Professional Documents
Culture Documents
6-Pressure Build Up Test-Pressure
6-Pressure Build Up Test-Pressure
6-Pressure Build Up Test-Pressure
A pressure buildup test was run on a gas well in newly discovered reservoir.
Known and calculated data are summarized below and in Table. Because the
reservoir pressure has not been depleted, the semi-log straight line should
extrapolate to original reservoir pressure at a Horner time ratio of unity, i.e., p* =
pi.
Pws = Pwf at ∆t = 0