A – SCOPE
ISSUER: Purchase Order or
CDB Melchorita N/A
(CONTRACTOR,SUBCONTRACTOR) Subcontract Numb:
Peru LNG Export Project
PROJECT : Works Designation: Piles Prefabrication-Welding
Marine Facilities EPC Contract
WORKPACKAGE: W03 – Trestle & Associated Works Works Start Date: 15 – May – 2007 (Estimated)
Mechanical Completion
Dec – 2008 (Estimated)
Date:
C – VALIDATION
Approved for Construction - Modifying Attendance on Hold for
03-Mar-08 06 N/A VJU PCO TBA PLNG
Joint Fit-up of welds.
Approved for Construction – Including Owner’s comments and
12-Dec-07 05 N/A VJU PCO TBA PLNG
ITRs
Approved for Construction - Modifying Attendance on Hold for
27-Nov-07 04 N/A VJU PCO TBA PLNG
Joint Fit-up of welds.
Approved for Construction-Including specific straightness
requirements on fabricated piles and a new ITR for straightness
23-Oct-07 03 N/A VJU PCO TBA PLNG
report. It also includes an explanatory graphic for welding repairs
location.
06-Sep-07 02 Approved for Construction N/A VJU PCO TBA PLNG
18-Jul-07 01 Approved for Construction N/A VJU PCO TBA PLNG
23-Apr-07 0A Issue for review N/A VJU PCO TBA PLNG
Date Rév. Revision SUB CRT CONS - CDB QC - CDB TPart OWN
PERU LNG EXPORT PROJECT Date: 03-Mar-08
MARINE FACILITIES EPC CONTRACT
INSPECTION AND TESTING PLAN Rev.: 05
Réf. F12254 CDB W03 QUA ITP 60053
Page: 2/7
Job code Origin Unit Code Discipline Doc Type Sequential
• Applicables Codes
o AWS D1.1/D1.1 M : 2006 Structural Welding Code – Steel
o ASTM E709-01 Standard Guide for Magnetic Particle Examination
o ASTM E165-02 Standard Test Method for Liquid Penetrant Examination
o API RP 2A-WSD Recommended Practice for Planning, Designing and Constructing Fixed Offshore Platforms-Working Stress Design
Involvement code Name Implementation to the organization involved in the case of documents Implementation to the organization involved in the case of works
E Execution The organization involved issues the document. The organization involved performs the inspection or checks and issues the relevant ITRs.
R Review The organization involved performs and formalizes a review of relevant documents and/or quality records. N/A
S Surveillance N/A The organization involved watches (supervise) the inspection, control or test.
A Acceptance Formal acceptance in writing of the inspection(s) or test(s) performed is required. N/A
W Witnessing Witnessing organization must be notified within the contractually agreed time scale; its non attendance shall not delay the inspection or check being carried out by the performing organization.
H Validation (Hold point) The organization involved must approve the document, prior to the execution of the corresponding works. Operations are not allowed to proceed beyond this point until inspected and approved without non-conformities
Other mentions : (*) means « through survey » or « through sampling » EXE is in charge of performing works and controls. It can be SCT, VDR or CTR (refer to CQCP)
PERU LNG EXPORT PROJECT Date: 03-Mar-08
MARINE FACILITIES EPC CONTRACT
INSPECTION AND TESTING PLAN Rev.: 05
Réf. F12254 CDB W03 QUA ITP 60053
Page: 5/7
Job code Origin Unit Code Discipline Doc Type Sequential
o IF REQUIRED: Repair welding Visual Inspection As per F12254-CDB-W01-WEL-PRO- Piles fabrication – Repair Weld E S S
Involvement code Name Implementation to the organization involved in the case of documents Implementation to the organization involved in the case of works
E Execution The organization involved issues the document. The organization involved performs the inspection or checks and issues the relevant ITRs.
R Review The organization involved performs and formalizes a review of relevant documents and/or quality records. N/A
S Surveillance N/A The organization involved watches (supervise) the inspection, control or test.
A Acceptance Formal acceptance in writing of the inspection(s) or test(s) performed is required. N/A
W Witnessing Witnessing organization must be notified within the contractually agreed time scale; its non attendance shall not delay the inspection or check being carried out by the performing organization.
H Validation (Hold point) The organization involved must approve the document, prior to the execution of the corresponding works. Operations are not allowed to proceed beyond this point until inspected and approved without non-conformities
Other mentions : (*) means « through survey » or « through sampling » EXE is in charge of performing works and controls. It can be SCT, VDR or CTR (refer to CQCP)
PERU LNG EXPORT PROJECT Date: 03-Mar-08
MARINE FACILITIES EPC CONTRACT
INSPECTION AND TESTING PLAN Rev.: 05
Réf. F12254 CDB W03 QUA ITP 60053
Page: 6/7
Job code Origin Unit Code Discipline Doc Type Sequential
Involvement code Name Implementation to the organization involved in the case of documents Implementation to the organization involved in the case of works
E Execution The organization involved issues the document. The organization involved performs the inspection or checks and issues the relevant ITRs.
R Review The organization involved performs and formalizes a review of relevant documents and/or quality records. N/A
S Surveillance N/A The organization involved watches (supervise) the inspection, control or test.
A Acceptance Formal acceptance in writing of the inspection(s) or test(s) performed is required. N/A
W Witnessing Witnessing organization must be notified within the contractually agreed time scale; its non attendance shall not delay the inspection or check being carried out by the performing organization.
H Validation (Hold point) The organization involved must approve the document, prior to the execution of the corresponding works. Operations are not allowed to proceed beyond this point until inspected and approved without non-conformities
Other mentions : (*) means « through survey » or « through sampling » EXE is in charge of performing works and controls. It can be SCT, VDR or CTR (refer to CQCP)
PERU LNG EXPORT PROJECT Date: 03-Mar-08
MARINE FACILITIES EPC CONTRACT
INSPECTION AND TESTING PLAN Rev.: 05
Réf. F12254 CDB W03 QUA ITP 60053
Page: 7/7
Job code Origin Unit Code Discipline Doc Type Sequential
Mechanical completion
As per
By CONTRACTOR QA/QC Manager
• Mechanical Completion F12254-CDB-W01-QUA-PRO-00205 Mechanical Completion Certificate H H H
& OWNER Representative
– Mechanical Completion
Final Dossier
All ITR & Mechanical Completion
• Compilation of all QC records (according to final dossier procedure) H H H
Certificates
Involvement code Name Implementation to the organization involved in the case of documents Implementation to the organization involved in the case of works
E Execution The organization involved issues the document. The organization involved performs the inspection or checks and issues the relevant ITRs.
R Review The organization involved performs and formalizes a review of relevant documents and/or quality records. N/A
S Surveillance N/A The organization involved watches (supervise) the inspection, control or test.
A Acceptance Formal acceptance in writing of the inspection(s) or test(s) performed is required. N/A
W Witnessing Witnessing organization must be notified within the contractually agreed time scale; its non attendance shall not delay the inspection or check being carried out by the performing organization.
H Validation (Hold point) The organization involved must approve the document, prior to the execution of the corresponding works. Operations are not allowed to proceed beyond this point until inspected and approved without non-conformities
Other mentions : (*) means « through survey » or « through sampling » EXE is in charge of performing works and controls. It can be SCT, VDR or CTR (refer to CQCP)