CONTRACTOR:
105
Installation of FIRE PROTECTION &FZCV SYSTEM (Inside MECH
Building )
106 Installation of NOVEC 1230 FIRE SUPPRESSION SYSTEM MECH
99 Installation of WATER SUPPLY SYSTEM INSIDE BUILDING MECH Under DAR review
Installation of DRAINAGE, RWP, CONDENSTARE DRAIN AND VENT
100 MECH Under DAR review
PIPE SYSTEM(Inside Building )
Installation of SEWAGE,STORM WATER SYSTEM(EXTERNAL
101 MECH Under QC Review
WORK )
Installation of WATER SUPPLY,FIRE FIGHTING ,FORCED LINE
102 MECH Under QC Review
SYSTEM,IRRIGATION SYSTEM (EXTERNAL WORK )
Installation of PRE-INSULATED CHILLED WATER SYSTEM
103 MECH Under QC Review
(EXTERNAL WORK )
104 Installation of FIRE HYDRANT. MECH