Perimeter Fence Mambayaan Pre-Cast
Perimeter Fence Mambayaan Pre-Cast
JONG GOMEZ
4.0 REBARS
4.1 10mm x 6.0m DSB lgths. 337 53,920.00
4.2 9mm x 6.0m DSB lgths. 2388 262,680.00
4.3 TIE WIRE roll 20 28,000.00
SUB-TOTAL MATERIALS COST 344,600.00
LABOR COST @ 30% 103,380.00
SUB-TOTAL ITEM # 4 447,980.00
5.0 FORMWORKS
5.1 MATERIALS COST ( SUPPLY ) m. 13,000.00
LABOR COST m. 3,000.00
SUB-TOTAL ITEM # 5.0 16,000.00
0.70
5-10MMØ BED BARS
SPACE EQUALLY O.C. 0.26 0.18 0.26
BOTHWAYS
4-10MM Ø 0.26
VERT. BARS
2.00
0.70 0.18 SIDE
0.26
TOP
PLAN
0.40
0.40
0.60
0.20 2.80
FRONT
FROM THE OFFICE OF: OWNER: SEAL: PROJECT TITLE: PREPARED BY: SHEET NO.:
PERIMETER FENCE
LOCATION: MAMBAYAAN, BALINGASAG, MISAMIS ORIENTAL