sqm
Norms No. F1(9-1)
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.10 1050.00 1155.00
Unskilled Md 1.25 735.00 918.75
Material C.G.I sheet Sq.M 12.00 653.16 7837.93 0.5mm th.
8 Nutbolt with washer No. 30.00 18.08 542.40
J hook No. 25.00 12.43 310.75
Bitumen Washer No. 25.00 0.73 18.36
Sub-Total 10783.19
Total (Dept. Rate) 10783.19 1078.32

B 24 gauge Colour 0.5mm


Unit 10 Sqm
Norms No. F1(9-1)
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.10 1050.00 1155.00
Unskilled Md 1.25 735.00 918.75
Material C.G.I sheet Sq.M 12.00 791.51 9498.18 0.5mm th.
8 Nutbolt with washer No. 30.00 18.08 542.40
J hook No. 25.00 12.43 310.75
Bitumen Washer No. 25.00 0.73 18.36
Sub-Total 12443.44
Total (Dept. Rate) 12443.44 1244.34

C 26 gauge 0.35mm
Unit 10 Sqm
Norms No. F1(9-1)
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.10 1050.00 1155.00
Unskilled Md 1.25 735.00 918.75
Material C.G.I sheet Sq.M 12.00 495.50 5946.01
Nutbolt with washer No. 30.00 18.08 542.40
8 mmJ hook No. 25.00 12.43 310.75
Bitumen Washer No. 25.00 0.73 18.36
Sub-Total 8891.28
Total (Dept. Rate) 8891.28 889.13

D 26 gauge Colour 0.35mm


Unit 10 Sqm
Norms No. F1(9-1)
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.10 1050.00 1155.00
Unskilled Md 1.25 735.00 918.75
Material C.G.I sheet Sq.M 12.00 611.33 7335.99
Nutbolt with washer No. 30.00 18.08 542.40
8 mmJ hook No. 25.00 12.43 310.75
Bitumen Washer No. 25.00 0.73 18.36
Sub-Total 10281.25
Total (Dept. Rate) 10281.25 1028.13

E 28 gauge 0.28mm
Unit 10 Sqm
Norms No. F1(9-1)
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.10 1050.00 1155.00
Unskilled Md 1.25 735.00 918.75
Material C.G.I sheet Sq.M 12.00 392.54 4710.48
Nutbolt with washer No. 30.00 18.08 542.40
8 mmJ hook No. 25.00 12.43 310.75
Bitumen Washer No. 25.00 0.73 18.36
Sub-Total 7655.74
Total (Dept. Rate) 7655.74 765.57
F 28 gauge Colour 0.28mm
Unit 10 Sqm
Norms No. 9/1, 69
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.10 1050.00 1155.00
Unskilled Md 1.25 735.00 918.75
Material 28 gauge C.G.I sheet Sq.M 12.00 511.59 6139.07
Nutbolt with washer No. 30.00 18.08 542.40
8 mmJ hook No. 25.00 12.43 310.75
Bitumen Washer No. 25.00 0.73 18.36
Sub-Total 9084.33
Total (Dept. Rate) 9084.33 908.43

14 Item : Ridge Plain sheet Roofing Works works including material collection.
A 24 Gauge Plain Sheet
Unit 10 Rm
Norms No. F4(9-2)
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 2.00 1050.00 2100.00
Unskilled Md 3.00 735.00 2205.00
Material Plain sheet 24 guage RM 12.00 602.44 7229.30 0.5mm
Nutbolt No. L.S 60.00
Sub-Total 11594.30
Total (Dept. Rate) 11594.30 1159.43
Note:- The breadth of plain sheet is to be assumed 60 cm.

B 26 Gauge Plain Sheet


Unit 10 Rm
Norms No. F4(9-2)
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 2.00 1050.00 2100.00
Unskilled Md 3.00 735.00 2205.00
Material Plain sheet 26gauage RM 12.00 501.10 6013.15 0.35mm
Nutbolt No. L.S 60.00
Sub-Total 10378.15
Total (Dept. Rate) 10378.15 1037.82

C 28 Gauge Plain Sheet


Unit 10 Rm
Norms No. F4(9-2)
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 2.00 1050.00 2100.00
Unskilled Md 3.00 735.00 2205.00
Material Plain sheet 26gauage RM 12.00 354.71 4256.50 0.26mm
Nutbolt No. L.S 60.00
Sub-Total 8621.50
Total (Dept. Rate) 8621.50 862.15

15 Item : C.G.I Gutter Works including material collection.


150 mm -450mm wide Colour G.I. Plain sheet Rain Gutter works including iron
A
bracket, Notbolt, Washer .
Norms No. F7
Unit 10 RM.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.75 1050.00 1837.50
Unskilled Md 2 735.00 1470.00
Material Plain Sheet, 26g RM 13.5 501.10 6764.80 300mm wide
Bracket 40x3mm Nos 32 56.44 1806.19
NutBolt with washer Nos 48 18.08 867.84
Sub-Total 12746.33
Total (Dept. Rate) 12746.33 1274.63

B 150 mm -450mm wide plain G.I. Plain sheet Rain Gutter works including iron
bracket, Notbolt, Washer .
Norms No. F7
Unit 10 RM.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.75 1050.00 1837.50
Unskilled Md 2 735.00 1470.00
Material Plain Sheet, 28 g RM 13.5 354.71 4788.57 300mm wide
Bracket Nos 32 56.44 1806.19
with washer &
NutBolt with washer Nos 48 18.08 867.84 bolt
Sub-Total 10770.10
Total (Dept. Rate) 10770.10 1077.01

1.2 mm thick heavy Corrugated Fiber sheet Roofing works including material
16 Item : collection all complete works .
Unit 10 Sq.m
Norms No. F14
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.1 1050.00 1155.00
Unskilled Md 1.25 735.00 918.75
Material Fiber sheet 1.2 mm
heavy Sq.m 12 2918.11 35017.34
J Hook Nos 25 12.43 310.75
Bitumen Washer Nos 30 0.73 22.04
NutBolt with washer Nos. 30 18.08 542.40
Sub-Total 37966.28
Total (Dept. Rate) 37966.28 3796.63

1.2mm thick heavy Ridge Fiber plain sheet Roofing works including material
17 Item : collection all complete works .
Unit 10 RM
Norms No. F15
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 2 1050.00 2100.00
Unskilled Md 3 735.00 2205.00
Material Fiber sheet 1.2 mm
heavy Rm 12 1750.87 21010.41
Nutbolt Nos. LS 60.00
Sub-Total 25375.41
Total (Dept. Rate) 25375.41 2537.54

18 Item : Slate Roofing works including material collection with all complete works.
Unit 10 Sq.M
Norms No. F9(9-5)
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 4.00 1050.00 4200.00
Unskilled Md 5.00 735.00 3675.00
Material slate Sq.m 24.00 450.00 10800.00
Sub-Total 18675.00
Sub-Total (Dept. Rate) 18675.00 1867.50

19 Item: UPVC Roofing works including material collection with all complete
A 2mm thick UPVC Roofing Works
Norms No. F22
Unit 10 Sq.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.50 1050.00 1575.00
Unskilled Md 1.00 735.00 735.00
Material 2mm thick UPVC Sheet SqM 12.00 1459.60 17515.18
Clip No. 14.00 7.91 110.74
Screw No. 28.00 6.78 189.84
Sub-Total 20125.76
Total (Dept. Rate) 20125.76 2012.58

B 3mm thick UPVC Roofing Works


Norms No. F23
Unit 10 Sq.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.50 1050.00 1575.00
Unskilled Md 1.00 735.00 735.00
Material 3mm thick UPVC Sheet SqM 12.00 2067.76 24813.17
Clip No. 14.00 7.91 110.74
Screw No. 28.00 6.78 189.84
Sub-Total 27423.75
Total (Dept. Rate) 27423.75 2742.38

3mm thick UPVC Ridge covering works including material collection all complete
20 Item : works .
Unit 10 RM
Norms No. F15
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 2 1050.00 2100.00
Unskilled Md 3 735.00 2205.00
Material
UPVC ridge Cover3 mm Rm 12 1017.00 12204.00
Nutbolt Nos. LS 60.00
Sub-Total 16569.00
Total (Dept. Rate) 16569.00 1656.90

21 Item: Wood Works


A Salwood frame with wood size 100*75mm
Norms No. G1(10-1)
Unit Cu. M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 34.00 1050.00 35700.00
Unskilled Md 3.40 735.00 2499.00
Material Salwood Cu.M 1.10 194095.00 213504.50
Screw No. 184.00 1.13 207.92
Hold fast No. 92.00 18.08 1663.36
Sub-Total 253574.78
Total (Dept. Rate) 253574.78

B Local wood frame with wood size 100*75mm


Norms No. G1(10-1)
Unit Cu. M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 34.0 1050.00 35700.00
Unskilled Md 3.4 735.00 2499.00
Material Local wood Cu.M 1.1 40583.50 44641.85
Screw No. 184 1.13 207.92
Hold fast No. 92 18.08 1663.36
Sub-Total 84712.13
Total (Dept. Rate) 84712.13

C 38mm th.sal wood in panneled door & window shutter.


Norms No. G2(10-2)
Unit 2.114Sq. M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 10.0 1050.00 10500.00
Unskilled Md 1.0 735.00 735.00
Material Salwood Cu.M 0.084 194095.00 16303.98
Hinges 100mm No. 6.0 30.51 183.06
Tower bolt 150mm No. 1.0 79.10 79.10
Tower bolt 300mm No. 1.0 135.60 135.60
Handle No. 2.0 30.51 61.02
Screw No. L.S. 50.00
locking set 250mm No. 1.0 237.30 237.30
Sub-Total 28285.06 per Sq.m.
Total (Dept. Rate) 28285.06 13379.88
D 38mm th.local wood in panneled door & window shutter.
Norms No. G2(10-2)
Unit 2.114 Sq. M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 10.0 1050.00 10500.00
Unskilled Md 1.0 735.00 735.00
Material Local wood Cu.M 0.084 40583.50 3409.01
Hinges 100mm No. 6.0 30.51 183.06
Tower bolt 150mm No. 1.0 79.10 79.10
Tower bolt 300mm No. 1.0 135.60 135.60
Handle No. 2.0 30.51 61.02
Screw No. L.S. 50.00
locking set 250mm No. 1.0 237.30 237.30
Sub-Total 15390.09 per Sq.m.
Total (Dept. Rate) 15390.09 7280.08
E 4mm th. glazed window shutter with 38*75mm sal wood frame.
Norms No. G3(10-4)
Unit 2.23 Sq. M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 9.0 1050.00 9450.00
Unskilled Md 0.9 735.00 661.50
Material Salwood Cu.M 0.049 194095.00 9510.66
Hinges 75 No. 8.0 18.08 144.64
Tower bolt 100mm No. 4.0 54.24 216.96
Handle No. 2.0 30.51 61.02
Screw L.S 20.00
4 mm plain glass m2 1.085 1033.88 1121.76
Sub-Total 21186.54 per Sq.m.
Total (Dept. Rate) 21186.54 9500.69

F 4mm th. glazed window shutter with 38*75mm local wood frame.
Norms No. G3(10-4)
Unit 2.23 Sq. M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 9.0 1050.00 9450.00
Unskilled Md 0.9 735.00 661.50
Material Local wood Cu.M 0.049 40583.50 1988.59
Hinges 75 No. 8.0 18.08 144.64
Tower bolt 100mm No. 4.0 54.24 216.96
Handle No. 2.0 30.51 61.02
Screw L.S 20.00
4 mm plain glass m2 1.085 1033.88 1121.76
Sub-Total 13664.47 per Sq.m.
Total (Dept. Rate) 13664.47 6127.57

G Flush door with 38mm th. Sal wood frame & 4mm commercial plywood shutter.
Norms No. G4(10-7)
Unit 2.245 Sq. M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 7.0 1050.00 7350.00
Unskilled Md 0.7 735.00 514.50
Material Salwood Cu.M 0.0346 194095.00 6715.69
Hinges 100mm No. 3.0 30.51 91.53
Tower bolt 150mm No. 2.0 79.10 158.20
Mortise lock(Brass) No. 0.0 1779.75 0.00
Screw L.S 20.00
4mm ply wood m2 4.65 255.43 1187.75
Sub-Total 16037.67 per Sq.m.
Total (Dept. Rate) 16037.67 7143.73
Flush door with 38mm th.local wood frame & 4mm commercial plywood on both
H side
Norms No. G4(10-7)
Unit 2.245 Sq. M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 7.0 1050.00 7350.00
Unskilled Md 0.7 735.00 514.50
Material Local wood Cu.M 0.0346 40583.50 1404.19
Hinges 100mm No. 3.0 30.51 91.53
Tower bolt 150mm No. 2.0 79.10 158.20
Mortise lock(Brass) No. 0.0 1779.75 0.00
Screw L.S 20.00
4mm ply wood m2 4.65 255.43 1187.75
Sub-Total 10726.17 per Sq.m.
Total (Dept. Rate) 10726.17 4777.80

I Door shutter with 38mm th.local wood frame & fixing of 26 gauge plain sheet in both
side.
Norms No. G4(10-9)
Unit 2.245 Sq. M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 7.0 1050.00 7350.00
Unskilled Md 0.7 735.00 514.50
Material local wood Cu.M 0.0346 40583.50 1404.19
Hinges 100mm No. 3.0 30.51 91.53
Tower bolt 150mm No. 2.0 79.10 158.20
Mortise lock(Brass) No. 0.0 1779.75 0.00
Screw L.S 20.00
Plain sheet(26 gauge) m2 4.65 501.10 2330.10
Sub-Total 11868.52 per Sq.m.
Total (Dept. Rate) 11868.52 5286.64

Mosquito proof door & window shutter with 38mm th.sal wood frame & 24 gauge
J
G.I wire.
Norms No. G4(10-10)
Unit 2.245 Sq. M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 5.0 1050.00 5250.00
Unskilled Md 0.5 735.00 367.50
Material Salwood Cu.M 0.026 194095.00 5046.47
Hinges 100mm No. 3.0 30.51 91.53
Tower bolt 150mm No. 2.0 79.10 158.20
Handle No. 2.0 30.51 61.02
Spring No. 1.0 180.80 180.80
Screw L.S 20.00
Mosquito proof jali m2 2.13 425.72 906.78
Sub-Total 12082.30 per Sq.m.
Total (Dept. Rate) 12082.30 5381.87
Mosquito proof door & window shutter with 38mm th.Shisham wood frame & 24
K
gauge G.I wire.
Norms No. G4(10-10)
Unit 2.245 Sq. M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 5.0 1050.00 5250.00
Unskilled Md 0.5 735.00 367.50
Material Shisham wood Cu.M 0.026 112928.00 2936.13
Hinges 100mm No. 3.0 30.51 91.53
Tower bolt 150mm No. 2.0 79.10 158.20
Handle No. 2.0 30.51 61.02
Spring No. 1.0 180.80 180.80
Screw L.S 10.00
Mosquito proof jali m2 2.13 425.72 906.78
Sub-Total 9961.95 per Sq.m.
Total (Dept. Rate) 9961.95 4437.40

L Making & fixing of salwood truss


Norms No. F21
Unit Cu. M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 17.65 1050.00 18532.50
Unskilled Md 26.00 735.00 19110.00
Material Salwood Cu.M 1.05 194095.00 203799.75
Flat iron L.S. 100.00
Screw L.S. 50.00
Nut bolts L.S. 30.00
Sub-Total 241622.25
Total (Dept. Rate) 241622.25

M Making & fixing of local wood truss


Norms No. F21
Unit Cu. M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 17.65 1050.00 18532.50
Unskilled Md 26.00 735.00 19110.00
Material Local wood Cu.M 1.05 40583.50 42612.68
Flat iron L.S. 100.00
Screw L.S. 50.00
Nut bolts L.S. 30.00
Sub-Total 80435.18
Total (Dept. Rate) 80435.18

N Making & fixing of 25mm sal wood eaves board.


Norms No. F20(10-19)
Unit 10 Sq.m
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.430 1050.00 1501.50
Unskilled Md 0.143 735.00 105.11
Material Sal wood Cu.M 0.275 194095.00 53376.13
Screw L.S. 40.00
Sub-Total 55022.73
Total (Dept. Rate) 55022.73 5502.27

O Making & fixing of 25mm local wood eaves board.


Norms No. F20(10-19)
Unit 10 Sq.m
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.430 1050.00 1501.50
Unskilled Md 0.143 735.00 105.11
Material Iocal wood Cu.M 0.275 40583.50 11160.46
Screw L.S. 40.00
Sub-Total 12807.07
Total (Dept. Rate) 12807.07 1280.71

4mm Commercial plywood ceilling with 50*75mm salwood size & 600*900mm frame
P size.
Norms No. N7(10-16)ka
Unit 35.58 Sq. M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 23.0 1050.00 24150.00
Unskilled Md 2.3 735.00 1690.50
Material Salwood Cu.M 0.45 194095.00 87342.75
listic No. L.s 50.00
nails No. L.s 40.00
4mm ply wood m2 37.50 255.43 9578.61
Sub-Total 122851.86
Total (Dept. Rate) 122851.86 3452.83

Commercial plywood ceilling with 50*75mm local wood size & 600*900mm frame
Q size.
Particular N7(10-16)ka
Unit 35.58 Sq. M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 23.0 1050.00 24150.00
Unskilled Md 2.3 735.00 1690.50
Material Local wood Cu.M 0.45 40583.50 18262.58
listic No. L.s 30.00
nails No. L.s 25.00
4mm ply wood m2 37.50 255.43 9578.61
Sub-Total 53736.69
Total (Dept. Rate) 53736.69 1510.31

22 Item: Flooring Works


38mm thick 1:2:4 Cement Concrete floor Carting including finishing by rubbing
A
Cement.
Norms No. H1(11-1)kha
Unit 10 Sqm
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.25 1050.00 1312.50
Unskilled Md 2.00 735.00 1470.00
Material cement(N.S.) M.T. 0.130 17515.00 2276.95
sand(Crusher screen) Cu.m 0.180 2100.00 378.00
Aggregate 12 mm M.T. 0.360 1850.00 666.00
Sub-Total 6103.45
Total (Dept. Rate) 6103.45 610.35

50mm thick 1:2:4 Cement Concrete floor Carting including finishing by rubbing
B
Cement.
Norms No. H1(11-1)ga
Unit 10 Sqm
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.25 1050.00 1312.50
Unskilled Md 2.50 735.00 1837.50
Material cement(N.S.) M.T. 0.170 17515.00 2977.55
sand(Crusher screen) Cu.m 0.230 2100.00 483.00
Aggregate 20 mm M.T. 0.460 1850.00 851.00
Sub-Total 7461.55
Total (Dept. Rate) 7461.55 746.16

75mm thick 1:2:4 Cement Concrete floor Carting including finishing by rubbing
C
Cement.
Norms No. H1(11-1)gha
Unit 10 Sqm
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.25 1050.00 1312.50
Unskilled Md 3.00 735.00 2205.00
Material cement(N.S.) M.T. 0.260 17515.00 4553.90
sand(Crusher screen) Cu.m 0.340 2100.00 714.00
Aggregate 20 mm M.T. 0.680 1850.00 1258.00
Sub-Total 10043.40
Total (Dept. Rate) 10043.40 1004.34

25 mm th.mosaic flooring with 12.5mm th cement plaster (1:2) base course & 6 mm
D th marble chips with white cement (1:1) surface course including rubbing &
polishing
Norms No. H4(11-4)
Unit 10 Sqm
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 3.50 1050.00 3675.00
Unskilled Md 36.00 735.00 26460.00
Material Cement ( Nepali ) M.T. 0.089 17515.00 1558.84
sand(Crusher screen) Cu.m 0.122 2100.00 256.20
white cement M.T. 0.089 38420.00 3419.38
3mm marble chips Cu.m 0.061 24923.56 1520.34
oxalic acid kg 0.370 224.87 83.20
mein polish kg 0.118 423.75 50.00
terpaintain lit 0.538 113.00 60.79
rubbing stone
(Carborandum) L.S. 60.00
Sub-Total 37143.75
Total (Dept. Rate) 37143.75 3714.38
Note: 25kg chips in 1bag and 1 bag marble chips is asumed as 1 cft volume

E Flooring tile Works in (1:4) Cement Sand mortar


Norms No. H6(11-7)
Unit 10 Sqm
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 13.00 1050.00 13650.00
Unskilled Md 4.50 735.00 3307.50
Material Cement(N.S. marks) M.T. 0.056 17515.00 980.84
sand (Crusher screen) Cu.m 0.152 2100.00 319.20
Procelain glazed tile sqm 11.000 790.62 8696.77 asumed 12"x12"
White Cement kg 3.228 38.42 124.02
Sub-Total 27078.33
Total (Dept. Rate) 27078.33 2707.83

13 mm th. marble with cement sand (1:2) surface course including rubbing &
F
polishing
Norms No. H34
Unit 10 Sqm
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 2.00 1050.00 2100.00
Unskilled Md 21.50 735.00 15802.50 13.5 for rubbing
Material Cement(N.S. marks) M.T. 0.130 17515.00 2276.95
sand (Crusher screen) Cu.m 0.183 2100.00 384.30
13 mm thick marble sqm 11.000 2189.40 24083.37
oxalic acid kg 0.370 224.87 83.20
mein polish kg 0.118 423.75 50.00
terpaintain lit 0.538 113.00 60.79
rubbing stone L.S. 60.00
Sub-Total 44901.12
Total (Dept. Rate) 44901.12 4490.11

G 16mm Granaite with 20mm thick cement sand (1:2) surface course including
rubbing & polishing
Norms No. H26(11-6)
Unit 10 Sqm
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 2.00 1050.00 2100.00
Unskilled Md 21.50 735.00 15802.50 13.5 for rubbing
Material Cement(N.S. marks) M.T. 0.130 17515.00 2276.95
sand (Crusher screen) Cu.m 0.183 2100.00 384.30
16 mm thick granaite sqm 11.000 4559.55 50155.05
oxalic acid kg 0.370 224.87 83.20
mein polish kg 0.118 423.75 50.00
terpaintain lit 0.538 113.00 60.79
rubbing stone 1.000 60.00
Sub-Total 70972.80
Total (Dept. Rate) 70972.80 7097.28
H 25-37.5 mm th Flagstone paving in 1:4 cement sand mortar
Norms No. H19(11-9)
Unit 10 Sqm
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 2.00 1050.00 2100.00
Unskilled Md 4.50 735.00 3307.50
Material Cement(N.S. marks) M.T. 0.060 17515.00 1050.90
sand (Crusher screen) Cu.m 0.165 2100.00 346.50
25-37.5mm Flag stone Sqm 11.000 1065.00 11715.00
Sub-Total 18519.90
Total (Dept. Rate) 18519.90 1851.99

I Brick ballast filling works.


Norms No. H19(11-20)
Unit 10 Cu. M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 10.00 1050.00 10500.00
Material Brick ballast Cu.M. 11.00 3277.00 36047.00
Sub-Total 46547.00
Total (Dept. Rate) 46547.00 4654.70

23 Item : Painting works


A 2 coat waterproof cement paint works.
Norms No. J4(13-4)kha
Unit 100 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 5.0 1050.00 5250.00
Unskilled Md 5.0 735.00 3675.00
Material Cement paint Kg 48.5 80.23 3891.16
Sub-Total 12816.16
Total (Dept. Rate) 12816.16 128.16
B 2 coat white washing in new surface in wall
Norms No. J1(13-1)kha
Unit 100 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.5 1050.00 1575.00
Unskilled Md 1.1 735.00 808.50
Material lime Kg 22.0 20.34 447.48
Gum Kg 0.88 244.08 214.79
Sub-Total 3045.77
Total (Dept. Rate) 3045.77 30.46
C 2 coat white washing in new surface in ceiling
Norms No. J1(13-1)kha
Unit 100 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.9 1050.00 1968.75
Unskilled Md 1.4 735.00 1010.63
Material lime Kg 22.0 20.34 447.48
Gum Kg 0.88 244.08 214.79
Sub-Total 3641.65
Total (Dept. Rate) 3641.65 36.42
D White washing in old surface
Norms No. J2(13-2)
Unit 100 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 0.8 1050.00 840.00
Unskilled Md 0.7 735.00 514.50
Material lime Kg 10.0 20.34 203.40
Gum Kg 0.4 244.08 97.63
Sub-Total 1655.53
Total (Dept. Rate) 1655.53 16.56

E Two coat distemper painting over one coat primer .


Norms No. J3(13-3)ka and ga
Unit 100 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 3.8 1050.00 3990.00 2 for primer
Unskilled Md 3.8 735.00 2793.00 2 for primer
Material Distemper powder Kg 5.0 293.80 1469.00
primer lit 8.0 355.95 2847.60
Sub-Total 11099.60
Total (Dept. Rate) 11099.60 111.00

F One coat Emulsion paint over one coat primer .


Norms No. J5(13-5)ka and kha
Unit 100 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 8.0 1050.00 8400.00 3 for primer
Unskilled Md 5.0 735.00 3675.00 3 for primer
Material Plastic Emulsion paint ltr 9.0 565.00 5085.00
primer lit 8.1 355.95 2883.20
Sub-Total 20043.20
Total (Dept. Rate) 20043.20 200.43

G Two coat Emulsion paint over one coat primer .


Norms No. J5(13-5)ka and ga
Unit 100 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 12.0 1050.00 12600.00 3+5+4
Unskilled Md 8.0 735.00 5880.00 3+2+3
Material Plastic Emulsion paint ltr 16.0 565.00 9040.00 9 for first coat
primer lit 8.1 355.95 2883.20
Sub-Total 30403.20
Total (Dept. Rate) 30403.20 304.03

H One Coat Weather Coat(apex) Excluding primer .


Norms No. J18(13-5)kha
Unit 100 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 5.0 1050.00 5250.00
Unskilled Md 2.0 735.00 1470.00
Material Weather coat(apex) ltr 9.0 904.00 8136.00
Sub-Total 14856.00
Total (Dept. Rate) 14856.00 148.56
I Two Coat Weather Coat(apex) Excluding primer .
Norms No. J18(13-5)kha
Unit 100 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 9.0 1050.00 9450.00
Unskilled Md 5.0 735.00 3675.00
Material Weather coat(apex) ltr 16.0 904.00 14464.00
Sub-Total 27589.00
Total (Dept. Rate) 27589.00 275.89

J 2 coat Weather coat (apex) over one coat primer.


Norms No. J5(13-5)ka and ga
Unit 100 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 12.00 1050.00 12600.00 3+5+4
Unskilled Md 8.00 735.00 5880.00 3+2+3
Material Weather coat ltr 16.00 904.00 14464.00 9 for first coat
Primer ltr 8.10 355.95 2883.20
Sub-Total 35827.20
Total (Dept. Rate) 35827.20 358.27

K 2 coat readymade Enamelpaint over one coat primer.


Norms No. J5(13-5)ka and ga
Unit 100 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 12.00 1050.00 12600.00
Unskilled Md 8.00 735.00 5880.00
Material Enamel paint ltr 16.00 508.50 8136.00
Primer ltr 8.10 355.95 2883.20
Sub-Total 29499.20
Total (Dept. Rate) 29499.20 294.99

L 2 coat readymade Aluminium paint over one coat primer.


Norms No. J6(13-6)
Unit 100 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 10.75 1050.00 11287.50
Unskilled Md 10.75 735.00 7901.25
Material Aluminium paint ltr 10.76 678.00 7295.28
Khaksi Sheet 4.00 6.55 26.22
Primer ltr 8.10 355.95 2883.20
Sub-Total 29393.44
Total (Dept. Rate) 29393.44 293.93

M One Coat Red oxide paint


Norms No. J11(12-4)ga
Unit 100 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.7 1050.00 1785.00
Unskilled Md 1.7 735.00 1249.50
Material Red Oxide Kg 30.0 214.70 6441.00
Sub-Total 9475.50
Total (Dept. Rate) 9475.50 94.76

N Two Coat Red oxide paint


Norms No. J11(12-4)gha
Unit 100 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 3.5 1050.00 3675.00
Unskilled Md 3.5 735.00 2572.50
Material Red Oxide Kg 48.5 214.70 10412.95
Sub-Total 16660.45
Total (Dept. Rate) 16660.45 166.60
24 Item : Iron Works
Making & fixing 3*20 mm iron gril including one coat Red oxide paint after rubbing
A with sand paper.
Norms No. M1(24-1)ka
Unit 10 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
iron gril including labour
Material cost. Kg 10.00 2776.77 27767.66
1SqM=16.14kg Sub-Total 27767.66
Total (Dept. Rate) 27767.66 2776.77

Making & fixing 4.5*20 mm iron gril including one coat Red oxide paint after rubbing
B with sand paper.
Norms No. M2(24-1)kha
Unit 10 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
iron gril including labour
Material cost. Kg 10.00 3698.91 36989.14
1SqM=21.50kg Sub-Total 36989.14
Total (Dept. Rate) 36989.14 3698.91

Making & fixing of rolling shutter including one coat red oxide paint after rubbing
C with sand paper with all complete .
Norms No. M6(24-2)
Unit 10 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
18-20 gauge iron
shutter including labour
Material cost. Sqm 10.00 2171.15 21711.53
Total 21711.53
Total (Dept. Rate) 21711.53 2171.2

D Barbed wire fencing work


Norms No. M9(24-6)
Unit 100 M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.076 1050.00 1129.80
Unskilled Md 5.380 735.00 3954.30
Material G.I bared wire m 110.00 11.87 1305.15 1kg=10 m
Nails/hooks L.S. 40.00
Sub-Total 6429.25
Total (Dept. Rate) 6429.25 64.29

Assembling mechanical woven Gabion boxes, placing in polition including


25 Item : stretching, forming compartments, tying the side and diapharagms with binding
wire in each mesh, tying with bracing wires and tie wires and tying down the lid
complete including stone filling
Box size 1.5x1x1m using heavy zinc coated Hexagonal mesh type 100x120mm ,
A mesh wire 3mm, selvage wire 3.9mm lacing wire 2.4mm
Norms No. DoR SNo-24.2, Ref. to ss 2402(A),Sno 24.3 and SNo24.4
Unit Per box
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 0.41 1050.00 430.50
Unskilled Md 1.76 735.00 1293.60
Gabion wire machine
made10x12/3.0/3.9/2.4/
Material
zn Sqm 9 305.10 2745.90
Filling Stone CuM 1.65 2000 3300.00
Sub-Total 7770.00
Total (Dept. Rate) 7770.00 5180

Box size 2x1x1m using heavy zinc coated Hexagonal mesh type 100x120mm , mesh
B wire 3mm, selvage wire 3.9mm lacing wire 2.4mm
Norms No. DoR SNo-24.2, Ref. to ss 2402(A),Sno 24.3 and SNo24.4
Unit Per box
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 0.54 1050.00 567.00
Unskilled Md 2.29 735.00 1683.15
Gabion wire machine
made10x12/3.0/3.9/2.4/
Material zn Sqm 11 305.10 3356.10
Filling Stone CuM 2.2 2000 4400.00
Sub-Total 10006.25
Total (Dept. Rate) 10006.25 5003.125

Box size 3x1x1m using heavy zinc coated Hexagonal mesh type 100x120mm , mesh
C wire 3mm, selvage wire 3.9mm lacing wire 2.4mm
Norms No. DoR SNo-24.2, Ref. to ss 2402(A),Sno 24.3 and SNo24.4
Unit Per box
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 0.6 1050.00 630.00
Unskilled Md 2.6 735.00 1911.00
Gabion wire machine
made10x12/3.0/3.9/2.4/
Material
zn Sqm 16 305.10 4128.00
Filling Stone CuM 3.3 2000 6600.00
Sub-Total 13269.00
Total (Dept. Rate) 13269.00 4423

26 Item Hollow concrete block works


A 4" thick in 1:4 C /S motar
Norms No. C13
Unit Sq.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 0.25 1050.00 262.50
Unskilled Md 0.3 735.00 183.75
Material Cement M.T 0.014 17515.00 245.21
Block(4"x8"x16") No. 12.00 45.20 542.40
Sand (Crusher Screen) Cu.M 0.044 2100.00 92.40
Sub-Total 1326.26
Total (Dept. Rate) 1326.26

B 6" thick in 1:4 C /S motar


Norms No. C13
Unit Sq.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 0.25 1050.00 262.50
Unskilled Md 0.3 735.00 183.75
Material Cement M.T 0.014 17515.00 245.21
Block(6"x8"x16") No. 12.00 54.24 650.88
Sand (Crusher Screen) Cu.M 0.044 2100.00 92.40
Sub-Total 1434.74
Total (Dept. Rate) 1434.74
Back filling work with ordinary soil by making 15, 15cm layer and compact by
27 Item labour including 10m lead
A Back filling work with ordinary soil with sprinkling water
Norms No. B2,2(25)kha
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Unskilled Md 0.50 735.00 367.50
Material ordinary soil CuM 1.50 565.00 847.50
Water Lit 5.00 0.18 0.92
Sub-Total 1215.92
Total (Dept. Rate) 1215.92
Note: If soil is avilable free of cost then labour and water cost will be considerd

B Back filling work with ordinary soil without sprinkling water


Norms No. B2,2(25)kha
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Unskilled Md 0.25 735.00 183.75
Material ordinary soil CuM 1.30 565.00 734.50
Sub-Total 918.25
Total (Dept. Rate) 918.25
Note: If soil is avilable free of cost then only labour cost will be considerd

28 Dismantalling Works
Item
Dismantalling of mud mortar masonary with deposition up to 10 mtr. Lead works
A
Norms No. L1(19-1)
Unit Cu.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Unskilled Md 1.060 735.00 779.10
Sub-Total 779.10
Total (Dept. Rate) 779.10

Dismantalling of Cement mortar masonary with deposition up to 10 mtr. Lead


Item
works
B
Norms No. L1(19-2)
Unit Cu.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Unskilled Md 2.12 735.00 1558.20
Sub-Total 1558.20
Total (Dept. Rate) 1558.20

Item Dismantalling of R.C.C. or R.B.C. with deposition up to10 mtr. Works


C
Norms No. L1(19-3)
Unit Cu.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Unskilled Md 11.00 735.00 8085.00
Sub-Total 8085.00
Total (Dept. Rate) 8085.00

Item Dismantalling P.C.C. with deposition up to 10 mtr. Lead works


D
Norms No. L4(19-4)
Unit Cu.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Unskilled Md 4.00 735.00 2940.00
Sub-Total 2940.00
Total (Dept. Rate) 2940.00

Item Dismantalling Cement Plaster with deposition up to 10 mtr. Lead works


E
Norms No. L5
Unit Sq.m
Particular Description Unit Quantity Rate Amount Remarks
Labour Unskilled Md 0.108 735.00 79.38
Sub-Total 79.38
Total (Dept. Rate) 79.38

Cutting and Remove Reinforcement using on RCC or RBC with deposition up to 10


Item mtr. Lead works
F
Norms No. L20
Unit Sq.m
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 0.1 1050.00 105.00
Unskilled Md 1.000 735.00 735.00
Sub-Total 840.00
Total (Dept. Rate) 840.00

Item Dismantalling of Gabion box with deposition up to 10 mtr. Lead works


G
Norms No. L21
Unit Sq.m
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 0.1 1050.00 105.00
Unskilled Md 1.000 735.00 735.00
Sub-Total 840.00
Total (Dept. Rate) 840.00

Item Dismantalling of CGI Roofing with deposition up to 10 mtr. Lead works


H
Norms No. L22
Unit Sq.m
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 0.027 1050.00 28.35
Unskilled Md 0.040 735.00 29.40
Sub-Total 57.75
Total (Dept. Rate) 57.75

29 Item Miscellaneous Works

Plum Cement Concrete work. It includes all labour and material required for mixing, placing in
position, vibrating, compaction, finishing, curing and all other incidentals required to produce
concrete of specified strength as per the specification. Rate includes athe work of making,
fixing and removing of all centres and forms required for the work. (Concrete M15 grade + 40%
A Boulder in foundation)
Norms No. 41 (a) spec.cl.No11 (60% Concrete & 40% Boulder stone)
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 0.3 1050.00 315.00
Unskilled Md 4.0 735.00 2940.00
Material Cement(N.S. marks) M.T 0.192 17515.00 3362.88
Boulder stone 225 mm Cu.M 0.44 2000.00 880.00
Aggregate all Type Cu.M 0.51 1850.00 943.50
Sand (Crusher screen) Cu.M 0.27 2100.00 567.00
Sub-Total 9008.38
Total (Dept. Rate) 9008.38

B works.
Norms No. H24
Unit 10Sq.m.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.00 1050.00 1050.00
Unskilled Md 1.0 735.00 735.00
Material Putty Kg 21.28 45.20 961.86
Sub-Total 2746.86
Total (Dept. Rate) 2746.86 274.69

C works
Norms No. H24

Unit 10Sq.m.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 0.00 1050.00 0.00
Unskilled Md 0.0 735.00 0.00
Gypsum board false
Material ceiling works. Sq.m. 10 1277.15 12771.49
Sub-Total 12771.49
Total (Dept. Rate) 12771.49 1277.15
0.32 0.0528917 0.0397

0.53 0.4
ed 12"x12"

F 50 mm th Flagstone paving in 1:4 cement sand mortar


Norms11/9, 104
Unit 10 Sqm
ParticDescriptionUnit QuantitRate Amount Remarks
LabouSkilled Md 2.00 1050.00 2100.00
Unskilled Md 4.50 735.00 3307.50
MateriCement(N.S.M.T. 0.063 17515.00 1103.44
sand (CrushCu.m 0.171 2100.00 359.10
Flag stone Sqm 11.000 1065.00 11715.00
Sub-Total 18585.04
Sub-Total (Dept. R 18585.04 1858.50
Assamble Stone Filling
Sk 0.01 0.11 0.2 0.3
Usk 0.06 0.56 0.8 1.2

Assamble Stone Filling


Sk 0.0125 0.14 0.2 0.4
Usk 0.0625 0.69 0.8 1.6

Assamble Stone Filling


Sk 0.0125 0.20 0.2 0.4
Usk 0.0625 1.00 0.8 1.6
15.5 50.86
2.75
Pokhara Metropolitan City
Office of Execcutive Municipal
Province No. 4 , kaski , New Road
BOQ
Date: 2077/08/08
Project name: जय टोलमा कल्भर्ट निर्माण
Location : Pokhara -12 ,Near of Vetrenery ofiice

S. N. Description no Quantity Unit Rate Rate in Words Amount

1 E/w in excavation work 1 13.87 cum.

2 Stone Soling work 1 2.07 cum.

3 P.C.C. (1:2:4) work 1 2.07 cum.

4 Stone masonry work(1:4) 2 2.07 cum.


R.C.C. work (1:1.5:3) for culvert 1.00 cum.
5 with all complete 4.14

6 Reinforcement work 407.46 kg.

7 Form work for slab 1.00 20.70 sqm.

8 stone soling work 1.00 1.04 cum.

9 P.C.C.(1:2:4) work 1.00 0.70 cum.


TotaL (B)

Vat @ 13%
G. Total
Pokhara Metropolitan City
Office of Execcutive Municipal
Province No. 4 , kaski , New Road
BOQ
Date: 2077/08/08
Project name: जय टोलमा कल्भर्ट निर्माण
Location : Pokhara -12 ,Near of Vetrenery ofiice

S. N. Description no Quantity Unit Rate

1 E/w in excavation work 1 13.87 cum.

2 Stone Soling work 1 3.11 cum.

3 P.C.C. (1:2:4) work 1 2.77 cum.

4 Stone masonry work(1:4) 2 2.07 cum.


R.C.C. work (1:1.5:3) for culvert 1.00 cum.
5 with all complete 4.14

6 Reinforcement work 1.00 407.46 kg.

7 Form work for slab 1.00 20.70 sqm.


TotaL (B)

Vat @ 13%
G. Total
Metropolitan City
eccutive Municipal
, kaski , New Road
BOQ
: 2077/08/08

Rate in Words Amount