GD ala
Gsr Grain oryers START UP CHECK LIST
‘The GSI Group, inc.
P.O. Box 20 / 1004 E. Minois St.
Phone: 217-226-4421 Fax: 217-228-4420
CUSTOVER # DATE,
NAME SERVICED BY:
ADDRESS 1 DRYER MODEL:
ADDRESS 2 PANEL SERIA
cry
STATE ORDER #
PHONE # must have on
contact cqupment also
PRE-START __ START-UP
Motor amps: load _Unload _SCR___fant_fan?_fan3_fana_fan5_fan6
DRYER START UP CHECKLIST
INSPECT INLET & OUTLETS INSPECT UNLOAD/SCR MECHANISM
INSPECT ELECTRICAL CONNECTIONS — CHECK GAS TRAN INTEGRITY
— INSPECT MOISTURE SENSORS = CHECK GAS VALVES
— INSPECT PHYSICAL STRUCTURE OF DRYER. = CHECK FOR GAS LEAKS ON PIPE TRAINS
___ INSPECT SHEETS FOR RIPS OR MISSING BOLTS = __ CHECK GAS PRESSURE GAUGES
[INSPECT IoNrTOR AND FLAME ROD CHECK ELECTRICAL PANELS & TIOHTEN CONNECTIONS
INSPECT FAN BLADE (NO CRACKS) = START UP TO CHECK CONTROLS/SAFETY CIRCUIT
— CHECK BELTS, CHAINS AND ADJUST — CHECK AUGERS (UNLOAD, LOAD)
= WBRICATE BEARINGS OF NEEDED) = GAS PRESSURE FROM TANKS (AT LEAST 10PS})
—_INSPECTHATCH & DOOR SEALS = CHECK AND RECORD MOTOR AMPS
CHECK OIL LEVEL IN GEAR CASES, FILLAS NEEDED — ADVISE CUSTOMER OF AVAILABLE PARTS KITS
ALSO CHECK:
ELECTRICAL TO DRYER GAS TO DRYER FILL SYSTEM CONNECTED DRY DRAG CONNECTED
PARTS REPLACED OR LEFT FOR CUSTOMER
PARTNUMBER