Bunker Survey Calculation

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Bunker Survey Calculation

 March 27, 2010  Faisal Yusuf 9956 Views bunker survey, Bunker Survey Calculation, marine cargo surveyor, marine survey

The bunker calculation is simple and needs the following:


– Tank Sounding data and Tank Capacity Table. The Corrected Sounding means below is the
sounding after correcting with vessel’s trim and list.
– Temperature of Oil on Tanks,
– Oil Density @15*C,
– Table ASTM 54B (VCF) and Table ASTM 56 (WCF).

Now we could go with sample of 1 tank to test the calculation.

** Question :
FO Tank No. 1 Center, Corrected Sounding = 3.27 Meter,
Temperature = 34*C,and density @ 15*C = 0.9903 (given density).
Tank Volume at Sounding 3.20 M = 157.20 Cubic Meter,
at Sounding 3.30 M = 163.60 Cubic Meter.

** Answer :
– The Quantity in Metric Ton = Oil Vol x VCF x WCF,
– Observe Volume = {(3.27 – 3.20) / (3.30 – 3.20) x (163.60 – 157.20)} + 157.20
= (0.07/0.10) x (6.40) + 157.20 = 4.48 + 157.20 = 161.68 Cu.M.
– T 54B (VCF) > Density @ 15*C 0.9903 = 0.9870 (see the above picture you need to interpolate if
any different numbers on both columns).
ASTM Table 54B – T 56 (WCF) : Density @15*C 0.9903 = 0.9892
(Quick formula with reducing factor for WCF is Density @ 15*C – 0.0011 = 0.9903 – 0.0011 =
0.9892).
We don’t need to see the table anymore.
– So, The Quantity in MT is 161.68 x 0.9870 x 0.9892 = 157.85 MT.

Sample calculation tanks sounding attached below (the Temp below should be 34 C).

Note : If you do calculation with Volume in Barrel,  just uses ASTM Table 6B for VCF, ASTM Table
11 for WCF in Long Ton and then ASTM Table 13 for WCF in Metric Ton.

You might also like