Fs

You might also like

Download as pdf
Download as pdf
You are on page 1of 1
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2 Packae No. MAHSR - C-8 Section VI-1 Employer's Requirements (General Specifications) 4). “Manufacturing Quality Management Plan” means the subsidiary document in the Works Quality Management Plan (WQMP), submitted by the Contractor to the Engineer for consent, as specified in the Clause 5 {Manufacturing Quality Management Plan (MOMP)| under Sub-Division 07010; detailing provisions, for its management and control of manufacturing of the Works by itself or by the Subcontractor’ facilities or by both, that are to be implemented and maintained effectively during the period of the Works to be carried out off the Site “Method Statement” means a document, as specified in the Sub-Clause 2.8.1 [Reference to Method Statement and Manufacturer's Arrangement] under Sub-Division 07010, that states the way a particular work, task or process along with various associated aspects such as quality, safety, environment protection, time and resources; are planned to be directly controlled by the Contractor or its Subcontractor. ‘Monthly Progress Meeting” means the meeting specified under Sub-Division 04030 [Meetings] of the General Specifications. ‘Monthly Progress Report” means the report that the Contractor shall prepare and submit to the Engineer in accordance with the Sub-Division 04080 [Monthly Progress Report Requirements] “Nonconformity Report” means a report documenting non-fulfilment of a requirement, with objective evidence, the location and time of occurrence or detection, and provision for its proper resolution by the concerned responsible “Notice of No Objection” means a category of Engineer's response, issued by the Engineer to the Contractor as specified in the Clause 3 [Engineer 's Response] under Sub-Division 03020. “Notice of No Objection with Comments” means a category of Engineer's respons issued by the Engineer to the Contractor as specified in the Clause 3 [Engineer's Response] under Sub-Division 03020. “Notice of Objection” means a category of Engineer’s response, issued by the Engineer to the Contractor as specified in the Clause 3 [Engineer's Response] under Sub-Division 03020. “Not Reviewed” means a category of Engineer's response, issued by the Engineer to the Contractor as specified in the Clause 3 [Engineer’s Response] under Sub-Division 03020. “Off-Shore Independent Laboratory” means an Independent Laboratory, submitted by the Contractor to the Engineer for approval as specified in the Sub-Clause 5.4 [Off-Shore Independent Laboratory] undet Sub-Division 07020, that is outside the Country. “On-Site Laboratory” means Contractor's own laboratory submitted by the Contractor to the Engineer for approval as specified in the Sub-Clause 5.2 [On-Site Laboratory] under Sub-Division 07020. “Operation and Maintenance Manuals” means the manuals providing detailed instructions for operation and maintenance of all Plant, equipment and Maintenance Facilities, “Operation Manuals” means the manuals providing detailed instructions for operation of Division 03000, Page 8 of 27

You might also like