Download as pdf
Download as pdf
You are on page 1of 1
GD ala Gsr Grain oryers START UP CHECK LIST ‘The GSI Group, inc. P.O. Box 20 / 1004 E. Minois St. Phone: 217-226-4421 Fax: 217-228-4420 CUSTOVER # DATE, NAME SERVICED BY: ADDRESS 1 DRYER MODEL: ADDRESS 2 PANEL SERIA cry STATE ORDER # PHONE # must have on contact cqupment also PRE-START __ START-UP Motor amps: load _Unload _SCR___fant_fan?_fan3_fana_fan5_fan6 DRYER START UP CHECKLIST INSPECT INLET & OUTLETS INSPECT UNLOAD/SCR MECHANISM INSPECT ELECTRICAL CONNECTIONS — CHECK GAS TRAN INTEGRITY — INSPECT MOISTURE SENSORS = CHECK GAS VALVES — INSPECT PHYSICAL STRUCTURE OF DRYER. = CHECK FOR GAS LEAKS ON PIPE TRAINS ___ INSPECT SHEETS FOR RIPS OR MISSING BOLTS = __ CHECK GAS PRESSURE GAUGES [INSPECT IoNrTOR AND FLAME ROD CHECK ELECTRICAL PANELS & TIOHTEN CONNECTIONS INSPECT FAN BLADE (NO CRACKS) = START UP TO CHECK CONTROLS/SAFETY CIRCUIT — CHECK BELTS, CHAINS AND ADJUST — CHECK AUGERS (UNLOAD, LOAD) = WBRICATE BEARINGS OF NEEDED) = GAS PRESSURE FROM TANKS (AT LEAST 10PS}) —_INSPECTHATCH & DOOR SEALS = CHECK AND RECORD MOTOR AMPS CHECK OIL LEVEL IN GEAR CASES, FILLAS NEEDED — ADVISE CUSTOMER OF AVAILABLE PARTS KITS ALSO CHECK: ELECTRICAL TO DRYER GAS TO DRYER FILL SYSTEM CONNECTED DRY DRAG CONNECTED PARTS REPLACED OR LEFT FOR CUSTOMER PARTNUMBER

You might also like