Over the past few years Global Maritime has worked for operators, drilling contractors, and regulatory
authorities on many aspects of Jack-up design, analysis, guidance and damage investigation.

Major Projects
Company Jack-Ups Project
ENSCO ENSCO 50, 51, 53 and 106 PK and SWP Sites, Offshore India Site Assessment

ENSCO ENSCO 92 Carna Field, North Sea, Site Assessment

ENSCO ENSCO 71 Hull Wastage Effects-Detailed; FE Analysis

ENSCO ENSCO 102 Jasmine Field, North Sea, Site Assessment

ENSCO ENSCO 100 Monkwell, North Sea, Site Assessment

Rowan Rowan Anchorage Site Specific Study into the loss of the Rowan
Anchorage due to Hurricane IKE
Rowan Canada Rowan Gorilla III Alma and North Triumph, Site Assessment

ConocoPhillilps Various Jackup Operations at Chukchi Sea (Arctic)

ENSCO ENSCO 72 Quarters Support Structural Design

Rowan Various Towing resistance curves for Gorilla, Tarzan, 240C,


116C, 84-SDC and 116E class rigs

Rowan Gorilla VII Dry Transportation, North Sea to Angola

Nabors/ADC Dolphin III Dry Transportation , Gulf of Mexico to Angola


Texas

1
MARINE OFFSHORE AND ENGINEERING CONSULTANTS
JACK- UPS
Major Projects
Company Jack-Ups Project
LaBroy Shipyard Service Jack GM Proprietary Design
Noble Drilling JU2000E Independent Design Verification
Noble Drilling JU2000E North Sea Jack-Up Operational Maps
Rowan LeTourneau 116E, 240C Worldwide Jack-Up Operational Maps
Companies
ENSCO ENSCO 71 Upgrade of additional living quarters
KCA Deutag Various Jack-up Fleet Operations
Signet Maritime Various Consultancy for JU Towing Operations
GlobalSantaFe Main Pass I / High Island IV Dry Transportation, Gulf of Mexico to UAE
Rowan Scooter Yeargain / Hank Dry Transportation, Gulf of Mexico to UAE
Boswell
Rowan Gilbert Rowe / Paris Dry Transportation , Gulf of Mexico to UAE
Rowan California Dry Transportation, Gulf of Mexico to UAE
Rowan Charles Rowan / Arch Rowan / Dry Transportation , Gulf of Mexico to UAE
Middleton
Rowan Gorilla VI Dry Transportation , Halifax to Rotterdam
Noble Drilling Noble Scott Marks Site Assessment for North Sea Operations
Rowan Canada Gorilla III Site Assessment at Deep Panuke
Rowan Various Jack-up Fleet Hurricane Preparedness Study for 2006
and 2007 Hurricane Season
ENSCO 82 SD-C Rig Design Hurricane Collapse Curves

2
MARINE OFFSHORE AND ENGINEERING CONSULTANTS
JACK- UPS
Major Projects
Company Jack-Up Project
Underwriter’s Rig Various Rig Valuation and Hurricane Preparedness Study
Committee
Songa Offshore Songa Neptune Review of reactivation program and reactivation survey
Rowan Companies Various Independent review of jack-up hull salvage operation
LeTourneau Various Assessment of performance during Hurricanes Katrina and Rita
ENSCO ENSCO98 Hurricane preparedness study
ENSCO ENSCO69 Hurricane preparedness study
GlobalSantaFe HIGH ISLAND II Assessment of performance during Hurricane Rita
ENSCO ENSCO69 Assessment of performance during Hurricane Rita
GlobalSantaFe GSF ADRIATIC III Assessment of performance during Hurricane Rita
IADC Various Consequence based preload criteria
Rowan Gorilla VI Site assessments at Lewis Hill and White Rose offshore Nova Scotia
Rowan Various Marine advisor for Rowan rig moves
GlobalSantaFe Constellation II Dry Transportation on the M/V American Cormorant
Noble Drilling Various Location approval for Shelton Franks, Paul Romano, Noble Gene
Rosser, Noble Paul Wolff, Noble Lelster Pettus, Earl Frederickson.
Noble Drilling Various Transportation of four mooring winches for the Homer Ferrington.
Bollard pull calculations for field and ocean tow of Homer Ferrington
ENSCO ENSCO 100 Pushover analyses of the rig as part of the North Sea Safety Case
ENSCO ENSCO 80 Pushover analyses of the rig as part of the North Sea Safety Case
Rowan Gorilla III Site specific assessment at Lewis Hill offshore Nova Scotia
Rowan Gorilla VI Feasibility study at Otway Basin, Australia
LeTourneau Super Gorilla Maine Operation Manual: towing curves
HSE General Study: Impact of Changes to T&R 5-5A on Jack-up Reliability
Rowan General Study: Impact of sudden hurricanes on jack-up’s operational limits
JIP Various Spudcan-Footprint Interaction

Detailed structural modeling of jack-ups

3
MARINE OFFSHORE AND ENGINEERING CONSULTANTS
JACK-UPS
JU Operational Map
Service Jack Design

Company Jack-ups Project


GlobalSantaFe Galaxy Goldeneye feasibility study incorporating leg extension design.
Underwriters Various Operations review—audit of operations of drilling contractors - examining
operations, maintenance, HSE/Safety, asset risk control, vessel condition
(structural and drilling equipment).
ENSCO ENSCO 101 Pushover analysis of the rig for the North Sea safety case.
ENSCO ENSCO 85 Pushover analysis of the rig for the North Sea safety case.
GlobalSantaFe New Build New build operating capability review.
GlobalSantaFe F&G Mod. VI Site specific assessment at Skene, UK North Sea
BHP Billiton Douglas DA 116-C Jacking system verification scheme and inspection.
Unocal Seafox I Spudcan modification design for extended (10 year) operations as a mobile
production unit
LeTourneau Various Consultancy on jack-up motion analysis with MOSES
GlobalSantaFe F&G Mod VI Site specific assessments at Otway Basin, Australia
GlobalSantaFe F&G Mod VI Site specific assessments at Tierra del Fuego, Argentina
ENSCO ENSCO 102 Pushover analysis of the rig for the North Sea safety case
ENSCO ENSCO 70 Pushover analysis of the rig for the North Sea safety case
GlobalSantaFe MLT-116c Site specific assessment at Tapis-F (Malaysia).
GlobalSantaFe MLT-116c Rig upgrade: Glomar Adriatic IV
GlobalSantaFe MLT-116c Site specific assessment offshore Tunisia.
STATOIL Various Screening study for South Pass.
GlobalSantaFe MLT-116c Site specific assessment at Amenan (Nigeria).
GlobalSantaFe MLT-116c Site specific assessment at Dutch North Sea

4
MARINE OFFSHORE AND ENGINEERING CONSULTANTS
JACK-UPS

Company Jack-ups Project


GlobalSantaFe F&G Mod. V Site assessment: ETAP (UK North Sea), Otway Basin (Australia),
Tierra del Fuego (Argentina).
GlobalSantaFe MLT 116C Site assessment: Serudon, Bintang-A, Binatang-B, Irong Barat,
GlobalSantaFe F&G Mod II Rig upgrade: GLOMAR MAIN PASS IV.
GlobalSantaFe Baker Marine Site assessment: Parameswara at Bass Straits
GlobalSantaFe General Technical Study: Reduction in T&R 5-5A Load Factors
GlobalSantaFe General Warranty survey: Transportation of Glomar Adriatic IX from GoM to
Angola, Glomar Highland III from Gabon to GoM
Noble Drilling MLT 84SD Site Assessment: Viosca Knoll Block 900
Noble Drilling Baker Marine Technical Study: feasibility of operating Noble Julie Robertson off-
shore Sable Island
Rowan MLT Technical Study: return period for site assessment in the GoM:
116C/84S/116S Rowan Odessa, Rowan Fort Worth, Gilbert Rowe, Rowan Alaska and
Rowan Louisana.
Rowan Super Gorilla class Collapse and reliability analysis: Arbroath (North Sea)
Rowan Canada Super Gorilla class Site assessment: Thebauld, Panuke, Venture, Southampton, Marquis
(nova Scotia)
Rowan Canada MLT Gorilla III Site assessments: Panuke and Southhampton
LeTourneau Super Gorilla class Marine Operation Manual: towing curves
IADC General Technical Study: Improvement of the North Sea Annex of T&R 5-5A
IADC General Seminar: Reliability Analysis of Jack-ups
HSE General Technical Study: Impact of Changes to T&R 5-5A on Jack-up Reli-
ability
IADC Jack-up Committee Technical study on the reliability of jack-ups and conservatism of
SNAME bulletin 5-5A assessment criteria

FE analyses of jack-up structural details

5
MARINE OFFSHORE AND ENGINEERING CONSULTANTS
JACK-UPS

Pushover FE analyses of jack-up structure

Company Jack-up Project


Health and Recommendations The risks of damage resulting from possible contact between fixed in-
Safety for guidance stallations and jack-ups maneuvering into tender-assist and similar modes.
Executive The procedure was developed in consultation with Santa Fe.
Santa Fe Drilling Galveston Key Development of rapid assessment charts for drilling operations in south-
Co (North Sea) ern North Sea based on site specific assessments, pre-loads and overturn-
ing checks and excessive pinion reactions. Vessel impacts, towage and
touch down analyses were also performed.
LeTourneau Super Gorilla classs Motions analysis of a ‘Super’ Gorrila

Roll
Towing+Current Speed = 6 knots 4
2500
Total Towing force (tonnes)

TOC1 Head Sea


2000 TOC2 3 Quarter Sea
TOC3
TOC4 Beam Sea
1500
Deg/m

TOC5
TOC5 2
1000

1
500 TOC1

0 0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 0 5 10 15 20
Beaufort Scale Period (Sec)

Jack-up towing curve Jack-up motion study

6
MARINE OFFSHORE AND ENGINEERING CONSULTANTS
JACK-UPS
LEG LOAD (MN)

0 100 200 300 400 500


Cantilever Load Calculation 0
Allowable Load Chart
Mod V1 (Galaxy)
Edit data in cells with blue text Units in tonnes and meters

Starboard (+ve) Drill floor offset (B) from Jack-up centerline Port (-ve)
2
1502.1 15.0 12.0 9.0 6.0 3.0 0.0 -3.0 -6.0 -9.0 -12.0 -15.0
46.0 2104 2393 2600 2600 2600 2600 2600 2600 2600 2290 2008
49.0 1816 2084 2394 2600 2600 2600 2600 2600 2283 1981 1720
52.0 1559 1809 2097 2434 2600 2600 2600 2313 1986 1705 1462
Cantilever outreach (A)

55.0 1328 1561 1831 2145 2517 2600 2385 2024 1719 1457 1231
4
58.0 1119 1338 1591 1885 2233 2504 2100 1763 1478 1233 1021
61.0 930 1135 1372 1649 1975 2220 1841 1526 1259 1030 832
64.0 757 950 1173 1433 1740 1960 1605 1309 1059 844 658
67.0 598 780 990 1234 1524 1722 1388 1110 875 674 499
70.0 452 623 821 1052 1325 1502 1188 927 706 516 352
6

TIP DEPTH (m)


70
0 The allowable loads indicated above are defined as the load additional to the weights specified
below that can be supported at the rotary center. The values below may be modified by adjusting
the appropriate Drill Floor or Cantilever Weight sheet.

+ve Stbd. -ve Port 8


Analysis parameters:
Rotary Offset (B)
Conductor Tensioner Load = 0.00 k
Setback Load = 0.00 k
Elevated Pipe Rack Load = 0.00 k
BOP Load = 0.00 k 10
Cantilever
Mud Return Load = 0.00 k
Outreach
( A) Miscellaneous Loads = 0.00 k
Total Drill Floor Weight = 1966.00 k
Total Cantilever Weight = 2026.00 k

12
PRELOAD = 150MN
Leg load with 100% backflow

Leg load without backflow

Special Expertise such as punch through analysis 14

and load chart calculations

Company Jack-Ups Project


Total Joint Industry Detailed non-linear motions, structural and seabed investigations into the
Arco British Project impact forces arising during touch down for a wide variety of soil types
and leg elevations. Specific technical input received from Marathon Le
Tourneau and Friede & Goldman on 116-C and L780 MOD V rigs used in
the studies. End product was on-board software to determine risk of struc-
tural damage.
Rowan Rowan Gorilla V Marine advisor for the Mississippi River transit from fabrication yard to
fitting out yard and dry transportation from Texas to Rotterdam. Work
included development of marine procedures and liaison with USCG.
Statoil Fields 9/2 and Site specific assessments including fatigue analysis of rigs West Omikrom
15/2 and Maersk Endeavour for production. Foundation fixity effects were ex-
amined in detail and a foundation frame was also sized and costed.
BP Early Production Study of the use of jack-up rigs as early production systems. Identification
Systems of generic types and individual rigs. The areas of study were environ-
mental loading, structural adequacy, available deck space and services.
Hamilton Oil Liverpool Bay Production of Statutory Operations Manual for certification after conver-
Company sion of unit to an accommodation and services platform in the Douglas
field. Structural and stability analyses performed to support guidance in
manual.
Solicitor Key Biscayne Retained as independent technical consultants following damage to this
unit while under tow. Areas of particular interest were the analysis of al-
lowable leg length under tow, the structural integrity of jack houses and
the finite element analysis of leg guides, jack house and associated support
structures under severe environmental load.

7
MARINE OFFSHORE AND ENGINEERING CONSULTANTS
JACK-UPS

Company Jack-Ups Project


Solicitor Ocean Champion Technical advisers to charterers following major
damage to mat and leg structures. Work included
analysis of soil conditions and environment, structural
analysis of mat, legs, jack house and support structures.

Solicitor AV1 Technical consultants to parties engaged in the arbitration


relating to AV1. Work included in depth analysis of the
soil conditions, environmental conditions, and structural
adequacy of the jack- up, both as designed and as
constructed, in order to identify the reason for the failure of
the jacking and support system of this new-built vessel.
British Gas Slant Drilling Rigs Consultants to British Gas Insurance Department on
various aspects of these rigs.

Solicitor Jay Robertson Technical consultants investigating the causes of sinking of


this jack up while under tow from USA to Argentina with
full leg length installed

American Global Maritime Inc. London +44 207 922 8900


11767 Katy Freeway, Suite 660 Aberdeen +44 1224 625600
Houston, Texas 77079 Stavanger +47 51 81 61 61
Fax: +1 281 558 0541 Shanghai +86 21 5835 6662
Watts: +1 888 209 6569 Singapore +65 6238 1811
Email: agm@globalmaritimeus.com Vung Tau +84 64 352 6700
Website: www.globalmaritime.com Jakarta +6221 5316 4426
Baku +994 12 4 97 8932