ASRAMA PUTRA PONDOK PESANTREN BINA UMAT
Rev. Date : 9/06/2019
Thickness plat = 30 cm
Mu max (derived fr SAP2000)= 7.031 tm
As = 8.72 cm2
Used bar:
D16 - 150 + D13 - 150 22.24 cm2 > As = 8.72 cm2
so Construction is "OK"
M8 = 3.45 cm2
M10 = 5.33 cm2
6.00 1.88 cm2
8.00 3.35 cm2
10.00 5.23 cm2
12.00 7.54 cm2
13.00 8.84 cm2
16.00 13.40 cm2
19.00 18.89 cm2
22.00 25.33 cm2
PERHITUNGAN STRUKTUR Doc. No.:
Rev. 0
ASRAMA PUTRA PONDOK PESANTREN BINA UMAT
Rev. Date : 19/05/2019
Thickness plat = 20 cm
Mu max (derived fr SAP2000)= 7.031 tm
As = 13.57 cm2
Used bar:
D12 - 200 Double 15.07 cm2 > As = 13.57 cm2
so Construction is "OK"
M8 = 3.45 cm2
M10 = 5.33 cm2
6.00 1.88 cm2
8.00 3.35 cm2
10.00 5.23 cm2
12.00 7.54 cm2
13.00 8.84 cm2
16.00 13.40 cm2
19.00 18.89 cm2
22.00 25.33 cm2
PERHITUNGAN STRUKTUR Doc. No.:
Rev. 0
ASRAMA PUTRA PONDOK PESANTREN BINA UMAT
Rev. Date : 19/05/2019
Thickness plat = 12 cm
Mu max (derived fr SAP2000)= 1 tm
As = 3.47 cm2
Used bar:
D10 - 150 Double 10.47 cm2 > As = 3.47 cm2
so Construction is "OK"
M8 = 3.45 cm2
M10 = 5.33 cm2
6.00 1.88 cm2
8.00 3.35 cm2
10.00 5.23 cm2
12.00 7.54 cm2
13.00 8.84 cm2
16.00 13.40 cm2
19.00 18.89 cm2
22.00 25.33 cm2
PERHITUNGAN STRUKTUR Doc. No.:
Rev. 0
ASRAMA PUTRA PONDOK PESANTREN BINA UMAT
Rev. Date : 19/05/2019
Thickness plat = 11 cm
Mu max (derived fr SAP2000)= 1 tm
As = 3.86 cm2
Used bar:
D10 - 150 Double 10.47 cm2 > As = 3.86 cm2
so Construction is "OK"
M8 = 3.45 cm2
M10 = 5.33 cm2
6.00 1.88 cm2
8.00 3.35 cm2
10.00 5.23 cm2
12.00 7.54 cm2
13.00 8.84 cm2
16.00 13.40 cm2
19.00 18.89 cm2
22.00 25.33 cm2
PERHITUNGAN STRUKTUR Doc. No.:
Rev. 0
ASRAMA PUTRA PONDOK PESANTREN BINA UMAT
Rev. Date : 19/05/2019
Thickness plat = 11 cm
Mu max (derived fr SAP2000)= 1 tm
As = 3.86 cm2
Used bar:
D10 - 150 Double 10.47 cm2 > As = 3.86 cm2
so Construction is "OK"
M8 = 3.45 cm2
M10 = 5.33 cm2
6.00 1.88 cm2
8.00 3.35 cm2
10.00 5.23 cm2
12.00 7.54 cm2
13.00 8.84 cm2
16.00 13.40 cm2
19.00 18.89 cm2
22.00 25.33 cm2
PERHITUNGAN STRUKTUR Doc. No.:
Rev. 0
ASRAMA PUTRA PONDOK PESANTREN BINA UMAT
Rev. Date : 19/05/2019
Thickness plat = 10 cm
Mu max (derived fr SAP2000)= 1 tm
As = 4.34 cm2
Used bar:
D8 - 150 Double 6.70 cm2 > As = 4.34 cm2
so Construction is "OK"
M8 = 3.45 cm2
M10 = 5.33 cm2
6.00 1.88 cm2
8.00 3.35 cm2
10.00 5.23 cm2
12.00 7.54 cm2
13.00 8.84 cm2
16.00 13.40 cm2
19.00 18.89 cm2
22.00 25.33 cm2