Bi-bccp-00-Cem-157-Mg-0013 r1 Piping Isometric For Potable Water System

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 25

220 MW (GAS) / 212 MW (HSD)

NET COMBINED CYCLE Document ISOMETRIC DRAWINGS FOR


Project POWER PROJECT AT BHOLA,
Title POTABLE WATER SYSTEM
BANGLADESH
Document Number BI-BCCP-00-CEM-157-MG-0013 Revision R1 Sheets 24

220 MW (GAS) / 212 MW (HSD) NET COMBINED


PROJECT: CYCLE POWER PROJECT AT BHOLA,
BANGLADESH

OWNER:
NUTAN BIDYUT (BANGLADESH) LIMITED,
BANGLADESH

ENGINEERING CONSULTANT:
L&T-SARGENT & LUNDY LTD.

EPC CONTRACTOR:
Bisho Infra Projects Limited
(EPC)

ISOMETRIC DRAWINGS FOR POTABLE


DOCUMENT TITLE:
WATER SYSTEM

DOCUMENT NUMBER: BI-BCCP-00-CEM-157-MG-0013

REVISION STATUS
SIGN

INITIAL

SIGN
ISSUED FOR
R1 25-JAN-2019
CONSTRUCTION
INITIAL DDP MRB SUB -- -- -- -- -- SUB

SIGN
SUBMITTED FOR
R0 30-NOV-2018
INFORMATION
INITIAL DDP MRB SUB -- -- -- -- -- SUB

CV EL IC ME QA APP
APP
DSN CHD ROV DETAILS OF REVISION DATE
D CLEARED
REV ED

L&T-S&L SP

(This document is a property of SP. This is not transferable and shall not be used for any purpose other than
for which it is intended)
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FABRICATION MATERIALS
0M
N 80
45
.
ITEM SIZE SCHEDULE/
N QTY. DESCRIPTION
75 C
L. NO. (DN / MM) RATING
15 O
M F M
TA 1 3.3 M 80 10S PIPE, ASTM A 312 GRADE TP304L, ASME B36.19M
N
K
2 0.7 M 40 40S PIPE, ASTM A 312 GRADE TP304L, ASME B36.19M
E
32 3 1 80X80 10S TEE, ASTM A 403 GRADE WP304L, ASME B16.9
4.
50
1M 4 2 80X40 10S ECCENTRIC REDUCER (FOT), ASTM A 403 GRADE WP304L, ASME B16.9

CONN. TO 5 2 80X25 CLASS 3000 SOCKOLET, ASTM A 182 GRADE F304L, MSS SP-97
00GKB10BB001 6 3 80 10S 90 DEG LR ELBOW, ASTM A 403 GRADE WP304L, ASME B16.9
6 1
1 NOZZLE-N2
7 2 40 CLASS 3000 90 DEG SW ELBOW, ASTM A 182 GRADE F304L, ASME B16.11
90.0° 2 POTABLE WATER TANK
37 8 2 40 CLASS 3000 SOCKET WELDED COUPLING, ASTM A 182 GRADE F304L, ASME B16.11
E 322.554M E 322.926M
N 80.450M N 80.450M
L L
EL +0.700M EL +0.700M

ERECTION MATERIALS

ITEM SIZE SCHEDULE/

3 2
EL +0.700M QTY. DESCRIPTION
NO. (DN) RATING

9 1 80 SPECIALTY, TEMP STRAINER

10 1 80 CLASS 150 00GKB11AA001, GLOBE VALVE,WITH BUTT WELD ENDS

11 1 80 CLASS 150 00GKB12AA001, GLOBE VALVE,WITH BUTT WELD ENDS


K K
12 1 80 SPECIALTY, TEMP STRAINER

1
6
90.0°
E 322.554M
N 81.513M
EL +0.247M 00GKB10BR001-DN80

40
9
E 321.857M
HOLD LIST:
N 81.513M 1 7 6
J
EL +0.247M 8 10
J

62
DRAIN LINE
LINE: 00GKB11BR401-DN25 9
9 31 00GKB11-BQ295G

10 NOTES:
5 1
ORIEN. DIR.=
10 00GKB11AA001
01. FOR GENERAL NOTES & LEGENDS REFER DWG. NO.: BI-BCCP-00-CEM-124-MG-002.
DOWN 8 02. ALL DIMENSIONS ARE IN MM AND ELEVATIONS AND CO- ORDINATES ARE IN METER UNLESS NOTED OTHERWISE.
37
90.0° 03. ELEVATION EL(+)0.000 CORRESPONDS TO RL 4.400M,WHICH IS THE FINISHED FLOOR LEVEL OF STEAM TURBINE
1
GENERATOR BUILDING.
I 04. TOP OF PAVING IN THE MAIN PLANT AREA, COVERING GTG & STG ISLAND IS AT EL(-)0.150 AND FINISHED GRADE I

4 LEVEL OF PLANT IS AT EL(-)0.300M UNLESS OTHERWISE SPECIFIED.


E 321.857M 3
00GKB11-BQ294G 05. ELEVATION (EL.) SHOWN ON THE DRAWING IS THE CENTER OF PIPE ELEVATION UNLESS NOTED OTHERWISE.
N 81.513M E 322.554M 5 20 06. BILL OF MATERIAL SHOWN ON THE DRAWING IS FOR ESTABLISHING APPROXIMATE PIPE LENGTHS AND
EL +0.169M N 80.450M 5
PIPE FITTINGS / COMPONENTS.NO ALLOWANCES ARE CONSIDERED IN BILL OF MATERIAL.
EL +0.247M 19 07. PIPING SYSTEMS SHALL BE FABRICATED AND ERECTED IN ACCORDANCE WITH ASME B31.1.
9 43 08. NO COLD PULL IS PERMISSIBLE.
8
9 09. FOR DESIGN PRESSURE, TEMPERATURE AND INSULATION THICKNESS REFER PIPELINE LIST
00GKB11AT001
39 DOC. NO. GI-BCCP-00-CEM-113-GM-0003.
4 11 10. PIPING SYSTEM SHALL CONFIRM TO MATERIAL SPECIFICATION PDT BHL-0101, UNLESS NOTED OTHERWISE.
3 11. ALL PIPES 40 NB AND BELOW AS ROUTED ARE INDICATIVE AND TO GUIDE ROUTING AT SITE,
21MM OFFSET 23
H H
ANY MODIFICATION REQUIRED FOR AVOIDING INTERFERENCE OR FOR BETTER ACCESS MAY BE CARRIED OUT
12 AT SITE DURING ERECTION.
00GKB12-BQ296R 12. INLINE COMPONENT LENGTH SUCH AS VALVES, STRAINERS, SIGHT GLASS, ETC. SHALL BE VERIFIED AT SITE
13 BEFORE CUTTING ADJACENT PIPE.
15 14 1 1 6
13. IF CARD BOARD BLASTING METHOD IS EMPLOYED FOR PIPE LINE CLEANING, SUITABLE ARRANGEMENT SHALL BE
90.0°
00GKB12BR001-DN80
20 DONE TO SUIT AT SITE.
8 E 322.554M 14. ALL PIPING TERMINAL POINT LOCATION AND SIZE TO BE MODIFY AT SITE BASED ON ACTUAL TERMINAL
2 N 80.013M
48 POINT AVAILABILITY.
1 EL +0.247M
29 15. SW FULL COUPLING SHALL BE USED FOR JOINING PIPE HAVING LENGTH MORE THAN 6M AND UNION SHALL BE
2 E 321.857M USED AT EVERY 24 M OF STRAIGHT SPOOL LENGTH AS SHOWN IN DESIGN DRAWINGS OR AS REQUIRED BY
N 80.013M
1 21 ERECTOR.SW FULL COUPLING AND UNION CLASS RATING SHALL BE SAME AS OTHER FITTINGS USED IN DESIGN
EL +0.247M 22 DRAWINGS.
9
7 16 DRAIN LINE
90.0° 202 LINE: 00GKB12BR401-DN25 23 31
9
38
E 320.445M
N 81.513M REFERENCE DRAWINGS:
00GKB11-BQ293R
EL +0.267M 16 E 321.857M
17 N 80.013M
24 DRAWING NO. DRAWING TITLE

8 GI-BCCP-00-CEM-157-IF-0011 P&ID FOR POTABLE WATER SYSTEM


EL +0.169M 37 11
2 00GKB11BR001-DN80
00GKB12AA001 GI-BCCP-00-VEM-114-MB-0011 GA OF PLANT POTABLE WATER PUMPS

GI-BCCP-00-CEM-151-MB-0039 GA OF POTABLE WATER TANK


F F

5
00GKB12-BQ297G
ORIEN. DIR.=
5
15 18 16 DOWN
7
90.0°

12
CONN. TO 00GKB12AT001 9
39
00GKB11AP001 1
SUCTION 4
25
POTABLE WATER PUMP-A 21MM OFFSET
E
E 320.445M
26 E

N 81.356M
EL +0.267M 27
29 28 1

8 1
48
1
29
00GKB12-BQ298R
NG.

2
D 12 D
TI

1 25-JAN-19 ISSUED FOR CONSTRUCTION DDP MRB MKA SIB MCC --- SUB
N W RI

7
2 0 30-NOV-18 ISSUED FOR CONSTRUCTION DDP MRB MKA CK MUM --- SUB
ON I

90.0°
SSI

E 320.445M 38 REV. DATE DESCRIPTION PREP MECH ELEC CIVIL C&I SES APPD.
R PERM I

202
N 80.013M
STAMP:
EL +0.267M
31 30
THOUT THEI

CONN. TO
00GKB12AP001
ED OR LENT W I

CAP SUCTION
POTABLE WATER PUMP-B
CLOF PIPE GENERALLY REVISED
75 M M

C C
E 320.445M
N 79.856M
TED AND M UST NOT BE COPI

25 NB PIPE
2 EL +0.267M
15
7 32 1
220 MW (GAS) / 212 MW (HSD) NET
SOCKET END
BALL VALVE PROJECT: COMBINED CYCLE POWER PROJECT
REDUCING TEE 25NB
AT BHOLA, BANGLADESH
75 M M
75 M M

25 NB PIPE
MI

25 NB PIPE OWNER: NUTAN BIDYUT (BANGLADESH) LTD.


S THE PROPERTY OF L&T -SARGENT & LUNDY LI

B B
ONSHORE
CONTRACTOR: BISHO INFRA PROJECTS LIMITED
SOCKET END BALL VALVE
REDUCING TEE 25NB ONSHORE
CONSULTANT: L & T - SARGENT & LUNDY LIMITED
25 NB PIPE
75 M M

CL OF PIPE DATE NAME SIGN TITLE:

PREPARED 30-NOV-18 DDP ISOMETRIC DRAWING FOR


CAP
SPECIAL NOTES: CHECKED 30-NOV-18 MRB POTABLE WATER SYSTEM
GN I
NG AND DESI

A A
01. CONTRACTOR/INSTALLER SHALL TAKE ALL APPROPRIATE PRECAUTIONS TO ENSURE APPROVED 30-NOV-18 SUB

TYPICAL VENT PIPING TYPICAL DRAIN PIPING THE SAFETY OF ALL PEOPLE LOCATED ON THE WORK SITE INCLUDING CONTRACTOR/

841m m x 594m m )
DEPARTMENT: MECHANICAL
INSTALLER'S PERSONNEL (OR THAT OF ITS SUBCONTRACTOR(S)) PERFORMING THE WORK.
S DRAW I

02. THE PDF FORMAT OF THE ELECTRONIC FILE OF THIS DRAWING IS FOR IMPLEMENTATION, L&T-S&L JOB NO.: FD18090000
THE ELECTRONIC FILE OF THE DRAWING IN ANY OTHER FORMAT IS FOR INFORMATION. DRAWING NO.: BI-BCCP-00-CEM-157-MG-0013 SCALE:NONE SHEET: 01 OF 24 REV. 1
THI

A1 (
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

CAD FILE NAME:BI-BCCP-00-CEM-157-MG-0013-01.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FABRICATION MATERIALS
N ITEM SIZE SCHEDULE/
QTY. DESCRIPTION
NO. (DN / MM) RATING
M M
1 8.8 M 50 40S PIPE, ASTM A 312 GRADE TP304L, ASME B36.19M

2 0.4 M 32 40S PIPE, ASTM A 312 GRADE TP304L, ASME B36.19M

3 1 50X50 CLASS 3000 SOCKET WELDED TEE, ASTM A 182 GRADE F304L, ASME B16.11

4 2 50X32 CLASS 3000 SW REDUCING COUPLING, ASTM A 182 GRADE F304L, ASME B16.11

5 4 50X25 CLASS 3000 SW REDUCING TEE, ASTM A 182 GRADE F304L, ASME B16.11

6 6 50 CLASS 3000 90 DEG SW ELBOW, ASTM A 182 GRADE F304L, ASME B16.11

7 2 32 CLASS 3000 90 DEG SW ELBOW, ASTM A 182 GRADE F304L, ASME B16.11

8 2 32 CLASS 3000 SOCKET WELDED COUPLING, ASTM A 182 GRADE F304L, ASME B16.11

L L

K K

6 ERECTION MATERIALS
90.0° 6
E 319.254M 90.0° ITEM SIZE SCHEDULE/
QTY. DESCRIPTION
N 81.651M E 320.774M NO. (DN) RATING
EL +2.330M N 81.651M 9 1 50 CLASS 600 00GKB11AA201, CHECK VALVE,WITH SOCKET WELD ENDS
EL +0.588M
164 10 1 50 CLASS 600 00GKB11AA101, GLOBE VALVE,WITH SOCKET WELD ENDS
13
J 4 J
11 1 50 CLASS 600 00GKB12AA101, GLOBE VALVE,WITH SOCKET WELD ENDS
6 38
26 0 12 1 50 CLASS 600 00GKB12AA201, CHECK VALVE,WITH SOCKET WELD ENDS
16
7

1 90.0°
17
3
8 7 11
E 320.774M
5 N 81.201M
17 18
EL +0.588M
1
4 2
8
11
99 37 6 5
4 HOLD LIST:
I 9 00GKB11-BQ287R I
1 10 8
11 3 2
1

00GKB11-BQ289G
8
37
12 9
5 00GKB11AA201
1 E 320.130M 0M

2
N 81.651M 45
.
80
EL +0.588M N
C
L
DRAIN LINE W .O
AT F
NOTES:
ER PO
H LINE: 00GKB11BR402-DN25 H
1 00GKB11BR002-DN50
26 TA TA 01. FOR GENERAL NOTES & LEGENDS REFER DWG. NO.BI-BCCP-00-CEM-157-MG-0013-01
19 E 320.130M 37 N BLE
K
N 81.651M E
32
4.
EL +0.535M 50
6 1M
13 12
CONN. TO
1
00GKB11-BQ288G 12
3 14 5 00GKB11AP001 90.0°

8 00GKB12-BQ290R DISCHARGE E 320.774M


49 39 38 75
0 N 80.151M
30 POTABLE WATER PUMP-A
1 E 320.774M EL +0.588M
1
5 00GKB12BR002-DN50 N 81.201M
5 3
E 318.647M 23 EL +0.422M 164
E 319.254M 13
N 80.452M
N 80.452M 4
EL +2.330M
1 30 CONT. ON EL +2.330M
1
6
38
26 1 4
16 15 27 26
1
6 1 LINE: 00GKB20BR115-DN25
6
90.0°
E 318.647M
31 5 BI-BCCP-00-CEM-157-MG-0113-SHT.01
N 80.506M
E 319.019M
90.0°
6 REFERENCE DRAWINGS:
E 319.254M E 319.019M 10
EL +2.330M 37 E 319.254M 11
N 81.651M
33
N 80.452M N 80.452M 36 N 80.151M 25
5 DRAWING NO. DRAWING TITLE
32 37
2
EL +2.330M EL +2.384M
2
EL +0.588M EL +2.330M 24 23
28 7
00GKB20-BQ285G 37
8 29 00GKB12-BQ292R
90.0°
10 1 8
18 PT E 320.774M
F 11 30 22 F
00GKB20 00GKB11AA101 21 N 79.701M
1 CP101 12 EL +0.588M
54
37
8 31
31 00GKB12AA201
18 5
1 E 320.130M
N 80.151M
EL +0.588M

32 0M
45
33 DRAIN LINE
80
.
1

1 LINE: 00GKB12BR402-DN25 N
00GKB20BR001-DN50 C
E 320.130M L
E W .O E
6 AT F
CONT. ON N 80.151M ER PO
35 34
90.0° 11
DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.03 EL +0.535M TA TA
E 319.254M N BLE
8 00GKB12AA101 K
E 316.815M 5 49 E
N 80.151M 37 32
N 80.452M 4.
EL +0.588M 50
EL +2.330M 1M

EL +0.588M 26
37

2
00GKB12-BQ291G

20
NG.

D D
TI

1 25-JAN-19 ISSUED FOR CONSTRUCTION DDP MRB MKA SIB MCC --- SUB
N W RI

75
0
0 30-NOV-18 ISSUED FOR CONSTRUCTION DDP MRB MKA CK MUM --- SUB
ON I
SSI

REV. DATE DESCRIPTION PREP MECH ELEC CIVIL C&I SES APPD.
R PERM I

STAMP:
THOUT THEI

CONN. TO
00GKB12AP001
ED OR LENT W I

DISCHARGE
POTABLE WATER PUMP-B
C E 320.774M C

N 79.701M
TED AND M UST NOT BE COPI

EL +0.422M

220 MW (GAS) / 212 MW (HSD) NET


PROJECT: COMBINED CYCLE POWER PROJECT
GENERALLY REVISED
AT BHOLA, BANGLADESH
MI

OWNER: NUTAN BIDYUT (BANGLADESH) LTD.


S THE PROPERTY OF L&T -SARGENT & LUNDY LI

1
B B
ONSHORE
CONTRACTOR: BISHO INFRA PROJECTS LIMITED

ONSHORE
CONSULTANT: L & T - SARGENT & LUNDY LIMITED

DATE NAME SIGN TITLE:

PREPARED 30-NOV-18 DDP ISOMETRIC DRAWING FOR


SPECIAL NOTES: CHECKED 30-NOV-18 MRB POTABLE WATER SYSTEM
GN I
NG AND DESI

A A
01. CONTRACTOR/INSTALLER SHALL TAKE ALL APPROPRIATE PRECAUTIONS TO ENSURE APPROVED 30-NOV-18 SUB
THE SAFETY OF ALL PEOPLE LOCATED ON THE WORK SITE INCLUDING CONTRACTOR/

841m m x 594m m )
DEPARTMENT: MECHANICAL
INSTALLER'S PERSONNEL (OR THAT OF ITS SUBCONTRACTOR(S)) PERFORMING THE WORK.
S DRAW I

02. THE PDF FORMAT OF THE ELECTRONIC FILE OF THIS DRAWING IS FOR IMPLEMENTATION, L&T-S&L JOB NO.: FD18090000
THE ELECTRONIC FILE OF THE DRAWING IN ANY OTHER FORMAT IS FOR INFORMATION. DRAWING NO.: BI-BCCP-00-CEM-157-MG-0013 SCALE:NONE SHEET: 02 OF 24 REV. 1
THI

A1 (
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

CAD FILE NAME:BI-BCCP-00-CEM-157-MG-0013-02.DGN

50mm
M0-GKB-130501-1
00GKB12AA201
D64432C2-9C09-449C-9E99-8AA48FD18809
A597BFF3-AF33-4C54-9EC7-7879B930ABC4
C388584B-DE09-4EDB-B01E-CFB1B505BD21
88871190-156B-4C16-B0C0-6D24C65BECEB
990F8E08-3A57-44C2-B914-3DDD58834B2A
A50AF3AA-ACE0-4695-BA29-964C52836EBD
3DEC674C-058D-4A7B-9FA3-A742D762ACB1
M
E82E6A5D-21EE-4D22-8D80-747EE6C03F55
50mm
0
B1BCAACA-46C9-4187-A241-B010643D8F20
0-GKB-130501-1
DNXX
WS 00GKB12AA201
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FABRICATION MATERIALS
N 5 ITEM SIZE SCHEDULE/
QTY. DESCRIPTION
90.0° NO. (DN / MM) RATING
M E 316.761M 3 4 1 22.0 M 50 40S PIPE, ASTM A 312 GRADE TP304L, ASME B36.19M
M

N 80.452M
00GKB20-BQ284R 2 1 50X50 CLASS 3000 SOCKET WELDED TEE, ASTM A 182 GRADE F304L, ASME B16.11
EL +3.033M
3 1 50X25 CLASS 3000 SW REDUCING TEE, ASTM A 182 GRADE F304L, ASME B16.11

4 1 50X25 CLASS 3000 SW REDUCING COUPLING, ASTM A 182 GRADE F304L, ASME B16.11
20
1
5 5 50 CLASS 3000 90 DEG SW ELBOW, ASTM A 182 GRADE F304L, ASME B16.11

6 1 25 CLASS 3000 SOCKET WELDED COUPLING, ASTM A 182 GRADE F304L, ASME B16.11
00GKB20-BQ283G

1
5
30
00
L L
5
90.0°
E 316.761M 00GKB20-BQ282R
N 80.452M
EL +2.330M 30
1 00
2 54

6 00GKB20-BQ281R

CONT. ON
K DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.02 30 K
00
E 316.815M
N 80.452M 15
86
EL +2.330M 0
00GKB20-BQ280G
ERECTION MATERIALS
30
00 ITEM SIZE SCHEDULE/
QTY. DESCRIPTION
VENT LINE NO. (DN) RATING
LINE: 00GKB20BR501-DN25
00GKB20-BQ279R E 316.761M
N 64.592M
J J
25 EL +3.087M
12

3
1
E 316.761M
N 64.592M
EL +3.033M

7 5
HOLD LIST:
1 90.0°
I
8 E 316.761M
164 I

N 64.369M
9 10 EL +3.033M
CONT. ON
22
2 LINE: 00GKB20BR117-DN25
DWG : DWG:BI-BCCP-00-CEM-157-MG-0113-SHT.02
38 E 317.137M
N 64.369M
4
17 EL +2.220M
1 NOTES:

1
13 14
H 6 H
01. FOR GENERAL NOTES & LEGENDS REFER DWG. NO.BI-BCCP-00-CEM-157-MG-0013-01

4
11 13MM OFFSET
2
E 316.761M

7
12 N 64.369M
33 98 EL +2.233M
EL +2.233M
14
15

5
90.0°
E 315.328M 1
N 64.369M
EL +2.233M REFERENCE DRAWINGS:
00GKB20-BQ116G DRAWING NO. DRAWING TITLE
16
17

F F

E E
1

18 19
EL +0.133M
NG.

D D
TI

00GKB20-BQ115R 1 25-JAN-19 ISSUED FOR CONSTRUCTION DDP MRB MKA SIB MCC --- SUB
N W RI

5
90.0° 0 30-NOV-18 ISSUED FOR CONSTRUCTION DDP MRB MKA CK MUM --- SUB
ON I

38
E 315.328M 2
SSI

REV. DATE DESCRIPTION PREP MECH ELEC CIVIL C&I SES APPD.
R PERM I

N 64.369M
00GKB20BR001-DN50
EL +0.133M STAMP:
THOUT THEI

14
94
ED OR LENT W I

5
C 1 C
90.0°
20 21 E 315.328M
TED AND M UST NOT BE COPI

N 62.876M
EL +0.133M
220 MW (GAS) / 212 MW (HSD) NET
PROJECT: COMBINED CYCLE POWER PROJECT
AT BHOLA, BANGLADESH
MI

OWNER: NUTAN BIDYUT (BANGLADESH) LTD.


S THE PROPERTY OF L&T -SARGENT & LUNDY LI

B B
ONSHORE
54 CONTRACTOR: BISHO INFRA PROJECTS LIMITED
CONT. ON
DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.04
ONSHORE
E 315.274M CONSULTANT: L & T - SARGENT & LUNDY LIMITED
N 62.876M
EL +0.133M DATE NAME SIGN TITLE:

PREPARED 30-NOV-18 DDP ISOMETRIC DRAWING FOR


SPECIAL NOTES: CHECKED 30-NOV-18 MRB POTABLE WATER SYSTEM
GN I
NG AND DESI

A A
01. CONTRACTOR/INSTALLER SHALL TAKE ALL APPROPRIATE PRECAUTIONS TO ENSURE APPROVED 30-NOV-18 SUB
THE SAFETY OF ALL PEOPLE LOCATED ON THE WORK SITE INCLUDING CONTRACTOR/

841m m x 594m m )
DEPARTMENT: MECHANICAL
INSTALLER'S PERSONNEL (OR THAT OF ITS SUBCONTRACTOR(S)) PERFORMING THE WORK.
S DRAW I

02. THE PDF FORMAT OF THE ELECTRONIC FILE OF THIS DRAWING IS FOR IMPLEMENTATION, L&T-S&L JOB NO.: FD18090000
THE ELECTRONIC FILE OF THE DRAWING IN ANY OTHER FORMAT IS FOR INFORMATION. DRAWING NO.: BI-BCCP-00-CEM-157-MG-0013 SCALE:NONE SHEET: 03 OF 24 REV. 1
THI

A1 (
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

CAD FILE NAME:BI-BCCP-00-CEM-157-MG-0013-03.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FABRICATION MATERIALS
N ITEM SIZE SCHEDULE/
QTY. DESCRIPTION
NO. (DN / MM) RATING
M M
1 59.5 M 50 40S PIPE, ASTM A 312 GRADE TP304L, ASME B36.19M

2 1 50X25 CLASS 3000 SW REDUCING TEE, ASTM A 182 GRADE F304L, ASME B16.11

3 2 50 CLASS 3000 45 DEG SW ELBOW, ASTM A 182 GRADE F304L, ASME B16.11

L L

CONT. ON
DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.03
E 315.274M
N 62.876M
K EL +0.133M K

00GKB20-BQ114R

00GKB20-BQ113G ERECTION MATERIALS

ITEM SIZE SCHEDULE/


QTY. DESCRIPTION
NO. (DN) RATING
00
00GKB20-BQ112R 1 30

00GKB20-BQ111R 00
J
30 J

00GKB20-BQ110G 00
2 30

00GKB20-BQ109R 00
30

00
00GKB20-BQ108R 3 30

00GKB20-BQ107G 00
30
HOLD LIST:
I I

00GKB20-BQ106R 00
30
00GKB20BR001-DN50
00
4 30
00GKB20-BQ105R

00GKB20-BQ104G
00
30
00GKB20-BQ103R
5 NOTES:
H 00 H
30 01. FOR GENERAL NOTES & LEGENDS REFER DWG. NO.BI-BCCP-00-CEM-157-MG-0013-01

00GKB20-BQ102R
00
30

00GKB20-BQ101G 6 30
00

00GKB20-BQ100R 00
30

00GKB20-BQ099R 00
30

00
00GKB20-BQ098G 7 30
CONT. ON 00GKB20-BQ096R
LINE : 00GKB20BR102-DN25 00
DWG : BI-BCCP-00-CEM-157-MG-0113-SHT.03 30
REFERENCE DRAWINGS:
E 259.109M
00
N 62.876M 8 30 DRAWING NO. DRAWING TITLE
EL +0.187M
2 9 00
30
E 259.109M
N 62.876M
F 00GKB20-BQ095G F
EL +0.133M
775
00GKB20-BQ097R
CONT. ON 1
DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.05
10
E 255.644M
N 64.764M
EL +0.133M 2612
11 9
00GKB20-BQ094R 96 19
1306
12 16
1
E E

3 45.0° 45.0° E 257.490M


45.0°
E 255.644M
41
14 13 N 62.876M
18 47 EL +0.133M
N 64.723M 47 18
3
EL +0.133M
45.0°
NG.

D D
TI

1 25-JAN-19 ISSUED FOR CONSTRUCTION DDP MRB MKA SIB MCC --- SUB
N W RI

0 30-NOV-18 ISSUED FOR CONSTRUCTION DDP MRB MKA CK MUM --- SUB
ON I
SSI

REV. DATE DESCRIPTION PREP MECH ELEC CIVIL C&I SES APPD.
R PERM I

STAMP:
THOUT THEI
ED OR LENT W I

C C
TED AND M UST NOT BE COPI

220 MW (GAS) / 212 MW (HSD) NET


PROJECT: COMBINED CYCLE POWER PROJECT
AT BHOLA, BANGLADESH
MI

OWNER: NUTAN BIDYUT (BANGLADESH) LTD.


S THE PROPERTY OF L&T -SARGENT & LUNDY LI

B B
ONSHORE
CONTRACTOR: BISHO INFRA PROJECTS LIMITED

ONSHORE
CONSULTANT: L & T - SARGENT & LUNDY LIMITED

DATE NAME SIGN TITLE:

PREPARED 30-NOV-18 DDP ISOMETRIC DRAWING FOR


SPECIAL NOTES: CHECKED 30-NOV-18 MRB POTABLE WATER SYSTEM
GN I
NG AND DESI

A A
01. CONTRACTOR/INSTALLER SHALL TAKE ALL APPROPRIATE PRECAUTIONS TO ENSURE APPROVED 30-NOV-18 SUB
THE SAFETY OF ALL PEOPLE LOCATED ON THE WORK SITE INCLUDING CONTRACTOR/

841m m x 594m m )
DEPARTMENT: MECHANICAL
INSTALLER'S PERSONNEL (OR THAT OF ITS SUBCONTRACTOR(S)) PERFORMING THE WORK.
S DRAW I

02. THE PDF FORMAT OF THE ELECTRONIC FILE OF THIS DRAWING IS FOR IMPLEMENTATION, L&T-S&L JOB NO.: FD18090000
THE ELECTRONIC FILE OF THE DRAWING IN ANY OTHER FORMAT IS FOR INFORMATION. DRAWING NO.: BI-BCCP-00-CEM-157-MG-0013 SCALE:NONE SHEET: 04 OF 24 REV. 1
THI

A1 (
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

CAD FILE NAME:BI-BCCP-00-CEM-157-MG-0013-04.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FABRICATION MATERIALS
N ITEM SIZE SCHEDULE/
QTY. DESCRIPTION
NO. (DN / MM) RATING
M M
CONT. ON 1 33.6 M 50 40S PIPE, ASTM A 312 GRADE TP304L, ASME B36.19M
DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.06 2 1 50X25 CLASS 3000 SW REDUCING TEE, ASTM A 182 GRADE F304L, ASME B16.11
E 255.612M
54 3 2 50 CLASS 3000 90 DEG SW ELBOW, ASTM A 182 GRADE F304L, ASME B16.11
N 90.182M
EL +8.533M

54.8°
EL +8.533M

35.2°
44 31
L
11 10 L
3
90.0°
E 255.644M
N 90.138M
EL +8.533M

00GKB20-BQ082G
EL +5.375M
K K

ERECTION MATERIALS
9
ITEM SIZE SCHEDULE/
QTY. DESCRIPTION
NO. (DN) RATING

00GKB20BR001-DN50
J J

00GKB20-BQ083G
EL +2.378M

HOLD LIST:
I I

7 8
3
90.0°
E 255.644M NOTES:
H N 90.138M H
01. FOR GENERAL NOTES & LEGENDS REFER DWG. NO.BI-BCCP-00-CEM-157-MG-0013-01
EL +0.133M 1

11
50

00GKB20-BQ084R
20
00

00GKB20-BQ085R

30
00

6 REFERENCE DRAWINGS:
00GKB20-BQ086G DRAWING NO. DRAWING TITLE

30
00

F F
00GKB20-BQ087R

30
00

25
5 09
9
00GKB20-BQ088R

30
00
E 00GKB20-BQ089G E

30
00

00GKB20-BQ090R
NG.

D D
TI

1 25-JAN-19 ISSUED FOR CONSTRUCTION DDP MRB MKA SIB MCC --- SUB
N W RI

30
00
0 30-NOV-18 ISSUED FOR CONSTRUCTION DDP MRB MKA CK MUM --- SUB
ON I
SSI

3 REV. DATE DESCRIPTION PREP MECH ELEC CIVIL C&I SES APPD.
R PERM I

00GKB20-BQ091R
STAMP:
THOUT THEI

30
00
ED OR LENT W I

00GKB20-BQ092G 2
E 255.644M
C C
71 N 65.039M
6
TED AND M UST NOT BE COPI

EL +0.133M

00GKB20-BQ093R 2 27 220 MW (GAS) / 212 MW (HSD) NET


TO DRAIN 1 5 CONT. ON
LINE:00GKB20BR401-DN25 PROJECT: COMBINED CYCLE POWER PROJECT
DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.04
E 255.644M 1 AT BHOLA, BANGLADESH
E 255.644M
N 65.039M
N 64.764M
MI

EL +0.079M
EL +0.133M OWNER: NUTAN BIDYUT (BANGLADESH) LTD.
S THE PROPERTY OF L&T -SARGENT & LUNDY LI

B B
ONSHORE
CONTRACTOR: BISHO INFRA PROJECTS LIMITED

ONSHORE
CONSULTANT: L & T - SARGENT & LUNDY LIMITED

DATE NAME SIGN TITLE:

PREPARED 30-NOV-18 DDP ISOMETRIC DRAWING FOR


SPECIAL NOTES: CHECKED 30-NOV-18 MRB POTABLE WATER SYSTEM
GN I
NG AND DESI

A A
01. CONTRACTOR/INSTALLER SHALL TAKE ALL APPROPRIATE PRECAUTIONS TO ENSURE APPROVED 30-NOV-18 SUB
THE SAFETY OF ALL PEOPLE LOCATED ON THE WORK SITE INCLUDING CONTRACTOR/

841m m x 594m m )
DEPARTMENT: MECHANICAL
INSTALLER'S PERSONNEL (OR THAT OF ITS SUBCONTRACTOR(S)) PERFORMING THE WORK.
S DRAW I

02. THE PDF FORMAT OF THE ELECTRONIC FILE OF THIS DRAWING IS FOR IMPLEMENTATION, L&T-S&L JOB NO.: FD18090000
THE ELECTRONIC FILE OF THE DRAWING IN ANY OTHER FORMAT IS FOR INFORMATION. DRAWING NO.: BI-BCCP-00-CEM-157-MG-0013 SCALE:NONE SHEET: 05 OF 24 REV. 1
THI

A1 (
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

CAD FILE NAME:BI-BCCP-00-CEM-157-MG-0013-05.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FABRICATION MATERIALS
N ITEM SIZE SCHEDULE/
QTY. DESCRIPTION
NO. (DN / MM) RATING
M M
1 33.6 M 50 40S PIPE, ASTM A 312 GRADE TP304L, ASME B36.19M

2 1 50X25 CLASS 3000 SW REDUCING TEE, ASTM A 182 GRADE F304L, ASME B16.11

3 2 50 CLASS 3000 90 DEG SW ELBOW, ASTM A 182 GRADE F304L, ASME B16.11

L L

K K

ERECTION MATERIALS

ITEM SIZE SCHEDULE/


QTY. DESCRIPTION
TO VENT NO. (DN) RATING
LINE : 00GKB20BR502-DN25
E 255.464M
J N 90.391M J

00GKB20-BQ076R EL +8.587M
E 255.464M
N 90.391M
18589 CONT. ON
3 3 EL +8.533M
E 244.716M
7 6 253
3000 DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.05
90.0° 1 3000 257 E 255.612M
N 105.558M 3000
3000
EL +8.533M 2597 N 90.182M
2
5 12
EL +8.533M
4 1
1
00GKB20-BQ075R
3
00GKB20-BQ078R
HOLD LIST:
I 00GKB20-BQ079R
00GKB20-BQ080G
2 2
54.5° I

00GKB20-BQ077G 00GKB20-BQ081R

35.5°

EL +5.375M
00GKB20-BQ074G

15
37
6

7
NOTES:
89
H 10 H
01. FOR GENERAL NOTES & LEGENDS REFER DWG. NO.BI-BCCP-00-CEM-157-MG-0013-01

00GKB20BR001-DN50

CONT. ON
DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.07
E 243.135M
N 112.030M
8
EL +0.133M

EL +2.375M
00GKB20-BQ073G

30 6663
1 01
1

3
200 90.0°
REFERENCE DRAWINGS:
0
13.7°
E 244.716M DRAWING NO. DRAWING TITLE
15 N 105.558M
2
00GKB20-BQ070R 11 6
EL +0.133M

F F
64 00GKB20-BQ071G
74 76.3°

00GKB20-BQ072R 10 9
EL +0.133M
81
15

E E
NG.

D D
TI

1 25-JAN-19 ISSUED FOR CONSTRUCTION DDP MRB MKA SIB MCC --- SUB
N W RI

0 30-NOV-18 ISSUED FOR CONSTRUCTION DDP MRB MKA CK MUM --- SUB
ON I
SSI

REV. DATE DESCRIPTION PREP MECH ELEC CIVIL C&I SES APPD.
R PERM I

STAMP:
THOUT THEI
ED OR LENT W I

C C
TED AND M UST NOT BE COPI

220 MW (GAS) / 212 MW (HSD) NET


PROJECT: COMBINED CYCLE POWER PROJECT
AT BHOLA, BANGLADESH
MI

OWNER: NUTAN BIDYUT (BANGLADESH) LTD.


S THE PROPERTY OF L&T -SARGENT & LUNDY LI

B B
ONSHORE
CONTRACTOR: BISHO INFRA PROJECTS LIMITED

ONSHORE
CONSULTANT: L & T - SARGENT & LUNDY LIMITED

DATE NAME SIGN TITLE:

PREPARED 30-NOV-18 DDP ISOMETRIC DRAWING FOR


SPECIAL NOTES: CHECKED 30-NOV-18 MRB POTABLE WATER SYSTEM
GN I
NG AND DESI

A A
01. CONTRACTOR/INSTALLER SHALL TAKE ALL APPROPRIATE PRECAUTIONS TO ENSURE APPROVED 30-NOV-18 SUB
THE SAFETY OF ALL PEOPLE LOCATED ON THE WORK SITE INCLUDING CONTRACTOR/

841m m x 594m m )
DEPARTMENT: MECHANICAL
INSTALLER'S PERSONNEL (OR THAT OF ITS SUBCONTRACTOR(S)) PERFORMING THE WORK.
S DRAW I

02. THE PDF FORMAT OF THE ELECTRONIC FILE OF THIS DRAWING IS FOR IMPLEMENTATION, L&T-S&L JOB NO.: FD18090000
THE ELECTRONIC FILE OF THE DRAWING IN ANY OTHER FORMAT IS FOR INFORMATION. DRAWING NO.: BI-BCCP-00-CEM-157-MG-0013 SCALE:NONE SHEET: 06 OF 24 REV. 1
THI

A1 (
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

CAD FILE NAME:BI-BCCP-00-CEM-157-MG-0013-06.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FABRICATION MATERIALS
N ITEM SIZE SCHEDULE/
QTY. DESCRIPTION
NO. (DN / MM) RATING
M M
1 48.3 M 50 40S PIPE, ASTM A 312 GRADE TP304L, ASME B36.19M

2 2 50X25 CLASS 3000 SW REDUCING TEE, ASTM A 182 GRADE F304L, ASME B16.11

3 3 50 CLASS 3000 90 DEG SW ELBOW, ASTM A 182 GRADE F304L, ASME B16.11

L L

K K

ERECTION MATERIALS

ITEM SIZE SCHEDULE/


QTY. DESCRIPTION
NO. (DN) RATING

J J

CONT. ON
DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.08
E 236.585M
N 157.229M
EL -0.921M
1

HOLD LIST:
I I

00GKB20BR001-DN50

3
90.0° NOTES:
E 236.585M
H
16 1 01. FOR GENERAL NOTES & LEGENDS REFER DWG. NO.BI-BCCP-00-CEM-157-MG-0013-01
H

N 157.229M 15 30
EL -1.817M 00

30
00

00GKB20-BQ055R 16
93
2
30
00 00GKB20-BQ062G
00GKB20-BQ056R
14 3 00GKB20-BQ063R
E 236.585M
90.0° 2449 00GKB20-BQ068G
N 138.844M 1 CONT. ON
00GKB20-BQ057G 3000
30 EL +0.133M 3 2 LINE:00GKB20BR120-DN25
00 000 7548
8 7 3000
DWG : BI-BCCP-00-CEM-157-MG-0113-SHT.04
REFERENCE DRAWINGS:
E 243.122M 53
3000 DRAWING NO. DRAWING TITLE
30 N 112.082M
00 00GKB20-BQ061R 6
00GKB20-BQ058R 3000 EL +0.187M
00GKB20-BQ060G 3000 E 243.122M
00GKB20-BQ059R
5 2999 N 112.082M
13 59
7
00GKB20-BQ064R
00GKB20-BQ066R 281 EL +0.133M
F
2
4 1 F

14
53
E 236.585M 00GKB20-BQ065G 3 75.7°
1

N 140.297M
EL -1.817M 12 11 2
1 26 00GKB20-BQ067R 2
1
81
2 14.3°
3 00GKB20-BQ069R

90.0°
TO DRAIN E 236.585M
10 9 N 138.844M
CONT. ON
LINE : 00GKB20BR402-DN25
E
DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.06 E
E 236.585M EL -1.817M 50
65 E 243.135M
N 140.297M
N 112.030M
EL -1.871M EL -1.817M
EL +0.133M
NG.

D D
TI

1 25-JAN-19 ISSUED FOR CONSTRUCTION DDP MRB MKA SIB MCC --- SUB
N W RI

0 30-NOV-18 ISSUED FOR CONSTRUCTION DDP MRB MKA CK MUM --- SUB
ON I
SSI

REV. DATE DESCRIPTION PREP MECH ELEC CIVIL C&I SES APPD.
R PERM I

STAMP:
THOUT THEI
ED OR LENT W I

C C
TED AND M UST NOT BE COPI

220 MW (GAS) / 212 MW (HSD) NET


PROJECT: COMBINED CYCLE POWER PROJECT
AT BHOLA, BANGLADESH
MI

OWNER: NUTAN BIDYUT (BANGLADESH) LTD.


S THE PROPERTY OF L&T -SARGENT & LUNDY LI

B B
ONSHORE
CONTRACTOR: BISHO INFRA PROJECTS LIMITED

ONSHORE
CONSULTANT: L & T - SARGENT & LUNDY LIMITED

DATE NAME SIGN TITLE:

PREPARED 30-NOV-18 DDP ISOMETRIC DRAWING FOR


SPECIAL NOTES: CHECKED 30-NOV-18 MRB POTABLE WATER SYSTEM
GN I
NG AND DESI

A A
01. CONTRACTOR/INSTALLER SHALL TAKE ALL APPROPRIATE PRECAUTIONS TO ENSURE APPROVED 30-NOV-18 SUB
THE SAFETY OF ALL PEOPLE LOCATED ON THE WORK SITE INCLUDING CONTRACTOR/

841m m x 594m m )
DEPARTMENT: MECHANICAL
INSTALLER'S PERSONNEL (OR THAT OF ITS SUBCONTRACTOR(S)) PERFORMING THE WORK.
S DRAW I

02. THE PDF FORMAT OF THE ELECTRONIC FILE OF THIS DRAWING IS FOR IMPLEMENTATION, L&T-S&L JOB NO.: FD18090000
THE ELECTRONIC FILE OF THE DRAWING IN ANY OTHER FORMAT IS FOR INFORMATION. DRAWING NO.: BI-BCCP-00-CEM-157-MG-0013 SCALE:NONE SHEET: 07 OF 24 REV. 1
THI

A1 (
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

CAD FILE NAME:BI-BCCP-00-CEM-157-MG-0013-07.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FABRICATION MATERIALS
N ITEM SIZE SCHEDULE/
QTY. DESCRIPTION
NO. (DN / MM) RATING
M M
1 15.1 M 50 40S PIPE, ASTM A 312 GRADE TP304L, ASME B36.19M

2 1 50 CLASS 3000 90 DEG SW ELBOW, ASTM A 182 GRADE F304L, ASME B16.11

3 2 50 CLASS 3000 45 DEG SW ELBOW, ASTM A 182 GRADE F304L, ASME B16.11

L L

K K

ERECTION MATERIALS

ITEM SIZE SCHEDULE/


QTY. DESCRIPTION
NO. (DN) RATING

J J

42 CONT. ON
3
DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.09
45.0°
E 230.196M
E 236.585M
N 169.815M
EL -0.867M
N 163.385M HOLD LIST:
I
9036 EL -0.867M I

3000 3000 1250 1190


1
8 7
3
45.0°
6
45.0° 45.0°
5 4
1

E 230.196M 00GKB20-BQ048G 00GKB20-BQ049R


00GKB20-BQ050R
NOTES:
N 169.774M 00GKB20-BQ051G
H H
EL -0.867M 01. FOR GENERAL NOTES & LEGENDS REFER DWG. NO.BI-BCCP-00-CEM-157-MG-0013-01
00GKB20BR001-DN50 10
00

63 00GKB20-BQ052R
89
89
63
61
56

00GKB20-BQ053R 25
00

2
REFERENCE DRAWINGS:
90.0° DRAWING NO. DRAWING TITLE
16 E 236.585M
65
N 157.229M
EL -0.867M
00GKB20-BQ054G
F F

2 1 EL -0.867M

CONT. ON
E E
DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.07
E 236.585M
N 157.229M
EL -0.921M
NG.

D D
TI

1 25-JAN-19 ISSUED FOR CONSTRUCTION DDP MRB MKA SIB MCC --- SUB
N W RI

0 30-NOV-18 ISSUED FOR CONSTRUCTION DDP MRB MKA CK MUM --- SUB
ON I
SSI

REV. DATE DESCRIPTION PREP MECH ELEC CIVIL C&I SES APPD.
R PERM I

STAMP:
THOUT THEI
ED OR LENT W I

C C
TED AND M UST NOT BE COPI

220 MW (GAS) / 212 MW (HSD) NET


PROJECT: COMBINED CYCLE POWER PROJECT
AT BHOLA, BANGLADESH
MI

OWNER: NUTAN BIDYUT (BANGLADESH) LTD.


S THE PROPERTY OF L&T -SARGENT & LUNDY LI

B B
ONSHORE
CONTRACTOR: BISHO INFRA PROJECTS LIMITED

ONSHORE
CONSULTANT: L & T - SARGENT & LUNDY LIMITED

DATE NAME SIGN TITLE:

PREPARED 30-NOV-18 DDP ISOMETRIC DRAWING FOR


SPECIAL NOTES: CHECKED 30-NOV-18 MRB POTABLE WATER SYSTEM
GN I
NG AND DESI

A A
01. CONTRACTOR/INSTALLER SHALL TAKE ALL APPROPRIATE PRECAUTIONS TO ENSURE APPROVED 30-NOV-18 SUB
THE SAFETY OF ALL PEOPLE LOCATED ON THE WORK SITE INCLUDING CONTRACTOR/

841m m x 594m m )
DEPARTMENT: MECHANICAL
INSTALLER'S PERSONNEL (OR THAT OF ITS SUBCONTRACTOR(S)) PERFORMING THE WORK.
S DRAW I

02. THE PDF FORMAT OF THE ELECTRONIC FILE OF THIS DRAWING IS FOR IMPLEMENTATION, L&T-S&L JOB NO.: FD18090000
THE ELECTRONIC FILE OF THE DRAWING IN ANY OTHER FORMAT IS FOR INFORMATION. DRAWING NO.: BI-BCCP-00-CEM-157-MG-0013 SCALE:NONE SHEET: 08 OF 24 REV. 1
THI

A1 (
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

CAD FILE NAME:BI-BCCP-00-CEM-157-MG-0013-08.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

CONT. ON FABRICATION MATERIALS


N DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.22
ITEM SIZE SCHEDULE/
E 230.196M QTY. DESCRIPTION
NO. (DN / MM) RATING
N 196.044M
M 54 M
EL +8.030M 1 34.6 M 50 40S PIPE, ASTM A 312 GRADE TP304L, ASME B36.19M

2 1 50X50 CLASS 3000 SOCKET WELDED TEE, ASTM A 182 GRADE F304L, ASME B16.11

3 4 50 CLASS 3000 90 DEG SW ELBOW, ASTM A 182 GRADE F304L, ASME B16.11
3
89.7°
E 230.196M
13
12 N 195.990M
EL +8.030M

L L

EL +7.900M 00GKB20-BQ035G

CONT. ON
DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.10
E 230.196M
N 196.044M
EL +3.533M

K K
53

1
11
2
ERECTION MATERIALS
E 230.196M
ITEM SIZE SCHEDULE/
N 195.990M EL +3.533M QTY. DESCRIPTION
NO. (DN) RATING
EL +3.533M

10
J J

EL +3.400M 00GKB20-BQ036G

00GKB20BR001-DN50
HOLD LIST:
3
I I
90.0°
1

E 230.196M
N 195.990M
EL +0.133M
9 8

44
2

EL +0.133M
NOTES:
H H
01. FOR GENERAL NOTES & LEGENDS REFER DWG. NO.BI-BCCP-00-CEM-157-MG-0013-01
15
14 35
45

00GKB20-BQ037R

10
33

00GKB20-BQ038R 3
90.0°
00GKB20-BQ039G 7 6 E 230.196M
N 192.445M
EL +0.133M
REFERENCE DRAWINGS:
DRAWING NO. DRAWING TITLE

F F
1

4 5
EL -0.867M 00GKB20-BQ040R

3 00GKB20-BQ041R
51
E
90.0° 8 E

E 230.196M
N 192.445M 20 00GKB20-BQ042G
00
EL -0.867M
3
30 00GKB20-BQ043R
00

30
00
NG.

D D
TI

00GKB20-BQ044R 1 25-JAN-19 ISSUED FOR CONSTRUCTION DDP MRB MKA SIB MCC --- SUB
N W RI

30
22 00 0 30-NOV-18 ISSUED FOR CONSTRUCTION DDP MRB MKA CK MUM --- SUB
ON I

63
0 2
SSI

00GKB20-BQ045G REV. DATE DESCRIPTION PREP MECH ELEC CIVIL C&I SES APPD.
R PERM I

STAMP:
THOUT THEI

30 00GKB20-BQ046R
00

1
ED OR LENT W I

30 00GKB20-BQ047R
00
CONT. ON
C C
DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.08
30
00 E 230.196M
TED AND M UST NOT BE COPI

1 N 169.815M
EL -0.867M
220 MW (GAS) / 212 MW (HSD) NET
PROJECT: COMBINED CYCLE POWER PROJECT
AT BHOLA, BANGLADESH
MI

OWNER: NUTAN BIDYUT (BANGLADESH) LTD.


S THE PROPERTY OF L&T -SARGENT & LUNDY LI

B B
ONSHORE
CONTRACTOR: BISHO INFRA PROJECTS LIMITED

ONSHORE
CONSULTANT: L & T - SARGENT & LUNDY LIMITED

DATE NAME SIGN TITLE:

PREPARED 30-NOV-18 DDP ISOMETRIC DRAWING FOR


SPECIAL NOTES: CHECKED 30-NOV-18 MRB POTABLE WATER SYSTEM
GN I
NG AND DESI

A A
01. CONTRACTOR/INSTALLER SHALL TAKE ALL APPROPRIATE PRECAUTIONS TO ENSURE APPROVED 30-NOV-18 SUB
THE SAFETY OF ALL PEOPLE LOCATED ON THE WORK SITE INCLUDING CONTRACTOR/

841m m x 594m m )
DEPARTMENT: MECHANICAL
INSTALLER'S PERSONNEL (OR THAT OF ITS SUBCONTRACTOR(S)) PERFORMING THE WORK.
S DRAW I

02. THE PDF FORMAT OF THE ELECTRONIC FILE OF THIS DRAWING IS FOR IMPLEMENTATION, L&T-S&L JOB NO.: FD18090000
THE ELECTRONIC FILE OF THE DRAWING IN ANY OTHER FORMAT IS FOR INFORMATION. DRAWING NO.: BI-BCCP-00-CEM-157-MG-0013 SCALE:NONE SHEET: 09 OF 24 REV. 1
THI

A1 (
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

CAD FILE NAME:BI-BCCP-00-CEM-157-MG-0013-09.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FABRICATION MATERIALS
N ITEM SIZE SCHEDULE/
QTY. DESCRIPTION
NO. (DN / MM) RATING
M M
1 65.8 M 50 40S PIPE, ASTM A 312 GRADE TP304L, ASME B36.19M

2 3 50 CLASS 3000 90 DEG SW ELBOW, ASTM A 182 GRADE F304L, ASME B16.11

L L

K K

53

ERECTION MATERIALS

ITEM SIZE SCHEDULE/


2 QTY. DESCRIPTION
CONT. ON NO. (DN) RATING
90.0°
DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.11
E 228.543M
E 228.597M
N 260.365M
N 260.365M
J J
EL +3.533M
EL +3.533M
16
15 1
00GKB20-BQ140R

14 00GKB20-BQ139G

28
00
13 00GKB20-BQ138R

27
75
00GKB20-BQ137R

27
HOLD LIST:
I 75 I
00GKB20-BQ136G

28
00
12 00GKB20-BQ135R

30
00
00GKB20-BQ134R

30
00
00GKB20-BQ133G

30
00 11 00GKB20-BQ132R NOTES:
H H
30 01. FOR GENERAL NOTES & LEGENDS REFER DWG. NO.BI-BCCP-00-CEM-157-MG-0013-01
00
00GKB20-BQ131R

27
50
10 00GKB20-BQ130G

28 00GKB20BR001-DN50
50
00GKB20-BQ129R

27
50 9 00GKB20-BQ128R

63 00GKB20-BQ127G
70
7 25
00

25 00GKB20-BQ126R
00 8 REFERENCE DRAWINGS:
25 DRAWING NO. DRAWING TITLE
00
00GKB20-BQ125R

30
00
00GKB20-BQ124G

F 29 F
00
7 00GKB20-BQ123R
2
90.0°
29
00 E 230.196M
00GKB20-BQ122R
N 196.657M
30 EL +3.533M EL +3.533M
00 6 00GKB20-BQ121G 00GKB20-BQ117R 61
4
30
00
00GKB20-BQ120R

14 1
55
5 00GKB20-BQ119R 14
0
2 1
E E
30
00
00GKB20-BQ118G

19 1
67
4 3 53
16

2 CONT. ON
90.0° DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.09
971
NG.

D E 228.543M E 230.196M D
TI

1 25-JAN-19 ISSUED FOR CONSTRUCTION DDP MRB MKA SIB MCC --- SUB
N W RI

N 196.657M N 196.044M
EL +3.533M 0 30-NOV-18 ISSUED FOR CONSTRUCTION DDP MRB MKA CK MUM --- SUB
ON I

EL +3.533M
SSI

REV. DATE DESCRIPTION PREP MECH ELEC CIVIL C&I SES APPD.
R PERM I

STAMP:
THOUT THEI
ED OR LENT W I

C C
TED AND M UST NOT BE COPI

220 MW (GAS) / 212 MW (HSD) NET


PROJECT: COMBINED CYCLE POWER PROJECT
AT BHOLA, BANGLADESH
MI

OWNER: NUTAN BIDYUT (BANGLADESH) LTD.


S THE PROPERTY OF L&T -SARGENT & LUNDY LI

B B
ONSHORE
CONTRACTOR: BISHO INFRA PROJECTS LIMITED

ONSHORE
CONSULTANT: L & T - SARGENT & LUNDY LIMITED

DATE NAME SIGN TITLE:

PREPARED 30-NOV-18 DDP ISOMETRIC DRAWING FOR


SPECIAL NOTES: CHECKED 30-NOV-18 MRB POTABLE WATER SYSTEM
GN I
NG AND DESI

A A
01. CONTRACTOR/INSTALLER SHALL TAKE ALL APPROPRIATE PRECAUTIONS TO ENSURE APPROVED 30-NOV-18 SUB
THE SAFETY OF ALL PEOPLE LOCATED ON THE WORK SITE INCLUDING CONTRACTOR/

841m m x 594m m )
DEPARTMENT: MECHANICAL
INSTALLER'S PERSONNEL (OR THAT OF ITS SUBCONTRACTOR(S)) PERFORMING THE WORK.
S DRAW I

02. THE PDF FORMAT OF THE ELECTRONIC FILE OF THIS DRAWING IS FOR IMPLEMENTATION, L&T-S&L JOB NO.: FD18090000
THE ELECTRONIC FILE OF THE DRAWING IN ANY OTHER FORMAT IS FOR INFORMATION. DRAWING NO.: BI-BCCP-00-CEM-157-MG-0013 SCALE:NONE SHEET: 10 OF 24 REV. 1
THI

A1 (
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

CAD FILE NAME:BI-BCCP-00-CEM-157-MG-0013-10.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FABRICATION MATERIALS
N ITEM SIZE SCHEDULE/
QTY. DESCRIPTION
NO. (DN / MM) RATING
M M
1 19.1 M 50 40S PIPE, ASTM A 312 GRADE TP304L, ASME B36.19M

2 5 50 CLASS 3000 90 DEG SW ELBOW, ASTM A 182 GRADE F304L, ASME B16.11

L L

EL +3.533M

K K

5 4

1 00GKB20-BQ146R
ERECTION MATERIALS

ITEM SIZE SCHEDULE/


QTY. DESCRIPTION
NO. (DN) RATING

2
28
90.0° 50
J J
E 231.500M
N 269.830M
EL +3.533M
2
90.0°
E 231.500M
N 271.416M
EL +0.203M

HOLD LIST:
I
9 8 00GKB20-BQ145G
94
65
I

28
50
1
2

15 90.0°
86 E 231.500M
N 269.830M 00GKB20BR001-DN50

1
EL +0.203M

NOTES:
92
0 3
H 00GKB20-BQ147G H
01. FOR GENERAL NOTES & LEGENDS REFER DWG. NO.BI-BCCP-00-CEM-157-MG-0013-01

28
50

00GKB20-BQ144R

7 6

EL +0.203M
1

61
2 5
90.0° 2 REFERENCE DRAWINGS:
E 231.500M 90.0°
E 231.500M DRAWING NO. DRAWING TITLE
N 271.416M 00GKB20-BQ143R
EL -2.067M N 260.365M
EL +3.533M
1 2
CONT. ON
DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.12
F 00GKB20-BQ142G F
E 231.500M 10
1
N 271.470M 11
EL -2.067M

EL -2.067M

54

E E

68
22
03
29
00GKB20-BQ141R

CONT. ON
DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.10
NG.

D E 228.597M D
TI

1 25-JAN-19 ISSUED FOR CONSTRUCTION DDP MRB MKA SIB MCC --- SUB
N W RI

N 260.365M
5
16 0 30-NOV-18 ISSUED FOR CONSTRUCTION DDP MRB MKA CK MUM --- SUB
ON I

EL +3.533M
SSI

REV. DATE DESCRIPTION PREP MECH ELEC CIVIL C&I SES APPD.
R PERM I

STAMP:
THOUT THEI
ED OR LENT W I

C C
TED AND M UST NOT BE COPI

220 MW (GAS) / 212 MW (HSD) NET


PROJECT: COMBINED CYCLE POWER PROJECT
AT BHOLA, BANGLADESH
MI

OWNER: NUTAN BIDYUT (BANGLADESH) LTD.


S THE PROPERTY OF L&T -SARGENT & LUNDY LI

B B
ONSHORE
CONTRACTOR: BISHO INFRA PROJECTS LIMITED

ONSHORE
CONSULTANT: L & T - SARGENT & LUNDY LIMITED

DATE NAME SIGN TITLE:

PREPARED 30-NOV-18 DDP ISOMETRIC DRAWING FOR


SPECIAL NOTES: CHECKED 30-NOV-18 MRB POTABLE WATER SYSTEM
GN I
NG AND DESI

A A
01. CONTRACTOR/INSTALLER SHALL TAKE ALL APPROPRIATE PRECAUTIONS TO ENSURE APPROVED 30-NOV-18 SUB
THE SAFETY OF ALL PEOPLE LOCATED ON THE WORK SITE INCLUDING CONTRACTOR/

841m m x 594m m )
DEPARTMENT: MECHANICAL
INSTALLER'S PERSONNEL (OR THAT OF ITS SUBCONTRACTOR(S)) PERFORMING THE WORK.
S DRAW I

02. THE PDF FORMAT OF THE ELECTRONIC FILE OF THIS DRAWING IS FOR IMPLEMENTATION, L&T-S&L JOB NO.: FD18090000
THE ELECTRONIC FILE OF THE DRAWING IN ANY OTHER FORMAT IS FOR INFORMATION. DRAWING NO.: BI-BCCP-00-CEM-157-MG-0013 SCALE:NONE SHEET: 11 OF 24 REV. 1
THI

A1 (
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

CAD FILE NAME:BI-BCCP-00-CEM-157-MG-0013-11.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FABRICATION MATERIALS
N ITEM SIZE SCHEDULE/
QTY. DESCRIPTION
NO. (DN / MM) RATING
M M
1 18.5 M 50 40S PIPE, ASTM A 312 GRADE TP304L, ASME B36.19M

2 2 50X25 CLASS 3000 SW REDUCING TEE, ASTM A 182 GRADE F304L, ASME B16.11

3 2 50 CLASS 3000 90 DEG SW ELBOW, ASTM A 182 GRADE F304L, ASME B16.11

CONT. ON
DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.13
E 231.500M
N 288.106M CONT. ON

EL +0.133M LINE:00GKB20BR105-DN25
DWG:BI-BCCP-00-CEM-157-MG-0113-SHT.05

L
E 231.500M L
2
N 288.052M
E 231.500M
EL +0.187M
N 288.052M
EL +0.133M

00GKB20-BQ154R
1
9

K 54 K

3
90.0°
74 49
4 2 E 231.500M
ERECTION MATERIALS
8 7 N 287.308M
EL +0.133M
ITEM SIZE SCHEDULE/
QTY. DESCRIPTION
EL +0.133M NO. (DN) RATING

J J

HOLD LIST:
I I
00GKB20BR001-DN50

NOTES:
6
H 5 01. FOR GENERAL NOTES & LEGENDS REFER DWG. NO.BI-BCCP-00-CEM-157-MG-0013-01
H

3
90.0°
E 231.500M
N 287.308M
1
EL -2.067M

20
00

00GKB20-BQ153G

30 REFERENCE DRAWINGS:
00
DRAWING NO. DRAWING TITLE

00GKB20-BQ152R

F F

4 15
44
00GKB20-BQ151R 30 1
00

E E

30
00

00GKB20-BQ150G

3
30
00
NG.

D 00GKB20-BQ149R D
TI

1 25-JAN-19 ISSUED FOR CONSTRUCTION DDP MRB MKA SIB MCC --- SUB
N W RI

2 0 30-NOV-18 ISSUED FOR CONSTRUCTION DDP MRB MKA CK MUM --- SUB
ON I

E 231.500M
SSI

32 N 271.866M REV. DATE DESCRIPTION PREP MECH ELEC CIVIL C&I SES APPD.
R PERM I

2
EL -2.067M STAMP:
THOUT THEI

00GKB20-BQ148R

2 1 39
6
ED OR LENT W I

1
C C

TO DRAIN
TED AND M UST NOT BE COPI

LINE : 00GKB20BR403-DN25
E 231.500M
N 271.866M
CONT. ON
220 MW (GAS) / 212 MW (HSD) NET
EL -2.121M PROJECT:
DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.11
COMBINED CYCLE POWER PROJECT
E 231.500M AT BHOLA, BANGLADESH
N 271.470M
MI

OWNER: NUTAN BIDYUT (BANGLADESH) LTD.


S THE PROPERTY OF L&T -SARGENT & LUNDY LI

EL -2.067M

B B
ONSHORE
CONTRACTOR: BISHO INFRA PROJECTS LIMITED

ONSHORE
CONSULTANT: L & T - SARGENT & LUNDY LIMITED

DATE NAME SIGN TITLE:

PREPARED 30-NOV-18 DDP ISOMETRIC DRAWING FOR


SPECIAL NOTES: CHECKED 30-NOV-18 MRB POTABLE WATER SYSTEM
GN I
NG AND DESI

A A
01. CONTRACTOR/INSTALLER SHALL TAKE ALL APPROPRIATE PRECAUTIONS TO ENSURE APPROVED 30-NOV-18 SUB
THE SAFETY OF ALL PEOPLE LOCATED ON THE WORK SITE INCLUDING CONTRACTOR/

841m m x 594m m )
DEPARTMENT: MECHANICAL
INSTALLER'S PERSONNEL (OR THAT OF ITS SUBCONTRACTOR(S)) PERFORMING THE WORK.
S DRAW I

02. THE PDF FORMAT OF THE ELECTRONIC FILE OF THIS DRAWING IS FOR IMPLEMENTATION, L&T-S&L JOB NO.: FD18090000
THE ELECTRONIC FILE OF THE DRAWING IN ANY OTHER FORMAT IS FOR INFORMATION. DRAWING NO.: BI-BCCP-00-CEM-157-MG-0013 SCALE:NONE SHEET: 12 OF 24 REV. 1
THI

A1 (
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

CAD FILE NAME:BI-BCCP-00-CEM-157-MG-0013-12.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FABRICATION MATERIALS
N ITEM SIZE SCHEDULE/
QTY. DESCRIPTION
NO. (DN / MM) RATING
M M
1 40.7 M 50 40S PIPE, ASTM A 312 GRADE TP304L, ASME B36.19M

2 2 50 CLASS 3000 45 DEG SW ELBOW, ASTM A 182 GRADE F304L, ASME B16.11

CONT. ON
DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.14
EL +0.133M E 232.723M
N 328.416M
L L
EL +0.133M

41

10 9 45.0°

E 232.723M
N 328.375M 45.0°
1

K 12 K
EL +0.133M 24

00GKB20-BQ169R
1730

ERECTION MATERIALS

ITEM SIZE SCHEDULE/


QTY. DESCRIPTION
NO. (DN) RATING
900

J J

24
45.0° 12

2
45.0°
E 231.500M
N 327.152M
EL +0.133M
HOLD LIST:
00GKB20-BQ168G
I 8 I

7 1
00GKB20BR001-DN50

00GKB20-BQ167R

25
00

00GKB20-BQ166R

NOTES:
22
50
H H
01. FOR GENERAL NOTES & LEGENDS REFER DWG. NO.BI-BCCP-00-CEM-157-MG-0013-01
00GKB20-BQ165G

30
00

00GKB20-BQ164R
6
28
00

00GKB20-BQ163R

24
50

00GKB20-BQ162G

5 REFERENCE DRAWINGS:
30
00
DRAWING NO. DRAWING TITLE

F F
39 30 00GKB20-BQ161R
04 00
6 4

00GKB20-BQ160R

30
00

00GKB20-BQ159G

E
25 3 E
00

00GKB20-BQ158R

30
00

00GKB20-BQ157R

2
30
00
NG.

D 00GKB20-BQ156G D
TI

1 25-JAN-19 ISSUED FOR CONSTRUCTION DDP MRB MKA SIB MCC --- SUB
N W RI

30 0 30-NOV-18 ISSUED FOR CONSTRUCTION DDP MRB MKA CK MUM --- SUB
ON I

00
SSI

REV. DATE DESCRIPTION PREP MECH ELEC CIVIL C&I SES APPD.
R PERM I

00GKB20-BQ155R
1 STAMP:
THOUT THEI

30
00
CONT. ON
DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.12
ED OR LENT W I

E 231.500M
54
C 5 N 288.106M C
EL +0.133M
TED AND M UST NOT BE COPI

220 MW (GAS) / 212 MW (HSD) NET


PROJECT: COMBINED CYCLE POWER PROJECT
AT BHOLA, BANGLADESH
MI

OWNER: NUTAN BIDYUT (BANGLADESH) LTD.


S THE PROPERTY OF L&T -SARGENT & LUNDY LI

B B
ONSHORE
CONTRACTOR: BISHO INFRA PROJECTS LIMITED

ONSHORE
CONSULTANT: L & T - SARGENT & LUNDY LIMITED

DATE NAME SIGN TITLE:

PREPARED 30-NOV-18 DDP ISOMETRIC DRAWING FOR


SPECIAL NOTES: CHECKED 30-NOV-18 MRB POTABLE WATER SYSTEM
GN I
NG AND DESI

A A
01. CONTRACTOR/INSTALLER SHALL TAKE ALL APPROPRIATE PRECAUTIONS TO ENSURE APPROVED 30-NOV-18 SUB
THE SAFETY OF ALL PEOPLE LOCATED ON THE WORK SITE INCLUDING CONTRACTOR/

841m m x 594m m )
DEPARTMENT: MECHANICAL
INSTALLER'S PERSONNEL (OR THAT OF ITS SUBCONTRACTOR(S)) PERFORMING THE WORK.
S DRAW I

02. THE PDF FORMAT OF THE ELECTRONIC FILE OF THIS DRAWING IS FOR IMPLEMENTATION, L&T-S&L JOB NO.: FD18090000
THE ELECTRONIC FILE OF THE DRAWING IN ANY OTHER FORMAT IS FOR INFORMATION. DRAWING NO.: BI-BCCP-00-CEM-157-MG-0013 SCALE:NONE SHEET: 13 OF 24 REV. 1
THI

A1 (
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

CAD FILE NAME:BI-BCCP-00-CEM-157-MG-0013-13.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FABRICATION MATERIALS
N ITEM SIZE SCHEDULE/
QTY. DESCRIPTION
NO. (DN / MM) RATING
M M
1 25.6 M 50 40S PIPE, ASTM A 312 GRADE TP304L, ASME B36.19M

2 2 50 CLASS 3000 45 DEG SW ELBOW, ASTM A 182 GRADE F304L, ASME B16.11

41
E 242.191M
N 350.159M
8
EL +0.133M
7 CONT. ON
DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.15
2
E 242.232M
45.0°
N 350.159M
L L
EL +0.133M

1
45.0°

00GKB20-BQ179R
K K

3000
ERECTION MATERIALS
6 94
68
ITEM SIZE SCHEDULE/
QTY. DESCRIPTION
NO. (DN) RATING

00GKB20-BQ178R
J J

3000
00GKB20BR001-DN50
13389

HOLD LIST:
I I

00GKB20-BQ177G
NOTES:
H H
3000

01. FOR GENERAL NOTES & LEGENDS REFER DWG. NO.BI-BCCP-00-CEM-157-MG-0013-01

00GKB20-BQ176R

68
1750

94

REFERENCE DRAWINGS:
DRAWING NO. DRAWING TITLE
00GKB20-BQ175R
989

F F
45.0°

2
45.0°
E 232.723M
N 340.692M
EL +0.133M

4 3 00GKB20-BQ174G
1

E E

00GKB20-BQ173R
20
00

2
NG.

D 30 D
TI

00 1 25-JAN-19 ISSUED FOR CONSTRUCTION DDP MRB MKA SIB MCC --- SUB
N W RI

00GKB20-BQ172R
0 30-NOV-18 ISSUED FOR CONSTRUCTION DDP MRB MKA CK MUM --- SUB
ON I

12
SSI

27 REV. DATE DESCRIPTION PREP MECH ELEC CIVIL C&I SES APPD.
5
R PERM I

STAMP:
THOUT THEI

00GKB20-BQ171G
30
00
ED OR LENT W I

00GKB20-BQ170R
C 1 C

25 CONT. ON
TED AND M UST NOT BE COPI

00
DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.13
E 232.723M
N 328.416M 220 MW (GAS) / 212 MW (HSD) NET
EL +0.133M PROJECT: COMBINED CYCLE POWER PROJECT
59
4 AT BHOLA, BANGLADESH
MI

OWNER: NUTAN BIDYUT (BANGLADESH) LTD.


S THE PROPERTY OF L&T -SARGENT & LUNDY LI

B B
ONSHORE
CONTRACTOR: BISHO INFRA PROJECTS LIMITED

ONSHORE
CONSULTANT: L & T - SARGENT & LUNDY LIMITED

DATE NAME SIGN TITLE:

PREPARED 30-NOV-18 DDP ISOMETRIC DRAWING FOR


SPECIAL NOTES: CHECKED 30-NOV-18 MRB POTABLE WATER SYSTEM
GN I
NG AND DESI

A A
01. CONTRACTOR/INSTALLER SHALL TAKE ALL APPROPRIATE PRECAUTIONS TO ENSURE APPROVED 30-NOV-18 SUB
THE SAFETY OF ALL PEOPLE LOCATED ON THE WORK SITE INCLUDING CONTRACTOR/

841m m x 594m m )
DEPARTMENT: MECHANICAL
INSTALLER'S PERSONNEL (OR THAT OF ITS SUBCONTRACTOR(S)) PERFORMING THE WORK.
S DRAW I

02. THE PDF FORMAT OF THE ELECTRONIC FILE OF THIS DRAWING IS FOR IMPLEMENTATION, L&T-S&L JOB NO.: FD18090000
THE ELECTRONIC FILE OF THE DRAWING IN ANY OTHER FORMAT IS FOR INFORMATION. DRAWING NO.: BI-BCCP-00-CEM-157-MG-0013 SCALE:NONE SHEET: 14 OF 24 REV. 1
THI

A1 (
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

CAD FILE NAME:BI-BCCP-00-CEM-157-MG-0013-14.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FABRICATION MATERIALS
N ITEM SIZE SCHEDULE/
QTY. DESCRIPTION
NO. (DN / MM) RATING
M M
1 41.8 M 50 40S PIPE, ASTM A 312 GRADE TP304L, ASME B36.19M

2 1 50X25 CLASS 3000 SW REDUCING TEE, ASTM A 182 GRADE F304L, ASME B16.11

3 2 50 CLASS 3000 90 DEG SW ELBOW, ASTM A 182 GRADE F304L, ASME B16.11

L L

K K

ERECTION MATERIALS

ITEM SIZE SCHEDULE/


QTY. DESCRIPTION
NO. (DN) RATING
CONT. ON
DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.16
E 281.688M
J J
N 350.159M
EL -2.467M

5
20
1
11 2
E 281.483M
N 350.159M
10 EL -2.467M

TO DRAIN
1 HOLD LIST:
I LINE:00GKB20BR406-DN25 I

E 281.483M
00
30 N 350.159M
EL -2.520M

3
00GKB20-BQ193R
90.0° 00
30
E 263.571M
N 350.159M
EL +0.133M 00GKB20-BQ192G
00GKB20-BQ186G NOTES:
2 00
H 91 30
H

4 5 17 01. FOR GENERAL NOTES & LEGENDS REFER DWG. NO.BI-BCCP-00-CEM-157-MG-0013-01

9 00GKB20-BQ191R
1 00GKB20BR001-DN50

50 00
27 30

3
3
00 90.0° 00 00GKB20-BQ190R
30 30
E 263.571M
N 350.159M
8
EL -2.467M
00 00 00GKB20-BQ189G
30 20

1
00GKB20-BQ184R
00GKB20-BQ185R
9
33 REFERENCE DRAWINGS:
21
00GKB20-BQ188R DRAWING NO. DRAWING TITLE
4
00 71
30

2
00GKB20-BQ183G 6 7 00GKB20-BQ187R

F F

50 EL -2.467M
25

00 00GKB20-BQ182R
30
1
03 00GKB20-BQ181R
26
E E

00GKB20-BQ180G

CONT. ON
DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.14
E 242.232M
N 350.159M
EL +0.133M
NG.

D D
TI

1 25-JAN-19 ISSUED FOR CONSTRUCTION DDP MRB MKA SIB MCC --- SUB
N W RI

0 30-NOV-18 ISSUED FOR CONSTRUCTION DDP MRB MKA CK MUM --- SUB
ON I
SSI

REV. DATE DESCRIPTION PREP MECH ELEC CIVIL C&I SES APPD.
R PERM I

STAMP:
THOUT THEI
ED OR LENT W I

C C
TED AND M UST NOT BE COPI

220 MW (GAS) / 212 MW (HSD) NET


PROJECT: COMBINED CYCLE POWER PROJECT
AT BHOLA, BANGLADESH
MI

OWNER: NUTAN BIDYUT (BANGLADESH) LTD.


S THE PROPERTY OF L&T -SARGENT & LUNDY LI

B B
ONSHORE
CONTRACTOR: BISHO INFRA PROJECTS LIMITED

ONSHORE
CONSULTANT: L & T - SARGENT & LUNDY LIMITED

DATE NAME SIGN TITLE:

PREPARED 30-NOV-18 DDP ISOMETRIC DRAWING FOR


SPECIAL NOTES: CHECKED 30-NOV-18 MRB POTABLE WATER SYSTEM
GN I
NG AND DESI

A A
01. CONTRACTOR/INSTALLER SHALL TAKE ALL APPROPRIATE PRECAUTIONS TO ENSURE APPROVED 30-NOV-18 SUB
THE SAFETY OF ALL PEOPLE LOCATED ON THE WORK SITE INCLUDING CONTRACTOR/

841m m x 594m m )
DEPARTMENT: MECHANICAL
INSTALLER'S PERSONNEL (OR THAT OF ITS SUBCONTRACTOR(S)) PERFORMING THE WORK.
S DRAW I

02. THE PDF FORMAT OF THE ELECTRONIC FILE OF THIS DRAWING IS FOR IMPLEMENTATION, L&T-S&L JOB NO.: FD18090000
THE ELECTRONIC FILE OF THE DRAWING IN ANY OTHER FORMAT IS FOR INFORMATION. DRAWING NO.: BI-BCCP-00-CEM-157-MG-0013 SCALE:NONE SHEET: 15 OF 24 REV. 1
THI

A1 (
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

CAD FILE NAME:BI-BCCP-00-CEM-157-MG-0013-15.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FABRICATION MATERIALS
N ITEM SIZE SCHEDULE/
QTY. DESCRIPTION
NO. (DN / MM) RATING
M M
1 31.5 M 50 40S PIPE, ASTM A 312 GRADE TP304L, ASME B36.19M

2 3 50 CLASS 3000 90 DEG SW ELBOW, ASTM A 182 GRADE F304L, ASME B16.11
54
CONT. ON
DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.17
E 284.982M
N 379.039M
2
EL +0.133M
E 284.929M 90.0°
54
N 379.045M

L
EL +0.133M L

83.7°
6.3° 9 10

1
6
83.7°

1
5
0
0
87
31
K K
00GKB20-BQ205R

1
9
9
8
00GKB20-BQ204G ERECTION MATERIALS

ITEM SIZE SCHEDULE/


QTY. DESCRIPTION
NO. (DN) RATING

3
0
0
2
00GKB20-BQ203R
J J

2
0
0
0
8
00GKB20-BQ202R

2
5
0
HOLD LIST:

0
I 00GKB20-BQ201G I

00GKB20-BQ200R

2
3

9
0

0
0

6
0

1
NOTES:
00GKB20BR001-DN50
H H
01. FOR GENERAL NOTES & LEGENDS REFER DWG. NO.BI-BCCP-00-CEM-157-MG-0013-01

3
0
0
0
00GKB20-BQ199R
28
88
6

3
0
0
0
00GKB20-BQ198G

6
REFERENCE DRAWINGS:
DRAWING NO. DRAWING TITLE

2
9
9
8
00GKB20-BQ197R

F F

3
00GKB20-BQ196R

0
0
0
5

9
7
5
E E
00GKB20-BQ195R 2
90.0°

9
7
5
E 281.742M

00GKB20-BQ194R N 350.159M
EL +0.133M
6.3°

4 3
EL +0.133M
NG.

D D
TI

1 25-JAN-19 ISSUED FOR CONSTRUCTION DDP MRB MKA SIB MCC --- SUB
N W RI

1
0 30-NOV-18 ISSUED FOR CONSTRUCTION DDP MRB MKA CK MUM --- SUB
ON I
SSI

REV. DATE DESCRIPTION PREP MECH ELEC CIVIL C&I SES APPD.
R PERM I

STAMP:
THOUT THEI
ED OR LENT W I

C C

CONT. ON
TED AND M UST NOT BE COPI

DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.15
E 281.688M
N 350.159M 220 MW (GAS) / 212 MW (HSD) NET
EL -2.467M
EL -2.467M PROJECT:
2 COMBINED CYCLE POWER PROJECT
90.0°
AT BHOLA, BANGLADESH
E 281.742M
1 2
MI

N 350.159M OWNER: NUTAN BIDYUT (BANGLADESH) LTD.


S THE PROPERTY OF L&T -SARGENT & LUNDY LI

EL -2.467M
B B
54
ONSHORE
CONTRACTOR: BISHO INFRA PROJECTS LIMITED

ONSHORE
CONSULTANT: L & T - SARGENT & LUNDY LIMITED

DATE NAME SIGN TITLE:

PREPARED 30-NOV-18 DDP ISOMETRIC DRAWING FOR


SPECIAL NOTES: CHECKED 30-NOV-18 MRB POTABLE WATER SYSTEM
GN I
NG AND DESI

A A
01. CONTRACTOR/INSTALLER SHALL TAKE ALL APPROPRIATE PRECAUTIONS TO ENSURE APPROVED 30-NOV-18 SUB
THE SAFETY OF ALL PEOPLE LOCATED ON THE WORK SITE INCLUDING CONTRACTOR/

841m m x 594m m )
DEPARTMENT: MECHANICAL
INSTALLER'S PERSONNEL (OR THAT OF ITS SUBCONTRACTOR(S)) PERFORMING THE WORK.
S DRAW I

02. THE PDF FORMAT OF THE ELECTRONIC FILE OF THIS DRAWING IS FOR IMPLEMENTATION, L&T-S&L JOB NO.: FD18090000
THE ELECTRONIC FILE OF THE DRAWING IN ANY OTHER FORMAT IS FOR INFORMATION. DRAWING NO.: BI-BCCP-00-CEM-157-MG-0013 SCALE:NONE SHEET: 16 OF 24 REV. 1
THI

A1 (
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

CAD FILE NAME:BI-BCCP-00-CEM-157-MG-0013-16.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FABRICATION MATERIALS
N ITEM SIZE SCHEDULE/
QTY. DESCRIPTION
NO. (DN / MM) RATING
M M
1 42.2 M 50 40S PIPE, ASTM A 312 GRADE TP304L, ASME B36.19M

2 1 50X25 CLASS 3000 SW REDUCING TEE, ASTM A 182 GRADE F304L, ASME B16.11

3 2 50 CLASS 3000 45 DEG SW ELBOW, ASTM A 182 GRADE F304L, ASME B16.11

L L

E 325.559M 41 CONT. ON
N 379.710M
K
DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.18 K
EL +0.133M
E 325.600M

84.4° N 379.706M
EL +0.133M
3
45.0°
ERECTION MATERIALS
5.6°
4 41
ITEM SIZE SCHEDULE/
11 12
QTY. DESCRIPTION
NO. (DN) RATING

1
51.3°
J J

45
24
00GKB20-BQ220R

1750
00GKB20-BQ219G

7235
10 HOLD LIST:
I I

3000
00GKB20BR001-DN50

46
56
00GKB20-BQ218R NOTES:

1718
H H
01. FOR GENERAL NOTES & LEGENDS REFER DWG. NO.BI-BCCP-00-CEM-157-MG-0013-01
CONT. ON
LINE:00GKB20BR114-DN25
DWG:BI-BCCP-00-CEM-157-MG-0113-SHT.06 38.7°

E 312.398M
E 319.912M
N 376.015M
560 N 375.186M
7
EL +0.187M 750
2 1 EL +0.133M
3
250 7 9 45.0°
2 8
396
1 00GKB20-BQ217R

00GKB20-BQ213G
5 00GKB20-BQ216G

3000 1 6
00GKB20-BQ212R 00GKB20-BQ215R REFERENCE DRAWINGS:
000
3
6.3° DRAWING NO. DRAWING TITLE
3000 4
3 E 312.398M 2
758
2 00
30 N 376.015M

00GKB20-BQ214R EL +0.133M
F
000 F
3
3
CONT. ON 00GKB20-BQ211R
000
DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.16 3
E 284.982M
3000 2 00GKB20-BQ210G 0
N 379.039M 93
0
00GKB20-BQ209R 34
EL +0.133M 200

2979 1 00GKB20-BQ208R

00GKB20-BQ207G
E E
83.7°
00GKB20-BQ206R

38
53
NG.

D D
TI

1 25-JAN-19 ISSUED FOR CONSTRUCTION DDP MRB MKA SIB MCC --- SUB
N W RI

0 30-NOV-18 ISSUED FOR CONSTRUCTION DDP MRB MKA CK MUM --- SUB
ON I
SSI

REV. DATE DESCRIPTION PREP MECH ELEC CIVIL C&I SES APPD.
R PERM I

STAMP:
THOUT THEI
ED OR LENT W I

C C
TED AND M UST NOT BE COPI

220 MW (GAS) / 212 MW (HSD) NET


PROJECT: COMBINED CYCLE POWER PROJECT
AT BHOLA, BANGLADESH
MI

OWNER: NUTAN BIDYUT (BANGLADESH) LTD.


S THE PROPERTY OF L&T -SARGENT & LUNDY LI

B B
ONSHORE
CONTRACTOR: BISHO INFRA PROJECTS LIMITED

ONSHORE
CONSULTANT: L & T - SARGENT & LUNDY LIMITED

DATE NAME SIGN TITLE:

PREPARED 30-NOV-18 DDP ISOMETRIC DRAWING FOR


SPECIAL NOTES: CHECKED 30-NOV-18 MRB POTABLE WATER SYSTEM
GN I
NG AND DESI

A A
01. CONTRACTOR/INSTALLER SHALL TAKE ALL APPROPRIATE PRECAUTIONS TO ENSURE APPROVED 30-NOV-18 SUB
THE SAFETY OF ALL PEOPLE LOCATED ON THE WORK SITE INCLUDING CONTRACTOR/

841m m x 594m m )
DEPARTMENT: MECHANICAL
INSTALLER'S PERSONNEL (OR THAT OF ITS SUBCONTRACTOR(S)) PERFORMING THE WORK.
S DRAW I

02. THE PDF FORMAT OF THE ELECTRONIC FILE OF THIS DRAWING IS FOR IMPLEMENTATION, L&T-S&L JOB NO.: FD18090000
THE ELECTRONIC FILE OF THE DRAWING IN ANY OTHER FORMAT IS FOR INFORMATION. DRAWING NO.: BI-BCCP-00-CEM-157-MG-0013 SCALE:NONE SHEET: 17 OF 24 REV. 1
THI

A1 (
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

CAD FILE NAME:BI-BCCP-00-CEM-157-MG-0013-17.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FABRICATION MATERIALS
N ITEM SIZE SCHEDULE/
QTY. DESCRIPTION
NO. (DN / MM) RATING
M M
1 38.3 M 50 40S PIPE, ASTM A 312 GRADE TP304L, ASME B36.19M

2 2 50X25 CLASS 3000 SW REDUCING TEE, ASTM A 182 GRADE F304L, ASME B16.11

3 2 50 CLASS 3000 90 DEG SW ELBOW, ASTM A 182 GRADE F304L, ASME B16.11

L L

K K

ERECTION MATERIALS

ITEM SIZE SCHEDULE/


QTY. DESCRIPTION
NO. (DN) RATING

J J

CONT. ON
DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.19
E 361.961M

3 N 375.694M
CONT. ON
90.0° EL -2.017M HOLD LIST:
I LINE : 00GKB20BR113-DN25 I
E 346.598M
DWG:BI-BCCP-00-CEM-157-MG-0113-SHT.08
N 377.389M
E 345.701M 00GKB20-BQ228G EL +0.133M
N 377.488M
903 445
EL +0.187M EL +0.133M

6 7
00GKB20-BQ231G 00
00GKB20BR001-DN50 30 1
2
00GKB20-BQ227R E 347.213M 000
837 3
1 14
53 N 377.321M NOTES:
10

1
EL -2.017M 500
H 00GKB20-BQ226R 2 H
1 00GKB20-BQ234G 01. FOR GENERAL NOTES & LEGENDS REFER DWG. NO.BI-BCCP-00-CEM-157-MG-0013-01
300
5 6.3°
0
000 4 250 13
3
23 2 500
202 2
3000 3 E 345.701M 46
00GKB20-BQ232R
19 3
00GKB20-BQ223R N 377.488M
6 12
00
CONT. ON 30
2
EL +0.133M 10 00GKB20-BQ230R 00GKB20-BQ233R
DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.17 2
8 9 36
E 325.600M 00
00GKB20-BQ225G 1 11 00GKB20-BQ229R 15
30
N 379.706M 7 3
500 00GKB20-BQ224R 99 6.3° EL -2.017M
EL +0.133M 2 20 90.0°
1 00GKB20BR001-DN50 83.7°
1 00GKB20-BQ222G
16
83.7°
E 346.598M 95 REFERENCE DRAWINGS:
00GKB20-BQ221R N 377.389M
DRAWING NO. DRAWING TITLE
EL -2.017M

TO DRAIN
23
16 LINE: 00GKB20BR404-DN25
F E 347.213M F

N 377.321M
EL -2.071M

E E
NG.

D D
TI

1 25-JAN-19 ISSUED FOR CONSTRUCTION DDP MRB MKA SIB MCC --- SUB
N W RI

0 30-NOV-18 ISSUED FOR CONSTRUCTION DDP MRB MKA CK MUM --- SUB
ON I
SSI

REV. DATE DESCRIPTION PREP MECH ELEC CIVIL C&I SES APPD.
R PERM I

STAMP:
THOUT THEI
ED OR LENT W I

C C
TED AND M UST NOT BE COPI

220 MW (GAS) / 212 MW (HSD) NET


PROJECT: COMBINED CYCLE POWER PROJECT
AT BHOLA, BANGLADESH
MI

OWNER: NUTAN BIDYUT (BANGLADESH) LTD.


S THE PROPERTY OF L&T -SARGENT & LUNDY LI

B B
ONSHORE
CONTRACTOR: BISHO INFRA PROJECTS LIMITED

ONSHORE
CONSULTANT: L & T - SARGENT & LUNDY LIMITED

DATE NAME SIGN TITLE:

PREPARED 30-NOV-18 DDP ISOMETRIC DRAWING FOR


SPECIAL NOTES: CHECKED 30-NOV-18 MRB POTABLE WATER SYSTEM
GN I
NG AND DESI

A A
01. CONTRACTOR/INSTALLER SHALL TAKE ALL APPROPRIATE PRECAUTIONS TO ENSURE APPROVED 30-NOV-18 SUB
THE SAFETY OF ALL PEOPLE LOCATED ON THE WORK SITE INCLUDING CONTRACTOR/

841m m x 594m m )
DEPARTMENT: MECHANICAL
INSTALLER'S PERSONNEL (OR THAT OF ITS SUBCONTRACTOR(S)) PERFORMING THE WORK.
S DRAW I

02. THE PDF FORMAT OF THE ELECTRONIC FILE OF THIS DRAWING IS FOR IMPLEMENTATION, L&T-S&L JOB NO.: FD18090000
THE ELECTRONIC FILE OF THE DRAWING IN ANY OTHER FORMAT IS FOR INFORMATION. DRAWING NO.: BI-BCCP-00-CEM-157-MG-0013 SCALE:NONE SHEET: 18 OF 24 REV. 1
THI

A1 (
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

CAD FILE NAME:BI-BCCP-00-CEM-157-MG-0013-18.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FABRICATION MATERIALS
N ITEM SIZE SCHEDULE/
QTY. DESCRIPTION
NO. (DN / MM) RATING
M M
1 51.5 M 50 40S PIPE, ASTM A 312 GRADE TP304L, ASME B36.19M

2 1 50X25 CLASS 3000 SW REDUCING TEE, ASTM A 182 GRADE F304L, ASME B16.11

3 3 50 CLASS 3000 90 DEG SW ELBOW, ASTM A 182 GRADE F304L, ASME B16.11

L L

K K

CONT. TO
DWG:BI-BCCP-00-CEM-157-MG-0113-SHT.09 ERECTION MATERIALS
LINE : 00GKB20BR112-DN25
E 410.774M ITEM SIZE SCHEDULE/
00GKB20-BQ252G QTY. DESCRIPTION
N 370.310M NO. (DN) RATING
EL +0.187M
3
E 410.774M 4
60 90.0°
J N 370.310M J

EL +0.133M

180 1 15 16
14
00GKB20-BQ250R
13
500
1 1
00GKB20-BQ248R 0 2
300 E 411.374M
N 370.244M
3000 12 6.3° EL +0.133M
CONT. TO HOLD LIST:
I 000 I
3 00GKB20-BQ251R DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.20

3000 11 E 411.374M
N 370.244M
00 00GKB20-BQ249G
30 EL +0.079M
00GKB20-BQ247R
3000 10
055
49 000 00GKB20-BQ246G
3

0
9
00 00GKB20-BQ245R
3 NOTES:
00GKB20-BQ241R

H H
0 00GKB20-BQ244R 01. FOR GENERAL NOTES & LEGENDS REFER DWG. NO.BI-BCCP-00-CEM-157-MG-0013-01
300

3000 8 00GKB20-BQ243G
0 00GKB20-BQ242R
300
00GKB20BR001-DN50
3000 7 00GKB20-BQ240G

000 9
3 00GKB20-BQ239R 35
49
000
3 3
90.0°
317 6 00GKB20-BQ238R
3
E 362.015M
N 375.688M 40 00GKB20-BQ237G
5
EL +0.133M 5
00GKB20-BQ236R
EL +0.133M
REFERENCE DRAWINGS:
3 4 83.7°
DRAWING NO. DRAWING TITLE

00GKB20-BQ235R
1

F F

54
54
45

83.7°
E 362.015M

E
N 375.688M E

3 EL -2.017M
6 54
6.3° 90.0°

1 2
CONT. TO
DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.18
E 361.961M
N 375.694M
EL -2.017M
NG.

D D
TI

1 25-JAN-19 ISSUED FOR CONSTRUCTION DDP MRB MKA SIB MCC --- SUB
N W RI

0 30-NOV-18 ISSUED FOR CONSTRUCTION DDP MRB MKA CK MUM --- SUB
ON I
SSI

REV. DATE DESCRIPTION PREP MECH ELEC CIVIL C&I SES APPD.
R PERM I

STAMP:
THOUT THEI
ED OR LENT W I

C C
TED AND M UST NOT BE COPI

220 MW (GAS) / 212 MW (HSD) NET


PROJECT: COMBINED CYCLE POWER PROJECT
AT BHOLA, BANGLADESH
MI

OWNER: NUTAN BIDYUT (BANGLADESH) LTD.


S THE PROPERTY OF L&T -SARGENT & LUNDY LI

B B
ONSHORE
CONTRACTOR: BISHO INFRA PROJECTS LIMITED

ONSHORE
CONSULTANT: L & T - SARGENT & LUNDY LIMITED

DATE NAME SIGN TITLE:

PREPARED 30-NOV-18 DDP ISOMETRIC DRAWING FOR


SPECIAL NOTES: CHECKED 30-NOV-18 MRB POTABLE WATER SYSTEM
GN I
NG AND DESI

A A
01. CONTRACTOR/INSTALLER SHALL TAKE ALL APPROPRIATE PRECAUTIONS TO ENSURE APPROVED 30-NOV-18 SUB
THE SAFETY OF ALL PEOPLE LOCATED ON THE WORK SITE INCLUDING CONTRACTOR/

841m m x 594m m )
DEPARTMENT: MECHANICAL
INSTALLER'S PERSONNEL (OR THAT OF ITS SUBCONTRACTOR(S)) PERFORMING THE WORK.
S DRAW I

02. THE PDF FORMAT OF THE ELECTRONIC FILE OF THIS DRAWING IS FOR IMPLEMENTATION, L&T-S&L JOB NO.: FD18090000
THE ELECTRONIC FILE OF THE DRAWING IN ANY OTHER FORMAT IS FOR INFORMATION. DRAWING NO.: BI-BCCP-00-CEM-157-MG-0013 SCALE:NONE SHEET: 19 OF 24 REV. 1
THI

A1 (
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

CAD FILE NAME:BI-BCCP-00-CEM-157-MG-0013-19.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FABRICATION MATERIALS
N ITEM SIZE SCHEDULE/
QTY. DESCRIPTION
CONT. ON NO. (DN / MM) RATING
M DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.21 M
1 16.9 M 50 40S PIPE, ASTM A 312 GRADE TP304L, ASME B36.19M
E 412.808M
2 1 50X25 CLASS 3000 SW REDUCING TEE, ASTM A 182 GRADE F304L, ASME B16.11
N 383.248M
6 EL +0.134M 3 3 3 50 CLASS 3000 90 DEG SW ELBOW, ASTM A 182 GRADE F304L, ASME B16.11
90.0°
54 E 412.803M
N 383.195M
83.7°
EL +0.134M
6.3°

EL +0.134M

L
9 10 L

54

1
K K

ERECTION MATERIALS
00GKB20BR001-DN50
ITEM SIZE SCHEDULE/
QTY. DESCRIPTION
NO. (DN) RATING

J J

7 8
3
E 412.803M 90.0°
N 383.195M
EL -2.017M

HOLD LIST:

1
I I

9
1
6
83.7°

28
14

3
4
00GKB20-BQ257R

3
E 412.702M 6 NOTES:
H N 382.285M H
01. FOR GENERAL NOTES & LEGENDS REFER DWG. NO.BI-BCCP-00-CEM-157-MG-0013-01
EL -2.017M
5
2

TO DRAIN
LINE: 00GKB20BR405-DN25
E 412.702M

1
N 382.285M
EL -2.071M

REFERENCE DRAWINGS:
00GKB20-BQ256R
DRAWING NO. DRAWING TITLE
4

3
0
0
0
F F

CONT. ON
DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.19

1
2
1
E 411.374M

1
4
N 370.244M
EL +0.079M

E 12 E
95
1
00GKB20-BQ255G

2
5
0
0
3
NG.

D D
TI

1 25-JAN-19 ISSUED FOR CONSTRUCTION DDP MRB MKA SIB MCC --- SUB
N W RI

00GKB20-BQ254R
0

2
30-NOV-18 ISSUED FOR CONSTRUCTION DDP MRB MKA CK MUM --- SUB
ON I

4
9
8
SSI

REV. DATE DESCRIPTION PREP MECH ELEC CIVIL C&I SES APPD.
R PERM I

STAMP:
THOUT THEI

1
ED OR LENT W I

C C

1
4
5
8
TED AND M UST NOT BE COPI

00GKB20-BQ253R

220 MW (GAS) / 212 MW (HSD) NET


PROJECT: COMBINED CYCLE POWER PROJECT
6.3°
AT BHOLA, BANGLADESH
MI

2 1 OWNER: NUTAN BIDYUT (BANGLADESH) LTD.


S THE PROPERTY OF L&T -SARGENT & LUNDY LI

3
B B
90.0°
ONSHORE
E 411.374M CONTRACTOR: BISHO INFRA PROJECTS LIMITED
N 370.244M
EL -2.017M ONSHORE
CONSULTANT: L & T - SARGENT & LUNDY LIMITED

DATE NAME SIGN TITLE:

PREPARED 30-NOV-18 DDP ISOMETRIC DRAWING FOR


SPECIAL NOTES: CHECKED 30-NOV-18 MRB POTABLE WATER SYSTEM
GN I
NG AND DESI

A A
01. CONTRACTOR/INSTALLER SHALL TAKE ALL APPROPRIATE PRECAUTIONS TO ENSURE APPROVED 30-NOV-18 SUB
THE SAFETY OF ALL PEOPLE LOCATED ON THE WORK SITE INCLUDING CONTRACTOR/

841m m x 594m m )
DEPARTMENT: MECHANICAL
INSTALLER'S PERSONNEL (OR THAT OF ITS SUBCONTRACTOR(S)) PERFORMING THE WORK.
S DRAW I

02. THE PDF FORMAT OF THE ELECTRONIC FILE OF THIS DRAWING IS FOR IMPLEMENTATION, L&T-S&L JOB NO.: FD18090000
THE ELECTRONIC FILE OF THE DRAWING IN ANY OTHER FORMAT IS FOR INFORMATION. DRAWING NO.: BI-BCCP-00-CEM-157-MG-0013 SCALE:NONE SHEET: 20 OF 24 REV. 1
THI

A1 (
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

CAD FILE NAME:BI-BCCP-00-CEM-157-MG-0013-20.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FABRICATION MATERIALS
N ITEM SIZE SCHEDULE/
QTY. DESCRIPTION
NO. (DN / MM) RATING
CONT. ON
M M
DWG:DWG:BI-BCCP-00-CEM-157-MG-0113-SHT.13 1 20.2 M 50 40S PIPE, ASTM A 312 GRADE TP304L, ASME B36.19M
LINE : 00GKB20BR122-DN25 164 2 1 50X25 CLASS 3000 SW REDUCING TEE, ASTM A 182 GRADE F304L, ASME B16.11
E 415.048M 38 3 1 50X25 CLASS 3000 ECCENTRIC REDUCER (FOB), ASTM A 182 GRADE F304L, ASME B16.11
N 403.546M
4 1 25 CLASS 3000 SOCKET WELDED COUPLING, ASTM A 182 GRADE F304L, ASME B16.11
EL +0.121M CONT. ON

7 DWG:DWG:BI-BCCP-00-CEM-157-MG-0113-SHT.10

6 LINE : 00GKB20BR106-DN25
E 415.005M
3 4
N 403.162M
13MM OFFSET
EL +0.187M
L L

1
E 415.005M
N 403.162M
83.8° EL +0.134M

1
8
4
5

4
17 2
22

1
K K

ERECTION MATERIALS

ITEM SIZE SCHEDULE/


QTY. DESCRIPTION
NO. (DN) RATING

00GKB20BR001-DN50
J J

00GKB20-BQ265R

2
5
0
0
HOLD LIST:
I I

00GKB20-BQ264R

3
0
0
0
3

NOTES:
H H
01. FOR GENERAL NOTES & LEGENDS REFER DWG. NO.BI-BCCP-00-CEM-157-MG-0013-01
00GKB20-BQ263G

3
0
0
0

2
0
0
3
4
00GKB20-BQ262R

3
REFERENCE DRAWINGS:

0
0
0
DRAWING NO. DRAWING TITLE

20
09
6

F
2 F

00GKB20-BQ261R

3
0
0
0
E E

00GKB20-BQ260G

1
7
5
0
1
NG.

D D
TI

1 25-JAN-19 ISSUED FOR CONSTRUCTION DDP MRB MKA SIB MCC --- SUB
N W RI

00GKB20-BQ259R
0 30-NOV-18 ISSUED FOR CONSTRUCTION DDP MRB MKA CK MUM --- SUB
ON I

1
9
SSI

3
REV. DATE DESCRIPTION PREP MECH ELEC CIVIL C&I SES APPD.

1
R PERM I

STAMP:
THOUT THEI
ED OR LENT W I

00GKB20-BQ258G

4
C C

7
4
TED AND M UST NOT BE COPI

6.2°
220 MW (GAS) / 212 MW (HSD) NET
PROJECT: COMBINED CYCLE POWER PROJECT
AT BHOLA, BANGLADESH
MI

OWNER: NUTAN BIDYUT (BANGLADESH) LTD.


S THE PROPERTY OF L&T -SARGENT & LUNDY LI

B B
ONSHORE
CONT. ON CONTRACTOR: BISHO INFRA PROJECTS LIMITED
DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.20
E 412.808M ONSHORE
N 383.248M CONSULTANT: L & T - SARGENT & LUNDY LIMITED
EL +0.134M
DATE NAME SIGN TITLE:

PREPARED 30-NOV-18 DDP ISOMETRIC DRAWING FOR


SPECIAL NOTES: CHECKED 30-NOV-18 MRB POTABLE WATER SYSTEM
GN I
NG AND DESI

A A
01. CONTRACTOR/INSTALLER SHALL TAKE ALL APPROPRIATE PRECAUTIONS TO ENSURE APPROVED 30-NOV-18 SUB
THE SAFETY OF ALL PEOPLE LOCATED ON THE WORK SITE INCLUDING CONTRACTOR/

841m m x 594m m )
DEPARTMENT: MECHANICAL
INSTALLER'S PERSONNEL (OR THAT OF ITS SUBCONTRACTOR(S)) PERFORMING THE WORK.
S DRAW I

02. THE PDF FORMAT OF THE ELECTRONIC FILE OF THIS DRAWING IS FOR IMPLEMENTATION, L&T-S&L JOB NO.: FD18090000
THE ELECTRONIC FILE OF THE DRAWING IN ANY OTHER FORMAT IS FOR INFORMATION. DRAWING NO.: BI-BCCP-00-CEM-157-MG-0013 SCALE:NONE SHEET: 21 OF 24 REV. 1
THI

A1 (
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

CAD FILE NAME:BI-BCCP-00-CEM-157-MG-0013-21.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FABRICATION MATERIALS
N ITEM SIZE SCHEDULE/
QTY. DESCRIPTION
NO. (DN / MM) RATING
M M
1 30.3 M 50 40S PIPE, ASTM A 312 GRADE TP304L, ASME B36.19M

2 3 50 CLASS 3000 90 DEG SW ELBOW, ASTM A 182 GRADE F304L, ASME B16.11

2
90.0°
E 259.695M
N 196.682M
EL +8.322M
L L

10 11
17
1 8

K K

1
CONT. ON
2 DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.23 ERECTION MATERIALS
90.0° E 259.695M
E 259.695M N 196.504M ITEM SIZE SCHEDULE/
QTY. DESCRIPTION
N 196.682M EL +8.322M NO. (DN) RATING
9 EL +8.033M
8
J 00GKB20-BQ024G J

95
22

00GKB20-BQ025R

50
27

00GKB20-BQ026R
HOLD LIST:
I I

50
27

00GKB20-BQ027G

00
26

00GKB20-BQ028R

7 NOTES:
00
H
26 01. FOR GENERAL NOTES & LEGENDS REFER DWG. NO.BI-BCCP-00-CEM-157-MG-0013-01
H

00GKB20BR003-DN50

00GKB20-BQ029R 00
26

0
50
29

00GKB20-BQ030G

6 00
26
REFERENCE DRAWINGS:
00GKB20-BQ031R DRAWING NO. DRAWING TITLE

00
26

F 00GKB20-BQ032R F
5
00
26

00GKB20-BQ033G

4 70
26

00GKB20-BQ034R

E E

00
26

2
90.0° 1
E 230.196M
3
N 196.682M 2
EL +8.033M
NG.

D CONT. ON D
TI

1 25-JAN-19 ISSUED FOR CONSTRUCTION DDP MRB MKA SIB MCC --- SUB
N W RI

DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.09
E 230.196M 0 30-NOV-18 ISSUED FOR CONSTRUCTION DDP MRB MKA CK MUM --- SUB
ON I

1 N 196.044M
SSI

REV. DATE DESCRIPTION PREP MECH ELEC CIVIL C&I SES APPD.
R PERM I

63 EL +8.030M
8 STAMP:
THOUT THEI

1
ED OR LENT W I

C C
TED AND M UST NOT BE COPI

220 MW (GAS) / 212 MW (HSD) NET


PROJECT: COMBINED CYCLE POWER PROJECT
AT BHOLA, BANGLADESH
MI

OWNER: NUTAN BIDYUT (BANGLADESH) LTD.


S THE PROPERTY OF L&T -SARGENT & LUNDY LI

B B
ONSHORE
CONTRACTOR: BISHO INFRA PROJECTS LIMITED

ONSHORE
CONSULTANT: L & T - SARGENT & LUNDY LIMITED

DATE NAME SIGN TITLE:

PREPARED 30-NOV-18 DDP ISOMETRIC DRAWING FOR


SPECIAL NOTES: CHECKED 30-NOV-18 MRB POTABLE WATER SYSTEM
GN I
NG AND DESI

A A
01. CONTRACTOR/INSTALLER SHALL TAKE ALL APPROPRIATE PRECAUTIONS TO ENSURE APPROVED 30-NOV-18 SUB
THE SAFETY OF ALL PEOPLE LOCATED ON THE WORK SITE INCLUDING CONTRACTOR/

841m m x 594m m )
DEPARTMENT: MECHANICAL
INSTALLER'S PERSONNEL (OR THAT OF ITS SUBCONTRACTOR(S)) PERFORMING THE WORK.
S DRAW I

02. THE PDF FORMAT OF THE ELECTRONIC FILE OF THIS DRAWING IS FOR IMPLEMENTATION, L&T-S&L JOB NO.: FD18090000
THE ELECTRONIC FILE OF THE DRAWING IN ANY OTHER FORMAT IS FOR INFORMATION. DRAWING NO.: BI-BCCP-00-CEM-157-MG-0013 SCALE:NONE SHEET: 22 OF 24 REV. 1
THI

A1 (
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

CAD FILE NAME:BI-BCCP-00-CEM-157-MG-0013-22.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FABRICATION MATERIALS
N ITEM SIZE SCHEDULE/
QTY. DESCRIPTION
NO. (DN / MM) RATING
M M
1 42.8 M 50 40S PIPE, ASTM A 312 GRADE TP304L, ASME B36.19M

2 2 50X25 CLASS 3000 SW REDUCING TEE, ASTM A 182 GRADE F304L, ASME B16.11

3 4 50 CLASS 3000 90 DEG SW ELBOW, ASTM A 182 GRADE F304L, ASME B16.11
CONT. ON
DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.24
E 302.265M
N 196.900M
EL +8.033M

00GKB20-BQ006G
L L

00GKB20-BQ007R

00
25
00GKB20-BQ008R

00
30
00GKB20-BQ009G
K K
17
00
20
00GKB20-BQ010R

ERECTION MATERIALS
01
25
00GKB20-BQ011R ITEM SIZE SCHEDULE/
QTY. DESCRIPTION
NO. (DN) RATING
00
25
00GKB20-BQ012G
J
16 J

01
25
00GKB20BR001-DN50

00GKB20-BQ013R 7
02
00 36
25
15
00GKB20-BQ014R
HOLD LIST:
I I

00
25
00GKB20-BQ015G

00
25
3 00GKB20-BQ016R
90.0° 14
E 266.237M 00
25
N 196.900M 00GKB20-BQ017R
EL +8.322M
NOTES:
H H
00 01. FOR GENERAL NOTES & LEGENDS REFER DWG. NO.BI-BCCP-00-CEM-157-MG-0013-01
25
00GKB20-BQ018G
9 45
13
10 0
00
25
1
00GKB20-BQ019R

00GKB20-BQ020R
00
25
1

00
25
163
REFERENCE DRAWINGS:
DRAWING NO. DRAWING TITLE
11 12 3
90.0°
3
E 266.237M
90.0°
N 196.450M
E 266.237M
F EL +8.322M F
N 196.900M CONT. TO 00GKB20-BQ021G

EL +8.033M LINE : 00GKB20BR123-DN25


DWG:BI-BCCP-00-CEM-157-MG-0113-SHT.14 1
E 265.076M 8
7
N 196.450M
EL +8.376M

0
44 62
11
6
E E
1
5 2
TO VENT 00GKB20-BQ022R E 265.076M
LINE: 00GKB20BR503-DN25 UGY-L N 196.450M
E 260.028M
EL +8.322M
PR#1
N 196.450M
EL +8.376M

00GKB20-BQ023R

CONT. ON 47
60 50
19
NG.

DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.22 2
D
37 D
TI

E 259.695M 1 25-JAN-19 ISSUED FOR CONSTRUCTION DDP MRB MKA SIB MCC --- SUB
N W RI

2
N 196.504M 0 30-NOV-18 ISSUED FOR CONSTRUCTION DDP MRB MKA CK MUM --- SUB
E 260.028M
ON I

EL +8.322M
SSI

N 196.450M
2 REV. DATE DESCRIPTION PREP MECH ELEC CIVIL C&I SES APPD.
R PERM I

EL +8.322M 37 UGY-13
STAMP:
EL +8.322M PR#1
THOUT THEI

4 23
0
1
3
ED OR LENT W I

C
1 2 C
3
33
TED AND M UST NOT BE COPI

3
90.0°
E 259.695M
N 196.450M 54
220 MW (GAS) / 212 MW (HSD) NET
PROJECT: COMBINED CYCLE POWER PROJECT
EL +8.322M
AT BHOLA, BANGLADESH
MI

OWNER: NUTAN BIDYUT (BANGLADESH) LTD.


S THE PROPERTY OF L&T -SARGENT & LUNDY LI

B B
ONSHORE
CONTRACTOR: BISHO INFRA PROJECTS LIMITED

ONSHORE
CONSULTANT: L & T - SARGENT & LUNDY LIMITED

DATE NAME SIGN TITLE:

PREPARED 30-NOV-18 DDP ISOMETRIC DRAWING FOR


SPECIAL NOTES: CHECKED 30-NOV-18 MRB POTABLE WATER SYSTEM
GN I
NG AND DESI

A A
01. CONTRACTOR/INSTALLER SHALL TAKE ALL APPROPRIATE PRECAUTIONS TO ENSURE APPROVED 30-NOV-18 SUB
THE SAFETY OF ALL PEOPLE LOCATED ON THE WORK SITE INCLUDING CONTRACTOR/

841m m x 594m m )
DEPARTMENT: MECHANICAL
INSTALLER'S PERSONNEL (OR THAT OF ITS SUBCONTRACTOR(S)) PERFORMING THE WORK.
S DRAW I

02. THE PDF FORMAT OF THE ELECTRONIC FILE OF THIS DRAWING IS FOR IMPLEMENTATION, L&T-S&L JOB NO.: FD18090000
THE ELECTRONIC FILE OF THE DRAWING IN ANY OTHER FORMAT IS FOR INFORMATION. DRAWING NO.: BI-BCCP-00-CEM-157-MG-0013 SCALE:NONE SHEET: 23 OF 24 REV. 1
THI

A1 (
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

CAD FILE NAME:BI-BCCP-00-CEM-157-MG-0013-23.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FABRICATION MATERIALS
164
N CONT. ON
ITEM SIZE SCHEDULE/
LINE : 00GKB20BR124-DN25 QTY. DESCRIPTION
NO. (DN / MM) RATING
DWG:BI-BCCP-00-CEM-157-MG-0113-SHT.17
M M
E 315.547M 1 15.0 M 50 40S PIPE, ASTM A 312 GRADE TP304L, ASME B36.19M
N 198.107M 38 2 1 50X25 CLASS 3000 SW REDUCING TEE, ASTM A 182 GRADE F304L, ASME B16.11
CONT. ON
EL +8.535M 3 1 50X25 CLASS 3000 SW REDUCING COUPLING, ASTM A 182 GRADE F304L, ASME B16.11
LINE : 00GKB20BR121-DN25
20 DWG:BI-BCCP-00-CEM-157-MG-0113-SHT.15
8 4 2 50 CLASS 3000 45 DEG SW ELBOW, ASTM A 182 GRADE F304L, ASME B16.11
1 E 315.547M
5 2 50 CLASS 3000 90 DEG SW ELBOW, ASTM A 182 GRADE F304L, ASME B16.11
6 N 197.696M
14 13 EL +8.602M
6 1 25 CLASS 3000 SOCKET WELDED COUPLING, ASTM A 182 GRADE F304L, ASME B16.11

3
13MM OFFSET

L L

00GKB20BR001-DN50

12
12
11 1
31

2
E 315.547M
N 197.696M
EL +8.548M
5
K 90.0° K

E 315.547M
N 196.465M
EL +8.548M
ERECTION MATERIALS
10 ITEM SIZE SCHEDULE/
9 QTY. DESCRIPTION
NO. (DN) RATING

J J

1
HOLD LIST:
I I

7 8
5
90.0°
NOTES:
E 315.547M
00GKB20-BQ001R
H H
1 N 196.465M 01. FOR GENERAL NOTES & LEGENDS REFER DWG. NO.BI-BCCP-00-CEM-157-MG-0013-01
EL +8.033M

00GKB20-BQ002R
6
00
24

00GKB20-BQ003G
REFERENCE DRAWINGS:
DRAWING NO. DRAWING TITLE
00
24

00GKB20BR001-DN50
F F

6
80
12
00
24
00GKB20-BQ004R

E E

00GKB20-BQ005R
38
30
NG.

D D
TI

1 25-JAN-19 ISSUED FOR CONSTRUCTION DDP MRB MKA SIB MCC --- SUB
N W RI

0 30-NOV-18 ISSUED FOR CONSTRUCTION DDP MRB MKA CK MUM --- SUB
ON I

4
SSI

41 615 REV. DATE DESCRIPTION PREP MECH ELEC CIVIL C&I SES APPD.
45.0° 22
R PERM I

16
E 302.306M STAMP:
N 196.900M 3 4
THOUT THEI

EL +8.033M 1
ED OR LENT W I

45.0°
45.0°
C
1 2 4
C

5
43 43
TED AND M UST NOT BE COPI

5 45.0°
E 302.741M
CONT. ON N 196.465M
220 MW (GAS) / 212 MW (HSD) NET
DWG:BI-BCCP-00-CEM-157-MG-0013-SHT.23 EL +8.033M
PROJECT: COMBINED CYCLE POWER PROJECT
E 302.265M
N 196.900M
AT BHOLA, BANGLADESH
EL +8.033M
MI

OWNER: NUTAN BIDYUT (BANGLADESH) LTD.


S THE PROPERTY OF L&T -SARGENT & LUNDY LI

B B
ONSHORE
CONTRACTOR: BISHO INFRA PROJECTS LIMITED

ONSHORE
CONSULTANT: L & T - SARGENT & LUNDY LIMITED

DATE NAME SIGN TITLE:

PREPARED 30-NOV-18 DDP ISOMETRIC DRAWING FOR


SPECIAL NOTES: CHECKED 30-NOV-18 MRB POTABLE WATER SYSTEM
GN I
NG AND DESI

A A
01. CONTRACTOR/INSTALLER SHALL TAKE ALL APPROPRIATE PRECAUTIONS TO ENSURE APPROVED 30-NOV-18 SUB
THE SAFETY OF ALL PEOPLE LOCATED ON THE WORK SITE INCLUDING CONTRACTOR/

841m m x 594m m )
DEPARTMENT: MECHANICAL
INSTALLER'S PERSONNEL (OR THAT OF ITS SUBCONTRACTOR(S)) PERFORMING THE WORK.
S DRAW I

02. THE PDF FORMAT OF THE ELECTRONIC FILE OF THIS DRAWING IS FOR IMPLEMENTATION, L&T-S&L JOB NO.: FD18090000
THE ELECTRONIC FILE OF THE DRAWING IN ANY OTHER FORMAT IS FOR INFORMATION. DRAWING NO.: BI-BCCP-00-CEM-157-MG-0013 SCALE:NONE SHEET: 24 OF 24 REV. 1
THI

A1 (
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

CAD FILE NAME:BI-BCCP-00-CEM-157-MG-0013-24.DGN