The document shows a floor plan and elevation drawings for a secondary containment area with 3 storage areas and a collecting sump. Dimensions are provided for the storage areas, sump, and overall containment area. The drawings are signed and dated, with a scale of 1:100 listed.
The document shows a floor plan and elevation drawings for a secondary containment area with 3 storage areas and a collecting sump. Dimensions are provided for the storage areas, sump, and overall containment area. The drawings are signed and dated, with a scale of 1:100 listed.
The document shows a floor plan and elevation drawings for a secondary containment area with 3 storage areas and a collecting sump. Dimensions are provided for the storage areas, sump, and overall containment area. The drawings are signed and dated, with a scale of 1:100 listed.
1 50.0000 STORAGE 1 STORAGE 2 STORAGE 3 2 Collecting Sump JC LABRA 1 FLOOR PLAN June 27, 2019 A-3 UNITS: mm SCALE: 1:100 JGO A B C D 1 2 3600 mm 3000 mm 2700 mm 1000 mm 700 mm 0.0 180.0000 2 FRONT ELEVATION 3 SIDE ELEVATION A-3 UNITS: mm SCALE : 1:100 A-3 UNITS: mm SCALE: 1:100 JVBuhian HAZARDOUS WASTE AND EMPTY DRUMS MR. ROBERTO C. FERNANDEZ ABA FLOOR PLAN AND ELEVATION 3 4 MANILA CORDAGE COMPANY STORAGE Chairman and President 1:100