5 SPS Hira RCC

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 13

VISHNU ENTERPRISES DOCNO.

-VE/HIRA/05/00

HAZARD IDENTIFICATION AND RISK ASSESSMENT REVISION:00


Name of the assessor Date Page No-1
Time Work area
Job Description RCC

Task Hazard Consequ Existing risk Risk Additional New risk Responsible
ences control rating controls rating Person
measures
L C R L C R

1.Material 1) Injury due 1.Severe  Proper use of 3 3 9 1.*Before 1 3 3 Site Supervisor


Handling to using Injury PPE starting the job Safety
shifting by improper 2.LTI  TBT before written Supervisor
engaged approach. 3.Electric work clearance to be
working people. Shock  Proper taken from
2) Slip, trip & 4.Slip& Supervision concern
fall hazards Fall department.
during 5.Dashin Proper and safe
materials g approach for
shifting from 6.Stress other materials
one place to & strain to be used as per
another. the guidance of
owner
3) Scratch & department and
Cut injury after receiving
during permission in
material written
handling. clearance.
*Proper access
4) Live cables. will be provided
for workmen.
5)Injury from 2.*Material will
existing be stacked as
materials. designated area
as per TSL.
6). Heavy *Workmen
vehicle should use safe
movement way to material
handling.
3.*All workmen
engaged in
material
handling to use
good condition
of hand gloves,
safety goggles
and avoid
carrying
materials on
their shoulder.*
Working people
should use all
required PPE’s
(Safety helmet,
Safety shoes,
safety goggles,
fire retardant
safety jacket,
Hand gloves, and
VISHNU ENTERPRISES DOCNO.-VE/HIRA/05/00

HAZARD IDENTIFICATION AND RISK ASSESSMENT REVISION:00


nose mask).
5.* * Safe
distance to be
kept from live
cables and
required PPE’s
to be used.
*Working people
will wear proper
and good
condition of
PPE’S (safety
goggles, safety
helmet, safety
shoe, cotton
jacket, hand
gloves, ear plug
and nose mask).
Supervisor to
ensure no
workmen shall
take rest/lunch
inside panel
room.
6.* Working
area to be
barricaded and
housekeeping to
be done before
starting of job
safe and clear
access to be
provided for
workmen
movement.

Name of the assessor Date Page No-2


Time Work area
Job Description RCC
Task Hazard Conseque Existing risk Risk Additional New risk Responsible
nces control measures rating controls rating Person
VISHNU ENTERPRISES DOCNO.-VE/HIRA/05/00

HAZARD IDENTIFICATION AND RISK ASSESSMENT REVISION:00


L C R L C R

2. Excavation by 1. Damage of 1.Severe  Proper use of 3 4 12 *Job only to be 1 4 4


machine. underground Injury PPE started after taking Site Supervisor
services 2.LTI  TBT before prior permission Safety
(cables, pipes) 3.Electric start of work for entry of heavy Supervisor
etc. Shock  Proper vehicles/equipmen Operator
4.Entangle Supervision ts.
2. Hit of ment *Pre approval for
person by 5.Slip& Fall mechanize
excavator/Bo 6.Environ excavation should
b cat and mental be taken as trail
heavy Pollution trench should be
vehicles. done.

3. Excavated *Keep proper safe


pit side distance from
collapse. excavator & 2 nos.
Flagman will be
4. Toppling of deployed at both
excavator/Bo ends.
b cat or
vehicle. *Proper shoring
should be done as
5. Falling of per site condition
person into and requirement.
the pit.
*Equipment
6. Collapse of should place at
excavated safe distance from
sides. excavation pit
.
7. Dust *De-watering
hazard. pump will be
installed for de-
watering from pit.

*50% Hydraulic
system of dumper
should be lift &
remove the vehicle
from its position &
applying break.
Further hydraulic
system should be
lifting up then
unloading the left
material.

*Proper access will


be made with
placing sand bag &
providing railing
as per standard.

*Working people
will use proper
and good condition
VISHNU ENTERPRISES DOCNO.-VE/HIRA/05/00

HAZARD IDENTIFICATION AND RISK ASSESSMENT REVISION:00


of PPE”S (safety
goggles, safety
helmet, safety
shoe, cotton jacket,
gloves, nose mask).

Name of the assessor Date Page No-3


Time Work area
Job Description RCC

Task Hazard Conseque Existing risk Risk Additional New risk Responsible
nces control measures rating controls rating Person
L C R L C R
3. Levelling by 1) Injury due 1.Severe  Proper use of 3 4 12 *Before starting 1 4 4
vibrator. to using Injury PPE the job written
improper 2.LTI  TBT before clearance is taken Site Supervisor
way. 3.Electric start of work from concern Safety
Shock  Proper department. Supervisor
2) Trip and 4.Entangle Supervision Operator
fall hazards ment *Proper approach
due to 5.Slip& Fall will be provided
negligence 6.Environ for safe access to
work. mental and egress.
Pollution
3) Physical *Charging
injury due to approval must be
using faulty taken from
equipment. competent
authority before
4. Flying chips starting the
and dust activity.
hazard.
*Double earthing
5) Injury due of eqpt. shall be
to not using ensured before
PPE’S. use. Electrical
connection should
6) Movement be through proper
of ELCB.
unauthorised
personnel. *Daily tool box talk
before starting of
VISHNU ENTERPRISES DOCNO.-VE/HIRA/05/00

HAZARD IDENTIFICATION AND RISK ASSESSMENT REVISION:00


7) Frayed job.
Wire
*Use of Non-
8) Movement Conductive sole
of other safety shoe,safety
vehicles. helmet .

*Workmen should
use good condition
of equipments.

*Area barricaded
all around the
working area
before starting the
job.

*Working people
will use proper
and good
condition of PPE”S
(safety goggles,
safety helmet,
safety shoe, cotton
jacket, gloves, nose
mask).

*Site supervisor
should watch all
workmen during
work and lunch
hour.

* Required PPE’S
to be used.

* Working area to
be barricaded and
safe distance to be
kept from other
machines/vehicles
.
VISHNU ENTERPRISES DOCNO.-VE/HIRA/05/00

HAZARD IDENTIFICATION AND RISK ASSESSMENT REVISION:00

Name of the assessor Date Page No-4


Time Work area
Job Description RCC

Task Hazard Consequ Existing risk Risk Additional New risk Responsible
ences control rating controls rating Person
measures
L C R L C R

4. 1. Fall of 1.Severe  Proper use of 3 3 9 1.a) Trained 1 3 3 Site Supervisor


Reinforcement material due Injury PPE workmen to be Safety
work. to improper 2.LTI  TBT before engaged in job Supervisor
stacking. 3.Electric work including all Worker
1. Manually *Hand and leg Shock  Proper required PPE's
handling of TMT injury due to 4.Slip& Supervision Helmet, Hand
Bar Sharp edge, Fall gloves,
Projected nail, 5.Eye Fluorescent
tor of injury jacket, nose
2. Stacking of
reinforcement. 6.Cut & mask, safety
Bar.
* Eye injury by bruises. shoe.
3. Bar bending.
flying dust b) Safety goggles
4.Laying of re-
particles. must be used by
bar as per
all workmen.
drawing.
2. Slips, Trips c) Work to be
and Fall done under
Hazard. experienced
3. Hand injury supervision.
due to d) TMT Bar to be
slipping/break stacked properly
ing of pipe on level surface.
during bar e) Head &
bending. shoulder load
should never be
4. A) Burn allowed and
injury and eye avoid over load
injury by (for men 35kg
spatter. and women
B) Failure of 25kg).
cutter machine 2. a) Working
and cutter area and
wheel. stacking area to
C) Electric be barricaded by
shock. safety ribbon
and provide
caution board.
b) Housekeeping
and proper
cleaning to be
VISHNU ENTERPRISES DOCNO.-VE/HIRA/05/00

HAZARD IDENTIFICATION AND RISK ASSESSMENT REVISION:00


done on daily
basis.
c) Provide Bar
Cap Wherever
required.
d) Provide
adequate
manpower.
3. a) Long
handle visually
inspected pipe/
dia to be used
for bending of
bar.
b) Pipe to be
cornered
properly with
TMT Bar.
4.a) Trained
person to be
engaged in job
including all
required
PPE's( Cotton
dress, 18' cotton
hand gloves, Leg
scan, Safety
goggles and
Face shield).
b) Provide
Spatter arrester
to control
spatter.
c) Tested and
visually
inspected cutter
machine to be
used by trained
person.
d) Tested and
valid wheel to be
used and ensure
wheel guard.
VISHNU ENTERPRISES DOCNO.-VE/HIRA/05/00

HAZARD IDENTIFICATION AND RISK ASSESSMENT REVISION:00


Name of the assessor Date Page No-5
Time Work area
Job Description RCC

Task Hazard Conseque Existing risk Risk Additional New risk Responsible
nces control measures rating controls rating Person
L C R L C R
5. Shuttering - 1. Hand and 1.Severe  Proper use of 3 3 9 1) Trained person 1 3 3
De-shuttering leg injury due Injury PPE to be engaged in
Work. to Sharp edge, 2.LTI  TBT before job including with Site Supervisor
Projected nail. 3.Eye start of work proper PPE's Hand Safety
*Eye injury by injury  Proper gloves, safety shoe, Supervisor
flying dust 4.Cuts & Supervision safety helmet, leg
particles. bruises guard, nose mask.
5.Slip& Fall * Safety goggles
2. Finger must be used by all
injury during workers.*Provide
Ply/Bottom adequate
cutting by manpower
Hacksaw/ 2) Guide wooden
Electrical Plank/block to be
cutter. used by trained
carpenter.*No
3. Fall of helper to be
person or allowed in skill
material while work (Power
working at operated tools).*
height. Tested and
visually inspected
4.Slip trip and Cutter machine to
fall hazard be used
due to 3) *Only height
Improper trained and
stacking of experience
material. personal will be
engaged for height
5.Electric elevation job.
Shock. *Only tested and
visually inspected
safety belt, fall
arrester to be
used. * Provide
standard platform
and Scaffolding
with hand rail,
mid-rail, toe board.
* Ensure the
anchorage point. *
All loose material
to be kept in a bag
and no loose
material shall be
left on working
platform.
*Working area to
be barricaded by
safety ribbon and
VISHNU ENTERPRISES DOCNO.-VE/HIRA/05/00

HAZARD IDENTIFICATION AND RISK ASSESSMENT REVISION:00


provide
watchmen, caution
board. *Nobody
shall be allowed to
go under the
working area.
4) Material should
be stacked
properly. *
Housekeeping to
be done on daily
basis.
5) *Tested and
visually inspected
Cutter machine to
be used
*Ensure Insulated
cable, ELCB, Plug,
Holder to be used
and Extension
board is should be
kept under
Canopy.

Name of the assessor Date Page No-6


Time Work area
Job Description RCC

Task Hazard Conseque Existing risk Risk Additional New risk Responsible
nces control measures rating controls rating Person
L C R L C R
VISHNU ENTERPRISES DOCNO.-VE/HIRA/05/00

HAZARD IDENTIFICATION AND RISK ASSESSMENT REVISION:00


6. RCC Work. 1.Accident 1.Severe  Proper use of 3 3 9 * Use of necessary 1 3 3
due to Injury PPE PPE’S like hand
unawareness 2.LTI  TBT before gloves, safety Site Supervisor
and 3.Eye start of work goggles, safety Safety
negligence. injury  Proper helmet, ear Supervisor
4.Cuts & Supervision muff/ear plug,
2. Accident
bruises dust mask etc. at
due to
5.Slip& Fall job.
untrained
6.Dashing
workmen and
supervisor. *Positioning ,
3. Heavy supporting and
vehicle fixing of
movement reinforcement by
4. Machine binding wire.
movement
5. Spatters * Materials of Rcc
6. falling short on
Unauthorised working area
personnel should be cleaned
movement immediately.

* All workmen will


be careful during
Rcc work.

*Passage to be
provided for the
movement of the
person

* Site supervisor
will present all the
time during
operation.

* Do not take rest


or sleep near the
Flying chips and
dust area.

* Area Barricading
properly by red or
safety tape before
starting the job.

* Working people
will use Safety
Helmet, Safety
Goggles, Jeans,
Jacket & Safety
Hand Gloves.
VISHNU ENTERPRISES DOCNO.-VE/HIRA/05/00

HAZARD IDENTIFICATION AND RISK ASSESSMENT REVISION:00

Name of the assessor Date Page No-7


Time Work area
Job Description RCC

Task Hazard Conseque Existing risk Risk Additional New risk Responsible
nces control measures rating controls rating Person
L C R L C R
VISHNU ENTERPRISES DOCNO.-VE/HIRA/05/00

HAZARD IDENTIFICATION AND RISK ASSESSMENT REVISION:00


7. Disposal of A. Accident 1.Eye  Proper use of 3 2 6 * Only 1 2 2
debris due to injury PPE Experience and
Manually. inexperience 2.Cuts &  TBT before trained worker Site Supervisor
bruises start of work Safety
worker. will be engaged.
3.Slip& Fall  Proper Supervisor
4.Stress & Supervision
B. Hand/ leg strain * During disposal
injury while work nobody
removing allow to go
debris working area.
pieces. *Working people
will wear proper
C. Eye injury and good
by flying condition of
particles. PPE’S (safety
goggles, safety
helmet, safety
D. Injury due shoe, cotton
to not using jacket, gloves,
PPE’S. ear plug and
nose mask).
E. Head
injury due to * Working area
low level of will be
structure. barricaded by
indicative or
F. Injury due protective
to using barricading and
damage one workman to
tools and be deputed for
tackles. alertness.

*Supervisor will
monitor no one
could go near the
disposal area.

*Workmen
should be aware
of the low level
of structure;
safety helmet
should be worn
by everyone.

* Only tested and


visually
inspected
tools/tackles to
be used all
workmen.

* PPE”S (safety
VISHNU ENTERPRISES DOCNO.-VE/HIRA/05/00

HAZARD IDENTIFICATION AND RISK ASSESSMENT REVISION:00


goggles, safety
helmet, safety
shoe, cotton
jacket, hand
gloves, ear plug
and nose mask).

RISK= LIKELIHOOD * CONSEQUENCES

(R= L* C)

N.B.- All Risk are calculated in the matrix scale 5*5

You might also like