10 Wartsila 18 V38 BGenerator Overhaul Tanzania
10 Wartsila 18 V38 BGenerator Overhaul Tanzania
RESULTS:
Goltens has successfully completed the overhaul of 7 of
these generators to date with the remaining 3 scheduled for
the next 12 months.
All have been delivered within the agreed timeline and
completed full operational testing of the engines prior to In-‐Situ
machining
of
upper
landing
surface
handing it back over to IPTL for return to operation.