PERHITUNGAN STRUKTUR Doc. No.

Rev. 0
ASRAMA PUTRA PONDOK PESANTREN BINA UMAT
Rev. Date : 9/06/2019

19. Plat Pondasi 30 cm

Thickness plat = 30 cm
Mu max (derived fr SAP2000)= 7.031 tm

As = Mu -----------------> As = Bar Required


0.8 x s a x 0.9 x d Mu = Momen derived from program SAP2000
sa = fy steel (yield strength)
703100 kgcm d = thickness concrete - concrete cover
0.80 x 4000 x 0.90 x 28

As = 8.72 cm2

Used bar:
D16 - 150 + D13 - 150 22.24 cm2 > As = 8.72 cm2
so Construction is "OK"

M8 = 3.45 cm2
M10 = 5.33 cm2
6.00 1.88 cm2
8.00 3.35 cm2
10.00 5.23 cm2
12.00 7.54 cm2
13.00 8.84 cm2
16.00 13.40 cm2
19.00 18.89 cm2
22.00 25.33 cm2
PERHITUNGAN STRUKTUR Doc. No.:

Rev. 0
ASRAMA PUTRA PONDOK PESANTREN BINA UMAT
Rev. Date : 19/05/2019

20. Plat Dinding 30 cm

Thickness plat = 20 cm
Mu max (derived fr SAP2000)= 7.031 tm

As = Mu -----------------> As = Bar Required


0.8 x sa x 0.9 x d Mu = Momen derived from program SAP2000
sa = fy steel (yield strength)
703100 kgcm d = thickness concrete - concrete cover
0.80 x 4000 x 0.90 x 18

As = 13.57 cm2

Used bar:
D12 - 200 Double 15.07 cm2 > As = 13.57 cm2
so Construction is "OK"

M8 = 3.45 cm2
M10 = 5.33 cm2
6.00 1.88 cm2
8.00 3.35 cm2
10.00 5.23 cm2
12.00 7.54 cm2
13.00 8.84 cm2
16.00 13.40 cm2
19.00 18.89 cm2
22.00 25.33 cm2
PERHITUNGAN STRUKTUR Doc. No.:

Rev. 0
ASRAMA PUTRA PONDOK PESANTREN BINA UMAT
Rev. Date : 19/05/2019

21. Plat Lantai 12 cm

Thickness plat = 12 cm
Mu max (derived fr SAP2000)= 1 tm

As = Mu -----------------> As = Bar Required


0.8 x sa x 0.9 x d Mu = Momen derived from program SAP2000
sa = fy steel (yield strength)
100000 kgcm d = thickness concrete - concrete cover
0.80 x 4000 x 0.90 x 10

As = 3.47 cm2

Used bar:
D10 - 150 Double 10.47 cm2 > As = 3.47 cm2
so Construction is "OK"

M8 = 3.45 cm2
M10 = 5.33 cm2
6.00 1.88 cm2
8.00 3.35 cm2
10.00 5.23 cm2
12.00 7.54 cm2
13.00 8.84 cm2
16.00 13.40 cm2
19.00 18.89 cm2
22.00 25.33 cm2
PERHITUNGAN STRUKTUR Doc. No.:

Rev. 0
ASRAMA PUTRA PONDOK PESANTREN BINA UMAT
Rev. Date : 19/05/2019

22. Plat Atap 11 cm

Thickness plat = 11 cm
Mu max (derived fr SAP2000)= 1 tm

As = Mu -----------------> As = Bar Required


0.8 x sa x 0.9 x d Mu = Momen derived from program SAP2000
sa = fy steel (yield strength)
100000 kgcm d = thickness concrete - concrete cover
0.80 x 4000 x 0.90 x 9

As = 3.86 cm2

Used bar:
D10 - 150 Double 10.47 cm2 > As = 3.86 cm2
so Construction is "OK"

M8 = 3.45 cm2
M10 = 5.33 cm2
6.00 1.88 cm2
8.00 3.35 cm2
10.00 5.23 cm2
12.00 7.54 cm2
13.00 8.84 cm2
16.00 13.40 cm2
19.00 18.89 cm2
22.00 25.33 cm2
PERHITUNGAN STRUKTUR Doc. No.:

Rev. 0
ASRAMA PUTRA PONDOK PESANTREN BINA UMAT
Rev. Date : 19/05/2019

23. Plat Tangga 11 cm

Thickness plat = 11 cm
Mu max (derived fr SAP2000)= 1 tm

As = Mu -----------------> As = Bar Required


0.8 x sa x 0.9 x d Mu = Momen derived from program SAP2000
sa = fy steel (yield strength)
100000 kgcm d = thickness concrete - concrete cover
0.80 x 4000 x 0.90 x 9

As = 3.86 cm2

Used bar:
D10 - 150 Double 10.47 cm2 > As = 3.86 cm2
so Construction is "OK"

M8 = 3.45 cm2
M10 = 5.33 cm2
6.00 1.88 cm2
8.00 3.35 cm2
10.00 5.23 cm2
12.00 7.54 cm2
13.00 8.84 cm2
16.00 13.40 cm2
19.00 18.89 cm2
22.00 25.33 cm2
PERHITUNGAN STRUKTUR Doc. No.:

Rev. 0
ASRAMA PUTRA PONDOK PESANTREN BINA UMAT
Rev. Date : 19/05/2019

24. Plat Kanopi 10 cm

Thickness plat = 10 cm
Mu max (derived fr SAP2000)= 1 tm

As = Mu -----------------> As = Bar Required


0.8 x sa x 0.9 x d Mu = Momen derived from program SAP2000
sa = fy steel (yield strength)
100000 kgcm d = thickness concrete - concrete cover
0.80 x 4000 x 0.90 x 8

As = 4.34 cm2

Used bar:
D8 - 150 Double 6.70 cm2 > As = 4.34 cm2
so Construction is "OK"

M8 = 3.45 cm2
M10 = 5.33 cm2
6.00 1.88 cm2
8.00 3.35 cm2
10.00 5.23 cm2
12.00 7.54 cm2
13.00 8.84 cm2
16.00 13.40 cm2
19.00 18.89 cm2
22.00 25.33 cm2