Professional Documents
Culture Documents
Asia Pacific Co. LTD
Asia Pacific Co. LTD
kr
#828 Hyundai Ventureville, 713 Suseo-dong, Gangnam-gu, Seoul, 135-539, Korea
Tel : +82-2-3412-4422 Fax : +82-2-6242-1944 E-mail : info@asia-pacific.co.kr
Contents
Ⅰ Corporate Overview Ⅱ
Ⅱ Products
8. Business Partners
Corporate Overview
1 Introduction
CEO
Europe (5%)
-Other Products CHINA (15%)
-Raw Material
-Oil,Gas&Automobile Plant
Japan (10%)
-Raw Material
2 GM UZBEKISTAN - 2012
3 UZ KORAM - 2012
Conveyor System
5 GM UZBEKISTAN - 2011 for Automobile
Paint Shop
6 UZ AUSTEM - 2011
Cold Rolled
JIS SPCC, SPCD, SPCE99ASTM : A366-91, A619, A620
ASTM A611-91A
PRODUCTS
1
2 Raw Materials
1) Steel products (Carbon)
Plate
ABS A, B, C, D, AH32, DH32, EH32, AH40, DH40, EH40, V-60
GL A32, D32, E32, A36, D36, E36, A40, D40, E40, 490T, 500T
SS330, 400, 490, 540, SM400, 490, 520, 570, SN400, 490, HSB500,
KS
600
A283 GrA, B, C, D, A36, A283 GrA, B, C, D, A572 Gr42, 50, 60, 65, A6
ASTM
33 GrE, A514F, A573 Gr70
A285 GrA, B, C, A515 Gr55, 60, 65, 70, A537 CLASS1, 2, A387 Gr11,
ASTM
12, 22, A302 GrC, A553-1
API API 5L- B, X42, X46, X52, X56, X60, X65, X70, X80, X90, X100, X120
JIS SMA400, 490, 570
PRODUCTS
1
2 Raw Materials
Galvanized steel
JIS/KS SGCC
Ferrite
430 : 16Cr - 0.05C
409L : 11Cr - 02Ti - LCN
410L : 12Cr - LCN
429EM : 14Cr - 1Si - 0.2Ti - LC
430J1L : 19Cr - 0.5Cu - 0.4Nb - LCN
436L : 18Cr - 1Mo - 0.3Ti - LCN
439 : 18Cr - 0.4Ti - LCN
444 : 19Cr - 2Mo - 0.3Nb - LCN
445NF : 21Cr - 0.3Ti - 0.4Cu - Si,Nb
446M : 26Cr - 2Mo - 0.3(Ti, Nb) - LCN(cold)
PRODUCTS
1
2 Raw Materials
1) Steel products (Wire - Rod)
JIS : SWRY11~21, YSW11~41, YGW11~24
JIS : SUP3, 6, 7, 8, 9A, 10, 11A, 12, 13
SAE : 9254, D, S, V, HV
DIN : 50CrV4, 54SiCrV6
JIS : SUJ1~5 - SAE : 52100
AISI : 1069, 1080
JIS : SWRM6~22
SAE : SAE1006~1022
DIN : D5-1, D9-1
ASTM : A510
JIS : SUM11~43
SAE : 1213, 1144
JIS : SWRH27~72A/B
SAE : 1026~1095
DIN : D26-2, 95-2
JIS : SWRS62~92A/B
JIS : SWRCH6A~22A, SWRCH10K~50K
SAE : 1006~1050
SAE : 10B30~35
JIS : SCr15-445, SCM412-822, SNCM 220-815,
SMn420-443, SMnC 420-443, SNC236-836
SAE : 1513-1548, 4118-4161, 5115-5145, 8620-8645
PRODUCTS
1
2 Raw Materials
Ball valves are manufactured to API Std Wafer Check valves are manufactured
. 6D and BS 5351, and tested to API St to API Std. 6D and API 594, and tested
d. 598. to API Std. 598.
These valves are used for quick shut These valves are used to prevent flow
off and low emission application. reversal in piping systems.
PRODUCTS
1
2 Raw Materials
2. Piping Materials (Acc’)
FITTING
ASTM : A105, 182, 234, 350, 403, 420, 694, 815, 860, 366
API 5L
FLANGE
ANSI : Class 150 Flange ~ Class 2500 Flange
ETC
TUBE : ASTM - A249, 268, 269, 270, 654
Asia-Pacific Co., Ltd. specialize in construction and development of various plant projects
for oil & gas industry including supplying of related materials.
PRODUCTS
2 Plant
2. Iron & Steel Facility
In Factory Automation, we provide services from engineering to construction and commissioning. Our d
edicated team and preeminent associates around the world devote ourselves to provide an exceptional
service to best meet our customer’s needs in enhancing or expanding their facilities.
PRODUCTS
2 Plant
4. Other Products
Y
Your G th P
Growth t
Partner
Wh
Who we are
Chemical
Services
(2.9%)
25%
(8 3%2))
(8.3%
Eng g &
Eng’g of Korea
Korea’ss GDP ((‘13)
13)
Heavy
(10.4%2))
Samsung
Financial
Services
(16.5%)
Group
$3051) (’13)
Electronics
28%
of Korea’s Market Cap. (‘13)
(62 0%)
(62.0%)
1
Samsung Group: Affiliates by Sector
6
Affili t
Affiliates
Electronics Chemical
4
Affili t
Affiliates
Samsung Electronics 4
Affiliates
Engineering & Heavy
Samsung Total Petrochemicals
Samsung General Chemicals
Samsung SDI
Samsung
g Fine Chemicals
Samsung Electro-Mechanics Hydrocarbon
d b
Samsung Power $9.3 Bil1)
Samsung BP Chemicals
Samsung SDS Engineering Industrial &
Environmental
Samsung Display
Samsung C&T Building
10
Samsung Corning Advanced Glass
Engineering & Civil $13.1 Bil1) Services
Construction Group Housing
Samsung C&T Affiliates
Shipbuilding Trading & Investment Group
6 Financial
Fi i l Samsung
S
Heavy Industries
Offshore $14.5 Bil1) Cheil Industries
Affiliates
Services Wind Energy Hotel Shilla
Cheil Worldwide
Samsung Life Insurance Power System
S-1 Corporation
S
Samsung Fire & Marine Insurance Samsung Techwin S
Security
it $2 9 Bil1)
$2.9 Samsung Medical Center
Samsung Card Defense
Samsung Economics Research Institute
Samsung Securities Samsung Biologics
Samsung Asset Management Samsung Bioepis
Samsung Venture Investment Samsung Welstory
2
Growth Milestone
Accumulated
Project Award
Hydrocarbon
Power
Ind. & Env.
1) Top 15 Oil & Gas EPC Contractors by Contracts Under Execution, 2Q 2013; 2) The Top 250 International Contractors, 2013; 3) Fertil-2 Ammonia/Urea Project in UAE (2014); 4) 2013 Top EPC
Contractors; 5) Middle East & North Africa; 6) Accumulated project award;
※ ‘World’s largest’ means the largest plant in the world at the time of completion
3
Key Figure
$14.8B 24 66Mil.
Order
Od B Backlog
kl (’13) Total
T t l Number
N C t i 2)
b off Countries Incident
I id t Free
F Man-hour
M h 3)
(As of May, 2014)
1) The Top 250 International Contractors (’13); 2) Based on on-going projects; 3) Sonatrach Skikda Refinery Project in Algeria (July 2009 ~ June 2014)
4
Organization & Leadership
Choong-heum
g Park
President and CEO
Project Control
Dept
Dept.
Sung-an Choi James Mackey Dae-jun Kim Chan-sul Jung Yun-ki Sung Myeong-soo Kim Hae-kyu Jeong
SEVP SEVP EVP EVP VP SEVP EVP/CFO
Contract
Management Dept.
Ind. & Env. Marketing Hydrocarbon Construction Safety & Env.
Business Div
Div. Div
Div. Proposal Div
Div. Di
Div. Div
Div.
Audit Dept.
Quality Management
Man-su Park Jae-hoon Choi Kyung-bae Choi Young-Geun Choi David Webber Dept.
VP VP EVP EVP EVP
5
Global Resource
HQ & Global Offices
8,255
, 38 15% 85%
Nationalities Certified Engineers Bachelor’s Degree or higher
Total Workforce
26,270
(As of Dec
Dec. 2014)
Global Offices
23
: Head Quarter
6 17
: CoE(Center of Excellence)
: LSC(Local
(L lSSupportt C
Center)
t )
6
What we do
Industrial &
Hydrocarbon
y Power
Environmental
Manufacturing
Refinery Coal
Facilities
Water
Gas Oil
Treatment
Petro
Petro- Environmental
chemical (Waste/Air)
% of Revenue
(’14E) 61% 10% 29%
7
Project Experience – Hydrocarbon & Power
Hydrocarbon
Upstream
Refinery
Power
• Gas – 4,000 MMSCFD
• Power: 660MW
8
Project Experience – Hydrocarbon
Upstream
Refinery
Client: PTT PUBLIC COMPANY LTD.
Gas
Ethylene/ Capacity
Propylene • GOSP : 800 MMSCFD
emical
EO/EG
Key Achievements
Petroche
9
Project Experience – Hydrocarbon
Upstream
Refinery
Client: Abu Dhabi Oil Refining Company
(TAKREER)
Gas
Capacity
Ethylene/ • Carbon Black Unit 40,600 MTPA
Propylene
• Delayed Coker Unit 29,500 BPSD
emical
EO/EG
Major Challenges
Petroche
9
Project Experience – Hydrocarbon
Upstream
Refinery
Client: TASNEE Petrochemicals
Gas
Capacity
Ethylene/ • Ethylene 1,000,000 MTPA
Propylene
• Propylene 300,000 MTPA
emical
EO/EG
Petroche
Key Achievements
Others
– Established a project safety record
((22.5 million incident-free man-hours))
– Won “Quality Excellence Award”
from client
10
Project Experience – Hydrocarbon
Upstream
Refinery
Client: Saudi Arabian Mining Co.
(Ma’aden)
Gas
Capacity
Ethylene/
Propylene • Ammonia 3,300 MTPD
emical
EO/EG
Petroche
Key Achievements
10
Project Experience – Hydrocarbon
Upstream
Refinery
Client: FERTIL (ADNOC Group)
Gas
Capacity
Ethylene/ • Ammonia 2,000 MTPD
Propylene
• Urea 3,500 MTPD
emical
EO/EG
Petroche
Key Achievements
Fertilizer
– MEED Quality Award in 2014
Others – 10 million man hours
without lost time incident
10
Project Experience – Power
Capacity: 433 MW
Coal
Key Achievements
11
Project Experience – Industrial & Environmental
IT Facilities
Client: Samsung Display
Manufacturing
Facilities
Key Achievements
Water
Treatment
12
Project Experience – Industrial & Environmental
IT Facilities
Client: Ministry of Works,
Kingdom of Bahrain
Manufacturing
Facilities
Key Achievements
Water
Treatment
12
Path to ‘Total Engineering Solution Provider’
Extended EPC
Traditional EPC
Conceptual & Detail Construction/
FEED Procurement O&M
Feasibility Study Engineering Commissioning
Refinery
90’s
Gas
Petro
Petro‐ 70’ss
70 80’ss
80
chemical
Power
vironmental
dustrial &
Industrial1)
Ind
Environmental2))
Env
1) Includes IT Facilities and Manufacturing Facilities; 2) Includes Water Treatment and Environmental(Waste, Air)
13
Why Samsung Engineering
1) Supply Chain Management; 2) Earned Value Management; 3) Creating Shared Value; 4) Corporate Social Responsibility
14
1 Safety, Our Core Value
42,223,578
ADNOC Shah Gas Development Package#4 U&O Project
(as of June ’14)
0.0065
30,000,000
SATORP Jubail Export Refinery Pkg. #3
Aromatics Project (’13) 2)
15
O
OPaL DFCU/AU 2
'08
1.0
ONGC Project
P
S
S-OIL Aromatics
14
1.1
S-Oil Project
P
'09
2.8
ADNOC
1.2
ADNOC Urea Project
U
2.5
Sonatrach
S
A
ADNOC Shah Gas Development
'10
1.5
ADNOC Package#4 U&O Prroject
P
S
Samsung Display S
SMD
1.3
SDC A2 Line Project
A
'11
3.0
ARAMCO
L
LUKOIL West Qurna
a
1.3
Lukoil Phase-2 GOSP Pro
P oject
S
Samsung Display S
SMD
1.8
T
TAKREER Carbon B
Black & Delayed Co
oker
'12
2.5
Balkhash Thermal P
B Power Project
2.1
BTPP
S
SWCC Yanbu Phasse-3 Power &
1.5
16
K
KNPC MAB Packag ge#1
mega projects1)) worth $25 billion (in 7 years)
'14
1.6
Interface Management
between client and contractors
(32% of Total Project Managers)
Knowledge Management
Systematic Risk Management
Experienced Project Manager Pool
3 Extensive Experience in Major Technologies
(CoE) B i Engineering
Basic E i i
※ CoE(Center of Excellence)
PDH Aromatic SM ABB PVC TA/PTA
Others
1) Samsung Engineering America; 2) Samsung Engineering India; 3) Samsung Engineering Saudi Arabia; 4) Samsung Engineering Thailand; 5) Amec Samsung Oil & Gas
17
4 Efficient Procurement Service through Global SCM
Piping 86%
Europe
America Control 80%
Middle Korea
Asia
East
Machinery 70%
Stationary
y 63%
Electric 50%
…
Global collaboration with 4,045 suppliers POC enables early involvement from proposal stage
Global Supply
pp y Chain Management
g
On Time On Budget
g With the Highest Quality
g y
18
5 Advanced Construction Management Service
1) CM Tool: Construction Progress Management Tool; 2) GPN: Global Partnership Network; 3) SCMS: Samsung Completion Management System
19
6 World Best EVM
’03
1st Phase Process Standardization / Integration
g
’06
Establishing Real-time
2nd Phase Business Cooperation System
’10
Redefining Project Management
3rd Phase from Proposal to Project Execution
’13
All-New Pursuing Quality Growth through
Innovation Preemptive Operational Excellence
Visibility
y in Management
g Speed-up
p p by
y Efficiency
y Upward
p Standardization
1) All work, material and vendor will have a single code for each specification; 2) A single data will be inputted into the system once and this will be shared in real time with everybody; 3) All
systems will be integrated into a single screen for each work function so that everybody can have easy access
20
7 CSV Beyond CSR
Education Initiative
Hope
p Libraries
Environmental
i l Education
d i Initiative
ii i Local Employment and Capability
Development
• Technical Training Center
Employee Fundraising - Training local people
Providing various online and offline • IInternship
t hi Program
P with
ith local
l l
environmental awareness programs institute
to children and youth - Skikda University
Corporate
Corporate Social
Social Responsibility
Responsibility Creating
Creating Shared
Shared Value
Value
21