POKHARA METROPOLITAN CITY

OFFICE OF THE MUNICIPAL EXECUTIVE


NEW ROAD ,KASKI
Date:
Name of project: Singapore Tole Bhitri Bato
Location: Pokhara -12
Code no. :

S. N. Description No Length BreadthAv. BreadthHeight Quantity Unit Rate Amount


E/w in escavation work for road levelling work
1 in BMS 1.0 133.00 4.10 0.20 109.06 cum. 529.94 57795.26
2 Stone soling work
0+000 1.0 0.00 4.00 0.00 0.10 0.00
0+023 1.0 23.00 4.90 4.45 0.10 10.24
0+054 1.0 31.00 4.10 4.50 0.10 13.95
0+062 1.0 8.00 4.10 4.10 0.10 3.28
0+069 1.0 7.00 4.10 4.10 0.10 2.87
0+102 1.0 33.00 4.10 4.10 0.10 13.53
0+133 1.0 31.00 4.10 4.10 0.10 12.71
133.00 25.30 Total 56.58 cum. 3502.5 198171.45

Prepared by: Recomm. by: Approved by:


Sub Er. Padma Paudel(Nepal) Ward Sec. Manju Dhungana Er. Kripa Ranjit
POKHARA METROPOLITAN CITY
OFFICE OF THE MUNICIPAL EXECUTIVE
NEW ROAD ,KASKI
Date:
Name of project: Singapore Tole Bhitri Bato
Location: Pokhara -12
Code no. :

S. N. Description No Length BreadthAv. BreadthHeight Quantity Unit Rate Amount


3 P.C.C.(1:2:4) work
0+000 1.0 0.00 3.20 0.00 0.10 0.00
0+023 1.0 23.00 4.10 3.65 0.10 8.40
0+054 1.0 31.00 3.30 3.70 0.10 11.47
0+062 1.0 8.00 3.30 3.30 0.10 2.64
0+069 1.0 7.00 3.30 3.30 0.10 2.31
0+102 1.0 33.00 3.30 3.30 0.10 10.89
0+133 1.0 31.00 3.30 3.30 0.10 10.23
Total 45.94 cum. 12129.36 557222.80
4 P.C.C.(1:2:4) work for Gutter 2.0 133.00 0.30 _ 0.08 5.99 cum. 12129.36 72654.87
5 Kerb stone block (50*10*30)cm. 2.0 131.00 524.00 no. 200.00 104800.00
6 form works 27.0 4.00 0.10 10.80 sqm 619.86 6694.49

Sub- Total 997338.87


3% contingencies 29920.17
G. Total 1027259.04
Mahanagar 450000.00
User Group 577259.04

Prepared by: Recomm. by: Approved by:


Sub Er. Padma Paudel(Nepal) Ward Sec. Manju Dhungana Er. Kripa Ranjit
POKHARA METROPOLITAN CITY
OFFICE OF THE MUNICIPAL EXECUTIVE
NEW ROAD ,KASKI
Detail Measurement
Date: 2077/10/5
Name of project: सिंगापुरे टोलको भित्रिबाटो ढलान
Location: Pokhara -12

S. N. Description No Length Breadth Av. Breadth Height Quantity Unit Rate Amount
E/w in excavation work for road levelling work
1 in BMS
0+00 1.0 0.00 3.25
0+17 1.0 17.00 4.30 3.775 0.25 16.04
0+27.5 1.0 10.50 4.90 4.6 0.25 12.08
0+42.5 1.0 15.00 3.80 3.80 0.25 14.25
0+54.5 1.0 12.00 3.80 3.8 0.25 11.40
0+64.2 1.0 9.70 7.00 5.4 0.25 13.10
66.86 cum 69.51 4647.70

2 Stone soling work


0+00 1 0 3.25
0+17 1 17 4.3 3.775 0.12 7.70
0+27.5 1 10.5 4.9 4.6 0.12 5.80
0+42.5 1 15 3.8 3.8 0.12 6.84
0+54.5 1 12 3.8 3.8 0.12 5.47
0+64.2 1 9.7 7 5.4 0.12 6.29
Total 32.09 cum. 3502.5 112411.34
3 P.C.C.(1:2:4) work
0+00 1 0 3.25
0+17 1 17 4.3 3.775 0.1 4.81
0+27.5 1 10.5 4.9 4.6 0.1 3.62
0+42.5 1 15 3.8 3.8 0.1 4.28
0+54.5 1 12 3.8 3.8 0.1 3.42
0+64.2 1 9.7 7 5.4 0.1 3.93
Total 20.06 cum. 12129.36 243304.35
4 P.C.C.(1:2:4) work for Gutter 0.0 0.00 0.00 0.0 0.00 cum. 12129.36 0.00
5 Kerb stone block (50*10*30)cm. 218.0 0.00 218.00 no. 200.00 43600.00

Prepared by: Approved by:


Ishwar Timilsina Er.Kripa Ranjit
6 form works 6.0 4.00 0.075 1.80 sqm 619.86 1115.75
Sub- Total 405079.14
3% contingencies 17044.19
G. Total 422123.33

Prepared by: Approved by:


Ishwar Timilsina Er.Kripa Ranjit
POKHARA METROPOLITAN CITY
OFFICE OF THE MUNICIPAL EXECUTIVE
NEW ROAD ,KASKI
Detail Estimate
Date: 2077/6/19
Name of project: सिंगापुरे टोलको भित्रिबाटो ढलान
Location: Pokhara -12

S. N. Description No Length Breadth Av. Breadth Height Quantity Unit Rate Amount
E/w in excavation work for road levelling work
1 in BMS 1.0 87.00 4.10 0.25 89.18 cum. 69.51 6198.55
2 Stone soling work
0+000 1.0 0.00 4.00
0+023 1.0 23.00 4.90 4.45 0.12 12.28
0+054 1.0 31.00 4.10 4.50 0.12 16.74
0+062 1.0 8.00 4.10 4.10 0.12 3.94
0+069 1.0 7.00 4.10 4.10 0.12 3.44
0+102 1.0 4.00 4.10 4.10 0.12 1.97
0+116 1.0 14.00 4.10 4.10 0.12 6.89
87.00 25.30 Total 45.26 cum. 3502.5 158523.15
3 P.C.C.(1:2:4) work
0+000 1.0 3.20
0+023 1.0 23.00 4.10 3.65 0.1 6.30
0+054 1.0 31.00 3.30 3.70 0.1 8.60
0+062 1.0 8.00 3.30 3.30 0.1 1.98
0+069 1.0 7.00 3.30 3.30 0.1 1.73
0+102 1.0 4.00 3.30 3.30 0.1 0.99
0+116 1.0 14.00 3.30 3.30 0.1 3.47
Total 23.07 cum. 12129.36 279824.34
4 P.C.C.(1:2:4) work for Gutter 2.0 87.00 0.30 _ 0.1 3.92 cum. 12129.36 47547.09
5 Kerb stone block (50*10*30)cm. 4.0 87.00 348.00 no. 200.00 69600.00
6 form works 26.0 4.00 0.10 10.40 sqm 619.86 6446.54

Sub- Total 568139.67


3% contingencies 17044.19
G. Total 585183.86
Mahanagar 450000.00

Prepared by: Approved by:


Ishwar Timilsina Er.Kripa Ranjit
User Group 135183.86

Prepared by: Approved by:


Ishwar Timilsina Er.Kripa Ranjit
POKHARA METROPOLITAN CITY
OFFICE OF THE MUNICIPAL EXECUTIVE
NEW ROAD ,KASKI

Name of project: Singapore Tole Bhitri Bato


Location: Pokhara -12
Code no. :

S. N. Description No Length BreadthAv. BreadthHeight


E/w in escavation work for road levelling work
1 in BMS 1.0 66.00 4.10 0.20
2 Stone soling work
0+000 1.0 0.00 4.00 0.00 0.10
0+023 1.0 23.00 4.90 4.45 0.10
0+054 1.0 31.00 4.10 4.50 0.10
0+062 1.0 12.00 4.10 4.10 0.10
0+065 1.0 0.00 4.10 4.10 0.10
0+102 1.0 0.00 4.10 4.10 0.10
0+133 1.0 0.00 4.10 4.10 0.10
66.00 25.30 Total
3 P.C.C.(1:2:4) work
0+000 1.0 0.00 3.20 0.00 0.10
0+023 1.0 23.00 4.10 3.65 0.10
0+054 1.0 31.00 3.30 3.70 0.10
0+062 1.0 12.00 3.30 3.30 0.10
0+069 1.0 0.00 3.30 3.30 0.10
0+102 1.0 0.00 3.30 3.30 0.10
0+133 1.0 0.00 3.30 3.30 0.10
Total
4 P.C.C.(1:2:4) work for Gutter 2.0 66.00 0.30 _ 0.08
5 Kerb stone block (50*10*30)cm. 2.0 66.00
6 form works 27.0 4.00 0.10
ETROPOLITAN CITY
MUNICIPAL EXECUTIVE
ROAD ,KASKI
Date:

Quantity Unit Rate Amount

54.12 cum. 529.94 28680.35

0.00
10.24
13.95
4.92
0.00 69
0.00
0.00
29.11 cum. 3502.5 101957.78

0.00
8.40
11.47
3.96
0.00
0.00
0.00
23.83 cum. 12129.36 289042.65
2.97 cum. 12129.36 36024.20
264.00 no. 220.00 58080.00
10.80 sqm 619.86 6694.49

Sub- Total 520479.47


3% contingencies 15614.38 585000
G. Total 536093.85
Mahanagar 450000.00
User Group 86093.85
INDEX OF MEASUREMENTS ENTERED

Pages Measured By
Name of work Done By
From To Name signature & date

Ishwar
1 1 सिंगापुरे टोलको भित्रिबाटो ढलान User's Commettee
Timilsina
ENTERED

Checked By Remarks

Name Signature & date

Er Kripa Ranjit
Project :- सिंगापुरे टोलको भित्रिबाटो ढलान

Pokhara MetroPolitancity Office


Newroad - 8, Kaski
MEASUREMENT BOOK
Issued To:
Site Incharge: Ishwar Timilsina

Site Name: Pokhara-12

Date of first entry:


Date of last entry:

Certified that this books contains 1 Page of pre - numbered measurement sheets.
ts.
g]kfn ;/fsf/
;+3Lo dfldnf tyf :yfgLo ljsf; dGqfno
kf]v/f dxfgu/kflnsf sfof{no
sf:sL kf]v/f
of]hgfsf] gfd M–Renovation of shed & Const. of Compound
sfo{ k'/f ug]{sfo{
wall ldlt –;DkGg
2063/ / k|ltj]bg
sfof{:yfg M– सिंगापुरे टोलको भित्रिबाटो ढलान
sfo{ ;"? ldlt M– @)&
sfo{ ;DkGg ldlt M– @)&
O{li6d]6 cg';f/ v'b nfu]sf] vr{
l;=g ljj/0f
kl/df0f b/ /sd kl/df0f b/
E/w in excavation work for road levelling
1 work in BMS 89.18 69.51 6198.55 66.86 69.51
2 Stone soling work 45.26 3502.50 158523.15 32.09 3502.50
3 P.C.C.(1:2:4) work 23.07 12129.36 279824.34 20.06 12129.36
4 P.C.C.(1:2:4) work for Gutter 3.92 12129.36 47547.09 0.00 12129.36
5 Kerb stone block (50*10*30)cm. 348.00 200.00 69600.00 218.00 200.00
form works 10.40 619.86 6446.54 1.80 619.86
Sub-Total 568139.67
Contengencies @ 3% 17,044.19
Grand Total 585183.86

तयार पार्ने स्वीकृ त गर्ने


d=n]=k=km=g+= !&^

f; dGqfno
fof{no
g v'b nfu]sf] vr{ :- 98349.82
O{li6d]6 /sdM– 585183.86
O{li6d]6 eGbf a9L jf 36L-163060.54
M– 36L
sfo{ ;DkGg ug]{ dfWod M– pkef]Qmf ;ldlt
b nfu]sf] vr{ km/s kg{ cfPsf] s}lkmot
/sd kl/df0f k|ltzt /sd

4647.70 -22.311 -1550.85


112411.34 -13.165 -46111.81
243304.35 -3.011 -36519.99
0.00 -3.920 -47547.09
43600.00 -130.000 -26000.00
1115.75 -8.600 -5330.80
405079.13 -163060.54
17,044.19 0.00
422123.32 -163060.54