Andrej Statika

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 9

1

STATIČKI PRORAČUN

A/ KROVNA KONSTRUKCIJA

b/d=10/12 opterecenje:
lmax< 3.85m 1.sop. tez. 0.55kN/m2
H<20.00m 2.sneg 0.75kN/m2
max= 11 3.vetar: V=19 m/s
Pokrivac: lim kz=1.00
max=80cm Qm,t,z=0,5*192*1.225/1000 =0.221kN/m2
W=0.221(0.4+1.4) = 0.40kN/m2
q⊥= 0.55 x cos11+0.75 x cos211+0.40 = 1.67kN/m2
qv = 0.55/cos10+0.75+0.40 = 1.80kN/m2
maxM = 2.22kNm

-kontrola napona
M 6
 m ll = max 2 = 0.92kNm <1.00 kN/cm2
bH
-kontrola ugiba g+s
5 q ⊥  L4 12
fM =   2.0 cm
384 Ell  b  H 3

2. ROŽNJAČE

lo = 3.20m
lr = 2.60m
b/d=14/16cm opterecenje:
1.sop. tez. = 0.20kN/ml
2.od krova: = 3.20kN/ml
qV =3.40kN/ml
qH = 0.74kN/ml

maxMx= 3.3kNm
maxMy= 0.95kNm

 = 0.93kN/cm2< dop.=1.00kN/cm2

Kontrola ugiba:

fx = 0.85cm
fy = 0.32cm
f = 0.91cm < fd
2

4. Grebeni / uvale

lmax< 4.25 m

b/d= 16/16
qo

qo= 0.2+2.80*1.8 = 5.24 kN/m1

lmax = 4.25 m

maxM = 0.064*5.24*4.252 = 6.06 kNm

kontrola napona:
M 6
 m ll = max 2 = 0.89 kN/cm2 < dop = 1.00 kN/cm2
bd

kontrola ugiba:
5 q  L 12
4

f =  = 2.04 cm < fdop = 2.125 cm


384 Ell  b  d 3

5. Stub 14/14 cm
6. Venčanice 12/12 cm ankerisane sa M14/1.50 m
7. Pajante 10/12 cm
8. Klešta 2*6/14 cm

Građa četinari II klase:


gd = 6.00 kN/m3
md = 1.00 kN/cm2
clld = 0.85 kN/cm2
mlld = 0.09 kN/cm2
Ell = 1000.0 kN/cm2
G = 50.0 kN/cm2
3

Pos 1 ytong tavanica


Rasponi 3,50m

Usvojena armature prema u svemu prema statičkom proračunu proizvođača.


Analiza opterećenja za Ytong tavanice:

1. stalno opterećenje:
- obrada = 1.50 kN/m2
- sop. tež. Ytong tavanice = 2,00 kN/m2

ukupno stalno opterećenje: g = 3,50 kN/m2

2.pokretno opterećenje: p = 2.00 kN/m2


P= zid od ytong bloka
Granični moment jednostruko armiranog preseka gredice Mbu:
Mbu = (h/k)2*b*fb ΔMu = Mu - Mbu
MB 25, RA 400/500:
fb = 2.05 kN/cm2 b=6cm

Potrebna armatura: Fa= Mbu/ zb/σa1 + ΔMu/(17.0-1.3)/ σa1


Fa’= ΔMu/(17.0-1.3)/ σa2

Usvojena armature prema u svemu prema statičkom proračunu proizvođača.

Pos 2 ytong tavanica


Rasponi 5,50m

Usvojena armature prema u svemu prema statičkom proračunu proizvođača.


Analiza opterećenja za Ytong tavanice:

1. stalno opterećenje:
- obrada = 1.50 kN/m2
- sop. tež. Ytong tavanice = 2,00 kN/m2

ukupno stalno opterećenje: g = 3,50 kN/m2

2.pokretno opterećenje: p = 2.00 kN/m2


P= zid od ytong bloka
Granični moment jednostruko armiranog preseka gredice Mbu:
Mbu = (h/k)2*b*fb ΔMu = Mu - Mbu
MB 25, RA 400/500:
fb = 2.05 kN/cm2 b=6cm

Potrebna armatura: Fa= Mbu/ zb/σa1 + ΔMu/(17.0-1.3)/ σa1


Fa’= ΔMu/(17.0-1.3)/ σa2

Usvojena armature prema u svemu prema statičkom proračunu proizvođača.


4

Pos 3 ytong tavanica


Rasponi 5,38m

Usvojena armature prema u svemu prema statičkom proračunu proizvođača.


Analiza opterećenja za Ytong tavanice:

1. stalno opterećenje:
- obrada = 1.50 kN/m2
- sop. tež. Ytong tavanice = 2,00 kN/m2

ukupno stalno opterećenje: g = 3,50 kN/m2

2.pokretno opterećenje: p = 2.00 kN/m2


P= zid od ytong bloka
Granični moment jednostruko armiranog preseka gredice Mbu:
Mbu = (h/k)2*b*fb ΔMu = Mu - Mbu
MB 25, RA 400/500:
fb = 2.05 kN/cm2 b=6cm

Potrebna armatura: Fa= Mbu/ zb/σa1 + ΔMu/(17.0-1.3)/ σa1


Fa’= ΔMu/(17.0-1.3)/ σa2

Usvojena armature prema u svemu prema statičkom proračunu proizvođača.

Pos 4 ytong tavanica


Rasponi 4.95m

Usvojena armature prema u svemu prema statičkom proračunu proizvođača.


Analiza opterećenja za Ytong tavanice:

1. stalno opterećenje:
- obrada = 1.50 kN/m2
- sop. tež. Ytong tavanice = 2,00 kN/m2

ukupno stalno opterećenje: g = 3,50 kN/m2

2.pokretno opterećenje: p = 2.00 kN/m2


P= zid od ytong bloka
Granični moment jednostruko armiranog preseka gredice Mbu:
Mbu = (h/k)2*b*fb ΔMu = Mu - Mbu
MB 25, RA 400/500:
fb = 2.05 kN/cm2 b=6cm

Potrebna armatura: Fa= Mbu/ zb/σa1 + ΔMu/(17.0-1.3)/ σa1


Fa’= ΔMu/(17.0-1.3)/ σa2
5

Usvojena armature prema u svemu prema statičkom proračunu proizvođača.

Pos 5 AB greda
Loh= 4.68m opterecenje;
B/d=20/45 - sop tez*1.6 4.50kN/m1
MB 25 - krov*1.7 10.00kN/m1
RA 400/500 - tavanica 45.00kN/m1

qu= 58.5kN/m1

Mu= 171kNm

PotFa= 11.5cm2

Odabrano: donja zona: 6R16


po sredini: 2R12
gornja zona: 2R12
uR8/20/10cm

Pos 6 AB greda
Loh= 4.93m opterecenje;
B/d=25/35 - sop tez*1.6 3.50kN/m1
MB 25 - krov*1.7 10.00kN/m1
RA 400/500

qu= 13.5kN/m1

Mu= 45kNm

PotFa= 4.0cm2

Odabrano: donja zona: 3R14


gornja zona: 2R12
uR8/20/10cm

Pos 7 AB greda
B/d=25/35 - sop tez*1.6 3.50kN/m1
MB 25 - krov*1.7 10.00kN/m1
6

RA 400/500

Odabrano: donja zona: 2R12


gornja zona: 2R12
uR8/20/10cm

Pos 8 AB kolenasta greda

Loh= 4.72m opterecenje;


B/d=25/35 - sop tez*1.6 3.50kN/m1
MB 25 - krov*1.7 15.00kN/m1
RA 400/500

qu= 18.5kN/m1

Mu= 57kNm

PotFa= 5.0cm2

Odabrano: donja zona: 4R14


gornja zona: 2R12
uR8/20/10cm

Pos 9 AB greda

Loh= 4.72m opterecenje;


B/d=25/35 - sop tez*1.6 3.50kN/m1
MB 25 - krov*1.7 15.00kN/m1
RA 400/500

qu= 18.5kN/m1

Mu= 57kNm

PotFa= 5.0cm2

Odabrano: donja zona: 4R14


gornja zona: 2R12
7

uR8/20/10cm

Pos 10 AB greda
Loh= 3.00m opterecenje;
B/d=25/35 - sop tez*1.6 3.50kN/m1
MB 25 - krov*1.7 10.00kN/m1
RA 400/500

qu= 13.5kN/m1

Mu= 45kNm

PotFa= 2.0cm2

Odabrano: donja zona: 3R12


gornja zona: 2R12
uR8/20/10cm

Pos 11 AB kontinalna greda


Loh= 4.32m opterecenje;
B/d=25/35 - sop tez*1.6 3.50kN/m1
MB 25 - krov*1.7 10.00kN/m1
RA 400/500

qu= 13.5kN/m1

Mu= 35kNm

PotFa= 3.3cm2

Odabrano: donja zona: 4R12


gornja zona: 2R12
uR8/20/10cm

Pos NV AB greda, nadvoji otvori, nadprozornici, nadvratnici


B/d=25(20)/20
MB 20
RA 400/500
8

Odabrano: donja zona: 2R12


gornja zona: 2R12
u6/20/10cm

Pos NV1 AB greda, nadvoji otvori, nadprozornici, nadvratnici


Lo> 2.00m
B/d=25(20)/20
MB 20
RA 400/500
Odabrano: donja zona: 2R12
gornja zona: 2R12
u6/20/10cm

Pregardne zidove d=12 ukrutiti horizontalnim serklažima, armiranim sa 28, u6/20cm


MB 20, izvode se u nivou nadvratnika celom dužinom zida.

Objekat je projektovan po pravilniku o tehničkim normativima za izgradnju objekata


visokogradnje u seizmičkim područjima. U skladu sa pravilnikom HS i KS minimalno su
armirani sa 2R12 u6/20/10 kao i VS 2R14 u6/15/7.5. Po članu 96. duzina neprekinutih
zidov za d= 25cm ne sme biti veća od 6.00m. Blokovi od gline (JUS.B.D1.015)
b/l/h=25/19/19cm M150. Produžni malter MM5. Uslovi za kontrolu materijala za zidanje II
kategorije. Kontrola izvodjenja radova B. I u svemu prema Pravilniku o tehničkim normativima
za zidane zidove.

T 1 – TRAKASTI TEMELJ

B= 40cm opterecenje:
H= 40cm - krov 4.8*2 9.60kN/m1
MB 25 - zidovi 4*3 12.00kN/m1
- tavanica 4.8*5,5 27.00kN/m1
- sop.tez. 10.00kN/m1

Ukupno: 58.6kN/m1

 = 58.6/0,4= 147,0kN/m2

Temeljarmratiserklazno: 2R12 uR8/20


9

Pos VG AB vezna greda


25/45cm
MB 25
RA 400/500

2R12 u6/20.
po sredini 2R12

U nivoupoda izvesti HS armiran 2R12 u6/20.

Ostali temelji usvojeni su konstruktivno.

Pre početka radova investitor je dužan da izvrši geomehaničko ispitivanje tla i ispitadimenzije,
stanjetemelja ukoliko se stvarno d razlikuje od potrebnog proračunom, neophodno je uraditi
novi proračun temelja i projetovati nove konstruktivne mere.

/sracunao/