Over the past few years Global Maritime has worked for operators, drilling contractors, and regulatory
authorities on many aspects of Jack-up design, analysis, guidance and damage investigation.
Major Projects
Company Jack-Ups Project
ENSCO ENSCO 50, 51, 53 and 106 PK and SWP Sites, Offshore India Site Assessment
Rowan Rowan Anchorage Site Specific Study into the loss of the Rowan
Anchorage due to Hurricane IKE
Rowan Canada Rowan Gorilla III Alma and North Triumph, Site Assessment
1
MARINE OFFSHORE AND ENGINEERING CONSULTANTS
JACK- UPS
Major Projects
Company Jack-Ups Project
LaBroy Shipyard Service Jack GM Proprietary Design
Noble Drilling JU2000E Independent Design Verification
Noble Drilling JU2000E North Sea Jack-Up Operational Maps
Rowan LeTourneau 116E, 240C Worldwide Jack-Up Operational Maps
Companies
ENSCO ENSCO 71 Upgrade of additional living quarters
KCA Deutag Various Jack-up Fleet Operations
Signet Maritime Various Consultancy for JU Towing Operations
GlobalSantaFe Main Pass I / High Island IV Dry Transportation, Gulf of Mexico to UAE
Rowan Scooter Yeargain / Hank Dry Transportation, Gulf of Mexico to UAE
Boswell
Rowan Gilbert Rowe / Paris Dry Transportation , Gulf of Mexico to UAE
Rowan California Dry Transportation, Gulf of Mexico to UAE
Rowan Charles Rowan / Arch Rowan / Dry Transportation , Gulf of Mexico to UAE
Middleton
Rowan Gorilla VI Dry Transportation , Halifax to Rotterdam
Noble Drilling Noble Scott Marks Site Assessment for North Sea Operations
Rowan Canada Gorilla III Site Assessment at Deep Panuke
Rowan Various Jack-up Fleet Hurricane Preparedness Study for 2006
and 2007 Hurricane Season
ENSCO 82 SD-C Rig Design Hurricane Collapse Curves
2
MARINE OFFSHORE AND ENGINEERING CONSULTANTS
JACK- UPS
Major Projects
Company Jack-Up Project
Underwriter’s Rig Various Rig Valuation and Hurricane Preparedness Study
Committee
Songa Offshore Songa Neptune Review of reactivation program and reactivation survey
Rowan Companies Various Independent review of jack-up hull salvage operation
LeTourneau Various Assessment of performance during Hurricanes Katrina and Rita
ENSCO ENSCO98 Hurricane preparedness study
ENSCO ENSCO69 Hurricane preparedness study
GlobalSantaFe HIGH ISLAND II Assessment of performance during Hurricane Rita
ENSCO ENSCO69 Assessment of performance during Hurricane Rita
GlobalSantaFe GSF ADRIATIC III Assessment of performance during Hurricane Rita
IADC Various Consequence based preload criteria
Rowan Gorilla VI Site assessments at Lewis Hill and White Rose offshore Nova Scotia
Rowan Various Marine advisor for Rowan rig moves
GlobalSantaFe Constellation II Dry Transportation on the M/V American Cormorant
Noble Drilling Various Location approval for Shelton Franks, Paul Romano, Noble Gene
Rosser, Noble Paul Wolff, Noble Lelster Pettus, Earl Frederickson.
Noble Drilling Various Transportation of four mooring winches for the Homer Ferrington.
Bollard pull calculations for field and ocean tow of Homer Ferrington
ENSCO ENSCO 100 Pushover analyses of the rig as part of the North Sea Safety Case
ENSCO ENSCO 80 Pushover analyses of the rig as part of the North Sea Safety Case
Rowan Gorilla III Site specific assessment at Lewis Hill offshore Nova Scotia
Rowan Gorilla VI Feasibility study at Otway Basin, Australia
LeTourneau Super Gorilla Maine Operation Manual: towing curves
HSE General Study: Impact of Changes to T&R 5-5A on Jack-up Reliability
Rowan General Study: Impact of sudden hurricanes on jack-up’s operational limits
JIP Various Spudcan-Footprint Interaction
3
MARINE OFFSHORE AND ENGINEERING CONSULTANTS
JACK-UPS
JU Operational Map
Service Jack Design
4
MARINE OFFSHORE AND ENGINEERING CONSULTANTS
JACK-UPS
5
MARINE OFFSHORE AND ENGINEERING CONSULTANTS
JACK-UPS
Roll
Towing+Current Speed = 6 knots 4
2500
Total Towing force (tonnes)
TOC5
TOC5 2
1000
1
500 TOC1
0 0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 0 5 10 15 20
Beaufort Scale Period (Sec)
6
MARINE OFFSHORE AND ENGINEERING CONSULTANTS
JACK-UPS
LEG LOAD (MN)
Starboard (+ve) Drill floor offset (B) from Jack-up centerline Port (-ve)
2
1502.1 15.0 12.0 9.0 6.0 3.0 0.0 -3.0 -6.0 -9.0 -12.0 -15.0
46.0 2104 2393 2600 2600 2600 2600 2600 2600 2600 2290 2008
49.0 1816 2084 2394 2600 2600 2600 2600 2600 2283 1981 1720
52.0 1559 1809 2097 2434 2600 2600 2600 2313 1986 1705 1462
Cantilever outreach (A)
55.0 1328 1561 1831 2145 2517 2600 2385 2024 1719 1457 1231
4
58.0 1119 1338 1591 1885 2233 2504 2100 1763 1478 1233 1021
61.0 930 1135 1372 1649 1975 2220 1841 1526 1259 1030 832
64.0 757 950 1173 1433 1740 1960 1605 1309 1059 844 658
67.0 598 780 990 1234 1524 1722 1388 1110 875 674 499
70.0 452 623 821 1052 1325 1502 1188 927 706 516 352
6
12
PRELOAD = 150MN
Leg load with 100% backflow
7
MARINE OFFSHORE AND ENGINEERING CONSULTANTS
JACK-UPS