S. N. Description No Length Breadth Av. Breadth Height Quantity Unit Rate Amount
E/w in excavation work for road levelling work
1 in BMS
0+00 1.0 0.00 3.25
0+17 1.0 17.00 4.30 3.775 0.25 16.04
0+27.5 1.0 10.50 4.90 4.6 0.25 12.08
0+42.5 1.0 15.00 3.80 3.80 0.25 14.25
0+54.5 1.0 12.00 3.80 3.8 0.25 11.40
0+64.2 1.0 9.70 7.00 5.4 0.25 13.10
66.86 cum 69.51 4647.70
S. N. Description No Length Breadth Av. Breadth Height Quantity Unit Rate Amount
E/w in excavation work for road levelling work
1 in BMS 1.0 87.00 4.10 0.25 89.18 cum. 69.51 6198.55
2 Stone soling work
0+000 1.0 0.00 4.00
0+023 1.0 23.00 4.90 4.45 0.12 12.28
0+054 1.0 31.00 4.10 4.50 0.12 16.74
0+062 1.0 8.00 4.10 4.10 0.12 3.94
0+069 1.0 7.00 4.10 4.10 0.12 3.44
0+102 1.0 4.00 4.10 4.10 0.12 1.97
0+116 1.0 14.00 4.10 4.10 0.12 6.89
87.00 25.30 Total 45.26 cum. 3502.5 158523.15
3 P.C.C.(1:2:4) work
0+000 1.0 3.20
0+023 1.0 23.00 4.10 3.65 0.1 6.30
0+054 1.0 31.00 3.30 3.70 0.1 8.60
0+062 1.0 8.00 3.30 3.30 0.1 1.98
0+069 1.0 7.00 3.30 3.30 0.1 1.73
0+102 1.0 4.00 3.30 3.30 0.1 0.99
0+116 1.0 14.00 3.30 3.30 0.1 3.47
Total 23.07 cum. 12129.36 279824.34
4 P.C.C.(1:2:4) work for Gutter 2.0 87.00 0.30 _ 0.1 3.92 cum. 12129.36 47547.09
5 Kerb stone block (50*10*30)cm. 4.0 87.00 348.00 no. 200.00 69600.00
6 form works 26.0 4.00 0.10 10.40 sqm 619.86 6446.54
0.00
10.24
13.95
4.92
0.00 69
0.00
0.00
29.11 cum. 3502.5 101957.78
0.00
8.40
11.47
3.96
0.00
0.00
0.00
23.83 cum. 12129.36 289042.65
2.97 cum. 12129.36 36024.20
264.00 no. 220.00 58080.00
10.80 sqm 619.86 6694.49
Pages Measured By
Name of work Done By
From To Name signature & date
Ishwar
1 1 सिंगापुरे टोलको भित्रिबाटो ढलान User's Commettee
Timilsina
ENTERED
Checked By Remarks
Er Kripa Ranjit
Project :- सिंगापुरे टोलको भित्रिबाटो ढलान
Certified that this books contains 1 Page of pre - numbered measurement sheets.
ts.
g]kfn ;/fsf/
;+3Lo dfldnf tyf :yfgLo ljsf; dGqfno
kf]v/f dxfgu/kflnsf sfof{no
sf:sL kf]v/f
of]hgfsf] gfd M–Renovation of shed & Const. of Compound
sfo{ k'/f ug]{sfo{
wall ldlt –;DkGg
2063/ / k|ltj]bg
sfof{:yfg M– सिंगापुरे टोलको भित्रिबाटो ढलान
sfo{ ;"? ldlt M– @)&
sfo{ ;DkGg ldlt M– @)&
O{li6d]6 cg';f/ v'b nfu]sf] vr{
l;=g ljj/0f
kl/df0f b/ /sd kl/df0f b/
E/w in excavation work for road levelling
1 work in BMS 89.18 69.51 6198.55 66.86 69.51
2 Stone soling work 45.26 3502.50 158523.15 32.09 3502.50
3 P.C.C.(1:2:4) work 23.07 12129.36 279824.34 20.06 12129.36
4 P.C.C.(1:2:4) work for Gutter 3.92 12129.36 47547.09 0.00 12129.36
5 Kerb stone block (50*10*30)cm. 348.00 200.00 69600.00 218.00 200.00
form works 10.40 619.86 6446.54 1.80 619.86
Sub-Total 568139.67
Contengencies @ 3% 17,044.19
Grand Total 585183.86
f; dGqfno
fof{no
g v'b nfu]sf] vr{ :- 98349.82
O{li6d]6 /sdM– 585183.86
O{li6d]6 eGbf a9L jf 36L-163060.54
M– 36L
sfo{ ;DkGg ug]{ dfWod M– pkef]Qmf ;ldlt
b nfu]sf] vr{ km/s kg{ cfPsf] s}lkmot