14

You might also like

Download as pdf
Download as pdf
You are on page 1of 1
rojct fn Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents «Part Package) MAHSR - C-7 Section VI-I Employer's Requirements (General Specifications) ii, Temporary drainage; iii, Signage as requi iv. Maintenance staff refuges as required; and vv, All temporary works associated with construction of the Works. Vi. Site preparation, earthwork for one (01) No. of Sub-Sectioning Post (SSP), one (01) No. DSS at Sabarmati Station and (01) No. SER, one (01) No. DSS at Ahmedabad Station 7. Station Entrance Building (SEB) 7.1. Station Entrance Building (SEB) works include design, manufacture, supply, construction, installation, testing and commissioning of Civil Works, Structural Works, Architectural Works, Electrical Works, Mechanical Works, Plumbing & Firefighting Works and FOB Works in accordance with the Basic Design document including drawings, conceptual designs, Design Requirements & Criteria and Technical Specifications as provided in the Employer’s Requirements 7.1.1, The SEB shall have 3 floor levels as mentioned below: i, Ground Floor: Passenger plaza, IR ticketing office ete. fi, First Floor: Passenger lobbies/interchange lobbies, IR offices etc. iii, Second Floor: Space for movement of HSR passengers and for small kiosks ete. 7.1.2, The SEB shall have direct connections with IR’s existing FOBs and Entry/Exit C & D of GMRCL’s underground metro station at Ahmedabad as per the Employer's Requirements. i, South side FOBs (Mumbai end): FOB-1A and FOB-1B ii, FOB (Sabarmati end): FOB-2 iii, Entry/Exit C & D of Underground Metro station 72. Structural Works: Contractor shall design & execute foundations, rigid frame, Roof Works etc of the building and FOBs based on the DRC, TS and Basic Design Drawings provided in the Employer's Requirements. 73. Arel -ctural Works A. Ground Floor Level i. Rainwater drainage and floor drainage; ii, Finishing of ex walls, staircase including side wall of stairs, escalators and elevator shafts (plaster, paint, cladding and flooring); iii, Ceiling finish including paint, plaster, false ceiling and false ceiling support system; iv. Structure and partitions for required rooms and shafts; v, Exterior and interior work for required rooms; vi. Flooring including tactile blocks of complete passenger plaza up to road; the development of roads and parking area are not in the scope of the Contract; Division 01000 Page 11 of 14

You might also like