INSPECTION AND TEST PLAN (ITP) FOR LIGHTNING PROTECTION SYSTEM

Employer: Ministry of Date: 16-12-2020 Rev: 00


Defense
KING SALMAN
AIRBASE PROJECT,
Engineer: Dar Al- Code :
CENTRAL SECTOR –
Handasah
DIRAB (PART 2)
Contractor: BSS JV

INSPECTION AND TEST PLAN


FOR
EXTERNAL DRAINAGE SYSTEM

Date Document No. Rev Prepared by Checked by Approved by


16/12/2020 00 Sajid Ullah Hassan Khawli Ziad Tarek Ali

EMPLOYER COMMENTS APPROVAL SIGNATURE

Inspection and Test Plan (ITP) for Lightning Protection System Page 1 of 6
INSPECTION AND TEST PLAN (ITP) FOR LIGHTNING PROTECTION SYSTEM

Employer: Ministry of Date: 16-12-2020 Rev: 00


Defense
KING SALMAN
AIRBASE PROJECT,
Engineer: Dar Al- Code :
CENTRAL SECTOR –
Handasah
DIRAB (PART 2)
Contractor: BSS JV

REVISION SHEET

Rev. Item/
No. Date Description From Page
No. Line

Inspection and Test Plan (ITP) for Lightning Protection System Page 2 of 6
INSPECTION AND TEST PLAN (ITP) FOR LIGHTNING PROTECTION SYSTEM

Employer: Ministry of Date: 16-12-2020 Rev: 00


Defense
KING SALMAN
AIRBASE PROJECT,
Engineer: Dar Al- Code :
CENTRAL SECTOR –
Handasah
DIRAB (PART 2)
Contractor: BSS JV

DOCUMENT DISTRIBUTION LIST

Copy
Recipient Position Location
No.
1 MINISTRY OF DEFENSE (Employer)
2 DAR AL-HANDASAH (Employer)
3 JV PROJECT DIRECTOR BSS JV MAIN OFFICE
4 JV CONTRACTS MANAGER BSS JV MAIN OFFICE
5 JV CONSTRUCTION MANAGER BSS JV MAIN OFFICE
6 JV QA/QC MANAGER BSS JV MAIN OFFICE

Inspection and Test Plan (ITP) for Lightning Protection System Page 3 of 6
INSPECTION AND TEST PLAN (ITP) FOR LIGHTNING PROTECTION SYSTEM

Employer: Ministry of Date: 16-12-2020 Rev: 00


Defense
KING SALMAN
AIRBASE PROJECT,
Engineer: Dar Al- Code :
CENTRAL SECTOR –
Handasah
DIRAB (PART 2)
Contractor: BSS JV

1.0 DEFINITIONS/ ABBREVIATIONS


1.1.1 Client/ Owner - Ministry of Defense
1.1.2 Consultant - Dar Al-Handasah
1.1.3 Contractor - BSS JV
1.1.4 Project - King Salam Airbase Central Sector-Dirab Part-2
1.1.5 QA/QC - Quality Control / Quality Assurance
1.1.6 MST - Method of Statement
1.1.7 ITP - Inspection and Test Plan
1.1.8 MS - Material Submittal

Symbol Abbreviation Definition


Verification of compliance with Specifications by witnessing activities
H Hold Point and providing an Inspection record, the activity can’t proceed without
witnessing
The notified inspection activity may proceed if the involved parties does
W Witness
not attend the inspection or test
S Surveillance Surveillance activity and review of document also included
Verification of Compliance with Specifications by review of documentary
R Review
evidence of QC related activities
Review/ Verification of Compliance with Specifications by review and approval of
R/A
Approval documentary evidence of QC related activities

Initiate / Initiate documents or Perform the activities or Inspections or Testing in


I/P
Perform accordance with Contract Specifications

Notes:
This document is based on Contract Specification, codes, standards and a good
engineering practice that is applied in Project and is intended to highlight the

Inspection and Test Plan (ITP) for Lightning Protection System Page 4 of 6
INSPECTION AND TEST PLAN (ITP) FOR LIGHTNING PROTECTION SYSTEM

Employer: Ministry of Date: 16-12-2020 Rev: 00


Defense
KING SALMAN
AIRBASE PROJECT,
Engineer: Dar Al- Code :
CENTRAL SECTOR –
Handasah
DIRAB (PART 2)
Contractor: BSS JV

minimum tests and inspections that ensure quality requirements are fulfilled within
the scope of the document.
In case of any conflict between this document and the Project Specification,
drawings and applicable codes, the project Specification shall take precedence over
this ITP.

Inspection and Test Plan (ITP) for Lightning Protection System Page 5 of 6
Drawing Review & IFC Drawing/Project
1.0 Approved Shop Drawings Document Submittals Project Manager I/P R R/A
Approvals Specification

Material Submittal Material Submittal, Project


2.0 Approved Material Submittal Material Submittals Project Manager I/P R R/A
Approvals Specification,

3.0 Materials

Approved Material Submittals, Approved Material


Material Receiving Relevant Project Specifications Submittals, Correct quantity Material Inspection Project Engineer /
3.1 I/P H H
Inspection 15060, 02730, Delivery Notes, and all material is in good Report (MIR) QC Engineer
Packing lists etc. condition.

4.0 Installation

Inspection for Installation of Manufacturer, Approved Shop Manufacturer/ Project


Underground Drainage drawings & Project Specifications Section 15430, Request For Project Engineer /
4.1 I/P H H
System Specifications Sections 02730 Sec 3.04 & method Inspection(RFI) QC Engineer
15430,02730 Sec 3.04 statement
Manufacturer, Approved Shop
Manufacturer/ Project
drawings & Project
Gravity Testing Specifications Section Request For Project Engineer /
5.0 Specifications Sections I/P H H
15430,02730 Sec 3.05 Part B Inspection(RFI) QC Engineer
15430,02730 Sec 3.05 Part B &
& Method statement
Method Statement

Legend: I/P - Initiate /Perform, S - Surveillance Inspection, W - Witness Inspection Point, H - Mandatory Hold Point for Inspection, R/A - Review & Approve,
IFCD - Issued for construction Drawing, SC – Sub Contractor , PE – Project Engineer R - Review