The Design & Build The Consultant Project The Client

Contractor : UCC DESIGN & BUILD OF


Infraroad JV EXTERNAL WORKS FOR
LANDSCAPE, IRRIGATION
NETWORK, CAR PARKING
AND SERVICES AT LUSAIL
(AL-DAAYEN AREA)

CHECK SHEET FOR: PRESSURE TESTING FOR IRRIGATION MAINLINE


CHECKLIST
CONTRACTOR
SUBCONTRACTOR

Section of Work: PRESSURE TESTING FOR IRRIGATION Location: All Zones


MAINLINE
Level: Landscape Area

PARAMETERS/DET Checked by Approve by


SR# DETAILS REMARKS
AILS S/C CONT. Consultant

1. Serial number of pressure gauges ……………………


2. Calibration date Day/Mon/Year

3. Calibration Due date Day/Mon/Year

4 Drawing Reference ……………………


5. Quantity of Pipe to be tested ………LM
6. Initial Test Pressure 9 Bar

7. Start Time … : …Hrs

8. End Time … : …Hrs

9. Holding Hours (4 hrs.) ……..Hrs

10 Final Test Pressure after 4 hrs. (end time) ……..Bar